CN208332707U - A kind of two electricity consumption wall-hung boiler of heating and bathing - Google Patents

A kind of two electricity consumption wall-hung boiler of heating and bathing Download PDF

Info

Publication number
CN208332707U
CN208332707U CN201820825426.4U CN201820825426U CN208332707U CN 208332707 U CN208332707 U CN 208332707U CN 201820825426 U CN201820825426 U CN 201820825426U CN 208332707 U CN208332707 U CN 208332707U
Authority
CN
China
Prior art keywords
heating
bathing
water
main controller
water flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820825426.4U
Other languages
Chinese (zh)
Inventor
孙小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan Song Yi Electric Co Ltd
Original Assignee
Zhongshan Song Yi Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Song Yi Electric Co Ltd filed Critical Zhongshan Song Yi Electric Co Ltd
Priority to CN201820825426.4U priority Critical patent/CN208332707U/en
Application granted granted Critical
Publication of CN208332707U publication Critical patent/CN208332707U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Medical Bathing And Washing (AREA)

Abstract

The utility model discloses a kind of two electricity consumption wall-hung boiler of heating and bathing, including outer housing, it is provided with display screen outside outer housing, heating system and bath system are installed in outer housing.Heating system includes heating water pipeline, and bath system includes bathing water pipeline, and heating water pipeline and bathing water pipeline are respectively independently arranged.Heating system further includes display screen, water pump, expansion tank, heater, heating water flow sensing unit, heating temperature sensor, heating temperature control device, silicon-controlled, main controller.Bath system further includes display screen, heater, bathing water flow sensing unit, bathing temperature sensor, bathing temperature controller, silicon-controlled, main controller.The electric wall-hung boiler of the utility model uses above-mentioned design, has the advantages that efficient, energy conservation, safety.

