CN208222824U - A kind of basement membrane preheating cabinet air uniform device - Google Patents

A kind of basement membrane preheating cabinet air uniform device Download PDF

Info

Publication number
CN208222824U
CN208222824U CN201820599676.0U CN201820599676U CN208222824U CN 208222824 U CN208222824 U CN 208222824U CN 201820599676 U CN201820599676 U CN 201820599676U CN 208222824 U CN208222824 U CN 208222824U
Authority
CN
China
Prior art keywords
return air
preheating cabinet
baffle
air
basement membrane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820599676.0U
Other languages
Chinese (zh)
Inventor
吴雄鹰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi spuna Industrial Technology Co.,Ltd.
Original Assignee
Wuxi Peak New Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Peak New Material Technology Co Ltd filed Critical Wuxi Peak New Material Technology Co Ltd
Priority to CN201820599676.0U priority Critical patent/CN208222824U/en
Application granted granted Critical
Publication of CN208222824U publication Critical patent/CN208222824U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

A kind of basement membrane preheating cabinet air uniform device, including preheating cabinet, circulating fan, heater, air supply tube, collection chamber, tuyere, return air baffle are sequentially installed in preheating cabinet, circulating fan is sent to heater heating, collection chamber is sent by air supply tube again, then it is connected to tuyere by collection chamber to spray to basement membrane preheating, by turning again to circulating fan air inlet after return air baffle after the pre- film of Hot-blast Heating that tuyere sprays;The return air baffle opens up the return air hole of different-diameter on plate, and return air baffle is installed to the two sides gap Bu Liu of return air baffle when in preheating cabinet body, and hot wind returns to the air inlet of circulating fan by the hole on return air baffle.The utility model is applied to hot wind preheating cabinet.Realize uniform return air purpose.

Description

A kind of basement membrane preheating cabinet air uniform device
Technical field
The utility model relates to a kind of novel return air retaining devices, and what it is in particular for basement membrane preheating cabinet system includes return air The air uniform device of baffle.
Background technique
Circulating fan air inlet centralized return air system causes internal temperature uneven in order to prevent in existing basement membrane preheating cabinet system It is even, return air baffle 9 is mounted between substrate and the air inlet of circulating fan, which generally uses blind plate, and width is same Basement membrane equivalent width, there are certain gap between return air baffle and the inner wall of preheating cabinet, the air sprayed from tuyere passes through two Latasuture gap flow to fan inlet.Pass through since return air only passes through two sides gap, due to not having gap, return air can not for intermediate region Pass through, causes two sides and intermediate non-uniform temperature.Existing return air baffle dress is exactly one piece without hole plate.
Utility model content
The utility model aim is, for above-mentioned existing return air baffle disadvantage, to provide a kind of novel even wind of basement membrane preheating cabinet Device, including return air retaining device are provided with return air hole on novel return air baffle, return so that return air can pass through intermediate gap To fan inlet, two sides and the non-uniform disadvantage of medium temperature are solved.
Technical solution used by the utility model is as follows: basement membrane preheating cabinet air uniform device, including preheating cabinet, in preheating cabinet It is sequentially installed with circulating fan, heater, air supply tube, collection chamber, tuyere, return air baffle, circulating fan is sent to heater Heating, then collection chamber is sent by air supply tube, tuyere is then connected to by collection chamber and is sprayed to basement membrane preheating, what tuyere sprayed By turning again to circulating fan air inlet after return air baffle after the pre- film of Hot-blast Heating;The return air baffle opens up not on plate With the return air hole of diameter, return air baffle is installed to the two sides gap Bu Liu of return air baffle when in preheating cabinet body, and hot wind passes through return air Hole on baffle returns to the air inlet of circulating fan, realizes uniform return air purpose.
1/3 region of center of return air baffle is uniformly provided with macropore, and the left side of return air baffle and 1/3 region on right side are uniformly opened There is aperture, the diameter macropores are the 150%-300% of the hole diameter.
The utility model has the beneficial effects that the utility model main member is the improvement of return air retaining device, using return air Retaining device opens up the return air hole of different-diameter on blind plate, increases return air baffle dimensions, is installed in preheating cabinet, two sides are not stayed Gap, air return to the air inlet of circulating fan by the hole on return air baffle, realize uniform return air purpose.To solve two sides With the non-uniform deficiency of medium temperature.
Detailed description of the invention
Fig. 1 a is the cross-sectional structure schematic diagram of the utility model.Fig. 1 b is that the vertical section structure of the utility model is illustrated Figure.
Fig. 2 is the utility model return air retaining device schematic diagram.
Fig. 3 is existing preheating cabinet structural schematic diagram.
Wherein: 1, preheating cabinet;2, collection chamber;3, tuyere;4 exhaust outlets;5, return air baffle;6, circulating fan;7, heater; 8, air supply tube;10, bracket;11, basement membrane;5-1 return air hole;5-2, return air hole;5-3, return air hole.Non-porous return air baffle 9.
Specific embodiment
With reference to the accompanying drawing, illustrate specific embodiment of the present utility model.
As shown in Figure 1, the basement membrane preheating cabinet air uniform device of the present embodiment includes preheating containing novel return air retaining device Case 1, circulating fan 6, heater 7, air supply tube 8, collection chamber 2, tuyere 3, novel return air baffle 5 etc. increase 5 ruler of return air baffle It is very little, it is installed in preheating cabinet 1, the return air baffle two sides gap Bu Liu.Air is sent to the heating of heater 7 by circulating fan 6, then leads to It crosses air supply tube 8 and is sent into collection chamber 2, then sprayed by tuyere 3 and heat basement membrane 11, after the Hot-blast Heating basement membrane 11 that tuyere 3 sprays 6 import of circulating fan is returned to by return air hole 5-1,5-2,5-3 on return air baffle 5, realizes uniform return air purpose.
Above description is the explanation to the utility model, is not the restriction to utility model, defined by the utility model Range is within the protection scope of the utility model referring to claim, can make any type of modification.

