CN208363460U - The steel reinforced concrete assembling stair of section are poured after a kind of setting - Google Patents

The steel reinforced concrete assembling stair of section are poured after a kind of setting Download PDF

Info

Publication number
CN208363460U
CN208363460U CN201820927022.6U CN201820927022U CN208363460U CN 208363460 U CN208363460 U CN 208363460U CN 201820927022 U CN201820927022 U CN 201820927022U CN 208363460 U CN208363460 U CN 208363460U
Authority
CN
China
Prior art keywords
section
bench
gangboard
prefabricated bench
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820927022.6U
Other languages
Chinese (zh)
Inventor
闰淼
彭林立
王毓
陈俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South Architectural Design Institute Co Ltd
Original Assignee
Central South Architectural Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South Architectural Design Institute Co Ltd filed Critical Central South Architectural Design Institute Co Ltd
Priority to CN201820927022.6U priority Critical patent/CN208363460U/en
Application granted granted Critical
Publication of CN208363460U publication Critical patent/CN208363460U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses the steel reinforced concrete assembling stair that section is poured after a kind of setting, including multiple prefabricated bench being parallel to each other, section is poured after being equipped between each prefabricated bench, it is horizontally-spliced that section is poured after passing through between each prefabricated bench, after pour and be equipped with reserved distributing reinforcement in section, multiple suspension centres and pin key hole to be provided are equipped in each prefabricated bench, pin key hole to be provided is distributed in the both ends of prefabricated bench.The construction of stair can be completed within the shorter duration, improves construction efficiency and construction quality, mitigates the weight of large span stair, reduces the requirement of hanging device, and construction is simple has good engineering promotional value.

