CN208334528U - A kind of operation risk test device of newly-built electric equipments in hydroelectric station - Google Patents

A kind of operation risk test device of newly-built electric equipments in hydroelectric station Download PDF

Info

Publication number
CN208334528U
CN208334528U CN201821135245.5U CN201821135245U CN208334528U CN 208334528 U CN208334528 U CN 208334528U CN 201821135245 U CN201821135245 U CN 201821135245U CN 208334528 U CN208334528 U CN 208334528U
Authority
CN
China
Prior art keywords
newly
test device
electric equipments
hydroelectric station
operation risk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821135245.5U
Other languages
Chinese (zh)
Inventor
杨荐茁
董伟
余章振
戴懿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821135245.5U priority Critical patent/CN208334528U/en
Application granted granted Critical
Publication of CN208334528U publication Critical patent/CN208334528U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model relates to electric equipments in hydroelectric station the field of test technology, and disclose a kind of operation risk test device of newly-built electric equipments in hydroelectric station, including fixed ring, the both ends of the fixed ring pass through steering column and are rotatably equipped with clamping plate and interlock plate, screw thread is equipped with adjusting screw rod in fixed ring between clamping plate, it is fixedly installed with turning handle in the bottom end for adjusting screw rod, and is fixedly installed with the adjusting block for strutting interlock plate on adjusting screw rod.The operation risk test device of the newly-built electric equipments in hydroelectric station, using air bag body dilatable under heating status, come detecting electric equipment conductor wire or external connection, whether load is excessive, it can be tested in real time in the environment of conductor wire or external connection can generate higher temperature when load is larger, warning note is carried out using LED dazzling light lamp when finding temperature anomaly, guarantees that the normal operation of electrical equipment is overhauled with timely investigation.