Description

A kind of two electricity consumption wall-hung boiler of heating and bathing
Technical field
The utility model relates to two electricity consumption wall-hung boilers of electroheat technology field more particularly to a kind of heating and bathing.
Background technique
When every weather cold, demand of the people to heating, which will dash forward, to fly to surge, and energy input even more turns at double.Especially exist There is no the area of central heating and in northern non-heating period, many family's selections install air-conditioning in parlor, bedroom, in health Between install super bath, to the bad old man of legs and feet the head of a bed be arranged an electric heater ... however, configuration many and diverse in this way due to thing It first makes rational planning for without passing through, does not only result in energy input and sharply increase, opened long along with air-conditioning and be easy to be air-dried, electric heater Heating surface (area) (HS is small also power-consuming.In recent years, also have using the related radiator heating of wall-hung boiler, mainly divide burnt gas wall hanging furnace and electric wall Furnace is hung, the disadvantage of burnt gas wall hanging furnace is to be easy gas leakage to cause gas poisoning, and especially winter, door and window was close for the energy conservation that keeps warm Envelope is divulged information unsmooth, it is easier to security risk occur;And the electric conversion rate of burnt gas wall hanging furnace is relatively low, causes the waste of the energy, A large amount of flue gas can be generated when running, pollute environment.Wall-hung boiler electric in this way is just quite by public welcome, but existing most electric walls It hangs furnace to have a single function, people can not be met simultaneously to the needs for the daily life water that warms up.
Chinese patent application publication No. CN103557548A, it discloses a kind of electrothermal heat the dual-purpose wall-hung boiler of bathing, Including heating mechanism and domestic hot-water mechanism, wherein heating mechanism mainly includes Nano semiconductor electrothermal tube, water circulating pump, heating Temp probe, heating safety valve, water inlet control solenoid valve, out water management solenoid valve, three-way diverter valve and central controller etc., it By central controller carry out be uniformly coordinated control;Domestic hot-water mechanism of the invention mainly include water flow sensor, Heat-exchangers of the plate type, hot water temperature's probe, priming valve, sealed expansion water tank, bathing valve and central controller etc., they pass through Central controller carries out being uniformly coordinated control.
The applicant is further improved innovation and creation present patent application technology on the basis of existing technology.
Utility model content
To overcome disadvantages mentioned above, the utility model provides a kind of two electricity consumption wall hanging of heating and bathing efficiently, energy saving, safe Furnace.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of two electricity consumption wall-hung boiler of heating and bathing, including outer housing, the outer housing are provided with display screen, the shell outside Heating system and bath system are installed in vivo;
The heating system and bath system include the heater for heating water flow in the heating system and bath system,
The heating system further includes heating water pipeline,
The bath system further includes bathing water pipeline,
Heating water pipeline and bathing water pipeline are respectively independently arranged,
The heating system further includes providing the water pump of power for water circulation, and the water pump is mounted on the heating water flow pipes On the road.
It is characterized by:
The heating system and bath system further include main controller, silicon-controlled,
The heating system further includes heating temperature sensor,
The display screen, heating temperature sensor, it is silicon-controlled be electrically connected with the main controller, the display screen is for setting Heating target water flow temperature is simultaneously sent to the main controller,
The heating temperature sensor is connected to the heating water flow pipes road, and the heating temperature sensor is for detecting Real-time water flow temperature derived from the heating water pipeline is simultaneously sent to the main controller,
The main controller passes through heater connecting and disconnecting of the circuit described in the SCR control.
The bath system further includes bathing temperature sensor,
The display screen, bathing temperature sensor, it is silicon-controlled be electrically connected with the main controller, the display screen is for setting Bathing target water flow temperature is simultaneously sent to the main controller,
The bathing temperature sensor is connected to the bathing water flow pipes road, and the bathing temperature sensor is for detecting Real-time water flow temperature derived from the bathing water pipeline is simultaneously sent to the main controller,
The main controller passes through heater connecting and disconnecting of the circuit described in the SCR control.
The heating system further includes heating temperature control device,
The heating temperature control device is for detecting the heating water pipeline export water flow temperature and controlling the heater electricity Road on-off.
The bath system further includes bathing temperature controller,
The bathing temperature controller is for detecting the bathing water pipeline export water flow temperature and controlling the heater electricity Road on-off.
The heating system further includes heating water flow sensing unit,
The heating water flow sensing unit is electrically connected with the main controller, and the heating water flow sensing unit is connected to the heating On water pipeline, for detecting real-time flow information and sending to the main controller, the heater and main controller electricity Connection, the main controller control the fever of the heater according to the real-time flow information that the heating water flow sensing unit detects Watt level.
The bath system further includes bathing water flow sensing unit,
The bathing water flow sensing unit is electrically connected with the main controller, and the bathing water flow sensing unit is connected to the bathing On water pipeline, for detecting real-time flow information and sending to the main controller, the heater and main controller electricity Connection, the main controller control the fever of the heater according to the real-time flow information that the bathing water flow sensing unit detects Watt level.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: the heating system further includes swelling water Case, the expansion tank are connected on heating water flow pipes road by water pipe.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: the bathing water pipeline includes bathing Outlet pipe, the bathing outlet pipe are mounted on bathing water pipeline water outlet.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: the bathing water pipeline further includes washing Outlet valve is bathed, the bathing outlet valve is connected on the bathing outlet pipe.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: the heating water pipeline further includes adopting Warm outlet pipe, the heating outlet pipe are mounted on heating water pipeline water outlet.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: heating water pipeline further includes that heating goes out Water valve, the heating outlet valve are connected on the heating outlet pipe.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: the heating water pipeline further includes mending Water pipe, the water supply pipe are connected to the heating water pipeline.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: the heating water pipeline further includes certainly Carry out water valve, the running water valve is connected on the water supply pipe.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: the heating water pipeline further includes adopting Warm back-water valve (BWV), the heating back-water valve (BWV) are mounted on the heating water pipeline backwater end.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: it further include having water pressure gauge, the water pressure gauge It is mounted on water pipeline.
