CN208312405U - A kind of garbage-incineration smoke purifying complete set of equipments - Google Patents

A kind of garbage-incineration smoke purifying complete set of equipments Download PDF

Info

Publication number
CN208312405U
CN208312405U CN201820884688.8U CN201820884688U CN208312405U CN 208312405 U CN208312405 U CN 208312405U CN 201820884688 U CN201820884688 U CN 201820884688U CN 208312405 U CN208312405 U CN 208312405U
Authority
CN
China
Prior art keywords
incinerator
complete set
garbage
equipments
smoke purifying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820884688.8U
Other languages
Chinese (zh)
Inventor
李峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Armi Environmental Protection Technology Co Ltd
Original Assignee
Jiangsu Armi Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Armi Environmental Protection Technology Co Ltd filed Critical Jiangsu Armi Environmental Protection Technology Co Ltd
Priority to CN201820884688.8U priority Critical patent/CN208312405U/en
Application granted granted Critical
Publication of CN208312405U publication Critical patent/CN208312405U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)
  • Chimneys And Flues (AREA)

Abstract

The utility model discloses a kind of garbage-incineration smoke purifying complete set of equipments, including spraying cooling clarifier, cyclone dust collectors, incinerator, electrical tar precipitator, booster fan and drop catcher, the spraying cooling clarifier, cyclone dust collectors, incinerator, electrical tar precipitator, booster fan and drop catcher are assembled into purification complete set of equipments by connecting pipe, the side of the incinerator is arranged with air blower and hydraulic feeding port up and down, the top of the incinerator is equipped with No.1 and recycles tank, the side of the No.1 circulation tank is connected with No.1 water pump, and the upper surface of No.1 circulation tank is fixedly installed with No.1 cooling tower.A kind of garbage-incineration smoke purifying complete set of equipments described in the utility model is equipped with electrical tar precipitator, being capable of tar in effective purifying smoke and filtering flue gas, avoid tar emission into air, air pollution is caused, is suitable for different operating situation, brings better prospect of the application.