Description

A kind of operation risk test device of newly-built electric equipments in hydroelectric station
Technical field
The utility model relates to electric equipments in hydroelectric station the field of test technology, specially a kind of newly-built electric equipments in hydroelectric station Operation risk test device.
Background technique
Power station is the integration engineering facility that water energy can be converted to electric energy;It generally comprises by water blocking, discharge structure shape At reservoir and Diversion system of hydropower station, power plant building and electromechanical equipment etc..Electric equipments in hydroelectric station is in the process of running at present Effective means of testing is not taken, operation risk gradually increases under the action of the reasons such as prolonged operation and aging, Lack effective test device in real time to test electric equipment operation, it is difficult to timely check problem.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the operation risk that the utility model provides a kind of newly-built electric equipments in hydroelectric station is surveyed Trial assembly is set, have can real-time testing and it is easy for installation the advantages that, solve current electric equipments in hydroelectric station in the process of running simultaneously Effective means of testing is not taken, and operation risk gradually increases under the action of the reasons such as prolonged operation and aging, lacks Weary effective test device in real time tests electric equipment operation, it is difficult to the problem of timely checking problem.
(2) technical solution
For realize it is above-mentioned can real-time testing and it is easy for installation the purpose of, the utility model provides the following technical solutions: a kind of The operation risk test device of newly-built electric equipments in hydroelectric station, including fixed ring, the both ends of the fixed ring pass through steering column It is rotatably equipped with clamping plate and interlock plate, screw thread is equipped with adjusting screw rod in the fixed ring between clamping plate, at the bottom for adjusting screw rod End is fixedly installed with turning handle, and the adjusting block for strutting interlock plate is fixedly installed on adjusting screw rod.
Two clamping plates elasticity between fixed ring side is equipped with compressed spring, in the inner wall of clamping plate retaining part It is fixedly installed with heat transmission fin, closed heat-insulation chamber is offered in the clamping plate on the inside of heat transmission fin, and place in heat-insulation chamber Have and be bonded with heat transmission fin and the air bag body of heat expansion, being led in the side of air bag body far from heat transmission fin by transverse movement Electric card piece and conductive deck grafting, and conductive card is electrically connected to a power source with conductive deck by concatenated early-warning lamp respectively.
Preferably, the adjusting block is round table-like, and the lesser one end of adjusting block is close to fixed ring side.
Preferably, the clamping plate and interlock plate are structure as a whole, and the tail end of interlock plate is inclined outwardly °-°.
Preferably, the distance between the distance that the adjusting block is advanced with respect to interlock plate and two clamping plate ends phase Deng.
Preferably, the lateral distance of the air bag body expanded by heating is greater than conductive distance of the card away from conductive deck.
Preferably, the lateral distance of the air bag body expanded by heating is greater than conductive distance of the card away from conductive deck.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of operation risk test dress of newly-built electric equipments in hydroelectric station Set, have it is following the utility model has the advantages that
1, the operation risk test device of the newly-built electric equipments in hydroelectric station can change adjusting block phase under the action of manually Both can be changed by the dynamics and spacing of clamping plate clamping in this way, reach since interlock plate and clamping plate are integral structures for the position of interlock plate The purpose being connect in real time with need equipment conductor wire to be tested or external connection to test device, easy to operate, once mounting Realize test in real time.
2, the operation risk test device of the newly-built electric equipments in hydroelectric station, utilizes air bag dilatable under heating status Body comes detecting electric equipment conductor wire or external connection, and whether load is excessive, can generate in conductor wire or external connection when load is larger It can be tested in real time in the environment of higher temperature, carry out warning note using LED dazzling light lamp when finding temperature anomaly, The normal operation and timely investigation for guaranteeing electrical equipment are overhauled.
Detailed description of the invention
Fig. 1 is the utility model front cutting structural schematic diagram;
Fig. 2 is the partial enlargement structural representation in the portion A in the utility model Fig. 1.
In figure: 1 fixed ring, 2 steering columns, 3 clamping plates, 4 interlock plates, 5 adjust screw rods, 6 adjusting blocks, 7 turning handles, 8 compressed springs, 9 heat-insulation chambers, 10 air bag bodies, 11 conductive cards, 12 conductive decks, 13 heat transmission fins.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
A kind of operation risk test device of newly-built electric equipments in hydroelectric station referring to FIG. 1-2, including fixed ring 1, it is fixed The both ends of ring 1 pass through steering column 2 and are rotatably equipped with clamping plate 3 and interlock plate 4, and clamping plate 3 and interlock plate 4 are structure as a whole, and even The tail end of movable plate 4 is inclined outwardly 10 ° -30 °, and screw thread, which is equipped with, in the fixed ring 1 between clamping plate 3 adjusts screw rod 5, is adjusting silk The bottom end of bar 5 is fixedly installed with turning handle 7, and the adjusting block 6 for strutting interlock plate 4 is fixedly installed on adjusting screw rod 5, Adjusting block 6 is round table-like, and the lesser one end of adjusting block 6 is close to 1 side of fixed ring, adjusting block 6 with respect to interlock plate 4 advance away from It is equal from the distance between two 3 ends of clamping plate, position of the adjusting block 6 with respect to interlock plate 4 can be changed under the action of manually, Since interlock plate 4 and clamping plate 3 are integral structures, dynamics and spacing that clamping plate 3 clamps both can be changed in this way, reached test device reality Shi Yuxu equipment conductor wire to be tested or the purpose of external connection connection, easy to operate, real-time survey can be realized in once mounting Examination.
Two clamping plates 3 elasticity between 1 side of fixed ring is equipped with compressed spring 8, plays and facilitates distracted purpose;? The inner wall of 3 retaining part of clamping plate is fixedly installed with heat transmission fin 13, offers in the clamping plate 3 of 13 inside of heat transmission fin closed Heat-insulation chamber 9, and be placed in heat-insulation chamber 9 and to be bonded with heat transmission fin 13 and the air bag body 10 of heat expansion, heat transmission fin 13 can The heat that conductor wire generates is passed into air bag body 10 to greatest extent, is passed through in air bag body 10 far from the side of heat transmission fin 13 12 grafting of the conductive card 11 of transverse movement and conductive deck, conductive card 11 are made with conductive deck 12 of conductive copper, gas The lateral distance of 10 expanded by heating of utricule is greater than conductive distance of the card 11 away from conductive deck 12, and conductive card 11 and conduction Deck 12 is electrically connected to a power source respectively by concatenated early-warning lamp 14, is entirely when conductive card 11 is contacted with conductive deck 12 System forms access, and LED dazzling light lamp issues light and carries out early warning at this time, and early-warning lamp 14 uses LED dazzling light lamp, and button electricity can be used in power supply Pond is mounted on the outer surface of clamping plate 3, as long as LED dazzling light lamp can be driven to run.
Using air bag body 10 dilatable under heating status come detecting electric equipment conductor wire or external connection whether load It is excessive, it can be tested in real time in the environment of conductor wire or external connection can generate higher temperature when load is larger, It was found that carrying out warning note using LED dazzling light lamp when temperature anomaly, guarantee that the normal operation of electrical equipment is examined with timely investigation It repairs.
In conclusion the operation risk test device of the newly-built electric equipments in hydroelectric station, can change under the action of manually Adjusting block 6 both can be changed what clamping plate 3 clamped since interlock plate 4 and clamping plate 3 are integral structures with respect to the position of interlock plate 4 in this way Dynamics and spacing achieve the purpose that test device is connect with equipment conductor wire or external connection to be tested is needed in real time, easy to operate, Real-time test can be realized in once mounting.
Using air bag body 10 dilatable under heating status come detecting electric equipment conductor wire or external connection whether load It is excessive, it can be tested in real time in the environment of conductor wire or external connection can generate higher temperature when load is larger, It was found that carrying out warning note using LED dazzling light lamp when temperature anomaly, guarantee that the normal operation of electrical equipment is examined with timely investigation It repairs, solves current electric equipments in hydroelectric station and do not take effective means of testing in the process of running, running for a long time And operation risk gradually increases under the action of the reasons such as aging, lack effective test device in real time to electric equipment operation into Row test, it is difficult to the problem of timely checking problem.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of operation risk test device of newly-built electric equipments in hydroelectric station, including fixed ring (1), it is characterised in that: described The both ends of fixed ring (1) pass through steering column (2) and are rotatably equipped with clamping plate (3) and interlock plate (4), consolidating between clamping plate (3) Determine screw thread on ring (1) and adjusting screw rod (5) is installed, is fixedly installed with turning handle (7) in the bottom end for adjusting screw rod (5), and adjusting The adjusting block (6) for strutting interlock plate (4) is fixedly installed on section screw rod (5);
Two clamping plates (3) elasticity between fixed ring (1) side is equipped with compressed spring (8), in clamping plate (3) clamping part The inner wall of position is fixedly installed with heat transmission fin (13), is offered in the clamping plate (3) on the inside of heat transmission fin (13) closed heat-insulated Chamber (9), and be placed in the heat-insulation chamber (9) and to be bonded with heat transmission fin (13) and air bag body (10) that heat expands, in air bag body (10) conductive card (11) and conductive deck (12) grafting of the side far from heat transmission fin (13) by transverse movement, and lead Electric card piece (11) is electrically connected to a power source with conductive deck (12) by concatenated early-warning lamp (14) respectively.
2. a kind of operation risk test device of newly-built electric equipments in hydroelectric station according to claim 1, it is characterised in that: The adjusting block (6) is round table-like, and adjusting block (6) lesser one end is close to fixed ring (1) side.
3. a kind of operation risk test device of newly-built electric equipments in hydroelectric station according to claim 1, it is characterised in that: The clamping plate (3) and interlock plate (4) are structure as a whole, and the tail end of interlock plate (4) is inclined outwardly 10 ° -30 °.
4. a kind of operation risk test device of newly-built electric equipments in hydroelectric station according to claim 1, it is characterised in that: The adjusting block (6) is equal with the distance between two clamping plate (3) ends with respect to the distance that interlock plate (4) advance.
5. a kind of operation risk test device of newly-built electric equipments in hydroelectric station according to claim 1, it is characterised in that: The lateral distance of air bag body (10) expanded by heating is greater than the conductive distance of card (11) away from conductive deck (12).
6. a kind of operation risk test device of newly-built electric equipments in hydroelectric station according to claim 1, it is characterised in that: The early-warning lamp (14) uses LED dazzling light lamp.
CN201821135245.5U 2018-07-18 2018-07-18 A kind of operation risk test device of newly-built electric equipments in hydroelectric station Expired - Fee Related CN208334528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821135245.5U CN208334528U (en) 2018-07-18 2018-07-18 A kind of operation risk test device of newly-built electric equipments in hydroelectric station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821135245.5U CN208334528U (en) 2018-07-18 2018-07-18 A kind of operation risk test device of newly-built electric equipments in hydroelectric station

