CN208323146U - A kind of pipeline construction device - Google Patents

A kind of pipeline construction device Download PDF

Info

Publication number
CN208323146U
CN208323146U CN201820626731.0U CN201820626731U CN208323146U CN 208323146 U CN208323146 U CN 208323146U CN 201820626731 U CN201820626731 U CN 201820626731U CN 208323146 U CN208323146 U CN 208323146U
Authority
CN
China
Prior art keywords
fixedly connected
spanner
slot
spanner slot
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820626731.0U
Other languages
Chinese (zh)
Inventor
孙长亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Yuwei Fluid Transmission Control Equipment Co Ltd
Original Assignee
Tianjin Yuwei Fluid Transmission Control Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Yuwei Fluid Transmission Control Equipment Co Ltd filed Critical Tianjin Yuwei Fluid Transmission Control Equipment Co Ltd
Priority to CN201820626731.0U priority Critical patent/CN208323146U/en
Application granted granted Critical
Publication of CN208323146U publication Critical patent/CN208323146U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)

Abstract

The utility model discloses a kind of pipeline construction device, including the first plier and the second plier, first plier is fixedly connected with the first fixed rotating plate, and shaft is rotatably connected at the described first fixed rotating plate center, is equipped with the first spanner slot in the shaft.The utility model, the spanner slot different there are two bore is set in the fixed rotating plate two sides of vice, it can be used for loading and unloading the screw of different size, the buffer unit being equipped in spanner slot can make spanner is stronger to block screw, after use, the fixed plate of spanner slot upper end restores to the original state, cover spanner slot, prevent dust or rainwater from entering slot internal corrosion spanner slot, user, which need to only carry a vice when working, can realize clamping, the function of cutting nippers and spanner, and vice can load and unload all different handle of length and size, the people for facilitating hand size different uses, this brings convenience in the process to pipeline construction, promote the progress of construction.