Description

The steel reinforced concrete assembling stair of section are poured after a kind of setting
Technical field
The utility model relates to technical field of buildings, and in particular to the steel reinforced concrete assembling building of section is poured after a kind of setting Ladder.
Background technique
Current China housing industryization is also in the starting stage, some in the assembled architecture that the country is built are pre- from application What assembled stair processed started.Assembled Building step-wedge cun is good unified, is easy to produce in batches, mention for the large area use of assembled stair Good chance is supplied, than cast-in-situ stair short construction period, progress is fast, and quality is easily guaranteed that.But common assembled stair one As compare the stair form for being suitble to small span, gangboard span is small, then gangboard thickness is thin, and from heavy and light, general tower crane, which can satisfy, to be wanted It asks.But large span flight stair, gangboard are thick, than heavier, need to install the biggish tower crane of Lifting Capacity for hoisting prefabricated component, Tower crane expense is more much higher than conventional project.The utility model provides the steel reinforced concrete assembling building that section is poured after a kind of setting Ladder has the advantage of conventional assembled stair, and work progress is quick, can be with large batch of batch production Prefabrication, and passes through Bench is divided into three parts by the mode that section is poured after setting, mitigates the weight of single bench, reduces the requirement of hanging device, construction Simply, there is good engineering promotional value.
Summary of the invention
The technical problems to be solved in the utility model is in view of the foregoing defects the prior art has, to provide one kind and set The steel reinforced concrete assembling stair for pouring section are postponed, the construction of stair can be completed within the shorter duration, improve construction efficiency And construction quality, mitigate the weight of large span stair, reduce the requirement of hanging device, there is construction is simple good engineering to push away Wide value.
Used technical solution is the utility model to solve above-mentioned technical problem:
The steel reinforced concrete assembling stair of section are poured after a kind of setting, it is each pre- including multiple prefabricated bench being parallel to each other Section is poured after being equipped between bench processed, it is horizontally-spliced to pour section after passing through between each prefabricated bench, after pour and be equipped with reserved distributing reinforcement in section, Multiple suspension centres and pin key hole to be provided are equipped in each prefabricated bench, pin key hole to be provided is distributed in the both ends of prefabricated bench, pin key Hole to be provided connect prefabricated bench with cast-in-place terraced beam for pin key to be arranged, by pin key.
According to above-mentioned technical proposal, after to pour the width of section be 200mm~400mm.
According to above-mentioned technical proposal, the number of prefabricated bench is 2, respectively prefabricated bench a and prefabricated bench b.
According to above-mentioned technical proposal, after pour the concrete absolute altitude higher than the concrete of prefabricated bench of section.
According to above-mentioned technical proposal, after pour the concrete label higher than the concrete of prefabricated bench of section.
According to above-mentioned technical proposal, 4 suspension centres are equipped in each prefabricated bench, 4 suspension centres are divided into two groups, two groups of suspension centres It is symmetrically distributed in the both ends of prefabricated bench.
According to above-mentioned technical proposal, each of prefabricated bench horizontal segment of marking time is equipped with gangboard distributing reinforcement, prefabricated bench Plate face and board bottom are respectively equipped with multiple gangboard upper longitudinal bars and gangboard board bottom indulges muscle, and gangboard upper longitudinal bar and gangboard board bottom indulge muscle point It is not distributed in the upper side and lower side of gangboard distributing reinforcement.
According to above-mentioned technical proposal, the inside of gangboard distributing reinforcement is equipped with gangboard reinforcing rib.
According to above-mentioned technical proposal, gangboard distributing reinforcement stretches out in the outside of prefabricated bench, and reserved point in section is poured as after Cloth muscle is connected with distributing reinforcement between the gangboard distributing reinforcement that contiguous prefabricated bench is stretched out and is welded to connect connector.
According to above-mentioned technical proposal, gangboard distributing reinforcement is C-shaped, and the number of prefabricated bench is 2, in two prefabricated bench Gangboard distributing reinforcement is symmetrical arranged, and two C-shaped gangboard distributing reinforcements are welded to connect connector by distributing reinforcement and connect, and forms an integral loop Shape.
The utility model has the following beneficial effects:
Large span bench is divided into multistage, can complete the construction of stair within the shorter duration, improve construction efficiency and Construction quality mitigates the weight of large span stair, reduces the requirement of hanging device, and there is construction is simple good engineering to promote Value.
Detailed description of the invention
Fig. 1 is the floor map that the steel reinforced concrete assembling stair of section are poured after being arranged in the utility model embodiment;
Fig. 2 is the A-A cross-sectional view of Fig. 1;
Fig. 3 is the B-B cross-sectional view of Fig. 1;
In figure, section is poured after 1- prefabricated bench a, 2- prefabricated bench b, 3-, 4- hangs nail, 5- pin key hole to be provided, 6- gangboard top Vertical muscle, 7- gangboard board bottom indulge muscle, 8- gangboard distributing reinforcement, 9- gangboard reinforcing rib, 10- distributing reinforcement welded connecting connector.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and examples.
Shown in referring to Fig.1~Fig. 3, the armored concrete dress of section is poured after being arranged in a kind of embodiment provided by the utility model With formula stair, including multiple prefabricated bench being parallel to each other, section 3 is poured after being equipped between each prefabricated bench, between each prefabricated bench It is horizontally-spliced that section 3 is poured after, after pour and be equipped with reserved distributing reinforcement in section 3, be equipped with multiple suspension centres and pin in each prefabricated bench Key hole to be provided 5, pin key hole to be provided 5 are distributed in the both ends of prefabricated bench, and pin key hole to be provided 5 is made for pin key to be arranged by pin key Prefabricated bench is connect with cast-in-place terraced beam.
Further, the width that section 3 is poured after is 300mm.
Further, the number of prefabricated bench is 2, respectively prefabricated bench a1 and prefabricated bench b2.
Further, a concrete absolute altitude higher than the concrete of prefabricated bench for section 3 is poured after.
Further, a concrete label higher than the concrete of prefabricated bench for section 3 is poured after.
Further, 4 suspension centres are equipped in each prefabricated bench, 4 suspension centres are divided into two groups, and two groups of suspension centres are symmetrical In the both ends of prefabricated bench;Suspension centre is to hang nail 4.
