CN208322482U - A kind of welding wire high speed copper plating production line - Google Patents

A kind of welding wire high speed copper plating production line Download PDF

Info

Publication number
CN208322482U
CN208322482U CN201820658928.2U CN201820658928U CN208322482U CN 208322482 U CN208322482 U CN 208322482U CN 201820658928 U CN201820658928 U CN 201820658928U CN 208322482 U CN208322482 U CN 208322482U
Authority
CN
China
Prior art keywords
welding wire
machine
nozzle
guided mode
grease
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820658928.2U
Other languages
Chinese (zh)
Inventor
袁关兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU XINGGUAN MACHINERY CO Ltd
Original Assignee
HANGZHOU XINGGUAN MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU XINGGUAN MACHINERY CO Ltd filed Critical HANGZHOU XINGGUAN MACHINERY CO Ltd
Priority to CN201820658928.2U priority Critical patent/CN208322482U/en
Application granted granted Critical
Publication of CN208322482U publication Critical patent/CN208322482U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

A kind of welding wire high speed copper plating production line, belong to metal wire material surface coating technology field, including being arranged successively and pay off rack that welding wire raw material sequentially passes through, mechanical descaling machine, belt sander, the first high pressure water washing machine, powder coating machine, rough wire drawing machine, fine wire drawing machine, grease removal machine, the second high pressure water washing machine, copper plating groove, third high pressure water washing machine, air-heater, polishing dragger, admission machine.The utility model changes traditional processing technology, reduces process, removes points of contamination, improves the feature of environmental protection of technique.

