CN208280470U - A kind of parapet of roofing waterproof construction - Google Patents

A kind of parapet of roofing waterproof construction Download PDF

Info

Publication number
CN208280470U
CN208280470U CN201820410636.7U CN201820410636U CN208280470U CN 208280470 U CN208280470 U CN 208280470U CN 201820410636 U CN201820410636 U CN 201820410636U CN 208280470 U CN208280470 U CN 208280470U
Authority
CN
China
Prior art keywords
wall
daughter
concrete panel
armored concrete
coiled material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820410636.7U
Other languages
Chinese (zh)
Inventor
黄轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Xin Mu Waterproof Engineering Co Ltd
Original Assignee
Nanjing Xin Mu Waterproof Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Xin Mu Waterproof Engineering Co Ltd filed Critical Nanjing Xin Mu Waterproof Engineering Co Ltd
Priority to CN201820410636.7U priority Critical patent/CN208280470U/en
Application granted granted Critical
Publication of CN208280470U publication Critical patent/CN208280470U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of parapet of roofing waterproof constructions, it applies in the field that house is built, it solves building top parapet part easily to seep water, the technical issues of drainage, its key points of the technical solution are that including armored concrete panel, the side of the armored concrete panel has poured daughter's wall, water repellent component is equipped between the armored concrete panel and daughter's wall, the water repellent component includes the waterproof coating being laid on armored concrete panel and the water bar that is connected between armored concrete panel and daughter's wall, the waterproof coating includes the modified asphalt felt layer and facing protective coating being successively laid on armored concrete panel, the water bar includes the coiled material one being laid on armoured concrete slab and the coiled material two for being laid on daughter's wall side, the coiled material one and daughter's wall One end of contact is equipped with right angle rib, has the technical effect for realizing building parapet part waterproof action.