Further, each of prefabricated bench horizontal segment of marking time is equipped with gangboard distributing reinforcement 8, the plate face and plate of prefabricated bench Bottom is respectively equipped with multiple gangboard upper longitudinal bars 6 and gangboard board bottom indulges muscle 7, and gangboard upper longitudinal bar 6 and gangboard board bottom are indulged muscle 7 and divided respectively It is distributed in the upper side and lower side of gangboard distributing reinforcement 8;So that prefabricated bench is accepted power raising, meets and rely on needs.
Further, the inside of gangboard distributing reinforcement 8 is equipped with gangboard reinforcing rib 9.
Further, gangboard distributing reinforcement 8 stretches out in the outside of prefabricated bench, and the reserved distributing reinforcement in section 3, phase are poured as after Distributing reinforcement, which is connected with, between the gangboard distributing reinforcement 8 that adjacent prefabricated bench is stretched out is welded to connect connector 10;An entirety is formed, is improved The intensity of entire stair.
Further, gangboard distributing reinforcement 8 is C-shaped, the gangboard when number of prefabricated bench is 2, in two prefabricated bench Distributing reinforcement 8 is symmetrical arranged, and two C-shaped gangboard distributing reinforcements 8 are welded to connect connector 10 by distributing reinforcement and connect, and forms an integral loop Shape;Further enhance the globality and stressed effect of entire bench.
Working principle of the utility model is:
One complete bench branch be divided into prefabricated bench a1, prefabricated bench b2 and after pour 3 three parts of section, prefabricated ladder Section a1, prefabricated bench b2 pour section 3 and are connected to become an entirety after passing through.In implementation process, first by prefabricated bench a1 and in advance For bench b2 processed in the prefabricated completion of specialized factory, prefabricated bench a1 is identical with prefabricated bench b2 arrangement of reinforcement;Mistake of the prefabricated bench in production Cheng Zhong, prefabricated bench a1 and prefabricated bench b2 reserve the gap 300mm in connecting portion, distributing reinforcement 8 are reserved in interstice coverage, in advance Distributing reinforcement length is stayed to meet specification connection request, as shown in FIG. 1 to 3;It is pre-buried on gangboard prefabricated bench a1 and prefabricated bench b2 Nail 4 is hung, is at the construction field (site) respectively lifted prefabricated bench a1 and prefabricated bench b2 using hanging device in place.Terraced beam is cast-in-place When pre-buried pin key, have pin key hole to be provided 5 at gangboard prefabricated bench a1 and prefabricated bench b2, the connection of gangboard and terraced beam uses pin key Connection, the setting of hold-down support and sliding support and connecting structure are the same as conventional assembled stair construction.By prefabricated bench a1 and The gangboard distributing reinforcement 8 that prefabricated bench b2 pours fragment position after is welded to connect, then using an absolute altitude higher than prefabricated gangboard Concrete carries out cast in situs, and prefabricated bench a1, prefabricated bench 2 pour the connection of section 3 and form complete bench after passing through.
The utility model provides the steel reinforced concrete assembling staircase structure that section is poured after a kind of setting, bench one is divided is Two, it is divided into the spans such as two, the parallel prefabricated bench of equal in width, pours section after 300mm is set between two prefabricated bench;Institute Assembled stair are stated to include two parallel prefabricated bench and pour section composition after connecting two prefabricated bench;Described two parallel bench On be respectively set there are four suspension centre and two pin key hole to be provided 5;Pour the assembled position that two bench are arranged in section after described, and After pour segment limit reserve bench horizontal distribution muscle;After the completion of described two parallel prefabricated bench are prefabricated, lifting in place, pours section after Place is welded to connect the prefabricated bench in two sides and reserves distributing reinforcement, then casting concrete, and Assembled Building is trapezoidal at a complete bench, ladder Section is connect with cast-in-place terraced beam by pin key.
Further, described two parallel bench are along bench direction single load bearing, the plate face of two bench, board bottom, water The arrangement of reinforcement of flat section is all the same, the plate face of bench, board bottom, horizontal segment arrangement of reinforcement be respectively that gangboard upper longitudinal bar 6, gangboard board bottom indulge muscle 7 and gangboard distributing reinforcement;The connection of two bench and terraced beam is the same as conventional assembled stair.
Further, section connection is poured after the use, prevents two prefabricated bench from deforming in edge joint position inconsistent, if gangboard There are surface layer or tapestry brick in face, and the connection of this piece can prevent edge joint position from generating crack.
Further, it is poured after after distribution bar is welded to connect at section, with the coagulation of a label higher than prefabricated bench Soil is poured.
Using the assembled staircase structure for pouring section after the setting of the utility model, carry out that the novel fabricated stair are installed Construction method are as follows:
(1) tailored template batch production precast concrete standard bench is used, and is conserved to concrete design strength, and in ladder Plate side reserved water divides cloth muscle equally, and length in reserve meets anchoring and requires;
(2) the pre-buried pin key on terraced beam;
(3) prefabricated standard bench is transported to construction site, prefabricated bench is lifted in place, terraced beam and bench progress pin key Connection, connection method is the same as conventional assembled stair;The gap 300mm is reserved between two prefabricated bench, by bench within the scope of 300mm Distributing reinforcement is welded to connect, and is then poured using a concrete higher than prefabricated bench, precast stair installation production It completes.
In conclusion the utility model discloses the steel reinforced concrete assembling stair for pouring section after a kind of setting, it will be common Bench be divided into three parts, after 300mm between the spans such as two, the parallel bench of equal in width and two bench Pour section.Suspension centre and two pin key hole to be provided 5 there are four being respectively set in described two parallel bench;Section is poured after described to be arranged two The assembled position of a bench, and pour segment limit after and reserve bench horizontal distribution muscle;After the completion of described two parallel bench are prefabricated, Lifting in place, pours after and is welded to connect bench reserved distributing reinforcement in two sides at section, then using the mixed of a label higher than prefabricated bench Solidifying soil carries out cast in situs, and Assembled Building is trapezoidal at a complete bench, and bench is connect with cast-in-place terraced beam by pin key.This is practical The novel advantage for having conventional assembled stair, work progress is quick, can be with large batch of batch production Prefabrication, and passes through The mode of segmentation solves the problems, such as large span assembled stair because from great and need using large-tonnage tower crane, construction party Face, it is at low cost, there is preferable engineering promotional value.
Above is only the preferred embodiment of the utility model, cannot limit the power of the utility model with this certainly Sharp range, therefore equivalence changes made according to the patent scope of the utility model, still belong to the protection scope of the utility model.