Description

A kind of garbage-incineration smoke purifying complete set of equipments
Technical field
The utility model relates to gas cleaning complete set of equipments field, in particular to a kind of garbage-incineration smoke purifying is at being arranged It is standby.
Background technique
Existing garbage-incineration smoke purifying complete set of equipments, still remains the fume treatment of waste incineration and much asks It inscribes, for example is easy to appear ashes blockage problem after the incineration firing in incinerator, flue gas can not be filtered effectively in purification process The impurity such as tar, dust in flue gas, certain garbage-incineration smoke purifying complete set of equipments may just be not provided with tar mistake at all Filter causes tar to be discharged into air together with gas, causes air pollution, to the use band of gas cleaning complete set of equipments Trouble centainly is carried out, for this purpose, we have proposed a kind of garbage-incineration smoke purifying complete set of equipments.
Utility model content
The technical problems to be solved in the utility model is to overcome the deficiencies of existing technologies, and it is net to provide a kind of flue gas of refuse burning Change complete set of equipments.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solution:
A kind of garbage-incineration smoke purifying complete set of equipments of the utility model, including spraying cooling clarifier, cyclone dust collectors, Incinerator, electrical tar precipitator, booster fan and drop catcher, the spraying cooling clarifier, cyclone dust collectors, incinerator, electric fishing Tar device, booster fan and drop catcher are assembled into purification complete set of equipments by connecting pipe, and the side of the incinerator is divided up and down Equipped with air blower and hydraulic feeding port, the top of the incinerator is equipped with No.1 and recycles tank, and the No.1 recycles tank Side be connected with No.1 water pump, and the upper surface of No.1 circulation tank is fixedly installed with No.1 cooling tower, and the spray drops The top of warm clarifier is provided with No. two circulation tanks, and the side of No. two circulations tank is connected with No. two water pumps, and The upper surface of No. two circulation tanks is fixedly installed with No. two cooling towers, and the upper surface of the drop catcher is fixedly installed with exhaust pipe Road.
Preferably, the other side of the incinerator is equipped with lighting-up tuyere, and the outer bottom of incinerator enters equipped with blower conduits Mouthful, the interior bottom of the incinerator is provided with stacked ashes separation turntable, and the lower end of ashes separation turntable is equipped with turntable drive Dynamic motor, the top of the incinerator is provided with heat exchanger.
Preferably, the inside of the cyclone dust collectors is equipped with high-temperaure coating.
Preferably, atomizing spray head, and the bottom of spraying cooling clarifier are provided at the top of the spraying cooling clarifier Portion is provided with water circulation outlet, and the No.1 that the atomizing spray head and water circulation export with outside setting recycles water storage Pond, No. two circulation tanks, No.1 cooling tower and No. two water pump connections.
Preferably, it is provided with high-field electrode at the top of the electrical tar precipitator, and electrical tar precipitator is internally provided with receipts Dirt pole plate and tar drip collector, the bottom of the electrical tar precipitator are provided with air inlet, and the upper end of air inlet is provided with can The maintenance mouth of opening and closing, another sidewall upper of the electrical tar precipitator are provided with exhanst gas outlet, and smoke outlet is provided with survey Warm device.
Preferably, the drop catcher is internally provided with two layers of nylon wire, and nylon wire is flexible adjustable structure.
The utility model beneficial effect achieved is: the garbage-incineration smoke purifying complete set of equipments passes through the electricity of setting Catch tar device, can effective impurity such as purifying smoke and filtering tar therein, cigarette ash, guarantee that the gas of discharge meets gas Purification standard avoids tar emission into air, causes air pollution, and whole device structure is simple, easy to operate, the effect used Fruit is more preferable relative to traditional approach.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the utility model.
In figure: 1, spraying cooling clarifier;2, cyclone dust collectors;3, incinerator;4, air blower;5, electrical tar precipitator;6, Connecting pipe;7, booster fan;8, drop catcher;9, hydraulic feeding port;10, No.1 recycles tank;11, No.1 water pump;12, one Number cooling tower;13, No. two circulation tanks;14, No. two water pumps;15, No. two cooling towers;16, exhaust pipe.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
Embodiment 1
As shown in Figure 1, a kind of garbage-incineration smoke purifying complete set of equipments, including spraying cooling clarifier 1, cyclone dust collectors 2, incinerator 3, electrical tar precipitator 5, booster fan 7 and drop catcher 8, spraying cooling clarifier 1, cyclone dust collectors 2, incinerator 3, Electrical tar precipitator 5, booster fan 7 and drop catcher 8 are assembled into purification complete set of equipments by connecting pipe 6, on the side of incinerator 3 Under be arranged with air blower 4 and hydraulic feeding port 9, the top of incinerator 3 is equipped with No.1 and recycles tank 10, and No.1 recycles tank 10 side is connected with No.1 water pump 11, and the upper surface of No.1 circulation tank 10 is fixedly installed with No.1 cooling tower 12, sprays The top of leaching cooling cleaner 1 is provided with No. two circulation tanks 13, and the side of No. two circulation tanks 13 is connected with No. two water Pump 14, and the upper surface of No. two circulation tanks 13 is fixedly installed with No. two cooling towers 15, the upper surface of drop catcher 8 is fixedly mounted There is exhaust pipe 16.
The other side of incinerator 3 is equipped with lighting-up tuyere, and the outer bottom of incinerator 3 is equipped with blower conduits entrance, incinerator 3 Interior bottom be provided with stacked ashes separation turntable, the lower end of ashes separation turntable is equipped with turntable driving motor, incinerator 3 Top be provided with heat exchanger;The inside of cyclone dust collectors 2 is equipped with high-temperaure coating;The top of spraying cooling clarifier 1 is set It is equipped with atomizing spray head, and the bottom of spraying cooling clarifier 1 is provided with water circulation outlet, the atomizing spray head and water body Loop exit with No.1 circulation 10, No. two circulation tanks 13 of tank of outside setting, No.1 cooling tower 12 and No. two Water pump 14 connects;The top of electrical tar precipitator 5 is provided with high-field electrode, and electrical tar precipitator 5 is internally provided with dust collecting pole plate With tar drip collector, the bottom of electrical tar precipitator 5 is provided with air inlet, and the upper end of air inlet is provided with maintenance to be opened/closed Mouthful, another sidewall upper of electrical tar precipitator 5 is provided with exhanst gas outlet, and smoke outlet is provided with thermal detector;Drop catcher 8 It is internally provided with two layers of nylon wire, nylon wire is flexible adjustable structure.
It should be noted that the utility model is a kind of garbage-incineration smoke purifying complete set of equipments, when in use, rubbish is burnt Gas cleaning complete set of equipments is burnt by incinerator 3, cyclone dust collectors 2, spraying cooling clarifier 1, electrical tar precipitator 5, booster fan 7, the multiple equipments component such as drop catcher 8 by connecting pipe 6 combination be formed by connecting, the side of incinerator 3 be provided with one it is hydraulic Feeding port 9, hydraulic feeding port 9 use hydraulic mechanism, in an automated manner by rubbish be sent into incinerator 3 in, incinerator 3 it is another Side is provided with a lighting-up tuyere, and for lighting rubbish pilot fuel and rubbish, the bottom of incinerator 3 is provided with blower conduits and enters Mouthful, air blower 4 is responsible for providing pressure-air into incinerator 3, increases the oxygen content of furnace interior, improves efficiency of combustion, simultaneously The bottom of incinerator 3 is provided with stacked ashes separation turntable, and the lower end of ashes separation turntable is equipped with turntable driving motor, ash Cinder separates turntable and rotated every three to five minutes once, and staff can carry out free adjusting, ashes point according to incineration firing amount Effect from turntable is to prevent from the rubbish ashes of 3 lower end of incinerator from repeatedly accumulating to cause ashes that furnace body can not be discharged, and causes rubbish Insufficient or even blocking of burning is flame-out, can be effectively by rubbish after ashes separation turntable rotates at set time intervals Being crushed after rubbish burning to base is opened, and falls ashes freely, meanwhile, the top of incinerator 3 is provided with heat exchanger, heat is handed over Parallel operation recycles water storage by No.1 water pump 11 and No. two water pumps 14 and extraneous 12, No. two cooling towers 15 of No.1 cooling tower, No.1 Pond 10 and No. two circulation tanks 13 connect and carry out specific process flow operation process, can be effectively reduced in incinerator 3 Raised temperature, the flue gas in incinerator 3 by cooling enter cyclone dust collectors 2, cyclone dust removal to rubbish during the burning process The inside of device 2 is equipped with coarse high-temperaure coating, when the inner wall of flue gas mixed gas high-speed impact cyclone dust collectors 2, used Under the action of property, the biggish solid waste of volume is freely fallen in smoke mixture, and the solid waste of lighter weight and gas Mixture can then enter spraying cooling clarifier 1, and spraying cooling clarifier 1 mainly carries out spraying and secondary drop to mixed gas Temperature falls the solid waste being relatively large in diameter in mixed gas, while can allow the steam of atomization and the exhaust gas of burning It is sufficiently mixed, desulphurization denitration processing is carried out to it, sprays and contains alkaline solution in the water body used, spraying cooling clarifier 1 top is provided with atomizing spray head, and bottom is provided with water circulation outlet, the No.1 cooling tower of the two and external setting 12, No. two cooling towers 15, No.1 circulation tank 10 and No. two circulation tank 13 connections, are recycled it, pass through The flue gas for crossing processing is entering electrical tar precipitator 5 after the processing of the equipment of front, and electrical tar precipitator 5 is mainly in flue gas Tar is handled, but due to the optimum working temperature of electrical tar precipitator 5 at 120 DEG C hereinafter, so, spraying cooling clarifier 1 plays a dual role of desulphurization denitration and cooling, if temperature is excessively high, electrical tar precipitator 5 ifs can not effectively work, in some instances it may even be possible to There is strike situation, the top of electrical tar precipitator 5 is provided with high-field electrode, is internally provided with dust collecting pole plate and tar dropping liquid is received Storage, tar dropping liquid after treatment, can form drop in the bottom of dust collecting pole plate and fall in bottoms tar collecting box, electric fishing The bottom of tar device 5 is provided with air inlet, and the upper end of air inlet is provided with maintenance mouth to be opened/closed, does not make for a long time for handling Tar processor removes the oil tar lump inside electrical tar precipitator 5, and can play maintenance and replacement portion to electrical tar precipitator 5 The effect of part, another sidewall upper of electrical tar precipitator 5 are provided with exhanst gas outlet, and smoke outlet is provided with thermal detector, survey Warm device can effectively detect the problem inside electrical tar precipitator 5, and timely and effectively the process flow for leading portion equipment provides centainly Reference and Row control, flue gas only remaining vapor and air after 5 separating tar of electrical tar precipitator, by booster fan 7 pumping, gas enter in the last one equipment drop catcher 8, and two layers of nylon wire, the aperture of nylon wire are provided in drop catcher 8 Reasonable aperture density can be set using needing according to specific, nylon wire allows vapor to exist for filtering vapor It is accumulated on nylon wire and forms water droplet and fallen, clean air is finally discharged by exhaust pipe 16, more practical.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (6)

1. a kind of garbage-incineration smoke purifying complete set of equipments, it is characterised in that: including spraying cooling clarifier (1), cyclone dust removal Device (2), incinerator (3), electrical tar precipitator (5), booster fan (7) and drop catcher (8), the spraying cooling clarifier (1), rotation Wind deduster (2), incinerator (3), electrical tar precipitator (5), booster fan (7) and drop catcher (8) are assembled by connecting pipe (6) At purification complete set of equipments, the side of the incinerator (3) is arranged with air blower (4) and hydraulic feeding port (9), the burning up and down The top of furnace (3) is equipped with No.1 circulation tank (10), and the side of No.1 circulation tank (10) is connected with No.1 water pump (11), and the upper surface of No.1 circulation tank (10) is fixedly installed with No.1 cooling tower (12), the spraying cooling clarifier (1) top is provided with No. two circulation tanks (13), and the side of No. two circulations tank (13) is connected with No. two water pumps (14), and the upper surface of No. two circulations tank (13) is fixedly installed with No. two cooling towers (15), the upper end of the drop catcher (8) Face is fixedly installed with exhaust pipe (16).
2. a kind of garbage-incineration smoke purifying complete set of equipments according to claim 1, it is characterised in that: the incinerator (3) the other side be equipped with lighting-up tuyere, and the outer bottom of incinerator (3) be equipped with blower conduits entrance, the incinerator (3) it is interior Bottom is provided with stacked ashes separation turntable, and the lower end of ashes separation turntable is equipped with turntable driving motor, the incinerator (3) top is provided with heat exchanger.
3. a kind of garbage-incineration smoke purifying complete set of equipments according to claim 1, it is characterised in that: the cyclone dust removal The inside of device (2) is equipped with high-temperaure coating.
4. a kind of garbage-incineration smoke purifying complete set of equipments according to claim 1, it is characterised in that: the spraying cooling Atomizing spray head is provided at the top of clarifier (1), and the bottom of spraying cooling clarifier (1) is provided with water circulation outlet, The No.1 that the atomizing spray head and water circulation export with outside setting recycles tank (10), No. two circulation tanks (13), No.1 cooling tower (12) and No. two water pump (14) connections.
5. a kind of garbage-incineration smoke purifying complete set of equipments according to claim 1, it is characterised in that: the electrically trapped tar oil Be provided with high-field electrode at the top of device (5), and electrical tar precipitator (5) be internally provided with dust collecting pole plate and tar dropping liquid is collected Device, the bottom of the electrical tar precipitator (5) are provided with air inlet, and the upper end of air inlet is provided with maintenance mouth to be opened/closed, described Another sidewall upper of electrical tar precipitator (5) is provided with exhanst gas outlet, and smoke outlet is provided with thermal detector.
6. a kind of garbage-incineration smoke purifying complete set of equipments according to claim 1, it is characterised in that: the drop catcher (8) be internally provided with two layers of nylon wire, nylon wire is flexible adjustable structure.
CN201820884688.8U 2018-06-08 2018-06-08 A kind of garbage-incineration smoke purifying complete set of equipments Expired - Fee Related CN208312405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820884688.8U CN208312405U (en) 2018-06-08 2018-06-08 A kind of garbage-incineration smoke purifying complete set of equipments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820884688.8U CN208312405U (en) 2018-06-08 2018-06-08 A kind of garbage-incineration smoke purifying complete set of equipments