Description

A kind of parapet of roofing waterproof construction
Technical field
The utility model relates to house construction applications, in particular to a kind of parapet of roofing waterproof construction.
Background technique
Parapet refers to that the parapet in building roof circumferential periphery, main function can also work as other than safeguarding safety It is used as the anti-hydraulic pressure brick constructed as head is received, also can be very good prevention rainwater and overflow to open, but during current architectural construction, by In the construction characteristic of building itself, the phenomenon that top of usual building will appear infiltration, leak, it is normal to influence building Use.
Utility model content
The purpose of the utility model is to provide a kind of parapet of roofing waterproof constructions, its advantage is that being advantageously implemented to building The waterproof action of object top parapet part.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of parapet of roofing is anti- Water-bound, including armored concrete panel, the side of the armored concrete panel have poured daughter's wall, the reinforced concrete Water repellent component is equipped between native panel and daughter's wall, the water repellent component includes the waterproof being laid on armored concrete panel Coating and the water bar being connected between armored concrete panel and daughter's wall, the waterproof coating include successively being laid with Modified asphalt felt layer and facing protective coating on armored concrete panel, the water bar include being laid on reinforcing bar to mix Coiled material one on concrete board and the coiled material two for being laid on daughter's wall side, one end that the coiled material one is contacted with daughter's wall Equipped with right angle rib, the coiled material two is equipped with diversion edges with one end that right angle rib contradicts, and the diversion edges are laid on right angle gear The outlying side from daughter's wall.
Through the above technical solutions, being equipped with water repellent component between armored concrete panel and daughter's wall, can be realized Stable waterproof effect, water repellent component include waterproof coating and water bar, and water bar includes coiled material one and coiled material two, volume One end that material one and daughter's wall contradict is vertical right angle rib, while the coiled material two of daughter's surface of wall is laid on daughter's wall On, diversion edges are Chong Die with right angle rib to be laid with, and realizes pertinent relation stable between coiled material one and coiled material two, while waterproof applies Layer then includes the modified asphalt felt layer and finishing paint protective layer being laid on armoured concrete slab, can be to extraneous rain Water realizes good isolation, and entire waterproof construction passes through the compound action of water bar and waterproof coating, realizes to roofing female The phenomenon that partially effective waterproof action of youngster's wall, reduction rain penetration.
The utility model is further arranged to: the diversion edges are trapezoidal, described diversion edges one end and right angle rib surface Mating, the vertical rib is equipped with the slot for diversion edges grafting.
Through the above technical solutions, the water conservancy diversion rim portion due to coiled material two is laid on the side of right angle rib, by that will lead It is trapezoidal to flow side setting, can be improved the compactness contradicted between diversion edges and vertical rib, subtract areolate presence, while Vertical rib is additionally provided with the slot for diversion edges one end inlay card, and further reducing conflict between vertical rib and diversion edges may Existing gap error ensures stable waterproof effect to reduce the phenomenon that rainwater etc. is penetrated into from gap.
The utility model is further arranged to: the coiled material two is equipped with bevel edge, the parapet far from one end of diversion edges Body is equipped with the limit hole being inserted into for bevel edge, and the aperture of the limit hole is equipped with sealing compound block.
Through the above technical solutions, side of the coiled material two far from diversion edges is bevel edge, keep and the limit on daughter's wall Hole grafting has ensured the laying compactness of coiled material two Yu daughter's wall, reduces rainwater gap between coiled material two and daughter's wall and seeps The phenomenon that entering, while sealing compound block is additionally provided on limit hole, then the plugging effect to limit hole is realized, is ensured good close Envelope, waterproof action.
The utility model is further arranged to: the armored concrete panel is equipped with extruded sheet insulating layer, the extrusion molding The side that plate insulating layer and armored concrete panel contradict is equipped with several elastic granules.
It is protected through the above technical solutions, extruded sheet insulating layer can realize armored concrete panel, reduces rainwater etc. Armored concrete panel zone is directly reached, while can also be realized to indoor heat insulation effect, in armored concrete panel table Face can have hollow, and several elastic granules, which are then met, can be enhanced itself and steel in the process of deployment for carrying out extruded sheet insulating layer Friction between reinforced concrete panel ensures the reliable of entire waterproof construction.
The utility model is further arranged to: the extruded sheet insulating layer is equipped with water far from the side of armored concrete panel Cement mortar screed-coat.
