CN208308249U - A kind of fixed device of air hose promotion - Google Patents
A kind of fixed device of air hose promotion Download PDFInfo
- Publication number
- CN208308249U CN208308249U CN201820912439.5U CN201820912439U CN208308249U CN 208308249 U CN208308249 U CN 208308249U CN 201820912439 U CN201820912439 U CN 201820912439U CN 208308249 U CN208308249 U CN 208308249U
- Authority
- CN
- China
- Prior art keywords
- air hose
- angle steel
- bolt
- fixed device
- wirerope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 55
- 239000010959 steel Substances 0.000 claims abstract description 55
- 241000357293 Leptobrama muelleri Species 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 11
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 239000000463 material Substances 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 12
- 238000000034 method Methods 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000001737 promoting effect Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a kind of fixed device of air hose promotion, including at least one wirerope, several fixed pulleys are equipped on the wirerope, the lower end of the fixed pulley is equipped with stay bolt, the stay bolt is fixedly mounted on the upper end of hanger, the hanger is set on air hose, and the hanger includes at least four isometric angle steel, and at least four isometric angle steel are distributed in square shape.The utility model has the beneficial effects that structure is simple, and it is easy to operate, not only save the construction time, and material can be reused, and reduce costs, and improve economic benefit, fixation is formally installed for large span, high-altitude air hose and provides safety guarantee, for the convenient condition of air hose position Positioning Creates.
Description
Technical field
The air hose that the utility model relates to a kind of for solving large span, high altitude operation air hose fixed installation technical problem mentions
Rise fixed device.
Background technique
With the rapid development of construction industry, large span, the building of large space are more and more, and steel construction is in this case
Architectural engineering in be widely used.The structural members such as steel construction girder steel and steel column are more in building in the construction process,
The installation of superaltitude air hose is also more and more, and the case where large space, large span causes the extremely difficult construction of air hose, traditional air hose peace
Dress technique be difficult to adapt to new growth requirement, large space, large span building in air hose is installed, can encounter following several
The problem of a aspect: first is that due to free height, the fixed supporting point of building body air hose is insufficient, leads to the problem of positioning hardly possible, causes
High-altitude installation sunpender is difficult to construct, and is difficult to dock for each section after integral hoisting;Second is that since the splicing of air hose, assembling, maintenance belong to
High altitude operation has biggish security risk;Third is that air-line system installation will will cause and return with building interior decoration cross-operation
The problem of work or repeatedly maintenance adjustment.
Therefore, there is high altitude operation to be easy to leave security risk for existing air hose installation, and supporting point deficiency leaves biggish
Construction quality hidden danger, and it is larger to other finished product protection work difficulties the problems such as.
Utility model content
Purpose of utility model: the utility model aim be in view of the deficiencies of the prior art, provide it is a kind of beautiful and generous,
Quick and easy for installation, accurate air hose promotes fixed device, solves the problems, such as that air-line system installation is fixed temporarily hardly possible.
Technical solution: a kind of fixed device of air hose promotion described in the utility model, including at least one wirerope, in institute
It states and is equipped with several fixed pulleys on wirerope, the lower end of the fixed pulley is equipped with stay bolt, and the stay bolt is fixedly mounted on
The upper end of hanger, the hanger are set on air hose, and the hanger includes at least four isometric angle steel, and at least four is isometric
Angle steel is distributed in square shape.
Technical solutions of the utility model are further defined to, and the both ends of the wirerope are equipped with U-shaped buckle.
Further, the fixed pulley includes left baffle and right baffle, is equipped between the right baffle-plate and right shell body
Portion's disk, the right baffle-plate, right shell body upper end have the first bolt hole, with first bolt hole cooperation be equipped with the first spiral shell
Bolt, the right baffle-plate, right shell body lower end have the second bolt hole, with second bolt hole cooperation be equipped with the second bolt.
Further, the stay bolt includes nut and screw rod, and the lower end of the screw rod is installed on the top of hanger, in institute
Stating on nut has through hole along its diametrical direction, and second bolt is fixed in the second bolt hole after through hole.
Further, there is third bolt hole, with the third on the right baffle-plate, the middle part of right shell body and middle part disk
Bolt hole cooperation is equipped with third bolt.
