CN208295537U - A kind of double double pressure regulation skid mounted equipments that gasify - Google Patents

A kind of double double pressure regulation skid mounted equipments that gasify Download PDF

Info

Publication number
CN208295537U
CN208295537U CN201820469917.XU CN201820469917U CN208295537U CN 208295537 U CN208295537 U CN 208295537U CN 201820469917 U CN201820469917 U CN 201820469917U CN 208295537 U CN208295537 U CN 208295537U
Authority
CN
China
Prior art keywords
pressure regulator
valve
regulator valve
pressure
shut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820469917.XU
Other languages
Chinese (zh)
Inventor
孙志永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Liquid Equipment Technology Co Ltd
Original Assignee
Wuxi Liquid Equipment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Liquid Equipment Technology Co Ltd filed Critical Wuxi Liquid Equipment Technology Co Ltd
Priority to CN201820469917.XU priority Critical patent/CN208295537U/en
Application granted granted Critical
Publication of CN208295537U publication Critical patent/CN208295537U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Fluid Pressure (AREA)

Abstract

The utility model discloses a kind of double double pressure regulation skid mounted equipments that gasify, including the first gasifier, second gasifier, water-bath type recuperator, first pressure regulator valve, second pressure regulator valve, first safety valve, first shut-off valve, second shut-off valve, node, third pressure regulator valve, 4th pressure regulator valve, 5th pressure regulator valve, 6th pressure regulator valve, 7th pressure regulator valve, first filter, first pressure regulator, 8th pressure regulator valve, 9th pressure regulator valve, tenth pressure regulator valve, second filter, second pressure regulator, 11st pressure regulator valve, 12nd pressure regulator valve, third shut-off valve, second safety valve, first pressure gauge, second pressure gauge, third pressure gauge and thermometer;One voltage regulating line is common, and in addition one is done spare, if pressure regulator valve needs to maintain when repairing, can not have to die, flat from another route.Cryogenic liquid inputs air-heating type gasifier, and the natural gas after gasification is by pressure regulation and safety release input channel.Realize that gasification is integrated with voltage regulation function, it is compact-sized, it is easily installed debugging, shortens engineering time for client, reduces the cost.