Description

A kind of pipeline construction device
Technical field
The utility model relates to technical field of building construction more particularly to a kind of pipeline construction devices.
Background technique
Vice is also cutting pliers, is mostly used to draw out a nail or pinch off nail and iron wire, vice have German-style and it is American it Point, German-style is also known as European, and appearance is smooth, and Founder is felt, and focuses on the function of clamping;The American function of focusing on cutting nippers.The present age The function that vice has is relatively simple, can not realize multiple functions simultaneously, so that people are in pipeline construction in addition to needing band Vice, it is also necessary to other constructing devices are carried, to bringing many burdens on user's body, and most of vice handle Hand is all fixedly connected with plier, and the hand size of different users be it is different, this will lead to a kind of model Vice be only applicable to sub-fraction people, this can make troubles during pipeline construction to people, may affect The progress of construction.
Utility model content
Purpose of the utility model is to solve disadvantage existing in the prior art, function ratio that contemporary vice has It is more single, multiple functions cannot be realized simultaneously, so that people are in pipeline construction in addition to needing band vice, it is also necessary to carry it His constructing device, to bringing many burdens on user's body, and most of vice handle and plier are all fixed Connection, and the hand size of different users be it is different, a kind of this vice that will lead to model is only applicable to one Fraction people, and most people have uncomfortable feeling when in use, this can bring during pipeline construction to people Inconvenience, may affect the progress of construction, and a kind of pipeline construction device proposed.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of pipeline construction device, including the first plier and the second plier, it is solid that first plier is fixedly connected with first Determine rotating plate, shaft is rotatably connected at the described first fixed rotating plate center, is equipped with the first spanner slot in the shaft, described first The first fixed plate is slidably connected on spanner slot inner wall, the side of first fixed plate is fixedly connected with the first spring, described First spring is fixedly connected on the inner wall of the first spanner slot far from one end of the first fixed plate, the inner wall of the first spanner slot On be fixedly connected with first support bar, the first buffer board is fixedly connected in the first support bar, the shaft is fixedly connected There is the second fixed rotating plate, the described first fixed rotating plate and the second fixed rotating plate are fixedly connected to connecting rod, and the connection passes through Attachment device is fixedly connected with handle, and the described second fixed rotating plate is fixedly connected on the second plier, the described second fixed rotating plate It is inside equipped with the second spanner slot, slidably connects the second fixed plate on the second spanner slot inner wall, the one of second fixed plate Side is fixedly connected with second spring, and the second spring is fixedly connected in the second spanner slot far from one end of the second fixed plate On wall, it is fixedly connected with second support bar on the inner wall of the second spanner slot, is fixedly connected in the second support bar Two buffer boards.
Preferably, the attachment device includes cavity, and the cavity is located at handle close to one end of connecting rod, the cavity Third fixed plate is slidably connected on inner wall, the side of the third fixed plate is fixedly connected with third spring, the third bullet Spring is fixedly connected on cavity inner wall far from one end of third fixed plate, and the cavity internal screw thread is connected with nut, the nut One end be fixedly connected in connecting rod, the other end of the nut be against third fixed plate deviate from third spring side.
Preferably, pincers tooth and snips are equipped on first plier and the second plier.
Preferably, the first spanner slot and the second spanner slot are regular hexagon.
Preferably, the handle is equipped with rubber sleeve, and the rubber sleeve is equipped with anti-skid chequer.
Compared with prior art, the utility model has the beneficial effects that setting in the fixed rotating plate two sides of vice, there are two mouths The different spanner slot of diameter, can be used for loading and unloading the screw of different size, and the buffer unit being equipped in spanner slot can make spanner more Screw firmly is blocked, after use, the fixed plate of spanner slot upper end restores to the original state, and covers spanner slot, prevents dust or rainwater Into slot internal corrosion spanner slot, clamping, cutting nippers and spanner can be realized by allowing user that need to only carry a vice when working Function, in this way user at work, alleviate some burdens with it, and vice can load and unload length and size not With handle, facilitate the different people of hand size to use, this can be brought convenience during pipeline construction, promote construction into Exhibition.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of pipeline construction device structural schematic diagram;
Fig. 2 is the cross-sectional view of A-A in Fig. 1;
Fig. 3 be the utility model proposes a kind of pipeline construction device B at positive structure schematic.
In figure: 1 first plier, 2 handles, 3 first fixed rotating plates, 4 first spanner slots, 5 first springs, 6 first are fixed Plate, 7 first buffer boards, 8 first support bars, 9 second spanner slots, 10 second springs, 11 second fixed plates, 12 second buffer boards, 13 second support bars, 14 nuts, 15 cavitys, 16 third fixed plates, 17 third springs, 18 connecting rods, 19 shafts, 20 second are consolidated Determine rotating plate, 21 second pliers.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-3, a kind of pipeline construction device, including the first plier 1 and the second plier 21, the first plier 1 and second Pincers tooth and snips are equipped on plier 21, pincers tooth facilitates clamping iron wire and screw, snips that can cut iron wire, the first plier 1 is fixedly connected with the first fixed rotating plate 3, is fixedly connected with attachment device on the first fixed rotating plate 3, attachment device includes cavity 15, cavity 15 is located at handle 2 and slidably connects third fixed plate 16, third on one end of connecting rod 18,15 inner wall of cavity The side of fixed plate 16 is fixedly connected with third spring 17, and third spring 17 is fixedly connected on far from one end of third fixed plate 16 On 15 inner wall of cavity, 15 internal screw thread of cavity is connected with nut 14, and one end of nut 14 is fixedly connected in connecting rod 18, nut 14 The other end be against third fixed plate 16 deviate from third spring 17 side, in this way, vice can load and unload length and size all Different handles 2, the people for facilitating hand size different use.Shaft 19, shaft are rotatably connected at first fixed 3 center of rotating plate The first spanner slot 4 is equipped in 19, the notch of the first spanner slot 4 is the notch of ting model, and is regular hexagon, facilitates clamping smaller The positive six side screw cap of model, the first fixed plate 6 is slidably connected on 4 inner wall of the first spanner slot, and the side of the first fixed plate 6 is solid Surely it is connected with the first spring 5, the first spring 5 is fixedly connected on the inner wall of the first spanner slot 4 far from one end of the first fixed plate 6 On, it is fixedly connected with first support bar 8 on the inner wall of the first spanner slot 4, the first buffer board is fixedly connected in first support bar 8 7, shaft 19 is fixedly connected with the second fixed rotating plate 20, the first fixed rotating plate 3 and the second fixed 20 company of being fixedly connected to of rotating plate Extension bar 18, the connecting rod 18 are fixedly connected with handle 2 by attachment device, and handle 2 is equipped with rubber sleeve, the rubber sleeve Be equipped with anti-skid chequer, rubber sleeve have insulating effect, anti-skid chequer allow user hand and handle 2 between frictional force it is bigger, grab Stronger, the second fixed rotating plate 20 is fixedly connected on the second plier 21, is equipped with the second spanner slot in the second fixed rotating plate 20 9,9 notch of the second spanner slot is the notch of big model, and is regular hexagon, facilitates the positive six side screw cap of relatively large number of clamping, The second fixed plate 11 is slidably connected on second spanner slot, 9 inner wall, the side of the second fixed plate 11 is fixedly connected with second spring 10, second spring 10 is fixedly connected on the inner wall of the second spanner slot 9 far from one end of the second fixed plate 11, the second spanner slot 9 Inner wall on be fixedly connected with second support bar 13, the second buffer board 12 is fixedly connected in the second support bar 13.
In the utility model, when people use vice to Pipe installing or disassembly, first choice is according to the big of oneself palm Small suitable two handles 2 of selection are mounted in two connecting rods 18 of vice, then in use process, 1 He of the first plier Pincers tooth on second plier 21 can clamp installation folder or iron wire, and the snips on the first plier 1 and the second plier 21 Extra iron wire can be cut off, when pipeline needs fixture nut, it is only necessary to first be put into nut in the threaded hole on pipeline, so Spanner slot 4 or 9 of corresponding size on vice is set to be stuck in one end of nut cap according to the size of nut cap afterwards, when using first When spanner slot 4, at this moment the first fixed plate 3 on the first spanner slot 4 be pressed into slot under the effect of the pressure and with the in slot One buffer board 7 offsets, and nut cap is just stuck in completely in the first spanner slot 4 at this time, and then user rotates handle 2 by hand, makes Nut rapidly enters threaded hole, and pipeline is fixed, only need to be by the first spanner slot 4 from nut after completing fixed to nut It is taken out on cap, the first fixed plate 3 in the first spanner slot 4 can revert to original position under the action of the first 5 elastic force of spring again It sets, the conjunction of the first spanner slot 4 is closed, dust or rainwater is avoided to enter slot internal corrosion cell wall.
Equally, when using the second spanner slot 9, at this moment effect of the second fixed plate 11 on the second spanner slot 9 in pressure Under be pressed into slot and offset with the second buffer board 12 in slot, nut cap is just stuck in completely in the second spanner slot 9 at this time, so User rotates handle 2 by hand afterwards, and nut is made to rapidly enter threaded hole, and pipeline is fixed.After completing fixed to nut, The second spanner slot 9 need to only be taken out from nut cap, the second fixed plate 11 in the second spanner slot 9 again can be in second spring 10 Original position is reverted under the action of elastic force to close the conjunction of the second spanner slot 9, and dust or rainwater is avoided to enter slot internal corrosion slot Wall.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (5)