Description

A kind of welding wire high speed copper plating production line
Technical field
The utility model belongs to metal wire material surface coating technology field, and in particular to produces for a kind of welding wire high speed copper facing Line.
Background technique
Welding technique plays very important work in fields such as shipbuilding, petrochemical industry, rolling stock, electric power, nuclear reactors With an important branch of the welding wire as welding material, proportion is rising year by year in welding material.
It can make welding wire that there is good electric conductivity and antirust ability in solder wire material copper coating.Currently, existing weldering Wire copper plating process is divided into rough, finish draw and copper facing three process based on expansion bull copper facing, by it after the completion of wire drawing Then winding arrives plating copper process again and carries out welding wire surface copper facing in I-beam wheel.
Conventional carbon dioxide gas protecting welding wire production process is as follows:
First procedure: raw material → unwrapping wire → mechanical descaling → acid pickling and rust removing → washing → painting boron → drying of Φ 5.5mm → rough → semi-finished product spool spooling.
Second operation work: semi-finished product I-beam wheel unwrapping wire → finish draw → semi-finished product spool spooling.
Third procedure: semi-finished product I-beam wheel unwrapping wire → sand washing → alkali cleaning → washing → pickling → washing → copper facing → cold water Wash → neutralize → hot water wash → drying → polishing → quasi- finished product spool spooling.
Above-mentioned production process, the quasi- semi-finished product of the surface plated with copper from the raw material of Φ 5.5mm to Φ 1.2mm-Φ 0.8mm, It takes a three-stage approach, complex process.
There are 5 main points of contamination for above-mentioned production process: " pickling " of 1. first procedures;2. the first procedure " applying boron ";" alkali cleaning " 3. of third procedure;" pickling " 4. of third procedure;" neutralization " 5. of third procedure.In improvement The expenses of environmental protection for stating 5 points of contamination is higher, and the wasting of resources is than more serious.For example, carrying out chemical derusting using pickling will generate greatly The acid mist of amount, acid etching is serious, and waste acid quantity is very big, while generating a large amount of pickling waste waters.
There are 4 processes that energy consumption is high for above-mentioned production process: " drying " of 1. first procedures;2. first, second " the rough, finish draw " of process, using " variable-frequency motor ";3. " alkali cleaning " of third procedure needs to heat;4. third procedure " drying " need to heat.Above-mentioned operation energy consumption is higher, and operating cost is high.
In addition, traditional copper facing is multi-thread expansion, pollution is big, environment is poor, and energy consumption is high, takes up a large area.Three process, dress Machine capacity 400Kw or so, energy consumption is high, and generally requires 10 people operators, and human cost is high.
Utility model content
The purpose of the utility model is to overcome defect mentioned above and deficiencies, and propose a kind of welding wire high speed copper facing production Line.
The utility model realizes its purpose, and the technical solutions adopted are as follows.
A kind of welding wire high speed copper plating production line, including being arranged successively and pay off rack that welding wire raw material sequentially passes through, mechanical stripping Shell machine, belt sander, the first high pressure water washing machine, powder coating machine, rough wire drawing machine, fine wire drawing machine, grease removal machine, the second high-pressure washing Machine, copper plating groove, third high pressure water washing machine, air-heater, polishing dragger, admission machine.
The pay off rack is double-station fluid pressure type pay off rack;The admission machine is Double-plate wire-rewinding machine.
The first high pressure water washing machine, the second high pressure water washing machine, third high pressure water washing machine include include catch basin, high pressure Pump, nozzle, rinsing bowl, return pipe, jet mechanism, filter mechanism;The nozzle is mounted on inside rinsing bowl, and is come towards welding wire Direction;The nozzle is installed on water tool apron;The water tool apron is fixedly installed in plate;Nozzle on same plate is with welding wire original Material is that angularly ring is set in the center of circle;The nozzle inclination setting.
The catch basin is equipped with heating device;The catch basin is connected with high-pressure pump by wired hose;Wired hose One end connects catch basin, and the other end connects the input terminal of high-pressure pump;The high-pressure pump is connected with nozzle by high-pressure rubber pipe;It is described High-pressure rubber pipe one end connects high pressure pump output terminal, and the other end connects nozzle;The high pressure pump output terminal is equipped with relief valve and peace Full valve;The rinsing bowl is equipped with welding wire raw material;Guided mode before the washing front of the slot is equipped with first, after rear end is equipped with first Guided mode, guided mode after guided mode and first before welding wire is arranged in first;Water fender is rotatably equipped at the top of the rinsing bowl;The washing Plate is arranged at intervals in slot, welding wire raw material is arranged in plate;The angle of nozzle and welding wire is 30 ° ~ 70 °, on same plate Nozzle has 4;The jet mechanism includes gas nozzle, gas nozzle seat;The gas nozzle is divided into nozzle front and rear sides, and towards nozzle; The gas nozzle is installed on gas nozzle seat;The gas nozzle seat is installed on plate;Middle guided mode is installed, welding wire is arranged in inside the gas nozzle Middle guided mode and gas nozzle;Described return pipe one end connects rinsing bowl, and the other end connects filter mechanism;The filter mechanism includes light Axis puts paper bowl, porous plate, winding roll, roll paper motor;The optical axis is equipped with filtering paper bobbin, filters paper bobbin by filter paper It is wound into cylinder;The filter paper is layed in above porous plate after over-discharge paper bowl, and filter paper end is wound in winding roll;The volume The rotation of paper motor driven winding roll;The porous plate is located above catch basin;The filter paper is located above catch basin, and is located at The lower section of return water pipe end.