Publications (1)

Publication Number Publication Date
CN208334528U true CN208334528U (en) 2019-01-04

Family

ID=64784721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821135245.5U Expired - Fee Related CN208334528U (en) 2018-07-18 2018-07-18 A kind of operation risk test device of newly-built electric equipments in hydroelectric station

Country Status (1)

Country Link
CN (1) CN208334528U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111257717A (en) * 2020-03-03 2020-06-09 李鑫 Detection device for PIN diode

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111257717A (en) * 2020-03-03 2020-06-09 李鑫 Detection device for PIN diode

Similar Documents

Publication Publication Date Title
CN107845542B (en) Relay module convenient to dismouting
CN202600103U (en) Independent metal tip defect model for partial discharge test of gas insulated switchgear (GIS)
CN101126626A (en) Planeness detecting instrument
CN208334528U (en) A kind of operation risk test device of newly-built electric equipments in hydroelectric station
CN203587748U (en) High-voltage insulating rod detecting table
CN103837803A (en) High voltage insulating rod detection table
CN210720611U (en) Semiconductor refrigeration piece aging test tool based on constant temperature platform
CN103439183B (en) The clamping tooling of mechanical load of photovoltaic module test
CN211291919U (en) Generator carbon brush pressure spring elasticity testing arrangement
CN101858936A (en) Jointing clamp of electric meter
CN205178166U (en) Pneumatic socket of motor test
CN104440780A (en) Insulating pull rod tool
CN208479004U (en) A kind of substation with safe early warning theft protection
CN203900689U (en) Adjustable solar cell welding jig
CN203956794U (en) A kind of diode clamping device
CN109443435A (en) A kind of multinomial performance detection device of electrode slice
CN204731405U (en) Direct access electric energy meter calibrating frock
CN204903583U (en) Big power diode ageing tests anchor clamps of area heat dissipation function
CN204321634U (en) A kind of work piece holder
CN105242193B (en) A kind of power circuit shell temperature test device
CN209055125U (en) A kind of electronic product testing jig
CN109039282B (en) Photovoltaic module reworking EL test device and test method thereof
CN202886561U (en) Three-phase synchronization testing device for circuit breaker
CN104029146B (en) The pressing clamp of Short Axis Kind pipe fitting
CN207249062U (en) Overload relay Characteristics Detection testing stand special fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104

Termination date: 20190718

CF01 Termination of patent right due to non-payment of annual fee