Through the above technical solutions, need to ensure the levelness of coiled material when carrying out the laying of coiled material, reducing uneven can The accumulation of energy bring later period rainwater, influences good drainage effect, the setting of cement mortar screeding layer can then ensure coiled material Laying environment it is opposed flattened.
The utility model is further arranged to: one end that the coiled material one and coiled material two contradict is connect by heating block welding Seam.
Through the above technical solutions, can effectively be subtracted in the part that coiled material one and coiled material two connect by hot melt block welding Gap between small coiled material one and coiled material two improves the conflict tightness degree between coiled material one and coiled material two, reduces the infiltration of rainwater Enter situation.
The utility model is further arranged to: daughter's wall is equipped with the positioning for armored concrete panel grafting The inner wall in hole, the location hole is equipped with waterproof interlayer.
Through the above technical solutions, the setting of location hole, which facilitates construction personnel, is carrying out reinforcing bar Shanghai concrete slab and female Construction in youngster's wall fixation procedure, it is easy for installation, while waterproof interlayer then can effectively obstruct from positioning bore portion may seep The rainwater entered further increases the water repellent effect of entire waterproof construction.
The utility model is further arranged to: multiple gluing oxidant layer are equipped between the water bar and waterproof coating.
It is closed through the above technical solutions, gluing oxidant layer is conducive to enhance the fitting of stablizing between water bar and waterproof coating System, further decreases the presence in gap, to ensure the waterproof effect of waterproof construction entirety.
In conclusion the utility model has the following beneficial effects:
1, the setting of water repellent component realizes the combination waterproof effect to armored concrete panel and parapet part, effectively Reduce the phenomenon of rainwater infiltrated into inside building body;
2, connection between coiled material two and coiled material one is by way of slot and hot melt block welding, effective guarantee coiled material What is connected between one and coiled material two is secured and stable, and the presence for reducing gap causes rain penetration.
Detailed description of the invention
Fig. 1 is the schematic diagram for showing parapet of roofing waterproof construction in embodiment;
Fig. 2 is the enlarged drawing of A in Fig. 1.
Appended drawing reference: 1, armored concrete panel;2, daughter's wall;21, location hole;22, waterproof interlayer;3, waterproof group Part;31, waterproof coating;311, modified asphalt felt layer;312, facing protective coating;32, water bar;321, coiled material one; 322, coiled material two;4, right angle rib;41, diversion edges;42, slot;5, bevel edge;51, limit hole;52, sealing compound block;6, extruded sheet Insulating layer;61, elastic granule;7, cement mortar screeding layer;8, gluing oxidant layer.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment: a kind of parapet of roofing waterproof construction, as depicted in figs. 1 and 2, including armored concrete panel 1, in steel The side of reinforced concrete panel 1 has poured daughter's wall 2, is equipped on daughter's wall 2 and determines for what armored concrete panel 1 was inserted into Position hole 21 facilitates construction personnel and carries out quickly assembled pouring molding, while being equipped with waterproof interlayer in the inner wall of location hole 21 22, effectively limit the situation that rainwater penetrates between daughter's wall 2 and armored concrete panel 1.
As depicted in figs. 1 and 2, due under rainwater extreme weather situation, the concrete slab on building top and daughter Easily there is a phenomenon where rain leakages for wall part.The parapet waterproof construction is set between armored concrete panel 1 and daughter's wall 2 There is a water repellent component 3, water repellent component 3 includes the waterproof coating 31 being laid on armored concrete panel 1 and to be connected to reinforcing bar mixed Water bar 32 between solidifying soil panel 1 and daughter's wall 2.
As depicted in figs. 1 and 2, it is equipped with extruded sheet insulating layer 6 on armored concrete panel 1, can be realized to the external world Rainwater is directly entered the barrier of armored concrete part, while also having good heat insulation effect.In extruded sheet insulating layer 6 and steel The side that reinforced concrete contradicts is equipped with several elastic granules 61, it is contemplated that the hollow on 1 surface of armored concrete panel is not whole, elasticity The setting of particle 61 helps to enhance the friction of extruded sheet insulating layer 6 and armored concrete panel 1, ensures the stability of laying.
As depicted in figs. 1 and 2, water bar 32 is laid on the top of extruded sheet insulating layer 6, includes one 321 He of coiled material Coiled material 2 322 is discharged since final rainwater etc. needs to realize by the drainage of coiled material 1 and coiled material 2 322, in extrusion molding Plate insulating layer 6 is equipped with cement mortar screeding layer 7, can ensure that the coiled material 1 being finally laid with and coiled material 2 322 keep flat It is whole, reduce laying and the phenomenon that hollow causes rainwater to be accumulated occurs.