Description

A kind of double double pressure regulation skid mounted equipments that gasify
Technical field
The utility model belongs to industrial gasses equipment and Cryo Equipment technical field, and in particular to a kind of double double pressure regulation of gasifying Skid mounted equipment.
Background technique
With the development of globalization of world economy, it is 21 century that status of the natural gas in energy resource structure, which is growing, The novel environment friendly energy is accelerated to reduce atmosphere pollution to uplifting the people's living standard using natural gas and city gas gasification, add Strong environmental protection improves city grade, improves the investment climate, play the role of positive.Natural liquid gases LNG is as a kind of cleaning Fuel is widely applied in fields such as industry, domestic fuels.In recent years, the LNG project in China has obtained rapidly developing, Perfect infrastructure has all been formd in terms of gas.However, currently used for providing the gasification station of LNG, gas station only Suitable for fairly large industrial user's gas supply, large-scale consumer city central gas supply or have gas distributing system area compared with The peak regulation of large-scale city residential area user and industrial user, and its process flow is complicated, land occupation is big, project amount is big, builds a station Period is long and invests greatly, and residential area user and middle and small scale industrial user for no natural gas tube web area cannot then fit With.
Utility model content
The purpose of this utility model is to provide a kind of double double pressure regulation skid mounted equipments that gasify, and realize that gasification is with voltage regulation function One, it is compact-sized, be easily installed debugging, while realizing that a voltage regulating line is common, in addition one do it is spare, if pressure regulator valve need When maintaining repairing, it can not have to die.
To achieve the above object, the utility model provides the following technical solutions:
A kind of double double pressure regulation skid mounted equipments that gasify, including by the first gasifier, the second gasifier, water-bath type recuperator, the One pressure regulator valve, the second pressure regulator valve, the first safety valve, the first shut-off valve, the second shut-off valve, node, third pressure regulator valve, the 4th pressure regulation Valve, the 5th pressure regulator valve, the 6th pressure regulator valve, the 7th pressure regulator valve, first filter, the first pressure regulator, the 8th pressure regulator valve, the 9th pressure regulation Valve, the tenth pressure regulator valve, the second filter, the second pressure regulator, the 11st pressure regulator valve, the 12nd pressure regulator valve, third shut-off valve, second Safety valve, first pressure gauge, second pressure gauge, third pressure gauge and thermometer;
The input terminal of first gasifier connects equipment entrance by the first pressure regulator valve, and the second gasifier input terminal passes through second Pressure regulator valve connects equipment entrance, and the output end of the first gasifier successively passes through the first shut-off valve, the second shut-off valve, third pressure regulator valve It is connected to the entrance of water-bath type recuperator afterwards, the first safety valve is connected between the first shut-off valve and the second shut-off valve, the first peace Full valve connects high altitude discharge mouth, and the output end of the second gasifier is connected between the second shut-off valve and third pressure regulator valve, water-bath type The outlet of recuperator is successively after the 4th pressure regulator valve, the 7th pressure regulator valve, first filter, the first pressure regulator, the 9th pressure regulator valve Connect equipment export;One end of 5th pressure regulator valve is connected between the second shut-off valve and third pressure regulator valve, and the other end is connected to Between four pressure regulator valves and the 7th pressure regulator valve;After tenth pressure regulator valve, the second filter, the second pressure regulator, the series connection of the 12nd pressure regulator valve One end be connected between the 4th pressure regulator valve and the 7th pressure regulator valve, the other end connect equipment export;Pass through third at equipment export Shut-off valve connects the second safety valve;Node is connected between the second shut-off valve and third pressure regulator valve, and node connects thermometer;6th Pressure regulator valve is connected between the 4th pressure regulator valve and the 7th pressure regulator valve, and the 6th pressure regulator valve connects first pressure gauge;8th pressure regulator valve connects It connects between the first pressure regulator and the 9th pressure regulator valve, the 8th pressure regulator valve connects second pressure gauge;11st pressure regulator valve is connected to Between two pressure regulators and the 12nd pressure regulator valve, the 11st pressure regulator valve connects third pressure gauge.
Preferably, the model VALNG-1000/16 of the gasifier.
Preferably, the model HENG-1000/16 of the recuperator.
Compared with prior art, the utility model has the beneficial effects that
The utility model is the double double pressure regulation skid mounted equipments that gasify of one kind for actual conditions design, and a tune may be implemented Crimping road is common, and in addition one is done spare, if pressure regulator valve needs to maintain when repairing, can not have to die, from another route It is flat.Cryogenic liquid inputs air-heating type gasifier, and the natural gas after gasification is by pressure regulation and safety release input channel.This is practical It is novel with good performance, while economic cost is low, market prospects are considerable.Realize that gasification is integrated with voltage regulation function, structure It is compact, it is easily installed debugging, shortens engineering time for client, reduces the cost, at the same time as makeshift device, be moved easily.
Detailed description of the invention