Claims (10)

1. pouring the steel reinforced concrete assembling stair of section after a kind of setting, which is characterized in that including it is multiple be parallel to each other it is prefabricated Bench pours section after being equipped between each prefabricated bench, and it is horizontally-spliced to pour section after passing through between each prefabricated bench, after pour be equipped in section it is pre- Distributing reinforcement is stayed, multiple suspension centres and pin key hole to be provided are equipped in each prefabricated bench, pin key hole to be provided is distributed in prefabricated bench Both ends.
2. pouring the steel reinforced concrete assembling stair of section after setting according to claim 1, which is characterized in that after pour section Width is 200mm~400mm.
3. pouring the steel reinforced concrete assembling stair of section after setting according to claim 1, which is characterized in that prefabricated bench Number be 2, respectively prefabricated bench a and prefabricated bench b.
4. pouring the steel reinforced concrete assembling stair of section after setting according to claim 1, which is characterized in that after pour section A concrete absolute altitude higher than the concrete of prefabricated bench.
5. pouring the steel reinforced concrete assembling stair of section after setting according to claim 1, which is characterized in that after pour section A concrete label higher than the concrete of prefabricated bench.
6. pouring the steel reinforced concrete assembling stair of section after setting according to claim 1, which is characterized in that each prefabricated 4 suspension centres are equipped in bench, 4 suspension centres are divided into two groups, and two groups of suspension centres are symmetrically distributed in the both ends of prefabricated bench.
7. pouring the steel reinforced concrete assembling stair of section after setting according to claim 1, which is characterized in that prefabricated bench Each of horizontal segment of marking time be equipped with gangboard distributing reinforcement, the plate face and board bottom of prefabricated bench are respectively equipped with multiple gangboard upper longitudinal bars Muscle is indulged with gangboard board bottom, gangboard upper longitudinal bar and gangboard board bottom indulge the upper side and lower side that muscle is distributed in gangboard distributing reinforcement respectively.
8. pouring the steel reinforced concrete assembling stair of section after setting according to claim 7, which is characterized in that gangboard distribution The inside of muscle is equipped with gangboard reinforcing rib.
9. pouring the steel reinforced concrete assembling stair of section after setting according to claim 7, which is characterized in that gangboard distribution Muscle stretches out in the outside of prefabricated bench, and the reserved distributing reinforcement in section, the gangboard distributing reinforcement that contiguous prefabricated bench is stretched out are poured as after Between be connected with distributing reinforcement be welded to connect connector.
10. pouring the steel reinforced concrete assembling stair of section after setting according to claim 9, which is characterized in that gangboard point Cloth muscle is C-shaped, and the number of prefabricated bench is 2, and the gangboard distributing reinforcement in two prefabricated bench is symmetrical arranged, two C-shaped gangboards Distributing reinforcement is welded to connect connector connection by distributing reinforcement, and formation one is integral ring-shaped.
CN201820927022.6U 2018-06-15 2018-06-15 The steel reinforced concrete assembling stair of section are poured after a kind of setting Active CN208363460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820927022.6U CN208363460U (en) 2018-06-15 2018-06-15 The steel reinforced concrete assembling stair of section are poured after a kind of setting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820927022.6U CN208363460U (en) 2018-06-15 2018-06-15 The steel reinforced concrete assembling stair of section are poured after a kind of setting

