CN208244357U - A kind of flue gas cleaning system - Google Patents

A kind of flue gas cleaning system Download PDF

Info

Publication number
CN208244357U
CN208244357U CN201721454548.9U CN201721454548U CN208244357U CN 208244357 U CN208244357 U CN 208244357U CN 201721454548 U CN201721454548 U CN 201721454548U CN 208244357 U CN208244357 U CN 208244357U
Authority
CN
China
Prior art keywords
scrubbing tower
furnace gas
circulating slot
tower
condenser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721454548.9U
Other languages
Chinese (zh)
Inventor
潘海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin City Electric Ltd By Share Ltd Pankyo
Original Assignee
Tianjin City Electric Ltd By Share Ltd Pankyo
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin City Electric Ltd By Share Ltd Pankyo filed Critical Tianjin City Electric Ltd By Share Ltd Pankyo
Priority to CN201721454548.9U priority Critical patent/CN208244357U/en
Application granted granted Critical
Publication of CN208244357U publication Critical patent/CN208244357U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

A kind of flue gas cleaning system, it is characterised in that including scrubbing tower, condenser, demister, drying tower, circulating slot, settling tank, the scrubbing tower includes the first scrubbing tower and the second scrubbing tower;The circulating slot includes scrubbing tower circulating slot a, scrubbing tower circulating slot b, condenser acid storage tank;The furnace gas for needing to purify passes through the first scrubbing tower preliminary purification, furnace gas after primary wash enters the second scrubbing tower secondary washing, the furnace gas export of the double purification tower connects the condenser, furnace gas furnace gas after condensing tube condensation continues through pipeline into the demister, it is finally dry through drying tower again after demister demisting.