Fig. 1 is the pipeline structure schematic diagram of the utility model.
In Fig. 1: the first gasifier 1, the second gasifier 2, water-bath type recuperator 3, the first pressure regulator valve 4, the second pressure regulator valve 5, First safety valve 6, the first shut-off valve 7, the second shut-off valve 8, node 9, third pressure regulator valve 10, the 4th pressure regulator valve 11, the 5th pressure regulation Valve 12, the 6th pressure regulator valve 13, the 7th pressure regulator valve 14, first filter 15, the first pressure regulator 16, the 8th pressure regulator valve the 17, the 9th are adjusted Pressure valve 18, the tenth pressure regulator valve 19, the second filter 20, the second pressure regulator 21, the 11st pressure regulator valve 22, the 12nd pressure regulator valve 23, Third shut-off valve 24, first pressure gauge 26, second pressure gauge 27, third pressure gauge 28, thermometer 29, is set second safety valve 25 Standby entrance 30, equipment export 31, high altitude discharge mouth 32.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the double pressure regulation skid mounted equipments of double gasifications of the utility model, by the first gasifier 1, the second gasifier 2, Water-bath type recuperator 3, the first pressure regulator valve 4, the second pressure regulator valve 5, the first safety valve 6, the first shut-off valve 7, the second shut-off valve 8, section Point 9, third pressure regulator valve 10, the 4th pressure regulator valve 11, the 5th pressure regulator valve 12, the 6th pressure regulator valve 13, the filtering of the 7th pressure regulator valve 14, first Device 15, the first pressure regulator 16, the 8th pressure regulator valve 17, the 9th pressure regulator valve 18, the tenth pressure regulator valve 19, the second filter 20, second are adjusted Depressor 21, the 11st pressure regulator valve 22, the 12nd pressure regulator valve 23, third shut-off valve 24, the second safety valve 25, first pressure gauge 26, Second pressure gauge 27, third pressure gauge 28 and thermometer 29 form.
Connection type are as follows: the input terminal of the first gasifier 1 connects equipment entrance 30, the second gasification by the first pressure regulator valve 4 2 input terminal of device connects equipment entrance 30 by the second pressure regulator valve 5, and the output end of the first gasifier 1 successively passes through the first shut-off valve 7, the entrance of water-bath type recuperator 3 is connected to after the second shut-off valve 8, third pressure regulator valve 10, the first safety valve 6 is connected to first section Only between valve 7 and the second shut-off valve 8, the first safety valve 6 connects high altitude discharge mouth 32, and the output end of the second gasifier 2 is connected to Between second shut-off valve 8 and third pressure regulator valve 10, the 4th pressure regulator valve the 11, the 7th tune is successively passed through in the outlet of water-bath type recuperator 3 Equipment export 31 is connected after pressure valve 14, first filter 15, the first pressure regulator 16, the 9th pressure regulator valve 18;5th pressure regulator valve 12 One end is connected between the second shut-off valve 8 and third pressure regulator valve 10, and the other end is connected to the 4th pressure regulator valve 11 and the 7th pressure regulator valve Between 14;One end connection after tenth pressure regulator valve 19, the second filter 20, the second pressure regulator 21, the series connection of the 12nd pressure regulator valve 23 Between the 4th pressure regulator valve 11 and the 7th pressure regulator valve 14, the other end connects equipment export 31;It is cut at equipment export 31 by third Only valve 24 connects the second safety valve 25;Node 9 is connected between the second shut-off valve 8 and third pressure regulator valve 10, and node 9 connects temperature Table 29;6th pressure regulator valve 13 is connected between the 4th pressure regulator valve 11 and the 7th pressure regulator valve 14, the first pressure of the 6th pressure regulator valve 13 connection Power table 26;8th pressure regulator valve 17 is connected between the first pressure regulator 16 and the 9th pressure regulator valve 18, the 8th pressure regulator valve 17 connection second Pressure gauge 27;11st pressure regulator valve 22 is connected between the second pressure regulator 21 and the 12nd pressure regulator valve 23, the 11st pressure regulator valve 22 Connect third pressure gauge 28.
The application method and working principle of the utility model are as follows: referring to Fig. 1, the utility model is that a double gasifications are double Pressure regulation skid mounted equipment, voltage regulating line is common, and in addition one is done spare, if pressure regulator valve needs to maintain when repairing, can not have to It dies, it is flat from another route.Cryogenic liquid inputs air-heating type gasifier, and the natural gas after gasification passes through pressure regulation and safety Diffuse input channel.The utility model is with good performance, while economic cost is low, and market prospects are considerable.Realize gasification with Voltage regulation function is integrated, compact-sized, is easily installed debugging, is shortened engineering time for client, is reduced the cost, at the same time as facing When device, be moved easily.Gasifier, water-bath type recuperator use commercial goods, such as gasifier 1 can be used in the utility model Model HENG-1000 (number formulary)/16 can be used in model VALNG-1000 (number formulary)/16 (design pressure), water-bath type recuperator 2 (design pressure).
It can understand the above description of the embodiments is intended to facilitate those skilled in the art and apply this specially Benefit.Person skilled in the art obviously easily can make various modifications to these embodiments, and described herein General Principle is applied in other embodiments without having to go through creative labor.Therefore, the utility model is not limited to here Embodiment, those skilled in the art's announcement according to the present utility model, do not depart from improvement that the utility model scope is made and Modification should be all within the protection scope of the utility model.