A kind of two electricity consumption wall-hung boiler of heating and bathing as described above, it is characterised in that: it is provided with display screen outside the outer housing, The display screen is connected with the main controller, and the display screen is touch display screen.
The utility model has the advantage that compared with prior art
1, two electricity consumption wall-hung boiler of the utility model heating and bathing includes display screen, heating temperature sensor, bathing temperature Sensor, silicon-controlled and main controller, user set the target temperature of heating and bathing on a display screen, heating temperature sensor and Bathing temperature sensor detects water flow temperature information, and main controller passes through SCR control heater circuit according to the two temperature On-off can achieve efficient purpose.
2, two electricity consumption wall-hung boiler of the utility model heating and bathing includes heating water flow sensing unit and bathing water flow sensing unit, Heating water flow sensing unit and bathing water flow sensing unit detection water flow real-time traffic information are communicated to main controller, have PID in main controller Algoritic module cooperates the target temperature of setting using pid algorithm, and the power of regulation heating body assembly can achieve energy-efficient Purpose.
3, the utility model electricity wall-hung boiler further includes expansion tank, and expansion tank is connected to by water pipe with water circulation pipe, When water temperature increases, its pressure also can be increased and then, and the effect of expansion tank is the pressure for consuming its temperature change and generating, this Pressure in sample water circulation pipe would not be increased to outside safe range because water temperature increases, it is ensured that electric wall-hung boiler used Safety.
4, fever temperature is more than 105 DEG C by the automatic power supply for disconnecting heating temperature control device and the output of bathing temperature controller, is played Overtemperature prote effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model electricity wall-hung boiler;
In figure: 1, outer housing;2, water pump;3, heater;4, heat-generating pipe;5, silicon-controlled;6, heating water flow sensing unit;7, it washes Bath water flow sensor;8, heating temperature control device;9, bathing temperature controller;10, heating temperature sensor;11, bathing temperature sensor; 12, expansion tank;13, water pressure gauge;14, water supply pipe;15, heating outlet valve;16, bathing outlet valve;17, heating back-water valve (BWV);18, Running water valve;19, heating outlet pipe;20, bathing outlet pipe.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
As shown in Figure 1, a kind of two electricity consumption wall-hung boiler of heating and bathing, including outer housing 1,1 outer surface of outer housing are provided with aobvious Display screen, display screen are touch display screen, and display screen is connected with main controller, can be switched on a display screen, mode setting, adjusting The operation such as temperature.
Heating system and bath system are installed in outer housing 1;
Heating system and bath system include the heater 3 of water flow in heating system and bath system,
Heater 3 has the heat-generating pipe 4 of cast aluminium, is provided with ceramic heating device in heat-generating pipe 4, cold water is out of heat-generating pipe 4 It flows through and absorbs heat from ceramic heating device, reach and cold water heating is reached into heat exchange purpose.
Heating system further includes heating water pipeline,
Bath system further includes bathing water pipeline,
Heating water pipeline and bathing water pipeline are respectively independently arranged,
Heating system further includes that the water pump 2 of power is provided for water circulation, and water pump 2 is mounted on heating water flow pipes road, simultaneously Circulating chilled water is returned and the heat that heater generates is taken out of;
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, heating system and bath system further include main controller, controllable Silicon 5,
Heating system further includes heating temperature sensor 10,
Display screen, heating temperature sensor 10, silicon-controlled 5 are electrically connected with main controller, and user can be according to need on display screen Heating target water flow temperature is set, the heating target water flow temperature signal of setting is sent to main controller by display screen,
Heating temperature sensor 10 is connected to heating water flow pipes road, and heating temperature sensor 10 is for detecting heating water flow Real-time water flow temperature derived from pipeline is simultaneously sent to main controller,
Main controller passes through silicon-controlled 5 control, 3 connecting and disconnecting of the circuit of heater;
When heating target water flow temperature set by user is greater than the real-time water flow temperature that temperature sensor detects, master control Device sends a signal to silicon-controlled 5, and silicon-controlled 5 disconnecting circuit, heat-generating pipe 4 stops working.
When heating target water flow temperature set by user is less than the real-time water flow temperature that temperature sensor detects, master control Device sends a signal to silicon-controlled 5, and silicon-controlled 5 turning circuit, heat-generating pipe 4 is started to work.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, bath system further includes bathing temperature sensor 11,
Display screen, bathing temperature sensor 11, silicon-controlled 5 are electrically connected with main controller, and user can be according to need on display screen Bathing target water flow temperature is set, the bathing target water flow temperature signal of setting is sent to main controller by display screen,
Bathing temperature sensor 11 is connected to bathing water flow pipes road, and bathing temperature sensor 11 is for detecting bathing water flow Real-time water flow temperature derived from pipeline is simultaneously sent to main controller,
Main controller passes through silicon-controlled 5 control, 3 connecting and disconnecting of the circuit of heater;
When bathing target water flow temperature set by user is greater than the real-time water flow temperature that temperature sensor detects, master control Device sends a signal to silicon-controlled 5, and silicon-controlled 5 disconnecting circuit, heat-generating pipe 4 stops working.
When bathing target water flow temperature set by user is less than the real-time water flow temperature that temperature sensor detects, master control Device sends a signal to silicon-controlled 5, and silicon-controlled 5 turning circuit, heat-generating pipe 4 is started to work.