As depicted in figs. 1 and 2, coiled material 1 is laid on armored concrete panel 1, in coiled material 1 and reinforced concrete It is equipped with gluing oxidant layer 8 between soil, can ensure the good fit effect of coiled material 1, be supported in coiled material 1 and parapet part One end of touching is equipped with vertical right angle rib 4, and right angle rib 4 is bonded with the conflict of daughter's wall 2.
As depicted in figs. 1 and 2, coiled material 2 322 is laid on the side wall of daughter's wall 2, in coiled material 2 322 and daughter's wall It is again provided with gluing oxidant layer 8 between 2, has ensured that the stabilization between coiled material 2 322 and daughter's wall 2 is bonded, has reduced rainwater from seam The phenomenon that gap is penetrated into.The side that coiled material 2 322 and right angle rib 4 contradict is equipped with diversion edges 41, and trapezoidal, energy is arranged in diversion edges 41 It is enough to realize that the conflict between vertical rib is bonded, by hot melt block welding seam between diversion edges 41 and right angle rib 4, reduce The generation in gap, while it being additionally provided on coiled material 1 slot 42 for 41 grafting of diversion edges, further ensure diversion edges Being connected firmly between 41 and vertical rib.Coiled material 2 322 is equipped with bevel edge 5, bevel edge 5 and parapet far from one end of diversion edges 41 Grafting between the limit hole 51 being arranged on body 2 reduces the rainwater shape that gap enters between coiled material 2 322 and daughter's wall 2 Condition, while 51 part of limit hole also passes through sealing compound block 52 and is sealed processing, has further ensured coiled material 2 322 and parapet Type is completely embedded between body 2.
As depicted in figs. 1 and 2, waterproof coating 31 includes modified asphalt felt layer and facing protective coating 312, is successively laid with On the surface of coiled material 1 and coiled material 2 322, entire waterproof construction outermost is realized to the isolation Intercepting effect of rainwater etc., Water flow is set to flow through from daughter's wall 2 and reinforced concrete surface rapidly, it is final to realize discharge, reduce on building top Accumulate leakage phenomenon.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. a kind of parapet of roofing waterproof construction, including armored concrete panel (1), the one of the armored concrete panel (1) Side has poured daughter's wall (2), it is characterized in that: being equipped with waterproof group between the armored concrete panel (1) and daughter's wall (2) Part (3), the water repellent component (3) include the waterproof coating (31) being laid on armored concrete panel (1) and are connected to steel Water bar (32) between reinforced concrete panel (1) and daughter's wall (2), the waterproof coating (31) include successively being laid on Modified asphalt felt layer (311) and facing protective coating (312) on armored concrete panel (1), the water bar (32) Including the coiled material one (321) being laid on armoured concrete slab and it is laid on the coiled material two (322) of daughter's wall (2) side, One end that the coiled material one (321) contacts with daughter's wall (2) is equipped with right angle rib (4), and the coiled material two (322) and right angle are kept off One end that side (4) contradicts is equipped with diversion edges (41), and the diversion edges (41) are laid on right angle rib (4) far from daughter's wall (2) Side.
2. a kind of parapet of roofing waterproof construction according to claim 1, it is characterized in that: the diversion edges (41) are in ladder Shape, described diversion edges (41) one end and right angle rib (4) surface are mating, and the vertical rib is equipped with for diversion edges (41) The slot (42) of grafting.
3. a kind of parapet of roofing waterproof construction according to claim 1, it is characterized in that: the coiled material two (322) is separate One end of diversion edges (41) is equipped with bevel edge (5), and daughter's wall (2) is equipped with the limit hole (51) being inserted into for bevel edge (5), institute The aperture for stating limit hole (51) is equipped with sealing compound block (52).
4. a kind of parapet of roofing waterproof construction according to claim 1, it is characterized in that: the armored concrete panel (1) extruded sheet insulating layer (6) are equipped with, the side that the extruded sheet insulating layer (6) contradicts with armored concrete panel (1) is equipped with Several elastic granules (61).
5. a kind of parapet of roofing waterproof construction according to claim 4, it is characterized in that: the extruded sheet insulating layer (6) Side far from armored concrete panel (1) is equipped with cement mortar screeding layer (7).
6. a kind of parapet of roofing waterproof construction according to claim 1, it is characterized in that: the coiled material one (321) and volume One end that material two (322) contradicts passes through hot melt block welding seam.
7. a kind of parapet of roofing waterproof construction according to claim 1, it is characterized in that: being set on daughter's wall (2) There is the location hole (21) for armored concrete panel (1) grafting, the inner wall of the location hole (21) is equipped with waterproof interlayer (22).
8. a kind of parapet of roofing waterproof construction according to claim 1, it is characterized in that: the water bar (32) and anti- Multiple gluing oxidant layer (8) are equipped between water coating (31).
CN201820410636.7U 2018-03-24 2018-03-24 A kind of parapet of roofing waterproof construction Active CN208280470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820410636.7U CN208280470U (en) 2018-03-24 2018-03-24 A kind of parapet of roofing waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820410636.7U CN208280470U (en) 2018-03-24 2018-03-24 A kind of parapet of roofing waterproof construction