Description

A kind of flue gas cleaning system
Technical field
The utility model relates to purification systems, and in particular to flue gas cleaning system.
Background technique
Contain a large amount of flue dust and harmful substance in furnace gas, such as without processing is directly discharged in air that air can be made At serious pollution.Current flue gas cleaning process, is generally divided into wet process and dry method two major classes, using dry cleaning furnace gas The land occupation of mode purification device is huge, and harmful substance is not easy to remove, and wet process is widely used at present.Wet process is because of cleaning solution difference point It is two kinds of pickling and washing, washing process generates a large amount of waste water, to be also further processed.
Utility model content
In view of the above-mentioned problems, the purpose of this utility model is to provide a kind of flue gas cleaning devices with double scrubbing towers.
The utility model solves technical solution used by above-mentioned technical problem: a kind of flue gas cleaning system, feature Be to include scrubbing tower, condenser, demister, drying tower, circulating slot, settling tank, the scrubbing tower include the first scrubbing tower and Second scrubbing tower;The circulating slot includes scrubbing tower circulating slot a, scrubbing tower circulating slot b, condenser acid storage tank;It needs to purify Furnace gas passes through the first scrubbing tower preliminary purification, and the furnace gas after primary wash enters the second scrubbing tower secondary washing, described secondary The furnace gas export of purifying column connects the condenser, and furnace gas furnace gas after condensing tube condensation continues through pipeline into the demisting Device, it is finally dry through drying tower again after demister demisting.
Further, first scrubbing tower includes: baffle, orifice plate, furnace gas import, atomizer, cleaning solution entrance, the furnace Lower section is arranged on the left of first scrubbing tower in gas import, and furnace gas export setting is in the first washing column overhead, the atomization Device setting is arranged in the first scrubbing tower right side central, the cleaning solution entrance in the first scrubbing tower right upper portion, institute It states baffle and orifice plate forms scrubber layer, totally three layers of the scrubber layer, be distributed in the middle part of first scrubbing tower, on the atomizer It is provided with atomizing nozzle.
Further, the cleaning solution entrance of first scrubbing tower and cleaning solution outlet are all connected with the scrubbing tower circulating slot a, The scrubbing tower circulating slot a connection settling tank.
Further, second scrubbing tower includes: furnace gas import, furnace gas export, atomizer, cleaning solution outlet.The furnace Gas import is located at the second scrubbing tower left lower, and the furnace gas export is located at the second washing column overhead, described Atomizer is arranged in the middle part of second scrubbing tower, and the cleaning solution outlet is arranged in the second scrubbing tower lower right side,
Further, the second scrubbing tower atomizer is connected through inlet tube with the scrubbing tower circulating slot b, and described second washes The cleaning solution outlet for washing tower is connected through liquid back pipe with the scrubbing tower circulating slot b.
Further, the condenser includes furnace gas import, condenser pipe, condensate outlet, and the furnace gas import is arranged in institute Condenser top is stated, the condensate outlet connect with the condenser acid storage tank by liquid back pipe, passes through in the condenser pipe Condensed water.
Further, the condenser acid storage tank connects the scrubbing tower circulating slot b, the scrubbing tower circulating slot b connection institute State scrubbing tower circulating slot a, the scrubbing tower circulating slot a connection settling tank, the gas entered in settling tank is through gas purification It is discharged after device.
Further, between first scrubbing tower and the scrubbing tower circulating slot a can independent loops, second scrubbing tower Between the scrubbing tower circulating slot b can independent loops, can independent loops between the condenser and the condenser acid storage tank.
Utility model has the advantages that
1, dual washing tower is arranged in the utility model, and the furnace gas solid matter almost all after double purified is removed.
2, the utility model setting condenser discharges again after reducing furnace gas temperature, is more favorable for environmental protection.
3, settling tank is arranged in this reality utility model, all cleaning solutions is recovered to settling tank centralized processing, so that mud Slurry sedimentation is more thorough, and cleaning solution is collected more abundant.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the system flow chart of the utility model.
Wherein:
1, the first scrubbing tower;11, baffle;12, orifice plate;13, furnace gas import;
14, atomizer;15, cleaning solution entrance;16, scrubbing tower circulating slot a;2, the second scrubbing tower;
21, scrubbing tower circulating slot b;3, condenser;31, condenser pipe;32, condenser acid storage tank
4, demister;5, drying tower;6, settling tank;61, sewage draining exit;7, gas purifier;
8, water pump;
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
A kind of flue gas cleaning system as shown in Figure 1, it is characterised in that including scrubbing tower, condenser 3, demister, drying Tower 5, circulating slot, settling tank 6, the scrubbing tower include the first scrubbing tower 1 and the second scrubbing tower 2;The circulating slot includes washing Tower circulating slot a16, scrubbing tower circulating slot b21,3 acid storage tank of condenser;The furnace gas for needing to purify is preliminary net by the first scrubbing tower 1 Change, furnace gas after primary wash enters 2 secondary washing of the second scrubbing tower, described in the furnace gas export connection of the double purification tower Condenser 3, furnace gas furnace gas after the condensation of condenser pipe 31 continue through pipeline into the demister, after demister demisting, most It is dry through drying tower 5 again afterwards.
First scrubbing tower 1 includes: baffle 11, orifice plate 12, furnace gas import 13, atomizer 14, cleaning solution entrance, the furnace gas Below 1 left side of the first scrubbing tower, furnace gas export is arranged in 1 tower top of the first scrubbing tower, the mist setting of import 13 Change the setting of device 14 in 1 right side central of the first scrubbing tower, the cleaning solution entrance setting is on 1 right side of the first scrubbing tower Portion, the baffle 11 and orifice plate 12 form scrubber layer, totally three layers of the scrubber layer, are distributed in 1 middle part of the first scrubbing tower, institute It states and is provided with atomizing nozzle on atomizer 14.
Cleaning solution entrance and the cleaning solution outlet of first scrubbing tower 1 are all connected with the scrubbing tower circulating slot a16, the washing The tower circulating slot a16 connection settling tank 6.
Second scrubbing tower 2 includes: furnace gas import 13, furnace gas export, atomizer 14, cleaning solution outlet.The furnace gas import 13 are located at 2 left lower of the second scrubbing tower, and the furnace gas export is located at 2 tower top of the second scrubbing tower, the mist Change the setting of device 14 at 2 middle part of the second scrubbing tower, the cleaning solution outlet is arranged in 2 lower right side of the second scrubbing tower,
Second scrubbing tower, 2 atomizer 14 is connected through inlet tube with the scrubbing tower circulating slot b21, second scrubbing tower 2 Cleaning solution outlet be connected through liquid back pipe with the scrubbing tower circulating slot b21.
Condenser 3 includes furnace gas import 13, condenser pipe 31, condensate outlet, and the furnace gas import 13 is arranged described cold 3 top of condenser, the condensate outlet connect with 3 acid storage tank of condenser by liquid back pipe, pass through in the condenser pipe 31 Condensed water.
3 acid storage tank of condenser connects the scrubbing tower circulating slot b21, the scrubbing tower circulating slot b21 connection washing Tower circulating slot a16, the scrubbing tower circulating slot a16 connection settling tank 6, the gas entered in settling tank 6 is through gas purification It is discharged after device 7.
Between first scrubbing tower 1 and the scrubbing tower circulating slot a16 can independent loops, second scrubbing tower 2 and described Between scrubbing tower circulating slot b21 can independent loops, can independent loops between 3 acid storage tank of the condenser 3 and the condenser.
Working method:
Furnace gas to be processed enters 1 central space of the first scrubbing tower from the furnace gas import 13 of bottom, with the acid sprayed Liquid and the cleaning solution counter current contacting flow down from sieve plate and orifice plate 12, furnace gas humidifying cooling, and washed away most of mine dust.This is empty Between commonly referred to as humidification washing section.Furnace gas, into the cooling washing section in top, sequentially passes through the formation of orifice plate 12 after humidification washing Scrubber layer, hit 12 top baffle 11 of orifice plate, directly contacted with cold acid and sufficiently washed and cooled down.It is general to pass through three pieces of sieves After plate, furnace gas temperature is lowered, and the impurity such as mine dust are washed removing substantially, and part acid mist is captured, remaining takes tower out of by furnace gas.
The acid mist being carried over from the first scrubbing tower 1 enters the second scrubbing tower 2, and the atomizer 14 in the second scrubbing tower 2 continues It is spraying, increase the drop of acid mist, solid particle is as the nuclei of condensation, so that the drop with solid particle flows into tower bottom, carries out secondary Purification.Remaining furnace gas is carried over tower.
Furnace gas enters shell-and-tube indirect condenser 3, and cooled water is cooled to 40 DEG C hereinafter, institute's containing water vapor is condensate in wall Further increase acid mist diameter.So far furnace gas drops to 40 DEG C hereinafter, complete sensible heat is taken away by cooling water outside pipe by 330 DEG C.Furnace Gas enters electrostatic precipitator, and remaining denier mine dust is almost completely wiped, and eventually enters into dry in drying tower 5.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (8)