Further, the angle steel includes ontology, the ontology include first while and when second, first and second described side
It is of same size, several equally distributed screw holes along its length are formed on first side, are matched with the screw hole
It closes and is equipped with screw, adjacent angle steel is fixedly connected by screw.
Further, the hanger includes six angle steel, and six angle steel, which are sequentially connected, surrounds a bite glyph framework structure, institute
Stating the upper and lower end distribution of square shape frame structure, there are two lateral angle steel, two lateral angle steel back backrest interlaced arrangements;The mouth
A vertical angle steel is distributed in the left and right side of glyph framework structure, and the upper end of the vertical angle steel is welded in upper end transverse direction angle steel,
Lower end is welded in lower end transverse direction angle steel.
Further, the wirerope has two, and two wirerope are arranged in the two sides of air hose.
The utility model air hose promotes the preparation method of fixed device, comprising the following steps:
(1) according to square steel structure on air hose or structural beam slab, by the fixed wirerope of certain span, for carrying stress;
(2) number for determining fixed pulley is measured according to actual needs, and fixed pulley is used for hook air hose and slidable adjustment
Air hose position;
(3) air hose surrounding is fixed using angle steel, is fixed by bolts between adjacent angle steel, and the angle steel above air hose leans on
Outer fix reserves two bolts hole, and bolt hole with the stay bolt of fixed pulley for being connected;
(4) crane promotes air hose to after specified altitude assignment, then air hose is slid onto designated position by mobile fixed pulley, so
After air hose is fixedly mounted;
(5) after air hose installation is fixed, fixed pulley is reusable, while the angle steel for temporarily promoting air hose, can also root
Disassembly recycling is carried out according to engineering actual demand.
The utility model has the beneficial effects that structure is simple, and it is easy to operate, it has not only saved the construction time, but also material energy
It reuses, reduces costs, improve economic benefit, fixation is formally installed for large span, high-altitude air hose and provides safe guarantor
Convenient condition that barrier has been air hose position Positioning Creates.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the scheme of installation of the utility model.
Fig. 3 is the front view of fixed pulley in the utility model.
Fig. 4 is the side view of fixed pulley in the utility model.
Fig. 5 is the top view of fixed pulley in the utility model.
In figure: 1. fixed pulleys, 2. wirerope, 3. angle steel, 4. stay bolts, 5. screws, 6. air hoses.
Specific embodiment
Technical solutions of the utility model are described in detail below by attached drawing, but the protection scope of the utility model
It is not limited to the embodiment.
Embodiment 1: the present embodiment is illustrated by taking sports center of Bengbu city engineering gymnasium as an example.Bengbu body
It is moulded oval to educate Center Project gymnasium, oval surrounding is grandstand, and centre is indoor basketball court, and gymnasium overhead is
Steel construction adds metal Roof, in order to meet air draft requirement of divulging information in gymnasium, arranges a certain number of air drafts in gymnasium overhead
Pipe, flying height differ between 15.64m~19.37m.Air hose installation difficulty is high, installation process high altitude operation, risk compared with
Greatly.
For above-mentioned engineering, a kind of fixed device of air hose promotion is present embodiments provided, structure is as depicted in figs. 1 and 2,
Including two wirerope 2, two wirerope 2 are arranged in the two sides of air hose 6, and the both ends of wirerope 2 are equipped with U-shaped buckle, in steel wire
Multiple fixed pulleys 1 are equipped on rope 2, the lower end of fixed pulley 1 is equipped with stay bolt 4, and stay bolt 4 is fixedly mounted on the upper end of hanger,
Hanger is set on air hose 6.Hanger includes six isometric angle steel 3, and six angle steel 3, which are sequentially connected, surrounds a bite glyph framework knot
Structure is respectively arranged in upper end, the lower end of square shape frame structure there are two lateral angle steel, be located at square shape frame structure upper end or
Two lateral angle steel back backrest interlaced arrangements of lower end, are in addition respectively disposed with one on left side, the right side of square shape frame structure
A vertical angle steel, the upper end of vertical angle steel are welded on the lateral angle steel of square shape frame structure upper end, and lower end is welded on
On the lateral angle steel of square shape frame structure lower end.