Claims (2)

1. a kind of basement membrane preheating cabinet air uniform device, including preheating cabinet, circulating fan is sequentially installed in preheating cabinet, heater, is sent Air hose, collection chamber, tuyere, return air baffle, circulating fan is sent to heater heating, then is sent into collection chamber by air supply tube, Then it is connected to tuyere by collection chamber to spray to basement membrane preheating, by after return air baffle after the pre- film of Hot-blast Heating that tuyere sprays Turn again to circulating fan air inlet;It is characterized in that the return air baffle opens up the return air hole of different-diameter, return air on plate Baffle is installed to the two sides gap Bu Liu of return air baffle when in preheating cabinet body, and hot wind returns to circulated air by the hole on return air baffle The air inlet of machine.
2. basement membrane preheating cabinet air uniform device according to claim 1, it is characterized in that 1/3 region of center of return air baffle is uniform It is provided with macropore, the left side of return air baffle and 1/3 region on right side are uniformly provided with aperture, and the diameter macropores are the hole diameters 150%-300%.
CN201820599676.0U 2018-04-25 2018-04-25 A kind of basement membrane preheating cabinet air uniform device Active CN208222824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820599676.0U CN208222824U (en) 2018-04-25 2018-04-25 A kind of basement membrane preheating cabinet air uniform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820599676.0U CN208222824U (en) 2018-04-25 2018-04-25 A kind of basement membrane preheating cabinet air uniform device

Publications (1)

Publication Number Publication Date
CN208222824U true CN208222824U (en) 2018-12-11

Family

ID=64513047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820599676.0U Active CN208222824U (en) 2018-04-25 2018-04-25 A kind of basement membrane preheating cabinet air uniform device

Country Status (1)

Country Link
CN (1) CN208222824U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112011838A (en) * 2019-05-29 2020-12-01 上海炅杰橡塑实业有限公司 Circulating cooling device of spinning machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112011838A (en) * 2019-05-29 2020-12-01 上海炅杰橡塑实业有限公司 Circulating cooling device of spinning machine

Similar Documents

Publication Publication Date Title
CN205138083U (en) Glass instrument air current drying apparatus
CN208222824U (en) A kind of basement membrane preheating cabinet air uniform device
CN205002537U (en) Adjustable swirl formula air current oven
CN205119304U (en) Second grade refrigeration constant temperature and humidity system for spraying production line
CN204063867U (en) A kind of galvanized wire cleaning section drying system
CN203719332U (en) Drying room
CN104990101A (en) Gas boiler flow guide and air distribution plate
CN205156523U (en) Heated air circulation formula bakery
CN103245019A (en) Improved aging room
CN205109982U (en) Circulated air accuse temperature system for automatic spraying production line
CN212216131U (en) Device that disappearance mould coating was dried
CN203994319U (en) For the hot blast current equalizer of film stretching production line
CN209679524U (en) A kind of spray-drying installation
CN203489287U (en) Waste gas treatment and heat supply system of color steel plate production line
CN206572519U (en) A kind of annular flame burning heater
CN205270074U (en) Curing oven is scribbled to coloured silk
CN205004131U (en) A novel transformer cooling device for electric power field
CN203155491U (en) Internal air circulation system of paint oven
CN208983813U (en) A kind of pressure spray drying tower hot air heating system
CN205340601U (en) Efflux mixing arrangement of heat preservation function is taken to high efficiency
CN204404357U (en) The bathroom heating device that a kind of leaving water temperature is adjustable
CN203421338U (en) Flexible air pipe
CN205000026U (en) Spinning corridor system
CN204936488U (en) A kind of letterpress being equipped with drying unit
CN205026920U (en) Heating pipe of rapid heating

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210825

Address after: 214000 6, Xinnong Road, Shuofang street, Xinwu District, Wuxi City, Jiangsu Province

Patentee after: Wuxi Sipu sodium Industrial Technology Co.,Ltd.

Address before: 214142 No. 5, Xinnong Road, Shuofang street, Binhu District, Wuxi City, Jiangsu Province

Patentee before: WUXI FENGJI NEW MATERIAL TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 214000 6, Xinnong Road, Shuofang street, Xinwu District, Wuxi City, Jiangsu Province

Patentee after: Wuxi spuna Industrial Technology Co.,Ltd.

Address before: 214000 6, Xinnong Road, Shuofang street, Xinwu District, Wuxi City, Jiangsu Province

Patentee before: Wuxi Sipu sodium Industrial Technology Co.,Ltd.

CP01 Change in the name or title of a patent holder