1. a kind of flue gas cleaning system, it is characterised in that including scrubbing tower, condenser, demister, drying tower, circulating slot, sedimentation Pond, the scrubbing tower include the first scrubbing tower and the second scrubbing tower;The circulating slot includes that scrubbing tower circulating slot a, scrubbing tower follow Annular groove b, condenser acid storage tank;The furnace gas for needing to purify passes through the first scrubbing tower preliminary purification, furnace gas after primary wash into Enter the second scrubbing tower secondary washing, the furnace gas export of double purification tower connects the condenser, furnace gas furnace after condensing tube condensation Gas continues through pipeline into the demister, after demister demisting, finally again through drying tower drying.
2. a kind of flue gas cleaning system as described in claim 1, it is characterised in that first scrubbing tower includes: baffle, hole Lower section is arranged on the left of first scrubbing tower in plate, furnace gas import, atomizer, cleaning solution entrance, the furnace gas import, and furnace gas goes out Mouth setting is arranged in the first washing column overhead, the atomizer in the first scrubbing tower right side central, the cleaning solution Entrance setting forms scrubber layer in the first scrubbing tower right upper portion, the baffle and orifice plate, is distributed in first washing In the middle part of tower, atomizing nozzle is provided on the atomizer.
3. a kind of flue gas cleaning system as claimed in claim 1 or 2, it is characterised in that the cleaning solution of first scrubbing tower enters Mouth and cleaning solution outlet are all connected with the scrubbing tower circulating slot a, the scrubbing tower circulating slot a connection settling tank.
4. a kind of flue gas cleaning system as described in claim 1, it is characterised in that second scrubbing tower include: furnace gas into Mouth, furnace gas export, atomizer, cleaning solution outlet, the furnace gas import are located at the second scrubbing tower left lower, the furnace gas Outlet is located at the second washing column overhead, and the atomizer is arranged in the middle part of second scrubbing tower, the cleaning solution outlet It is arranged in the second scrubbing tower lower right side.
5. a kind of flue gas cleaning system as described in claim 1 or 4, it is characterised in that the second scrubbing tower atomizer pass through into Liquid pipe is connected with the scrubbing tower circulating slot b, and the cleaning solution outlet of second scrubbing tower is followed through liquid back pipe and the scrubbing tower Annular groove b is connected.
6. a kind of flue gas cleaning system as described in claim 1, it is characterised in that the condenser includes furnace gas import, condensation Pipe, condensate outlet, furnace gas import setting on the condenser top, the condensate outlet by liquid back pipe with it is described Condenser acid storage tank connects, and passes through condensed water in the condenser pipe.
7. a kind of flue gas cleaning system as described in claim 1, it is characterised in that washed described in the condenser acid storage tank connection Wash tower circulating slot b, the scrubbing tower circulating slot b connection scrubbing tower circulating slot a, described in the scrubbing tower circulating slot a connection Settling tank, the gas entered in settling tank are discharged after gas purifier.
8. a kind of flue gas cleaning system as described in claim 1, it is characterised in that first scrubbing tower and the scrubbing tower Between circulating slot a can independent loops, between second scrubbing tower and the scrubbing tower circulating slot b can independent loops, it is described cold It can independent loops between condenser and the condenser acid storage tank.
CN201721454548.9U 2017-11-03 2017-11-03 A kind of flue gas cleaning system Expired - Fee Related CN208244357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721454548.9U CN208244357U (en) 2017-11-03 2017-11-03 A kind of flue gas cleaning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721454548.9U CN208244357U (en) 2017-11-03 2017-11-03 A kind of flue gas cleaning system