The powder coating machine includes feeding chamber, feeding mechanism, mention material chamber, material lifting mechanism, guided mode after guided mode and third before third; The feeding mechanism includes the first motor and the first threaded rod;First threaded rod is arranged in feeding chamber, one end connection the One motor, other end direction mention material chamber;First threaded rod is horizontally disposed;The feeding top of chamber offers first and enters powder Hole;Dust catcher is fixedly installed with above the feeding chamber;Described mention expects that chamber and feeding chamber are interconnected;The material lifting mechanism includes Second motor, the second threaded rod, press-powder pipe;Second threaded rod, which is arranged in, mentions material chamber, and one end connects the second motor;Institute It states the second threaded rod and erects setting;Second threaded rod and the coaxial arrangement of press-powder pipe, and the second threaded rod is arranged in press-powder pipe; Described mention expects that top of chamber offers second and enters powder hole.
The grease removal machine includes including guided mode, second before reservoir, heating rod, drinking-water pipe, suction pump, grease-removal tank, second Guided mode, Jia Mo mechanism afterwards;The heating rod is inserted in reservoir;Described drinking-water pipe one end is inserted in reservoir, other end connection Grease-removal tank, and drinking-water pipe is equipped with suction pump;Guided mode before the grease-removal tank side is equipped with second, after the other side is equipped with second Guided mode;The grease-removal tank both ends offer leakage hole, and leakage hole is located at the surface of reservoir;Water blocking is provided on the inside of leakage hole There are gaps between at the top of siding, water blocking siding and grease-removal tank;The Jia Mo mechanism includes the clamping bar and swing rod being arranged in pairs; Scrubbing cloth is installed on the inside of the clamping bar;In grease-removal tank inner wall, the other end is mutually contacted with swing rod for clamping bar one end rotational installation; In grease-removal tank inner wall, inside and the clamping bar of the other end are touched for swing rod one end rotational installation.
The utility model changes traditional processing technology, reduces process, replaces passing with belt sander derusting and high-pressure washing Pickling, washing in system the first procedure of technique, are replaced in traditional handicraft third procedure with mechanical grease removal and high-pressure washing Sand washing, alkali cleaning, washing, pickling, washing remove points of contamination, improve the feature of environmental protection of technique.In addition, the utility model is mechanical Dusting replaces painting boron and drying in the first procedure of traditional handicraft, replaces traditional handicraft third with high-pressure washing and hot blast drying Cold water in procedure is washed, is neutralized, hot water wash and drying, rough and finish draw have used magneto as power, improved work The energy saving of skill.
The utility model high degree of automation, 1 operator can guard 2 production lines simultaneously, save manpower at This, and the installed capacity 290Kw or so of this production line, low energy consumption.
Detailed description of the invention
Fig. 1 is the flow chart of the utility model;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the schematic view of the front view of high pressure water washing machine;
Fig. 4 is the overlooking structure diagram of high pressure water washing machine;
Fig. 5 is the side structure schematic view of high pressure water washing machine;
Fig. 6 is the schematic view of the front view of grease removal machine;
Fig. 7 is the overlooking structure diagram of grease removal machine;
Fig. 8 is the left view structural representation of grease removal machine;
Fig. 9 is the unfolding state figure of grease removal Ji Jiamo mechanism;
Figure 10 is the closed state figure of grease removal Ji Jiamo mechanism;
Figure 11 is the schematic view of the front view of powder coating machine;
Figure 12 is the right side structural representation of powder coating machine;
Figure 13 is the overlooking structure diagram of powder coating machine;
In figure: pay off rack 1, mechanical descaling machine 2, belt sander 3, the first high pressure water washing machine 4, powder coating machine 5, rough wire drawing machine 6, Fine wire drawing machine 7, grease removal machine 8, the second high pressure water washing machine 9, copper plating groove 10, third high pressure water washing machine 11, air-heater 12, polishing are led Draw machine 13, admission machine 14,
Catch basin a1, wired hose a3, high-pressure pump a4, relief valve a5, safety valve a6, high-pressure rubber pipe a7, nozzle a8, water knife Seat a9, rinsing bowl a10, guided mode a12, water fender a13, plate a14, gas nozzle a15, gas nozzle seat after guided mode a11, first before first A16, middle guided mode a17, return pipe a18, filtering paper bobbin a19, filter paper a20, optical axis a21, put paper bowl a22, porous plate a23, Winding roll a24, roll paper motor a25;