1. a kind of pipeline construction device, including the first plier (1) and the second plier (21), which is characterized in that first plier (1) first fixed rotating plate (3) are fixedly connected with, are rotatably connected to shaft (19) at described first fixed rotating plate (3) center, it is described It is equipped with the first spanner slot (4) in shaft (19), slidably connects the first fixed plate (6), institute on the first spanner slot (4) inner wall The side for stating the first fixed plate (6) is fixedly connected with the first spring (5), and first spring (5) is far from the first fixed plate (6) One end is fixedly connected on the inner wall of the first spanner slot (4), is fixedly connected with first on the inner wall of the first spanner slot (4) Strut (8) is fixedly connected with the first buffer board (7) on the first support bar (8), and the shaft (19) is fixedly connected with second Fixed rotating plate (20), described first fixed rotating plate (3) and second fixed rotating plate (20) are fixedly connected to connecting rod (18), described Connecting rod (18) is fixedly connected with handle (2) by attachment device, and described second fixed rotating plate (20) are fixedly connected on the second pincers On mouth (21), it is equipped with the second spanner slot (9) in described second fixed rotating plate (20), is slided on the second spanner slot (9) inner wall It being connected with the second fixed plate (11), the side of second fixed plate (11) is fixedly connected with second spring (10), and described second Spring (10) is fixedly connected on the inner wall of the second spanner slot (9) far from the one end of the second fixed plate (11), second spanner It is fixedly connected on the inner wall of slot (9) second support bar (13), is fixedly connected with the second buffering on the second support bar (13) Plate (12).
2. a kind of pipeline construction device according to claim 1, which is characterized in that the attachment device includes cavity (15), the cavity (15) is located at the one end of handle (2) close to connecting rod (18), slidably connects on cavity (15) inner wall The side of third fixed plate (16), the third fixed plate (16) is fixedly connected with third spring (17), the third spring (17) one end far from third fixed plate (16) is fixedly connected on cavity (15) inner wall, and cavity (15) internal screw thread is connected with One end of nut (14), the nut (14) is fixedly connected on connecting rod (18), and the other end of the nut (14) is against Three fixed plates (16) deviate from the side of third spring (17).
3. a kind of pipeline construction device according to claim 1, which is characterized in that first plier (1) and the second pincers Pincers tooth and snips are equipped on mouth (21).
4. a kind of pipeline construction device according to claim 1, which is characterized in that the first spanner slot (4) and second Spanner slot (9) is regular hexagon.
5. a kind of pipeline construction device according to claim 1, which is characterized in that the handle (2) is equipped with rubber sleeve, The rubber sleeve is equipped with anti-skid chequer.
CN201820626731.0U 2018-04-28 2018-04-28 A kind of pipeline construction device Expired - Fee Related CN208323146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820626731.0U CN208323146U (en) 2018-04-28 2018-04-28 A kind of pipeline construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820626731.0U CN208323146U (en) 2018-04-28 2018-04-28 A kind of pipeline construction device