Publications (1)

Publication Number Publication Date
CN208280470U true CN208280470U (en) 2018-12-25

Family

ID=64750127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820410636.7U Active CN208280470U (en) 2018-03-24 2018-03-24 A kind of parapet of roofing waterproof construction

Country Status (1)

Country Link
CN (1) CN208280470U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472500A (en) * 2020-04-22 2020-07-31 四川省商业建设有限责任公司 Waterproof coiled material mounting structure and mounting method
CN113775117A (en) * 2021-09-24 2021-12-10 宁波益富乐生物科技有限公司 Building roof waterproof structure and construction method thereof
CN114482424A (en) * 2022-03-15 2022-05-13 南通新华建筑集团有限公司 Secondary pouring construction method for parapet wall with hidden rabbet
CN114607105A (en) * 2022-04-13 2022-06-10 江苏邗建集团有限公司 Roof anti-seepage structure and anti-seepage method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472500A (en) * 2020-04-22 2020-07-31 四川省商业建设有限责任公司 Waterproof coiled material mounting structure and mounting method
CN113775117A (en) * 2021-09-24 2021-12-10 宁波益富乐生物科技有限公司 Building roof waterproof structure and construction method thereof
CN114482424A (en) * 2022-03-15 2022-05-13 南通新华建筑集团有限公司 Secondary pouring construction method for parapet wall with hidden rabbet
CN114482424B (en) * 2022-03-15 2023-03-31 南通新华建筑集团有限公司 Secondary pouring construction method for parapet wall with hidden rabbet
CN114607105A (en) * 2022-04-13 2022-06-10 江苏邗建集团有限公司 Roof anti-seepage structure and anti-seepage method

Similar Documents

Publication Publication Date Title
CN208280470U (en) A kind of parapet of roofing waterproof construction
CN208844810U (en) A kind of building roof parapet flashing water proof structure
CN204300966U (en) Transformer station's optical lighting system
CN205242453U (en) Waterproof structure of basement roof movement joint
CN212641729U (en) High-strength basement side wall heat-insulation waterproof structure with water guide groove
CN212772858U (en) Heat preservation pantile pitched roof and parapet junction node structure
CN209837491U (en) Parapet antiseep node
CN208702032U (en) A kind of roof waterproof structure having upper manhole
CN208396171U (en) A kind of parapet seepage-proof structure
CN207974398U (en) roof waterproof structure
CN212176331U (en) Roof structure
CN205000360U (en) Basement structure with waterproof structure
CN211691115U (en) Pre-buried device of roofing downspout
CN211691104U (en) Building periphery waterproof heat-insulating structure
CN207905592U (en) A kind of bay window water-proof top plate
CN207974391U (en) Waterproof construction for roof
CN209384407U (en) Outer wall of basement waterproof construction
CN218881957U (en) Water seepage prevention structure of bay window
CN218405849U (en) Outer facade threshold waterproof construction
CN215484167U (en) Waterproof connection structure of mouth of a river falls in parapet bottom
CN215484133U (en) Waterproof connection structure of roofing access & exit threshold department
CN220469256U (en) Waterproof construction structure of flat roof
CN217128762U (en) Waterproof connection structure of roofing brick parapet bottom
CN218234069U (en) Threshold flashing structure of roof outlet door
CN217782449U (en) Parapet waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant