CN208310140U CN201820743490.8U CN201820743490U CN208310140U CN 208310140 U CN208310140 U CN 208310140U CN 201820743490 U CN201820743490 U CN 201820743490U CN 208310140 U CN208310140 U CN 208310140U
Authority
CN
China
Prior art keywords
built
fitting
diameter
precast stair
stair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820743490.8U
Other languages
Chinese (zh)
Inventor
陈龙
涂刚要
朱海生
杨皓东
王军
张明明
黄考
张瑞
秦玉山
王飞
方元
倪路路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201820743490.8U priority Critical patent/CN208310140U/en
Application granted granted Critical
Publication of CN208310140U publication Critical patent/CN208310140U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of precast stair accurate assembly accessory part, the built-in fitting including being embedded in structural beams, the correction mechanism for correcting built-in fitting position, the pilot hole mechanism being aligned for the pin key hole in precast stair with built-in fitting;Preferably, the built-in fitting is two bolts being embedded in structural beams.Utility model has the advantages that limiting the horizontal position of built-in fitting using correction mechanism, after pouring landing beam concrete curing to prescribed strength, again by the hoisting prefabricated stair of tower crane, stair pin key hole is passed through using pilot hole mechanism and entangles the positioning of built-in fitting pilot hole, reach the accurate splicing of precast stair Yu cast-in-place landing beam built-in fitting, it is ensured that be reliably connected.

Description

A kind of precast stair accurate assembly accessory part
Technical field
The utility model relates to precast stair mounting technology, a kind of specifically precast stair accurate assembly assisted group Part.
Background technique
Prefabricated concrete structure is the direction of the development of China's building industrialization in recent years, traditional cast-in-place concrete stair mould Plate construction is complicated, casting and compacting of concrete can not one-pass molding, it is poor in high temperature, arid season maintenance effect, easily cause height of marking time Injustice generally requires later period chisel and beats repairing treatment.So using precast stair substantially now, precast stair and landing beam assembly are solid It is fixed.And precast stair obtains the large-scale popularization of government and construction unit.
But in the prior art, often there is the problem of assembly precision difference in precast stair, and installation quality cannot obtain effectively Guarantee, the construction efficiency and function for seriously affecting precast stair use.
Utility model content
The technical issues of the utility model solves is that precast stair assembly precision control in the prior art is difficult.
The utility model solves the above problems by the following technical programs:
A kind of precast stair accurate assembly accessory part, including the built-in fitting, pre-buried for correcting being embedded in structural beams The correction mechanism of part position, the pilot hole mechanism being aligned for the pin key hole in precast stair with built-in fitting;
Preferably, the built-in fitting is two bolts being embedded in structural beams.
Preferably, the correction mechanism includes that cross bar and cross bar both ends are fixed with towards consistent sleeve;The sleeve It is vertical with cross bar;The axis spacing of two sleeves is two bolt axis spacing;The sleeve diameter is slightly larger than the diameter of bolt.
Preferably, the middle position of the cross bar is provided with the centering graticule that structure middle line centering is completed with lower layer.
Preferably, the pilot hole mechanism includes drawing ball, skirt;The ball cover that draws is located on skirt;The ball that draws is away from skirt The height of bottom end is less than the length of built-in fitting;The maximum outside diameter for drawing ball is slightly less than pin key bore dia;The skirt internal diameter omits Greater than built-in fitting diameter.
Preferably, the sleeve diameter is greater than diameter of bolt 2mm.
Preferably, the skirt internal diameter is greater than diameter of bolt 2mm.
Preferably, the ball maximum outside diameter that draws is less than pin key bore dia 2mm.
Utility model has the advantages that
The horizontal position that built-in fitting is limited using correction mechanism, pours the concrete curing of landing beam to prescribed strength Afterwards, then by the hoisting prefabricated stair of tower crane, stair pin key hole is passed through using pilot hole mechanism and entangles the positioning of built-in fitting pilot hole, reaches pre- The accurate splicing of stair processed and cast-in-place landing beam built-in fitting, it is ensured that be reliably connected.
Correction mechanism limits the spacing of two sleeves using cross bar, quickly corrects the horizontal position of two pre-embedded bolts, improves Working efficiency;It is provided on cross bar to middle graticule, the position system of upper and lower built-in fitting can be reached quickly with understructure centering One.
Pilot hole mechanism use with the skirts of built-in fitting diameter matches and with precast stair pin key bore dia is matched draws ball group The form of conjunction can be such that pre-embedded bolt is centered in pin key hole while realizing pilot hole, accelerate lifting speed, improve installation Precision.
Since the size of casing, skirt is slightly larger than the size of pre-embedded bolt, draws ball and be slightly less than pin key pore size, so water Flat error is small, and is easy to extract correction mechanism and pilot hole mechanism.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of correction mechanism and built-in fitting in the utility model;
When Fig. 2 is that the utility model precast stair assembles, the supplementary structure schematic diagram of pilot hole mechanism;
Fig. 3 is the structural schematic diagram in Fig. 2 after precast stair assembly in place;
Fig. 4 is the structural schematic diagram for extracting the pilot hole mechanism in Fig. 2.
Specific embodiment
To make the structure feature to the utility model and the effect of being reached has a better understanding and awareness, to compared with Good examples and drawings cooperate detailed description, are described as follows:
As shown in Figure 1 and Figure 2, a kind of precast stair accurate assembly accessory part, it is pre-buried in structural beams 5 including being embedded in Part 1, is aligned with built-in fitting 1 for the pin key hole 41 in precast stair 4 correction mechanism 2 for correcting 1 position of built-in fitting Pilot hole mechanism 3;
Built-in fitting 1 is two bolts being embedded in structural beams 5.
Correction mechanism 2 includes that cross bar 21 and 21 both ends of cross bar are fixed with towards consistent sleeve 22;Sleeve 22 and cross bar 21 is vertical;The axis spacing of two sleeves 22 is two screw axis spacing;22 internal diameter of sleeve is slightly larger than the diameter of bolt, general sleeve 22 internal diameters are greater than diameter of bolt 2mm.The middle position of cross bar 21 be provided with lower layer be completed structure middle line centering to acceptance of the bid Line 23.
Pilot hole mechanism 3 includes drawing ball 31, skirt 32;Draw ball 31 to be set on skirt 32;Draw ball 31 away from 32 bottom end of skirt Height is less than the length of built-in fitting 1;The maximum outside diameter for drawing ball 31 is slightly less than 41 diameter of pin key hole, general small 2mm.In skirt 32 Diameter is slightly larger than 1 diameter of built-in fitting.32 internal diameter of skirt is greater than diameter of bolt 2mm.
Since precast stair has certain thickness, if drawing the insufficient height of ball 31, bolt portion hanging in pin key hole Divide it is possible that shaking, so according to the actual situation, can determine that the number for drawing ball 31 or increase draw the height of ball 31.
Draw ball 31 to be set on skirt 32, for fixation, can be fixed by welding enhancing.Alternatively, it is also possible to draw Skirt 31 is respectively welded in the upper and lower ends of ball 31, as long as upper and lower skirt 32 and to draw 31 three of ball coaxial.
Key points for operation:
1. cast-in-place landing beam built-in fitting 1 is embedded
Cast-in-place structural applies man-hour requirement upper and lower each pre-buried 2 built-in fittings 1 of bench at structural beams 5 at the stair.By built-in fitting 1 steel plate is welded on the Reinforcement of bolt beams of concrete, it is ensured that in concrete placings, the position of built-in fitting 1 is not shifted, and is protected Demonstrate,prove the accuracy of 1 spacing of accuracy and built-in fitting of length in reserve.
It is fixed using correction mechanism 2 to improve bolt embedment horizontal accuracy, as shown in Figure 1, and passing through verification review. After bolt embedment, each stair respectively use 12 fixing bolt of correction mechanism up and down, and through 21 centering graticule 23 of cross bar under Layer is completed structure middle line and is finely adjusted.Since positioning sleeve shank diameter is merely greater than pre-embedded bolt diameter 2mm, ensure that pre-buried Bolt relative level deviation is less than 1mm.Correction mechanism 2 is removed after concrete final set, is reused.
2. cast-in-place structural concreting
The cast-in-place landing beam of stair pour smash before using level carry out absolutely, relative elevation control, guarantee demoulding after absolute altitude Control errors are repaired at deficiency using with grade cement mortar within 3mm, beyond at absolute altitude, carry out picking chisel equating.
Template should be checked before concreting, whether bolt, 1 position of built-in fitting meet code requirement, such as find built-in fitting 1 It is displaced in concrete casting, should stop pouring, reason when looking into is dealt carefully with, and pays attention to having to before concrete coagulation Built-in fitting 1 is retightened.In concrete casting, poker vibrator is generally used, bolt should be avoided collision as far as possible, forbid to shake Tamper is directly contacted with built-in fitting 1.After concrete is poured, it should be noted that reinforce maintenance, keep moistening around built-in fitting 1, prevent Only shrinkage deformation causes hollowing in built-in fitting 1.
3. precast stair 4 installs preceding finishing, surveying setting-out
Before hoisting prefabricated stair 4, corresponding staircase component end and side are measured and popped up in predetermined installation site Control line, and installation control line, landing beam absolute altitude are checked.20 thickness 1:1 cement mortar are laid on the ladder beam of gangboard both ends Screed-coat 6 (strength grade >=M15), the absolute altitude of screed-coat 6 answers precise control.
4. stair handling is installed
Tower crane must carry out examination and hang before formally lifting, first sling stopping when away from ground 500mm, check wirerope, suspension hook Stress condition is measured, and adjust stair step to horizontality by hoist after inspection is intact using horizontal ruler.
It is hung at the about 300mm of work layer overhead in tower crane and slightly pauses, the hand steered staircase boards adjustment direction of construction personnel, by building The sideline of gangboard is aligned with the installation control line on terraced beam, is each passed through stair pin key hole 41 using 4 pilot hole mechanisms 3, is such as schemed Shown in 3, the positioning of pre-embedded bolt pilot hole is entangled, is slowly declined, it is accurate in place.It is not allowed to lead to prefabricated building in place when avoiding no casing Ladder 4 damages bolt by pressure, accelerates lifting speed and precision.
The slow play 5. gangboard will come to a complete stop when shelving is forbidden quickly to put suddenly, causes gangboard clashing and breaking to avoid impact force is excessive.To ladder It is finely tuned again with crowbar after plate is basic in place, until installation site and absolute altitude are correct, shelve and completely attached at face.
6. after precast stair 4 is installed in place, extraction pilot hole mechanism 3 is that implementable grouting pours, as shown in Figure 4.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only the principles of the present invention, the utility model also has respectively on the premise of not departing from the spirit and scope of the utility model Kind changes and improvements, these changes and improvements are both fallen in the range of claimed invention.The requires of the utility model Protection scope defined by appended claims and its equivalent.