Publications (1)

Publication Number Publication Date
CN208363460U true CN208363460U (en) 2019-01-11

Family

ID=64929126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820927022.6U Active CN208363460U (en) 2018-06-15 2018-06-15 The steel reinforced concrete assembling stair of section are poured after a kind of setting

Country Status (1)

Country Link
CN (1) CN208363460U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409722A (en) * 2019-08-07 2019-11-05 浙江东南建筑设计有限公司 A kind of assembled staircase structure and its construction method
CN113323300A (en) * 2021-05-06 2021-08-31 浙江省建工集团有限责任公司 Beam type stair convenient to demould and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409722A (en) * 2019-08-07 2019-11-05 浙江东南建筑设计有限公司 A kind of assembled staircase structure and its construction method
CN113323300A (en) * 2021-05-06 2021-08-31 浙江省建工集团有限责任公司 Beam type stair convenient to demould and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN108360678B (en) A kind of assembled beam-column node tenon connection structure
CN106555453A (en) A kind of prefabricated overlapped hollow plate of prestressing force and its construction method
CN109083320A (en) Combine prefabricated panel and laminated floor slab structure and laminated floor slab construction method
CN108316466B (en) Prefabricated bay window component, assembled bay window node structure and construction method thereof
CN109518858A (en) Fabricated Beam-Slab connection structure and its construction method
CN208363460U (en) The steel reinforced concrete assembling stair of section are poured after a kind of setting
CN205421019U (en) Pre -tension steel reinforced concrete composite beam decking
CN204876055U (en) Building foundation
CN107268417A (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN208363461U (en) A kind of segmented steel reinforced concrete assembling stair
CN208884808U (en) Combine prefabricated panel and laminated floor slab structure
CN209556195U (en) Fabricated Beam-Slab connection structure
CN109137757A (en) A kind of anti-buckling structure of large span box girder with corrugated steel webs and construction method
CN110230414A (en) A kind of assembled platform canopy and its installation method
CN105755920B (en) Prefabrication and assembly construction concrete and its assembly method
CN113279423A (en) Prefabricated column pier and post-cast strip foundation beam assembly integral construction method
CN208309947U (en) A kind of hollow floor
CN206916935U (en) Assembled grange framework
CN204000958U (en) A kind of novel ater-casting place braced structures
CN219411447U (en) Reinforcing steel bar structure of building
CN215048058U (en) Hoisting tool for production and transportation of laminated slab bottom plate
CN217105550U (en) Reinforced concrete prefabricated integral-cast house structure
CN215518837U (en) Reinforced concrete prefabricated forming die
CN212742843U (en) Integral prefabricated sump pit