Claims (3)

1. a kind of double double pressure regulation skid mounted equipments that gasify, it is characterised in that: multiple including the first gasifier, the second gasifier, water-bath type Hot device, the first pressure regulator valve, the second pressure regulator valve, the first safety valve, the first shut-off valve, the second shut-off valve, node, third pressure regulator valve, 4th pressure regulator valve, the 5th pressure regulator valve, the 6th pressure regulator valve, the 7th pressure regulator valve, first filter, the first pressure regulator, the 8th pressure regulator valve, 9th pressure regulator valve, the tenth pressure regulator valve, the second filter, the second pressure regulator, the 11st pressure regulator valve, the 12nd pressure regulator valve, third are cut Only valve, the second safety valve, first pressure gauge, second pressure gauge, third pressure gauge and thermometer;
The input terminal of first gasifier connects equipment entrance by the first pressure regulator valve, and the second gasifier input terminal passes through the second pressure regulation Valve connects equipment entrance, and the output end of the first gasifier successively connects after the first shut-off valve, the second shut-off valve, third pressure regulator valve It is connected to the entrance of water-bath type recuperator, the first safety valve is connected between the first shut-off valve and the second shut-off valve, the first safety valve High altitude discharge mouth is connected, the output end of the second gasifier is connected between the second shut-off valve and third pressure regulator valve, water-bath type re-heat The outlet of device successively connects after the 4th pressure regulator valve, the 7th pressure regulator valve, first filter, the first pressure regulator, the 9th pressure regulator valve Equipment export;One end of 5th pressure regulator valve is connected between the second shut-off valve and third pressure regulator valve, and the other end is connected to the 4th tune Between pressure valve and the 7th pressure regulator valve;One after tenth pressure regulator valve, the second filter, the second pressure regulator, the series connection of the 12nd pressure regulator valve End is connected between the 4th pressure regulator valve and the 7th pressure regulator valve, and the other end connects equipment export;Ended at equipment export by third Valve connects the second safety valve;Node is connected between the second shut-off valve and third pressure regulator valve, and node connects thermometer;6th pressure regulation Valve is connected between the 4th pressure regulator valve and the 7th pressure regulator valve, and the 6th pressure regulator valve connects first pressure gauge;8th pressure regulator valve is connected to Between first pressure regulator and the 9th pressure regulator valve, the 8th pressure regulator valve connects second pressure gauge;11st pressure regulator valve is connected to the second tune Between depressor and the 12nd pressure regulator valve, the 11st pressure regulator valve connects third pressure gauge.
2. a kind of double double pressure regulation skid mounted equipments that gasify according to claim 1, it is characterised in that: the model of the gasifier For VALNG-1000/16.
3. a kind of double double pressure regulation skid mounted equipments that gasify according to claim 1, it is characterised in that: the model of the recuperator For HENG-1000/16.
CN201820469917.XU 2018-04-04 2018-04-04 A kind of double double pressure regulation skid mounted equipments that gasify Expired - Fee Related CN208295537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820469917.XU CN208295537U (en) 2018-04-04 2018-04-04 A kind of double double pressure regulation skid mounted equipments that gasify

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820469917.XU CN208295537U (en) 2018-04-04 2018-04-04 A kind of double double pressure regulation skid mounted equipments that gasify

Publications (1)

Publication Number Publication Date
CN208295537U true CN208295537U (en) 2018-12-28

Family

ID=64696097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820469917.XU Expired - Fee Related CN208295537U (en) 2018-04-04 2018-04-04 A kind of double double pressure regulation skid mounted equipments that gasify

Country Status (1)

Country Link
CN (1) CN208295537U (en)

Similar Documents

Publication Publication Date Title
DE202018106745U1 (en) A system with electrolysis-hydrogen production and ammonia synthesis in the coal-fired power plant
CN105003706B (en) A kind of Pressure reducing ratio is easy to the natural gas pressure-reducing valve of regulation
CN103706287B (en) A kind of dynamic gas mixer for simulating ship tail gas
CN206293546U (en) Vehicle-mounted hydrogen-feeding system
CN101856590B (en) Carbon capturing system and method for controlling electric carbon coordination in carbon capturing power plant after combustion
CN107257132A (en) A kind of electrical interconnection system synthetic load for considering that wind-powered electricity generation is abandoned cuts down model building method
CN211358409U (en) Gas mixing device
CN216260077U (en) Gas mixing hydrogen system
CN208295533U (en) A kind of storage tank booster gasification pressure regulation metering adds smelly sled
CN208295537U (en) A kind of double double pressure regulation skid mounted equipments that gasify
WO2022262286A1 (en) Stable hydrogen-doped natural gas control method and application
CN203453771U (en) Gas supplying device capable of continuously distributing gas and stabilizing wobbe index
CN105179768B (en) A kind of natural gas pressure-reducing valve for being beneficial to improve outlet pressure control accuracy
CN208295534U (en) A kind of steel cylinder gasification pressure regulation one sled
CN208295532U (en) A kind of storage tank pressurization sled
CN106784928A (en) Vehicle-mounted hydrogen-feeding system
CN208295535U (en) A kind of dull pressure skid mounted equipment of single gasification
CN204962299U (en) User's gas pressure regulating cabinet system
CN208295526U (en) One kind, which is unloaded, is pressurized sled
CN208295540U (en) A kind of cylinder group vaporization pressure regulation one skid mounted equipment that band is unloaded
CN208295536U (en) One kind unload storage tank gasification pressure regulation metering add it is smelly one sled
CN209041989U (en) A kind of single channel band bypass reducer unit
CN202509094U (en) Gas spread tower anti-leakage control device
CN114963017A (en) Natural gas line hydrogen-mixing comprehensive experiment system device
CN210944867U (en) Series connection type energy-saving carbon deoxidation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228