Claims (5)

1. a kind of precast stair accurate assembly accessory part, it is characterised in that: including be embedded in structural beams built-in fitting, be used for The correction mechanism for correcting built-in fitting position, the pilot hole mechanism being aligned for the pin key hole in precast stair with built-in fitting;It is described pre- Embedded part is two bolts being embedded in structural beams;The correction mechanism includes that cross bar and cross bar both ends are fixed with towards consistent Sleeve;The sleeve is vertical with cross bar;The axis spacing of two sleeves is two screw axis spacing;The sleeve diameter Slightly larger than the diameter of bolt;The pilot hole mechanism includes drawing ball, skirt;The ball cover that draws is located on skirt;The ball that draws is away from skirt The height of bottom end is less than the length of built-in fitting;The maximum outside diameter for drawing ball is slightly less than pin key bore dia;The skirt internal diameter omits Greater than built-in fitting diameter.
2. a kind of precast stair accurate assembly accessory part according to claim 1, it is characterised in that: in the cross bar Meta position installs the centering graticule for being equipped with and structure middle line centering being completed with lower layer.
3. a kind of precast stair accurate assembly accessory part according to claim 1, it is characterised in that: the sleeve diameter Greater than diameter of bolt 2mm.
4. a kind of precast stair accurate assembly accessory part according to claim 1, it is characterised in that: the skirt internal diameter Greater than diameter of bolt 2mm.
5. a kind of precast stair accurate assembly accessory part according to claim 1, it is characterised in that: described to draw ball maximum Outer diameter is less than pin key bore dia 2mm.
CN201820743490.8U 2018-05-17 2018-05-17 A kind of precast stair accurate assembly accessory part Active CN208310140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820743490.8U CN208310140U (en) 2018-05-17 2018-05-17 A kind of precast stair accurate assembly accessory part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820743490.8U CN208310140U (en) 2018-05-17 2018-05-17 A kind of precast stair accurate assembly accessory part