Publications (1)

Publication Number Publication Date
CN208323146U true CN208323146U (en) 2019-01-04

Family

ID=64779093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820626731.0U Expired - Fee Related CN208323146U (en) 2018-04-28 2018-04-28 A kind of pipeline construction device

Country Status (1)

Country Link
CN (1) CN208323146U (en)

Similar Documents

Publication Publication Date Title
CN208323146U (en) A kind of pipeline construction device
CN201574588U (en) Brick clamping device
CN201500940U (en) Multifunctional nippers with warped handle
CN203077166U (en) Water pipe pincers
CN202438640U (en) Steel bar cutting pliers
CN2925764Y (en) Fast integrated pipe tongs
CN201291427Y (en) Spanner
CN108637979A (en) A kind of portable hardware hammer
CN200974211Y (en) Screwdriver
CN201147908Y (en) Wire plier with bended handle
CN201511311U (en) Clamp
CN201524004U (en) Nutcracker
CN201669684U (en) Hammer with nail pulling function
CN210388892U (en) Novel pliers
CN207548609U (en) A kind of Quick-adjusting wrench
CN202667336U (en) Portable aluminum row bender
CN221009455U (en) Multifunctional wire pressing pliers
CN201128118Y (en) Ratchet type pinching tools
CN220243812U (en) Blood sampling bag blocking piece breaker
CN207593718U (en) A kind of Multipurpose manual tool
CN216251551U (en) Multifunctional crimping pliers
CN2723119Y (en) Hand vice
CN204686699U (en) A kind of multifunctional pliers
CN2533982Y (en) Elastic vices
CN101874712B (en) Nutcracker

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104

Termination date: 20190428

CF01 Termination of patent right due to non-payment of annual fee