As shown in Figures 3 to 5, fixed pulley 1 includes left baffle and right baffle, and middle part is equipped between right baffle-plate and right shell body
Disk, right baffle-plate, right shell body upper end have the first bolt hole, with the first bolt hole cooperation be equipped with the first bolt, right baffle-plate, the right side
The lower end of baffle has the second bolt hole, is equipped with the second bolt with the cooperation of the second bolt hole.Right baffle-plate, right shell body middle part and in
There is third bolt hole on portion's disk, be equipped with third bolt with the cooperation of third bolt hole.Stay bolt 4 includes nut and screw rod, spiral shell
The lower end of bar is installed on the top of hanger, has through hole along its diametrical direction on nut, the second bolt is after through hole
It is fixed in the second bolt hole.
In addition, angle steel 3 includes ontology, ontology include first while and when second, first and second side it is of same size, the
It is formed with 3 or 4 equally distributed screw holes along its length on one side, is equipped with screw 5 with screw hole cooperation, adjacent angle steel 3 is logical
Screw 5 is crossed to be fixedly connected.
The production method that the present embodiment air hose promotes fixed device, comprising the following steps:
(1) according to 6 position of air hose, the steel of 6 × 37 specifications is fixed on the girder steel or concrete component of 6 liang of upper sides of air hose
The Nominal Tensile and rupture pull force of cord 2(wirerope 2 need to meet the lifting weight requirement of air hose 6 and related accessory), steel
The both ends of cord 2 use the stuck fixation of U-shaped buckle, and wirerope 2 is for wearing fixed pulley 1 and promoting air hose 6;
(2) surrounding of air hose 6 uses specification fixed for the angle steel 3 of L50 × 3, is anchored between adjacent angle steel 3 using screw 5,
The model and its arrangement spacing that the arrangement spacing of angle steel 3 is 600mm(angle steel 3 are joined according to the size and weight of practical air hose 6
It is obtained according to " 03K132 suppot hanger of duct " atlas);
(3) in the two sides prepared screw-bolt hole for the angle steel 3 being located above air hose 6, bolt hole is for the stay bolt with fixed pulley 1
4 fixed (the arrangement spacing of fixed pulley 1 is identical as stress sunpender arrangement spacing);
(4) it after fixed pulley 1 and air hose 6 fix angle steel 3, is slided by pulling wirerope 2 and rolling, air hose 6 is adjusted
To design coordinate and elevation location;
(5) air hose 6 for adjusting good position is carried out formally reinforcing installation, after being installed, fixed pulley 1 and angle steel 3 can be with
Disassembly is reused, and can also be used as the hook gear that air hose 6 is formally installed.
In the construction process, high altitude operation must carry out safety guarantee work, when large span and high-altitude install big component,
Lifting device will not only guarantee easy for construction, and the safety of lifting device is also most important.The present embodiment air hose, which is promoted, to be fixed
Device is proposed aiming at the above problem, is promoted air hose 6 to specified absolute altitude by boom hoist cable 2, is passed through fixed pulley 1
It is mobile that air hose 6 is moved to designated position, it both ensure that installation quality, also provide safety guarantee, to increase economic effect
Benefit.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not
It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define
Under the premise of, it can various changes can be made in the form and details to it.
Claims (8)
1. a kind of air hose promotes fixed device, it is characterised in that: including at least one wirerope, be equipped on the wirerope
The lower end of several fixed pulleys, the fixed pulley is equipped with stay bolt, and the stay bolt is fixedly mounted on the upper end of hanger, described to hang
Frame is set on air hose, and the hanger includes at least four isometric angle steel, and at least four isometric angle steel are distributed in square shape.
2. a kind of air hose promotes fixed device according to claim 1, it is characterised in that: the both ends of the wirerope are equipped with U
Type buckle.
3. a kind of air hose promotes fixed device according to claim 1, it is characterised in that: the fixed pulley include right baffle-plate and
Right shell body, between the right baffle-plate and right shell body be equipped with middle part disk, the right baffle-plate, right shell body upper end have the first spiral shell
Keyhole, with first bolt hole cooperation be equipped with the first bolt, the right baffle-plate, right shell body lower end have the second bolt hole,
The second bolt is equipped with second bolt hole cooperation.