Publications (1)

Publication Number Publication Date
CN208310140U true CN208310140U (en) 2019-01-01

Family

ID=64711700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820743490.8U Active CN208310140U (en) 2018-05-17 2018-05-17 A kind of precast stair accurate assembly accessory part

Country Status (1)

Country Link
CN (1) CN208310140U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576639A (en) * 2020-05-08 2020-08-25 中国一冶集团有限公司 Fixing and positioning device for embedded bolts of prefabricated stairs and construction method
CN112095829A (en) * 2020-09-12 2020-12-18 北京市第三建筑工程有限公司 Method for quickly mounting tensile vibration isolator
CN112412067A (en) * 2020-11-19 2021-02-26 中冶建工集团有限公司 Accurate positioning method for prefabricated staircase
CN112412068A (en) * 2020-11-19 2021-02-26 中冶建工集团有限公司 Accurate positioning and assembling method for prefabricated staircase
CN112411766A (en) * 2020-11-26 2021-02-26 上海宝冶集团有限公司 Construction method of upper and lower end connecting node of prefabricated staircase
CN113585769A (en) * 2021-08-27 2021-11-02 中建三局集团有限公司 Method for installing closed space of assembled bare concrete horizontal component
CN113944337A (en) * 2021-10-29 2022-01-18 上海宝冶集团有限公司 Prefabricated wall installation elevation control method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576639A (en) * 2020-05-08 2020-08-25 中国一冶集团有限公司 Fixing and positioning device for embedded bolts of prefabricated stairs and construction method
CN112095829A (en) * 2020-09-12 2020-12-18 北京市第三建筑工程有限公司 Method for quickly mounting tensile vibration isolator
CN112412067A (en) * 2020-11-19 2021-02-26 中冶建工集团有限公司 Accurate positioning method for prefabricated staircase
CN112412068A (en) * 2020-11-19 2021-02-26 中冶建工集团有限公司 Accurate positioning and assembling method for prefabricated staircase
CN112412067B (en) * 2020-11-19 2022-03-18 中冶建工集团有限公司 Accurate positioning method for prefabricated staircase
CN112411766A (en) * 2020-11-26 2021-02-26 上海宝冶集团有限公司 Construction method of upper and lower end connecting node of prefabricated staircase
CN113585769A (en) * 2021-08-27 2021-11-02 中建三局集团有限公司 Method for installing closed space of assembled bare concrete horizontal component
CN113944337A (en) * 2021-10-29 2022-01-18 上海宝冶集团有限公司 Prefabricated wall installation elevation control method

Similar Documents

Publication Publication Date Title
CN208310140U (en) A kind of precast stair accurate assembly accessory part
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN203947771U (en) A kind of Bailey beam pendent form support system
CN110528390B (en) Construction method for erecting T-shaped beam in narrow space near existing line
CN106320715B (en) A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size
CN106120568A (en) Cross a river Main Bridge bridge pier secondary locking temporary consolidation structure and construction method
CN104727226B (en) Construction method for steel-concrete composite girder
CN102767288A (en) Method and structure for mounting precast reinforced concrete stairs
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN106192758A (en) Construction method for constructing large high pier column by using cantilever formwork
CN105464216B (en) Construction method based on integral lifting formwork-strengthening system superelevation super-section batter post
CN110817678A (en) Hoisting method of prefabricated column
CN106930194A (en) Inter-tie and pier stud global formation construction method and template used support
CN208235575U (en) Assembled concrete retaining wall that can have enough to meet need
CN106088493A (en) A kind of pin key connects mounting structure and the construction thereof of prefabricated bench
CN110184948A (en) A kind of Bridge beam construction method
CN211735397U (en) Positioning and guiding device for lattice column bored pile construction
CN114059782A (en) Construction method of prefabricated slab
CN102434007A (en) Construction process for installing vibration isolation support among floors
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN112324131B (en) One-frame dual-purpose large-span stiff beam construction structure and construction method thereof
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN102777044A (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN103132494B (en) Embedded anchor cone accurate positioning method

Legal Events