Guided mode after guided mode b6, second before reservoir b1, heating rod b2, drinking-water pipe b3, suction pump b4, grease-removal tank b5, second B7, leakage hole b8, water blocking siding b9, Jia Mo mechanism b10, clamping bar b11, fixed plate b12, scrubbing cloth b13, swing rod b14;
Feeding chamber c1, the first motor c2, dust catcher c3, the first threaded rod c4, first enter powder hole c5, mention material chamber c6, the Two motor c7, the second threaded rod c8, press-powder pipe c9, second enter before powder hole c10, third guided mode c12 after guided mode c11, third.
Specific embodiment
With reference to the accompanying drawing, the utility model is described in further detail.
A kind of welding wire high speed copper facing production technology, comprising the following steps:
S1: unwrapping wire unwrapping wire: is carried out to welding wire raw material.Further, welding wire raw material uses the welding wire raw material of Φ 5.5mm.Weldering Silk carries out unwrapping wire by pay off rack 1, preferably, the pay off rack 1 is double-station fluid pressure type pay off rack.
S2: mechanical descaling: the welding wire raw material after unwrapping wire is subjected to mechanical descaling by mechanical descaling machine 2, is played pre- Welding wire surface oxide skin is handled, while welding wire is straightened.
S3: derusting: the welding wire raw material after mechanical descaling is subjected to mechanical abrasive band derusting by belt sander 3, removes welding wire The oxide skin on raw material surface.
S4: the welding wire raw material after derusting first time high-pressure washing: is subjected to high-pressure washing, removal weldering by high pressure water washing machine The residual impurity on silk raw material surface.
S5: mechanical dusting: the welding wire raw material after high-pressure washing is subjected to mechanical dusting by powder coating machine, in welding wire original Material surface, which applies, applies lubricant.
S6: rough and finish draw: carrying out rough and finish draw into machine and finish draw machine excessively for the welding wire raw material after mechanical dusting, Obtain welding wire semi-finished product.Machine and finish draw machine carry out tube reducing drawing to welding wire raw material, the size requirement of welding wire needed for being made.
S7: mechanical grease removal, removal weldering mechanical grease removal: are carried out into grease removal machine is crossed to the welding wire semi-finished product after rough and finish draw The surface lubricant of silk semi-finished product.
S8: second high-pressure washing: carrying out high-pressure washing by high pressure water washing machine for the welding wire semi-finished product after mechanical grease removal, Further remove the surface lubricant residual and surface impurity of welding wire semi-finished product.
S9: high speed copper facing: by the welding wire semi-finished product after high-pressure washing by copper plating groove carry out high speed copper facing, obtain welding wire at Product.
S10: third time high-pressure washing: carrying out high-pressure washing by high pressure water washing machine for the welding wire finished product after high speed copper facing, Remove the surface impurity of welding wire semi-finished product.
S11: the welding wire finished product after high-pressure washing hot blast drying: is subjected to hot blast drying by air-heater.
S12: polishing: the welding wire finished product after hot blast drying is polished by polishing dragger.
S13: the welding wire finished product after polishing take-up: is subjected to take-up by admission machine.
A kind of welding wire high speed copper plating production line, including the pay off rack 1, mechanical descaling machine 2, belt sander 3, first being arranged successively High pressure water washing machine 4, powder coating machine 5, rough wire drawing machine 6, fine wire drawing machine 7, grease removal machine 8, the second high pressure water washing machine 9, copper plating groove 10, Third high pressure water washing machine 11, air-heater 12, polishing dragger 13, admission machine 14.
Preferably, the pay off rack 1 is double-station fluid pressure type pay off rack.
The mechanical descaling device that the mechanical descaling machine 2 is produced using Hangzhou astral crowne machinery Science and Technology Ltd..Equipment type Number XG-8/150, which plays pretreatment wire rod surface scale, while wire rod is straightened.
The first high pressure water washing machine 4, the second high pressure water washing machine 9, third high pressure water washing machine 11 include including catch basin A1, high-pressure pump a4, nozzle a8, rinsing bowl a10, return pipe a18, jet mechanism, filter mechanism.
The catch basin a1 is equipped with heating device.Storing in catch basin a1 has hot water.Heating device heats hot water, Water temperature is set to maintain certain temperature (such as 80 °).Hot water is more advantageous to removal welding wire surface impurity.
The high-pressure pump a4 input terminal connects catch basin a1 by pipeline.Further, the catch basin a1 and high-pressure pump A4 is connected by wired hose a3;The one end wired hose a3 connects catch basin a1, and the other end connects the input terminal of high-pressure pump a4.
The high-pressure pump a4 output end connects nozzle a8 by pipeline.Further, the high-pressure pump a4 and nozzle a8 is logical Cross high-pressure rubber pipe a7 connection;The one end the high-pressure rubber pipe a7 connects high-pressure pump a4 output end, and the other end connects nozzle a8;The height Press pump a4 output end is equipped with relief valve a5 and safety valve a6.