Publications (1)

Publication Number Publication Date
CN208312405U true CN208312405U (en) 2019-01-01

Family

ID=64709122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820884688.8U Expired - Fee Related CN208312405U (en) 2018-06-08 2018-06-08 A kind of garbage-incineration smoke purifying complete set of equipments

Country Status (1)

Country Link
CN (1) CN208312405U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810956A (en) * 2020-06-19 2020-10-23 海南发控智慧环境建设集团有限公司 High-efficient clear burner of macromolecular material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810956A (en) * 2020-06-19 2020-10-23 海南发控智慧环境建设集团有限公司 High-efficient clear burner of macromolecular material

Similar Documents

Publication Publication Date Title
CN101310831B (en) Carbon calcination fume dry cleaning method and device thereof
CN208177025U (en) A kind of boiler flue dust pelletizing system
CN115585454A (en) Automatically controlled burning smoke and dust purifies biomass fuel boiler
CN208312405U (en) A kind of garbage-incineration smoke purifying complete set of equipments
CN206935019U (en) Electric bag integrated dust collector
CN212236528U (en) Environment-friendly efficient welding fume purifier
CN211274055U (en) Cremation machine tail gas treatment equipment
CN209956998U (en) Micro-fog self-circulation dust removal device of coal conveying system of thermal power plant
CN107416373B (en) A kind of incineration of refuse flyash automatic storage unloads grey library
CN206980349U (en) A kind of grey storehouse ash-discharging device
CN215842303U (en) Biomass flue gas purifying and filtering device
CN206681818U (en) A kind of vehicle exhaust collection and treatment device
CN107930308A (en) A kind of energy conservation and environmental protection dust pelletizing system
CN209564819U (en) A kind of Cremation Machine device for purifying and treating tail gas
CN208032165U (en) A kind of energy conservation and environmental protection dust pelletizing system
CN102146302A (en) Centrifugal dedusting/detaring five-stage purifying-tank straw gasifying system
CN206934993U (en) A kind of novel deduster
CN202569835U (en) Single side air intake type online pulse cleaning bag deduster
CN203235579U (en) Wet-type multicyclone dust collector and a dedusting system with same
CN2680337Y (en) Straight pipe porous water dust remover
CN110848663A (en) High-efficient automatic coal-fired heating device
CN2799055Y (en) Wet method dust collector
CN109772043A (en) One kind removing fume and dust integral type pulse dust collector
CN110056924A (en) A kind of cyclone separating fume purifier of fume
CN217939636U (en) Chimney for refuse incineration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101

Termination date: 20200608