4. a kind of air hose promotes fixed device according to claim 3, it is characterised in that: the stay bolt includes nut and spiral shell
The lower end of bar, the screw rod is installed on the top of hanger, on the nut along its diametrical direction have through hole, described second
Bolt is fixed in the second bolt hole after passing through through hole.
5. a kind of air hose promotes fixed device according to claim 4, it is characterised in that: in the right baffle-plate, right shell body
There is third bolt hole in portion and middle part disk, be equipped with third bolt with third bolt hole cooperation.
6. a kind of air hose promotes fixed device according to claim 1, it is characterised in that: the angle steel includes ontology, described
Ontology include first while and when second, first and second side it is of same size, be formed with several edges on first side
The equally distributed screw hole of length direction is equipped with screw with screw hole cooperation, and adjacent angle steel is fixedly connected by screw.
7. a kind of air hose promotes fixed device according to claim 6, it is characterised in that: the hanger includes six angle steel,
Six angle steel, which are sequentially connected, surrounds a bite glyph framework structure, and there are two horizontal for the upper and lower end distribution of the square shape frame structure
To angle steel, two lateral angle steel back backrest interlaced arrangements;A vertical angle is distributed in the left and right side of the square shape frame structure
Steel, the upper end of the vertical angle steel are welded in upper end transverse direction angle steel, and lower end is welded in lower end transverse direction angle steel.
8. a kind of air hose promotes fixed device according to claim 1, it is characterised in that: the wirerope has two, two
Wirerope is arranged in the two sides of air hose.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820912439.5U CN208308249U (en) | 2018-06-12 | 2018-06-12 | A kind of fixed device of air hose promotion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820912439.5U CN208308249U (en) | 2018-06-12 | 2018-06-12 | A kind of fixed device of air hose promotion |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208308249U true CN208308249U (en) | 2019-01-01 |
Family
ID=64708178
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820912439.5U Expired - Fee Related CN208308249U (en) | 2018-06-12 | 2018-06-12 | A kind of fixed device of air hose promotion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208308249U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109969962A (en) * | 2019-03-07 | 2019-07-05 | 上海市安装工程集团有限公司 | A kind of automatic blast pipe hanging apparatus and its application method |
-
2018
- 2018-06-12 CN CN201820912439.5U patent/CN208308249U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109969962A (en) * | 2019-03-07 | 2019-07-05 | 上海市安装工程集团有限公司 | A kind of automatic blast pipe hanging apparatus and its application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206521197U (en) | A kind of adjustable balance hoisting beam | |
CN105621280B (en) | The apparatus and method for mounting and dismounting crane arm | |
CN107447665A (en) | A kind of laying method of self-anchored suspension bridge construction cat road carrying rope | |
CN208308249U (en) | A kind of fixed device of air hose promotion | |
CN220376298U (en) | Hanging basket lifting device | |
CN105952130B (en) | A kind of suspension platform installation method for the construction of building cornice position | |
CN108104335A (en) | A kind of cladding system of the assembled flexible of curtain wall | |
CN108560510A (en) | Surface low road movable overhaul platform in a kind of power station | |
CN210659348U (en) | Safety protection structure that building support set up | |
CN204592562U (en) | A kind of suspention suppot hanger of duct | |
CN207609232U (en) | A kind of holding pole structure and lamp stand communication tower | |
CN206799012U (en) | A kind of concrete batten transport of small space and installation tool group | |
CN206110810U (en) | Fixed armful of pole structure of staple bolt that slides | |
CN212141204U (en) | Anti-falling system for aerial work | |
CN111762690B (en) | Device and method for vertically hanging and horizontally moving multiple metal net curtains in place in large space | |
CN208472681U (en) | Surface low road movable overhaul platform in a kind of power station | |
CN209367696U (en) | A kind of attachment device of tower crane | |
CN204079226U (en) | A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts | |
CN207646957U (en) | A kind of cladding system of the assembled flexible of curtain wall | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
CN208280568U (en) | A kind of suspension type aerial work platform below girder steel | |
CN207620481U (en) | A kind of 35 rice lamp shaft towers | |
CN105926915B (en) | Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude | |
CN216974142U (en) | Non-standard hanging basket mounting structure | |
CN219219401U (en) | Temporary protection device for deformation joint in staggered floor construction of tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190101 |
|
CF01 | Termination of patent right due to non-payment of annual fee |