The rinsing bowl a10 is equipped with welding wire.Guided mode a11 before the front end the rinsing bowl a10 is equipped with first, rear end installation Guided mode a12 after having first, guided mode a12 after guided mode a11 and first before welding wire is arranged in first.Before first after guided mode a11 and first The setting of guided mode a12 is used for stretching and drawing welding wire.
Water fender a13 is rotatably equipped at the top of the rinsing bowl a10.It is the sky of a relative closure inside rinsing bowl a10 Between.The setting of water fender a13 avoids the water spray of high speed from splashing out from top and hurts sb.'s feelings.
Plate a14 is arranged at intervals in the rinsing bowl a10, welding wire is arranged in plate a14.Plate a14 is by rinsing bowl The inner space a10 is separated out several regions.Plate a14 is fixing device, guiding water flow and preventing the water spray of high speed from splashing out.
The nozzle a8 is mounted on inside rinsing bowl a10, and towards welding wire.The nozzle a8 is installed on water tool apron a9;Institute It states water tool apron a9 and is fixedly installed in plate a14;Using welding wire as the center of circle, angularly ring is set nozzle a8 on same plate a14.It is described Nozzle a8 is obliquely installed, preferably, the angle of nozzle a8 and welding wire is 30 ° ~ 70 °, the nozzle a8 on same plate a14 has 4 It is a.
The jet mechanism includes gas nozzle a15, gas nozzle seat a16;The gas nozzle a15 is divided into the front and rear sides nozzle a8, and Towards nozzle a8;The gas nozzle a15 is installed on gas nozzle seat a16;The gas nozzle seat a16 is installed on plate a14;The gas nozzle a15 Inside is equipped with middle guided mode a17, and welding wire is arranged in middle guided mode a17 and gas nozzle a15.Gas nozzle a15 connects cylinder by conduit, this is Routine techniques.
The setting of jet mechanism, to prevent the water spray of high speed from splashing out from front and back end.The plate of the rear and front end rinsing bowl a10 A14 plays the role of certain water blocking, but since welding wire passes through plate a14, there are gap, water sprays between plate a14 and welding wire Easily splashed out from the gap.The air-flow that jet mechanism generates is blown from the rear and front end rinsing bowl a10 toward centre, and playing prevents high speed The effect sprayed water from the gap spillage between plate a14 and welding wire.The work for preventing welding wire from shaking is played in the setting of middle guided mode a17 With.
The one end the return pipe a18 connects rinsing bowl a10, and the other end connects filter mechanism.
The filter mechanism includes optical axis a21, puts paper bowl a22, porous plate a23, winding roll a24, roll paper motor a25;Institute It states optical axis a21 and filtering paper bobbin a19 is installed, filter paper bobbin a19 by filter paper a20 and be wound into cylinder;The filter paper a20 around It is layed in after over-discharge paper bowl a22 above porous plate a23, the end filter paper a20 is wound in winding roll a24;The roll paper motor a25 Drive winding roll a24 rotation;The porous plate a23 is located above catch basin a1.The filter paper a20 is located on catch basin a1 Side, and it is located at the lower section of the end return pipe a18.Further, roll paper motor a25 output end is equipped with driving gear, winding roll A24 is coaxially installed with the driven gear engaged with driving gear.Roll paper motor a25 drives volume by driving gear, driven gear Paper bowl a24 movement.
When this high pressure water washing machine works, heating device is powered, so that the hot water of catch basin a1 is in the condition of high temperature.High-pressure pump Hot water is sucked out from catch basin a1, and sprays to welding wire by a4 movement, cleans the impurity of welding wire surface.The setting of jet mechanism, to Prevent the water spray of high speed from splashing out from front and back end.The hot water that impurity is had in rinsing bowl a10 reaches filter by return pipe a18 Structure returns to catch basin a1 from porous plate a23, completes the circulation of hot water after filter paper a20 filtering.On filter paper a20 When impurity deposits to a certain amount of, roll paper motor a25 movement winds old filter paper a20, so that being laid on porous plate a23 new Filter paper a20, guarantee the filter effect of filter mechanism.
This high pressure water washing machine completes the removal to the impurity of welding wire surface, phase by the hot water of the ejection high speed from nozzle For traditional pickling, alkali cleaning, small pollution of the environment, working environment is good.The hot water of the present apparatus is in the environment of relative closure Circulation is completed, heat abstraction is few, and energy utilization rate is high, energy-efficient.Also, the present apparatus is realized miscellaneous by setting filter mechanism The collection of matter guarantees that the long-time of device is effectively run.
The powder coating machine 5 includes feeding chamber c1, feeding mechanism, mention material chamber c6, material lifting mechanism, guided mode c11 and the before third Guided mode c12 after three.
The feeding mechanism includes the first motor c2 and the first threaded rod c4;The first threaded rod c4 is arranged in feeding Chamber c1, one end connect the first motor c2, and other end direction mentions material chamber c6;The first threaded rod c4 is horizontally disposed.
First, which is offered, at the top of the feeding chamber c1 enters powder hole c5;Dust catcher is fixedly installed with above the feeding chamber c1 c3。
The material chamber c6 and feeding chamber c1 that mentions is interconnected;The material lifting mechanism includes the second motor c7, the second screw thread Bar c8, press-powder pipe c9;The second threaded rod c8, which is arranged in, mentions material chamber c6, and one end connects the second motor c7;Second spiral shell Rasp bar c8 erects setting;The second threaded rod c8 and press-powder pipe c9 coaxial arrangement, and the second threaded rod c8 is arranged in press-powder pipe c9.Described mention expects that offering second at the top of chamber c6 enters powder hole c10.
Guided mode c12 is divided into the two sides of rack after guided mode c11 and third before the third.
Welding wire raw material sequentially passes through guided mode c11 before third, mentions guided mode c12 after material chamber c6, feeding chamber c1 and third.Second electricity Motivation c7 drives the second threaded rod c8 rotation, and powder sweeps along lower entrance press-powder pipe c9 and uplink in the second threaded rod c8.Welding wire is former For material across when press-powder pipe c9, powder is coated on welding wire raw material surface under the effect of the pressure.The powder of welding wire raw material excess surface Material falls into feeding chamber c1 when passing through feeding chamber c1, is recycled under the action of feeding mechanism and mentions material chamber c6, completes following for clout Ring uses.
When adding powder, powder is added first and enters powder hole c5, to increase the powder amount in feeding chamber c1;Powder is added second Enter powder hole c10, to increase the powder amount proposed in material chamber c6.
Powder is coated on welding wire raw material surface by material lifting mechanism, eliminates the drying in conventional apparatus by this powder coating machine 5 Mechanism, low energy consumption, pollution-free, and occupied area is small.And the present apparatus realizes that the circulation of clout makes by setting feeding mechanism With.
One group of mold is provided with inside the rough wire drawing machine 6 and fine wire drawing machine 7, circulating cooling is arranged in mold exterior Water.Preferably, the rough wire drawing machine 6 is commercially available LZ560/7 straight drawing machine;The fine wire drawing machine 7 is commercially available LZ400/8 straight drawing machine.
The grease removal machine 8 includes including reservoir b1, heating rod b2, drinking-water pipe b3, suction pump b4, grease-removal tank b5, second Guided mode b7, Jia Mo mechanism b10 after preceding guided mode b6, second.
The heating rod b2 is inserted in reservoir b1;The one end the drinking-water pipe b3 is inserted in reservoir b1, other end connection Grease-removal tank b5, and drinking-water pipe b3 is equipped with suction pump b4;Guided mode b6 before the side the grease-removal tank b5 is equipped with second, other side peace Equipped with guided mode b7 after second.
The both ends the grease-removal tank b5 offer leakage hole b8, and leakage hole b8 is located at the surface of reservoir b1;Leakage hole b8 Inside is provided with water blocking siding b9, at the top of water blocking siding b9 and grease-removal tank b5 between there are gaps.
The Jia Mo mechanism b10 includes the clamping bar b11 and swing rod b14 being arranged in pairs;Installation on the inside of the clamping bar b11 There is scrubbing cloth b13.Preferably, the clamping bar b11 installs scrubbing cloth b13 by fixed plate b12;It is solid on the inside of the clamping bar b11 Surely there is fixed plate b12;The fixed plate b12 is fixedly installed with scrubbing cloth b13.More preferably, the scrubbing cloth b13 is cleaning Cloth or scouring pad.
The one end the clamping bar b11 is rotatablely installed in grease-removal tank b5 inner wall, and the other end is contacted with swing rod b14 phase;The swing rod The one end b14 is rotatablely installed in grease-removal tank b5 inner wall, and inside and the clamping bar b11 of the other end are touched.The clamping bar b11 that is arranged in pairs and In swing rod b14,2 clamping bar b11 are divided into welding wire two sides, and 2 swing rod b14 are divided into welding wire two sides.The swing rod b14 connection gas Cylinder or other power devices.
When this grease removal machine works, reservoir b1 stores under the action of heating rod b2 high-temperature water.High temperature water flow is through drinking-water pipe B3 reaches grease-removal tank b5 and floods Jia Mo mechanism b10.From second after guided mode b6, Jia Mo mechanism b10 before welding wire sequentially passes through second Guided mode b7 is stretched and is gone out afterwards.The swing rod b14 is drawn close, to drive clamping bar b11 under the action of power device toward welding wire side It is acted toward welding wire side, scrubbing cloth b13 wraps welding wire, welding wire axial translation, to mechanically remove the sundries of welding wire surface. Reservoir b1 is flowed back in gap of the extra high-temperature water between water blocking siding b9 and the top grease-removal tank b5 in grease-removal tank b5.
This grease removal machine, structure is simple, at low cost, reliable and stable, is rapidly performed by degreasing processing, section by mechanical mode It can environmental protection.Jia Mo mechanism is installed on inside grease-removal tank, prevents dust from spreading, the dust substance after can focusing on degreasing.
The belt sander 3, copper plating groove 10, air-heater 12, polishing dragger 13, admission machine 14 are commercially available device.
The utility model is illustrated according to embodiment, and under the premise of not departing from present principles, the present apparatus can also be made Several modifications and improvements out.It should be pointed out that all using the modes technical solutions obtained such as equivalent substitution or equivalent transformation, example Such as: changing unwrapping wire form, cord reeling method, change form etc. of peeling off, all fall in the protection scope of the utility model.

Claims (6)

1. a kind of welding wire high speed copper plating production line, which is characterized in that including the unwrapping wire being arranged successively and welding wire raw material sequentially passes through Frame (1), mechanical descaling machine (2), belt sander (3), the first high pressure water washing machine (4), powder coating machine (5), rough wire drawing machine (6), finish draw Wire drawing machine (7), grease removal machine (8), the second high pressure water washing machine (9), copper plating groove (10), third high pressure water washing machine (11), air-heater (12), dragger (13), admission machine (14) are polished.
2. a kind of welding wire high speed copper plating production line as described in claim 1, which is characterized in that the first high pressure water washing machine (4), the second high pressure water washing machine (9), third high pressure water washing machine (11) include catch basin (a1), high-pressure pump (a4), nozzle (a8), Rinsing bowl (a10), return pipe (a18), jet mechanism, filter mechanism;The nozzle (a8) is mounted on rinsing bowl (a10) inside, And the direction come towards welding wire;The nozzle (a8) is installed on water tool apron (a9);The water tool apron (a9) is fixedly installed in plate (a14);Using welding wire raw material as the center of circle, angularly ring is set nozzle (a8) on same plate (a14);Nozzle (a8) inclination is set It sets.
3. a kind of welding wire high speed copper plating production line as claimed in claim 2, which is characterized in that the catch basin (a1) is equipped with Heating device;The catch basin (a1) and high-pressure pump (a4) are connected by wired hose (a3);The connection of wired hose one end (a3) Catch basin (a1), the other end connect the input terminal of high-pressure pump (a4);The high-pressure pump (a4) and nozzle (a8) pass through high-pressure rubber pipe (a7) it connects;Described high-pressure rubber pipe one end (a7) connects high-pressure pump (a4) output end, and the other end connects nozzle (a8);The high pressure Pump (a4) output end is equipped with relief valve (a5) and safety valve (a6);The rinsing bowl (a10) is equipped with welding wire raw material;The water Guided mode (a11) before the front end washing trough (a10) is equipped with first, guided mode (a12) after rear end is equipped with first, before welding wire is arranged in first Guided mode (a12) after guided mode (a11) and first;Water fender (a13) is rotatably equipped at the top of the rinsing bowl (a10);The washing It is arranged at intervals with plate (a14) in slot (a10), welding wire raw material is arranged in plate (a14);Nozzle (a8) and the angle of welding wire are 30 ° ~ 70 °, the nozzle (a8) on same plate (a14) has 4;The jet mechanism includes gas nozzle (a15), gas nozzle seat (a16); The gas nozzle (a15) is divided into the front and rear sides nozzle (a8), and towards nozzle (a8);The gas nozzle (a15) is installed on gas nozzle seat (a16);The gas nozzle seat (a16) is installed on plate (a14);Middle guided mode (a17), welding wire are installed inside the gas nozzle (a15) It is arranged in middle guided mode (a17) and gas nozzle (a15);Described return pipe one end (a18) connects rinsing bowl (a10), and the other end connected Filter structure;The filter mechanism includes optical axis (a21), puts paper bowl (a22), porous plate (a23), winding roll (a24), roll paper motor (a25);The optical axis (a21) is equipped with filtering paper bobbin (a19), and filtering paper bobbin (a19) is wound by filter paper (a20) Cylinder;The filter paper (a20) is layed in above porous plate (a23) after over-discharge paper bowl (a22), the filter paper end (a20) winding In winding roll (a24);Roll paper motor (a25) driving winding roll (a24) rotation;The porous plate (a23) is located at catch basin (a1) top;The filter paper (a20) is located above catch basin (a1), and is located at the lower section of the end return pipe (a18).
4. a kind of welding wire high speed copper plating production line as described in claim 1, which is characterized in that the powder coating machine (5) includes sending Material chamber (c1), feeding mechanism mention material chamber (c6), material lifting mechanism, guided mode (c12) after guided mode (c11) and third before third;It is described to send Expect that mechanism includes the first motor (c2) and the first threaded rod (c4);First threaded rod (c4) is arranged in feeding chamber (c1), One end connects the first motor (c2), and other end direction mentions material chamber (c6);First threaded rod (c4) is horizontally disposed;It is described to send First, which is offered, at the top of material chamber (c1) enters powder hole (c5);Dust catcher (c3) is fixedly installed with above the feeding chamber (c1);It is described It mentions material chamber (c6) and feeding chamber (c1) is interconnected;The material lifting mechanism include the second motor (c7), the second threaded rod (c8), Press-powder pipe (c9);Second threaded rod (c8), which is arranged in, mentions material chamber (c6), and one end connects the second motor (c7);Described second Threaded rod (c8) erects setting;Second threaded rod (c8) and press-powder pipe (c9) coaxial arrangement, and the second threaded rod (c8) is worn Set on press-powder pipe (c9);Described mention expects that offering second at the top of chamber (c6) enters powder hole (c10).
5. a kind of welding wire high speed copper plating production line as described in claim 1, which is characterized in that the grease removal machine (8) includes storing It is led after guided mode (b6), second before pond (b1), heating rod (b2), drinking-water pipe (b3), suction pump (b4), grease-removal tank (b5), second Mould (b7), Jia Mo mechanism (b10);The heating rod (b2) is inserted in reservoir (b1);Described drinking-water pipe (b3) one end is inserted in Reservoir (b1), the other end is connected to grease-removal tank (b5), and drinking-water pipe (b3) is equipped with suction pump (b4);The grease-removal tank (b5) one Guided mode (b6) before side is equipped with second, guided mode (b7) after the other side is equipped with second;Grease-removal tank (b5) both ends offer leakage Water hole (b8), leakage hole (b8) are located at the surface of reservoir (b1);It is provided with water blocking siding (b9), keeps off on the inside of leakage hole (b8) There are gaps between at the top of water siding (b9) and grease-removal tank (b5);The Jia Mo mechanism (b10) includes the clamping bar being arranged in pairs (b11) and swing rod (b14);Scrubbing cloth (b13) is installed on the inside of the clamping bar (b11);Clamping bar one end (b11) rotational installation In grease-removal tank (b5) inner wall, the other end is mutually contacted with swing rod (b14);Swing rod one end (b14) rotational installation is in grease-removal tank (b5) inner wall, inside and the clamping bar (b11) of the other end touch.
6. a kind of welding wire high speed copper plating production line as described in claim 1, which is characterized in that the pay off rack (1) is duplex Position fluid pressure type pay off rack;The admission machine (14) is Double-plate wire-rewinding machine.
CN201820658928.2U 2018-05-04 2018-05-04 A kind of welding wire high speed copper plating production line Active CN208322482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820658928.2U CN208322482U (en) 2018-05-04 2018-05-04 A kind of welding wire high speed copper plating production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820658928.2U CN208322482U (en) 2018-05-04 2018-05-04 A kind of welding wire high speed copper plating production line

Publications (1)

Publication Number Publication Date
CN208322482U true CN208322482U (en) 2019-01-04

Family

ID=64776605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820658928.2U Active CN208322482U (en) 2018-05-04 2018-05-04 A kind of welding wire high speed copper plating production line

Country Status (1)

Country Link
CN (1) CN208322482U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108372373A (en) * 2018-05-04 2018-08-07 杭州星冠机械科技有限公司 A kind of welding wire high speed copper facing production technology and production line
CN111957454A (en) * 2020-08-27 2020-11-20 济南东方结晶器有限公司 Nozzle for wire and method for coating surface coating of wire

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108372373A (en) * 2018-05-04 2018-08-07 杭州星冠机械科技有限公司 A kind of welding wire high speed copper facing production technology and production line
CN108372373B (en) * 2018-05-04 2023-12-08 杭州星冠机械科技有限公司 Welding wire high-speed copper plating production process and production line
CN111957454A (en) * 2020-08-27 2020-11-20 济南东方结晶器有限公司 Nozzle for wire and method for coating surface coating of wire

Similar Documents

Publication Publication Date Title
CN108372373A (en) A kind of welding wire high speed copper facing production technology and production line
CN110860416A (en) Color steel plate drying and spraying machine integrating alkali washing, degreasing and drying
CN205926377U (en) Efficient copper strips belt cleaning device
CN105921433B (en) Pass through formula cleaning device and its cleaning method
CN114023674B (en) Lead frame surface treatment device based on integrated circuit
CN208322482U (en) A kind of welding wire high speed copper plating production line
CN213925386U (en) Cloth belt cleaning device is used in clothing production
CN204303465U (en) A kind of for the cooling cleaning device in cable production technology
CN111644316A (en) Automatic coating equipment for battery processing
CN104128384A (en) Brass wire drawing technology
CN210701327U (en) Cleaning device for machine tool equipment
CN208695726U (en) A kind of automatic pad system
CN210701278U (en) Cleaning device for mechanical automation processing
CN211160824U (en) Annealing copper line belt cleaning device
CN219410056U (en) Surface treatment equipment for textile cotton yarn
CN117089853A (en) Dirty printing pickling device for surface of stainless steel broad panel and pickling process thereof
CN217254909U (en) Cleaning device for machining of numerical control lathe of stainless steel stamping part
CN202530162U (en) Chemical copper plating production line of solder wire
CN211757161U (en) Steel band belt cleaning device
CN215656700U (en) Cleaning device with recycling function for chemical plant equipment
CN205685131U (en) A kind of cleaning device for copper strip
CN213378547U (en) Multiple cooling mechanism of metal wire drawing machine
CN112337904B (en) Steel pipe online cleaning system
CN205283951U (en) Preceding processing apparatus is welded in hindering of production HDI board
CN212494171U (en) Electrophoresis application is with wasing filter equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant