Utility model content
For above-mentioned technical problem in the related technology, the utility model proposes a kind of all-weathers for railway building
Monitoring system can be monitored in real time and be assessed to the railway buildings state such as bridge.
To realize the above-mentioned technical purpose, the technical solution of the utility model is achieved in that
A kind of all-weather monitoring system for railway building, including data center, the data center are separately connected
There are battery, 4G module and data transmission board, the data transmission board is connected with the integrated sensor being set on railway building,
The integrated sensor includes accelerometer, gyroscope and three axle magnetometer, and the 4G module wireless communication is connected with backstage and takes
Business device.
Further, the data center includes single-chip microcontroller.
Further, the single-chip microcontroller connects the data transmission board by UART4.
Further, the single-chip microcontroller connects the 4G module by UART5.
Further, the data center is defeated by the power supply for being provided with data transmission board described in the connection of relay
Inbound port.
Further, the data transmission board is 485 communication boards.
Further, the model MPU-9250 of the integrated sensor.
The utility model has the beneficial effects that acceleration, inclined degree during being shaken to railway buildings such as bridges
It is equal effectively to be monitored, it is monitored in real time and is assessed so as to the state to railway building, it is situation of being on active service to it, firm
Property, durability and bearing capacity are assessed, and provide foundation and guidance for the maintenance, maintenance and administrative decision of bridge, can be with
Railroad bridge operation data is accumulated, provides reference for subsequent design.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to
In the range of the utility model protection.
As shown in Figure 1, a kind of all-weather monitoring system for railway building according to the utility model embodiment
System, including data center, the data center are connected separately with battery, 4G module and data transmission board, the data transmission board
It is connected with the integrated sensor being set on railway building, the integrated sensor includes accelerometer, gyroscope and three axis
Magnetometer, the 4G module wireless communication are connected with background server.
In a specific embodiment of the utility model, the data center includes single-chip microcontroller.
In a specific embodiment of the utility model, the single-chip microcontroller connects the data transmission board by UART4.
In a specific embodiment of the utility model, the single-chip microcontroller connects the 4G module by UART5.
In a specific embodiment of the utility model, the data center is by being provided with the connection of relay
The power input port of the data transmission board.
In a specific embodiment of the utility model, the data transmission board is 485 communication boards.
In a specific embodiment of the utility model, the model MPU-9250 of the integrated sensor.
In order to facilitate the above-mentioned technical proposal for understanding the utility model, below by way of practical new to this in specifically used mode
The above-mentioned technical proposal of type is described in detail.
Since the railway buildings such as bridge are complicated along thread environment, physical space is limited, monitoring information amount is big, position dynamic
And reasons, the not competent railway building safety monitoring transmission of traditional wired communication mode such as wired power supply is limited are wanted
It asks, communication can solve the problems, such as this.Since wireless communication technique is not required to transmission line, it is more there is no data line and chaotic and
The big equal trouble of wiring operation amount, brings convenience for engineering construction.
All-weather monitoring system (hereinafter referred to as monitoring system) described in the utility model for railway building is furnished with
4G module has the function of 4G network, and the acceleration of object that real-time measurement arrives under vibrating state can be passed through to mobile 4G net
Network is sent to cloud service platform, realizes the real-time Transmission of data.
Data center includes single-chip microcontroller, and the battery of 24V is used to power, and data center is realized by relay and passed to data
Input board and the control of the timing power supply of 4G module.
Data center sends data acquisition instructions by UART4, and integrated sensor acquisition real time data passes to data transmission
Plate passes to data center through UART4 again.
Data center sends instructions to 4G module by UART5, and 4G module is there are the data in data center to be uploaded to
Background server.
Integrated sensor is made of multiple concatenated sensors, these sensors can be accelerometer, gyroscope and three
Axis magnetometer etc..
The model MPU-9250, MPU-9250 of integrated sensor are by six axis Inertial Measurement Unit (accelerometers+gyro
Instrument) and three axle magnetometer be integrated in 3mm × 3mmQFN encapsulation in.MPU-9250 is integrated with AKM magnetometer AK8963, and sensitivity reaches
To 0.15 μ T/LSB.
Integrated sensor can measure the acceleration of the railway buildings under vibrating state such as bridge.It can measure bridge, roadbed
Whether sink Deng in long-time use process.Can measure the railway buildings such as bridge whether run-off the straight.To realize
To the three-D displacement of the railway buildings such as bridge, posture, vibration, etc. parameters measurement.
The function that data transmission board plays as integrated sensor power supply and signal conversion, signal transmission, data transmission board can
Think that 485 communication boards may be analog-digital converter.Data transmission board is transmitted after converting the signal that integrated sensor transmission comes
To data center.
Data center is used to control the normal work of each module, has the function of data collection, transmission etc..
Collected data can be uploaded to background server by 4G module.
Background server is stored and is analyzed to data, is commented to realize the state of the railway buildings such as bridge
Estimate and Risk-warning.
When specifically used, the number such as the acceleration of the railway buildings such as integrated sensor real-time measurement bridge under vibrating state
According to the data measured being then transferred to data center by data transmission board, data center is using mobile 4G network, in real time
It is transferred to background server, to realize the purpose of real time monitoring.
To sum up, by means of the above-mentioned technical proposal of the utility model, technology, cloud computing technology by wireless communication, to each
Item bridge, roadbed operation state index carry out real-time monitoring, acquire, transmit in real time to relevant information data, storing processing in time,
The cloud platforms such as background server are relied on simultaneously, the operation state of structures under the lines such as bridge, roadbed are assessed in real time and wind
The intelligent real-time monitoring in unattended situation is realized in dangerous early warning etc..
The above is only the preferred embodiments of the present utility model only, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.