A kind of two electricity consumption wall-hung boiler of heating and bathing, heating system further include heating temperature control device 8, heating temperature control device in the application 8 be overtemperature relay, for detecting heating water pipeline export water flow temperature and controlling 3 connecting and disconnecting of the circuit of heater, when temperature is super Power supply is disconnected when crossing 105 DEG C.
A kind of two electricity consumption wall-hung boiler of heating and bathing, bath system further include bathing temperature controller 9, bathing temperature controller in the application 9 be overtemperature relay, for detecting bathing water pipeline export water flow temperature and controlling 3 connecting and disconnecting of the circuit of heater, when temperature is super Power supply is disconnected when crossing 105 DEG C.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, heating system further includes heating water flow sensing unit 6,
Heating water flow sensing unit 6 is electrically connected with main controller, and heating water flow sensing unit 6 is connected to heating water flow pipes road, is used Whether there is water flowing in detection water pipe, and detects real-time flow information, then real-time flow information is sent to master Device is controlled, heater 3 is electrically connected with main controller, and main controller is controlled according to the real-time flow information that heating water flow sensing unit 6 detects The heating power size of heater 3.
There is pid algorithm module in main controller, using the power regulation of pid algorithm control heater 3.
When the real-time water flow that heating water flow sensing unit 6 detects is big, the hair for improving heater is controlled by main controller Thermal power.
When the real-time water flow that heating water flow sensing unit 6 detects is small, the hair for reducing heater is controlled by main controller Thermal power.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, bath system further includes bathing water flow sensing unit 7,
Bathing water flow sensing unit 7 is electrically connected with main controller, and bathing water flow sensing unit 7 is connected to heating water flow pipes road, is used Whether there is water flowing in detection water pipe, and detects real-time flow information, then real-time flow information is sent to master Device is controlled, heater 3 is electrically connected with main controller, and main controller is controlled according to the real-time flow information that bathing water flow sensing unit 7 detects The heating power size of heater 3.
There is pid algorithm module in main controller, using the power regulation of pid algorithm control heater 3.
When the real-time water flow that bathing water flow sensing unit 7 detects is big, the hair for improving heater 3 is controlled by main controller Thermal power.
When the real-time water flow that bathing water flow sensing unit 7 detects is small, the hair for reducing heater 3 is controlled by main controller Thermal power.
A kind of two electricity consumption wall-hung boiler of heating and bathing, heating system further include expansion tank 12, expansion tank 12 in the application Through water pipe connection on heating water flow pipes road, it uses pellosil that inside is divided into two to expansion tank 12, and half fills water, separately Half fills nitrogen, and when water temperature increases, pressure also can be increased and then, and the effect of nitrogen is to consume its temperature in expansion tank 12 The pressure of variation and generation.Expansion tank 12 is connected to by water pipe with water circulation pipe, and when water temperature raising, its pressure also can be with Raising, the effect of expansion tank 12 be to consume its temperature change and the pressure that generates.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, bathing water pipeline includes bathing outlet pipe 20, and bathing goes out Water pipe 20 is mounted on bathing water pipeline water outlet.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, bathing water pipeline further includes bathing outlet valve 16, bathing Outlet valve 16 is connected on bathing outlet pipe.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, heating water pipeline further includes heating outlet pipe 19, heating Outlet pipe 19 is mounted on heating water pipeline water outlet.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, heating water pipeline further includes heating outlet valve 15, heating Outlet valve 15 is connected on heating outlet pipe.
A kind of two electricity consumption wall-hung boiler of heating and bathing, heating water pipeline further include water supply pipe 14, water supply pipe 14 in the application It is connected to heating water pipeline, material is copper pipe.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, heating water pipeline further includes running water valve 18, tap water Valve 18 connects on water supply pipe.
A kind of two electricity consumption wall-hung boiler of heating and bathing in the application, heating water pipeline further includes heating back-water valve (BWV) 17, heating Back-water valve (BWV) 17 is mounted on heating water pipeline backwater end.
A kind of two electricity consumption wall-hung boiler of heating and bathing, further includes having water pressure gauge 13, water pressure gauge 13 is mounted on water flow in the application On pipeline.13 internal structure of water pressure gauge is copper capillary tube, the pressure of real-time display pipeline.Water pressure gauge 13 it is exposed with electric wall-hung boiler outside 1 surface of shell.Hydraulic pressure shown by water pressure gauge 13 can be checked on electric 1 surface of wall-hung boiler outer housing.
It is further improved, running water valve 18 is solenoid valve, and water pressure gauge 13 is built-in with hydraulic pressure sensor, hydraulic pressure sensor and master Device connection is controlled, when the pressure of water pressure gauge 13 is lower than 0.8bAR, main controller receives hydraulic pressure sensor signal and controls opening moisturizing 10 moisturizing of valve, tap water just pass through water supply pipe 9 into water circulation pipe, when pressure reaches 1.5bAR, stop moisturizing.
The utility model is to warm up bath two electricity consumption wall-hung boilers heating 10KW, bathing 8KW machine, and operational process is as follows:
Water is first mended, then water pump 2 first turns after being powered, heating water flow sensing unit 6 and bathing water flow sensing unit 7 and detects water Flow information is simultaneously communicated to main controller by stream real-time traffic information, there is pid algorithm module in main controller, using pid algorithm, cooperation The target temperature of setting, the power of 3 assembly of regulation heating body.
It is preferential that real-time data transmission to main controller executed into bathing when bathing water flow sensing unit detects water-flow signal Mode.
Heating temperature sensor 10 and bathing temperature sensor 11 detect water flow temperature information and are communicated to main controller, according to The target temperature set, the on-off that main controller passes through silicon-controlled 5 control, 3 circuit of heater.
If 3 temperature of heater is more than 105 DEG C of power supplys for exporting automatic disconnection heating temperature control device 8 and bathing temperature controller 9.
The preferable specific embodiment of the above, only the utility model, but scope of protection of the utility model not office It is limited to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical new according to this Type technical solution and its utility model design is subject to equivalent substitution or change, should all cover scope of protection of the utility model it It is interior.

Claims (11)

1. a kind of two electricity consumption wall-hung boiler of heating and bathing, including outer housing (1), the outer housing (1) is provided with display screen outside, described Heating system and bath system are installed in outer housing (1);
The heating system and bath system include the heater (3) for heating water flow in the heating system and bath system,
The heating system further includes heating water pipeline,
The bath system further includes bathing water pipeline,
Heating water pipeline and bathing water pipeline are respectively independently arranged,
The heating system further includes providing the water pump (2) of power for water circulation, and the water pump (2) is mounted on the heating water flow On pipeline;
It is characterized by:
The heating system and bath system further include main controller, silicon-controlled (5),
The heating system further includes heating temperature sensor (10),
The display screen, heating temperature sensor (10), silicon-controlled (5) are electrically connected with the main controller, and the display screen is used for Setting heating target water flow temperature is simultaneously sent to the main controller,
The heating temperature sensor (10) is connected to the heating water flow pipes road, and the heating temperature sensor (10) is used for It detects real-time water flow temperature derived from the heating water pipeline and is sent to the main controller,
The main controller controls heater (3) connecting and disconnecting of the circuit by described silicon-controlled (5);
The bath system further includes bathing temperature sensor (11),
The display screen, bathing temperature sensor (11), silicon-controlled (5) are electrically connected with the main controller, and the display screen is used for Setting bathing target water flow temperature is simultaneously sent to the main controller,
The bathing temperature sensor (11) is connected to the bathing water flow pipes road, and the bathing temperature sensor (11) is used for It detects real-time water flow temperature derived from the bathing water pipeline and is sent to the main controller,
The main controller controls heater (3) connecting and disconnecting of the circuit by described silicon-controlled (5);
The heating system further includes heating temperature control device (8),
The heating temperature control device (8) is for detecting the heating water pipeline export water flow temperature and controlling the heater (3) Connecting and disconnecting of the circuit;
The bath system further includes bathing temperature controller (9),
The bathing temperature controller (9) is for detecting the bathing water pipeline export water flow temperature and controlling the heater (3) Connecting and disconnecting of the circuit;
The heating system further includes heating water flow sensing unit (6),
The heating water flow sensing unit (6) is electrically connected with the main controller, and the heating water flow sensing unit (6) is connected to described adopt On warm water pipeline, for detecting real-time flow information and sending to the main controller, the heater (3) and the master control Device electrical connection, the main controller control the fever according to the real-time flow information that the heating water flow sensing unit (6) is detected The heating power size of body (3);
The bath system further includes bathing water flow sensing unit (7),
The bathing water flow sensing unit (7) is electrically connected with the main controller, and the bathing water flow sensing unit (7) is connected to described wash Bath water flow tube road, for detecting real-time flow information and sending to the main controller, the heater (3) and the master control Device electrical connection, the main controller control the fever according to the real-time flow information that the bathing water flow sensing unit (7) is detected The heating power size of body (3).
2. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 1, it is characterised in that: the heating system further includes Expansion tank (12), the expansion tank (12) are connected on heating water flow pipes road by water pipe.
3. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 1, it is characterised in that: the bathing water pipeline packet It includes bathing outlet pipe (20), the bathing outlet pipe (20) is mounted on bathing water pipeline water outlet.
4. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 3, it is characterised in that: the bathing water pipeline is also Including bathing outlet valve (16), the bathing outlet valve (16) is connected on the bathing outlet pipe.
5. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 1, it is characterised in that: the heating water pipeline is also Including heating outlet pipe (19), the heating outlet pipe (19) is mounted on heating water pipeline water outlet.
6. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 5, it is characterised in that: heating water pipeline further includes Heating outlet valve (15), the heating outlet valve (15) are connected on the heating outlet pipe.
7. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 1, it is characterised in that: the heating water pipeline is also Including water supply pipe (14), the water supply pipe (14) is connected to the heating water pipeline.
8. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 7, it is characterised in that: the heating water pipeline is also Including running water valve (18), the running water valve (18) is connected on the water supply pipe.
9. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 1, it is characterised in that: the heating water pipeline is also Including heating back-water valve (BWV) (17), the heating back-water valve (BWV) (17) is mounted on the heating water pipeline backwater end.
10. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 1, it is characterised in that: further include having water pressure gauge (13), the water pressure gauge (13) is mounted on water pipeline.
11. a kind of two electricity consumption wall-hung boiler of heating and bathing according to claim 1, it is characterised in that: outer housing (1) peripheral hardware It is equipped with display screen, the display screen is connected with the main controller, and the display screen is touch display screen.
CN201820825426.4U 2018-05-30 2018-05-30 A kind of two electricity consumption wall-hung boiler of heating and bathing Expired - Fee Related CN208332707U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820825426.4U CN208332707U (en) 2018-05-30 2018-05-30 A kind of two electricity consumption wall-hung boiler of heating and bathing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820825426.4U CN208332707U (en) 2018-05-30 2018-05-30 A kind of two electricity consumption wall-hung boiler of heating and bathing

Publications (1)

Publication Number Publication Date
CN208332707U true CN208332707U (en) 2019-01-04

Family

ID=64772297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820825426.4U Expired - Fee Related CN208332707U (en) 2018-05-30 2018-05-30 A kind of two electricity consumption wall-hung boiler of heating and bathing

Country Status (1)

Country Link
CN (1) CN208332707U (en)

Similar Documents

Publication Publication Date Title
CN102538186B (en) Multi-functional electric hot water boiler
CN103134232A (en) Air-source water heater with cooling, heating and clothes drying functions
CN201203200Y (en) Solar energy and gas dual-purpose combined type heating apparatus
CN203810526U (en) Electromagnetic water heating apparatus for warming
CN203203292U (en) Cold-warm clothes-drying air-energy water heater
CN103557548A (en) Electric-heating heat-supplying and bathing dual-purpose wall-hung furnace
CN201599940U (en) Integral wall-mounted type heat pump water heater
CN108458391A (en) A kind of combination hot-water heating system
CN208332707U (en) A kind of two electricity consumption wall-hung boiler of heating and bathing
CN104848383A (en) Self-adaption intelligent energy-saving heat exchange station
CN205825402U (en) A kind of energy-saving and water-saving water heater
CN205690691U (en) A kind of domestic gas-fired water heater heating and bath hot water pipeline cold water reflux
KR20110133073A (en) Heat pipe boiler and heating control system and circulating controller
CN205561229U (en) Energy -conserving water conservation gas hot water system
CN208253945U (en) A kind of dedicated shower heating system in sanitary shower room
CN103054306B (en) efficient hairdressing bed
CN208154575U (en) A kind of solar-electricity heating installation
CN208332650U (en) A kind of electricity wall-hung boiler
CN202707221U (en) Intelligent efficient energy-saving and environment-friendly automobile water-heating exhaust heater
CN202485202U (en) Multifunctional electric water boiler
CN209688991U (en) Water storage type electric heating water path system and wall-mounted furnace
CN2867194Y (en) Instant heat type hydroelectric warmer
CN201302288Y (en) Multifunctional water heater
CN204787285U (en) Bathing cold water backward flow water conservation intelligent control device
CN109631142A (en) A kind of energy-efficient central gas hot water optimization system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104