Publications (1)

Publication Number Publication Date
CN208244357U true CN208244357U (en) 2018-12-18

Family

ID=64620481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721454548.9U Expired - Fee Related CN208244357U (en) 2017-11-03 2017-11-03 A kind of flue gas cleaning system

Country Status (1)

Country Link
CN (1) CN208244357U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107596844A (en) * 2017-11-03 2018-01-19 天津市三木森电炉股份有限公司 A kind of flue gas cleaning system
CN109589737A (en) * 2019-01-23 2019-04-09 广州研华环境科技有限公司 A kind of cracking gas purification system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107596844A (en) * 2017-11-03 2018-01-19 天津市三木森电炉股份有限公司 A kind of flue gas cleaning system
CN109589737A (en) * 2019-01-23 2019-04-09 广州研华环境科技有限公司 A kind of cracking gas purification system and method

Similar Documents

Publication Publication Date Title
CN107185329A (en) A kind of high-effective dust-removing and device for reclaiming moisture
CN206430578U (en) A kind of vent gas treatment tower
CN104815528B (en) A kind of wet flue gas are from rise again type integrated fume purifier and its application
CN108014578A (en) The method and device of fine grained and condensable particle in low temperature spray cleaning coal-fired flue-gas
CN206652387U (en) A kind of ammonia desulfuration equipment of resourcebility
CN106422633A (en) Desulfurizing tower spraying, condensing, amplifying, dedusting and demisting integrated device
CN208244357U (en) A kind of flue gas cleaning system
CN204799098U (en) Compound desulfurizing tower
CN207654875U (en) Dust-extraction unit and cleaner
CN211487021U (en) Tube bundle type demisting and dedusting device
CN109482035A (en) A kind of desulfurization fume multi-stage condensing system
CN211936172U (en) Collection condensation dehumidification and dust removal integrated device after sintering flue gas wet flue gas desulfurization
CN205796855U (en) A kind of high-efficient wet-type organic abnormal flavour waste gas purification cleaner unit
CN205392026U (en) High humility dust processing system
CN107388847A (en) Heat reclaim unit and technique in flue gas desulfurization and denitration technique
CN208771706U (en) A kind of spray room exhaust treatment system
CN208049672U (en) Plume takes off white system
CN208413844U (en) The purifying plant of high yield super clean, high purified hydrofluoric acid
CN207071314U (en) A kind of acid mist treatment device of smoke test machine
CN107596844A (en) A kind of flue gas cleaning system
CN209333425U (en) A kind of asphalt water-proof coiled material production line air cleaning unit
CN205598775U (en) Reach defogging system including device in same direction as gravity field defogging device
CN201175637Y (en) Water curtain spray eliminator
CN207886878U (en) High-tower granulation dust drainage atomization cleaning dust mist device
CN210544005U (en) Tail gas washing tower integrating three-level washing of anhydrous calcium chloride

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181218

Termination date: 20211103