CN208219579U - The structure that a kind of diversion tunnel and ecological drainage tunnel combine - Google Patents
The structure that a kind of diversion tunnel and ecological drainage tunnel combine Download PDFInfo
- Publication number
- CN208219579U CN208219579U CN201820643198.9U CN201820643198U CN208219579U CN 208219579 U CN208219579 U CN 208219579U CN 201820643198 U CN201820643198 U CN 201820643198U CN 208219579 U CN208219579 U CN 208219579U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- diversion
- ecological drainage
- ecological
- diversion tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model provides the structure that a kind of diversion tunnel and ecological drainage tunnel combine, the structure that diversion tunnel and ecological drainage tunnel combine includes ecological drainage tunnel and diversion tunnel, ecological drainage tunnel and diversion tunnel are laid up and down, and the downstream of ecological drainage tunnel passes through ecological drainage tunnel vertical shaft and is connected to diversion tunnel.Suitable for the diversion tunnel of middle and high head and the combination arrangement of ecological drainage tunnel.With existing diversion tunnel compared with the structure of " dragon comes back " pattern that flood discharging tunnel combines, the utility model solves the problems, such as arranged apart with ecological drainage tunnel due to diversion tunnel and increases project amount, construction investment and construction period, the layout pattern combined by two buildings, solves the problems such as energy dissipating under the conditions of " dragon come back " common high-velocity flow cavitation erosion of pattern, high water head is difficult, meet construction diversion and the ecological requirement to discharge water, reduce project amount, construction investment is reduced, the duration is shortened.
Description
Technical field
The utility model belongs to the water conservancy project technical field in hydraulic and hydroelectric engineering, and in particular to a kind of diversion tunnel and ecology are put
The structure that water hole combines.
Background technique
As country is to the pay attention to day by day of environmental issue, in hydraulic and hydroelectric engineering construction, environmental protection administration can all require list
It is only that ecological drainage tunnel is set, to let out ecological flow under downstream, it is ensured that constructing with operational process middle and lower reaches natural river course not in power station
It stops.In response to environmental protection administration, currently, the way of ecological drainage tunnel routine is that ecology is separately provided to discharge water
Hole, and other buildings arrange that operation is independent of each other independently of each other.Although this conventional way is able to satisfy the need of engineering
It wants, but will increase construction investment, extend the duration.For diversion tunnel as a temporay building, main task is construction diversion, degree
Flood, after major project completion, lower lock water storage, and blocked, that is, its task is completed, and do not use.
Utility model content
The purpose of the utility model is to provide the structures that a kind of diversion tunnel and ecological drainage tunnel combine, and existing ecology is overcome to put
Water hole and diversion tunnel are individually arranged, caused investment problem big, long in time limit.
For this purpose, the utility model provides the structure that a kind of diversion tunnel and ecological drainage tunnel combine, including ecological drainage tunnel
And diversion tunnel, the ecology drainage tunnel and diversion tunnel are laid up and down, the downstream of ecological drainage tunnel passes through ecological drainage tunnel vertical shaft
It is connected to diversion tunnel.
The ecology drainage tunnel from upstream to downstream successively by ecological drainage tunnel have pressure section, ecological drainage tunnel work lock chamber,
Ecological drainage tunnel passes through ecology without pressure section downstream and ecological drainage tunnel vertical shaft upstream end without pressure section connection composition, ecological drainage tunnel
The connection of drainage tunnel eddy flow volute chamber.
The diversion tunnel is from upstream to downstream successively by inlet of diversion tunnel section, diversion tunnel work lock chamber, diversion tunnel block section
Connection composition, ecological drainage tunnel vertical shaft downstream is protruded into diversion tunnel block section and is communicated therewith.
The diversion tunnel block section and ecological drainage tunnel vertical shaft connectivity part tract are equipped with diversion tunnel coarctation segment, diversion tunnel contracting
Narrow section is connected to diversion tunnel block section, and the cross dimensions of diversion tunnel coarctation segment is less than the cross dimensions of diversion tunnel block section.
For gateway opening shape, ecological drainage tunnel has pressure section to put with ecology without section cross section is pressed for the diversion tunnel and ecological drainage tunnel
Water hole vertical shaft cross section is circle.
A kind of construction method for the structure that diversion tunnel and ecological drainage tunnel combine, includes the following steps:
Step 1, is first excavated and supporting inlet of diversion tunnel section and diversion tunnel work lock chamber, and then carrying out ecological drainage tunnel has
Press section, ecological drainage tunnel work lock chamber, excavation and first liner timbering of the ecological drainage tunnel without pressure section, ecological drainage tunnel eddy flow volute chamber;
Step 2 excavates ecological drainage tunnel vertical shaft by the way of from top to bottom, is connected to ecological drainage tunnel vertical shaft and ecology
Drainage tunnel eddy flow volute chamber when excavation, arranges lifting appliance on ecological drainage tunnel vertical shaft top, arrangement backhoe is grabbed on lifting appliance
The slag charge of excavation is promoted to ecological drainage tunnel vertical shaft top by bucket, direct discharging to dump truck, by ecological drainage tunnel vertical shaft into
Mouth is slagged tap;
Step 3, is excavated and supporting diversion tunnel block section, diversion tunnel coarctation segment, connection diversion tunnel block section discharge water with ecology
Hole vertical shaft;
Step 4 after the completion of ecological drainage tunnel and Diversion Tunnel excavation, carries out concrete knot to ecological drainage tunnel and diversion tunnel
Ecological drainage tunnel work lock chamber is closed in structure lining cutting, opens diversion tunnel work lock chamber, and diversion tunnel carries out overcurrent, is then shut off water conservancy diversion
Hole work lock chamber, carries out lower lock water storage, and diversion tunnel completes construction diversion;
Step 5, after diversion tunnel block section and diversion tunnel coarctation segment consolidate and meet design strength requirement, according to construction
It needs to open ecological drainage tunnel work lock chamber, ecology is carried out to downstream and is discharged water.
When excavating ecological drainage tunnel in step 1, first there is pressure section entrance to build construction road in ecological drainage tunnel, and by
Entrance is downstream excavated.
In step 1 excavate diversion tunnel in inlet of diversion tunnel section when, need to according to by inlet of diversion tunnel section upstream inlet and
The mode that lower exit is excavated into hole respectively, which is excavated, slags tap, and before excavating diversion tunnel work lock chamber, working tunnel is first arranged,
Then it takes mode from top to bottom to excavate, is slagged tap by working tunnel.
The knot that a kind of application for the structure that diversion tunnel and ecological drainage tunnel combine, the diversion tunnel and ecological drainage tunnel combine
Structure is suitable for the diversion tunnel of middle and high head and the combination arrangement of ecological drainage tunnel.
The utility model has the beneficial effects that the structure that this diversion tunnel provided by the utility model and ecological drainage tunnel combine
And its construction method and application, compared with the existing mode that ecological drainage tunnel is separately provided, the utility model solve due to
Diversion tunnel and ecological drainage tunnel it is arranged apart and the problem of increase project amount, construction investment and construction period, pass through two buildings
The layout pattern that object combines meets construction diversion and the ecological requirement to discharge water, reduces project amount, reduces engineering throwing
Money, shortens the duration;With existing diversion tunnel compared with the structure of " dragon comes back " pattern that flood discharging tunnel combines, solves " dragon lift
The problems such as energy dissipating is difficult under the conditions of head " the common high-velocity flow cavitation erosion of pattern, high water head, the life suitable for middle and high head
State drainage tunnel is arranged in conjunction with diversion tunnel.
The utility model is described in further details below with reference to attached drawing.
Detailed description of the invention
Fig. 1 is the elevational schematic view for the structure that diversion tunnel and ecological drainage tunnel combine.
Fig. 2 is the floor map for the structure that diversion tunnel and ecological drainage tunnel combine.
Fig. 3 is the schematic cross-sectional view that ecological drainage tunnel has pressure section or ecological drainage tunnel vertical shaft.
Fig. 4 is diversion tunnel or ecological schematic cross-sectional view of the drainage tunnel without pressure section.
Fig. 5 is the schematic diagram of diversion tunnel coarctation segment.
Description of symbols: 1. ecological drainage tunnels have pressure section;The lock chamber 2. ecological drainage tunnel works;3. ecological drainage tunnel is without pressure
Section;4. ecological drainage tunnel eddy flow volute chamber;5. ecological drainage tunnel vertical shaft;6. inlet of diversion tunnel section;The lock chamber 7. diversion tunnel works;8. leading
The block section Liu Dong;9. diversion tunnel coarctation segment;I, ecology drainage tunnel;II, diversion tunnel.
Specific embodiment
Embodiment 1:
In order to overcome existing ecological drainage tunnel and diversion tunnel to be individually arranged, caused investment problem big, long in time limit,
The utility model provides the structure that a kind of diversion tunnel and ecological drainage tunnel combine, and as depicted in figs. 1 and 2, including ecology discharges water
Hole I and diversion tunnel II, the ecology drainage tunnel I and about II diversion tunnel are laid, and the downstream of ecological drainage tunnel I is put by ecology
Water hole vertical shaft 5 is connected to diversion tunnel II.
The utility model passes through ecological drainage tunnel vertical shaft 5 and is connected to ecological drainage tunnel I with diversion tunnel II, preferably, such as
Shown in Fig. 2, ecological drainage tunnel vertical shaft 5 is set perpendicular to ground.Pass through the arrangement for combining ecological drainage tunnel I and diversion tunnel II
Form meets requirement of engineering, while effectively reducing construction investment again, shorten the duration.
Embodiment 2:
On the basis of embodiment 1, as depicted in figs. 1 and 2, specifically, it is described ecology drainage tunnel I from upstream to downstream according to
Secondary to be made of pressure section 1, ecological drainage tunnel work lock chamber 2, ecological drainage tunnel without the pressure connection of section 3 ecological drainage tunnel, ecology discharges water
Hole passes through ecological drainage tunnel eddy flow volute chamber 4 with ecological 5 upstream end of drainage tunnel vertical shaft without pressure 3 downstream of section and is connected to.
Ecological drainage tunnel vertical shaft 5, which needs to wait for ecological drainage tunnel, pressure section 1, ecological drainage tunnel work lock chamber 2, ecological drainage tunnel
It can be carried out after the completion without pressure section 3 and ecological 4 excavation supporting of drainage tunnel eddy flow volute chamber, using top-down digging mode.?
Lifting appliance is arranged on vertical shaft top, and arrangement backhoe grab bucket, is promoted to vertical shaft top for the slag charge of excavation, directly unloads on lifting appliance
Material is slagged tap to dump truck by import.
Embodiment 3:
On the basis of embodiment 1, as depicted in figs. 1 and 2, specifically, the diversion tunnel II from upstream to downstream successively
It is made of inlet of diversion tunnel section 6, diversion tunnel work lock chamber 7, the connection of diversion tunnel block section 8, ecological 5 downstream of drainage tunnel vertical shaft is stretched
Enter diversion tunnel block section 8 to communicate therewith.
When inlet of diversion tunnel section 6 is excavated, from upstream inlet and lower exit both ends to being excavated respectively into hole, out
Slag.When diversion tunnel work lock chamber 7 excavates, working tunnel need to be set, take top-down digging mode, gone out by working tunnel
Slag.The position that diversion tunnel II connects with ecological drainage tunnel vertical shaft 5 is excavated, supporting needs to wait for ecological 5 excavation supporting of drainage tunnel vertical shaft
It can carry out after the completion.
Embodiment 4:
On the basis of embodiment 3, as shown in Figure 1, the diversion tunnel block section 8 and ecological 5 connectivity part of drainage tunnel vertical shaft
Tract is equipped with diversion tunnel coarctation segment 9, and diversion tunnel coarctation segment 9 is connected to diversion tunnel block section 8, and diversion tunnel coarctation segment 9 is disconnected
Face size is less than the cross dimensions of diversion tunnel block section 8, as shown in Figure 5.
In order to realize diversion tunnel II completely, the reliable purpose that blocks, need to put in work 7 back segment of lock chamber, ecology of diversion tunnel
A section concrete block section 8 is arranged in vertical shaft 5 leading portion in water hole.Since the design discharge of ecological drainage tunnel I is far smaller than diversion tunnel II
Design discharge, section needed for ecological drainage tunnel I is smaller, and also to realize that the water flow of ecological drainage tunnel vertical shaft 5 is smooth
Send to diversion tunnel II, need to II section constriction of diversion tunnel, thus be provided with diversion tunnel coarctation segment 9.
Embodiment 5:
On the basis of embodiment 2, as shown in Figure 3 and Figure 4, the diversion tunnel II and ecological drainage tunnel are cross-section without pressure section 3
Face is gateway opening shape, and it is circle that ecological drainage tunnel, which has pressure section 1 and ecological 5 cross section of drainage tunnel vertical shaft,.
Embodiment 6:
A kind of construction method for the structure that diversion tunnel and ecological drainage tunnel combine, includes the following steps:
Step 1, first excavation and supporting inlet of diversion tunnel section 6 and diversion tunnel work lock chamber 7, then carry out ecological drainage tunnel
There are pressure section 1, ecological drainage tunnel work lock chamber 2, ecological drainage tunnel without pressure section 3, the excavation of ecological drainage tunnel eddy flow volute chamber 4 and a phase
Supporting;
Step 2 excavates ecological drainage tunnel vertical shaft 5 by the way of from top to bottom, is connected to ecological drainage tunnel vertical shaft 5 and life
State drainage tunnel eddy flow volute chamber 4 when excavation, arranges lifting appliance on ecological 5 top of drainage tunnel vertical shaft, arranges backhoe on lifting appliance
Grab bucket, is promoted to ecological 5 top of drainage tunnel vertical shaft for the slag charge of excavation, direct discharging to dump truck is erected by ecological drainage tunnel
5 import of well is slagged tap;
Step 3, excavation and supporting diversion tunnel block section 8, diversion tunnel coarctation segment 9, connection diversion tunnel block section 8 and ecology
Drainage tunnel vertical shaft 5;
After the completion of step 4, ecological drainage tunnel I and diversion tunnel II excavate, ecological drainage tunnel I and diversion tunnel II are mixed
Ecological drainage tunnel work lock chamber 2 is closed in Xtah Crude Clay structure lining cutting, opens diversion tunnel work lock chamber 7, and diversion tunnel II carries out overcurrent, so
Diversion tunnel work lock chamber 7 is closed afterwards, carries out lower lock water storage, and diversion tunnel II completes construction diversion;
Step 5, after diversion tunnel block section 8 and diversion tunnel coarctation segment 9 consolidate and meet design strength requirement, according to applying
Work needs to open ecological drainage tunnel work lock chamber 2, carries out ecology to downstream and discharges water.
It should be noted that diversion tunnel work lock chamber 7 is set in the rock mass after inlet of diversion tunnel section 6.
Embodiment 7:
On the basis of embodiment 6, when further, in step 1 excavating ecological drainage tunnel I, first have in ecological drainage tunnel
Pressure 1 entrance of section builds construction road, and is downstream excavated by entrance.The water conservancy diversion in diversion tunnel II is excavated in step 1
It, need to be in the way of being excavated respectively into hole from the upstream inlet of inlet of diversion tunnel section 6 and lower exit when the inducer 6 of hole
Excavation is slagged tap, and before excavating diversion tunnel work lock chamber 7, working tunnel is first arranged, then takes mode from top to bottom to excavate, by applying
It slags tap in work branch hole.
Embodiment 8:
Present embodiments provide a kind of application for the structure that diversion tunnel and ecological drainage tunnel combine, the diversion tunnel and ecology
The structure that drainage tunnel combines is suitable for the diversion tunnel of middle and high head and the combination arrangement of ecological drainage tunnel.With existing diversion tunnel
Compared with the structure of " dragon comes back " pattern that flood discharging tunnel combines, the present embodiment adaptation range is wider, solves " dragon comes back " pattern
The problems such as energy dissipating is difficult under the conditions of common high-velocity flow cavitation erosion, high water head, the ecology that can be adapted for middle and high head is put
Water hole is arranged in conjunction with diversion tunnel.
Exemplified as above is only to the utility model for example, not constituting to the protection scope of the utility model
Limitation, it is all to be belonged within the protection scope of the utility model with the same or similar design of the utility model.The present embodiment
The well-known components and common structure or conventional means of the component and the structure category industry that do not describe in detail, are not chatted one by one here
It states.
Claims (5)
1. the structure that a kind of diversion tunnel and ecological drainage tunnel combine, including ecological drainage tunnel (I) and diversion tunnel (II), feature exists
In: the ecology drainage tunnel (I) and diversion tunnel (II) are laid up and down, and the downstream of ecological drainage tunnel (I) passes through ecological drainage tunnel
Vertical shaft (5) is connected to diversion tunnel (II).
2. the structure that diversion tunnel as described in claim 1 and ecological drainage tunnel combine, it is characterised in that: the ecology drainage tunnel
(I) successively there are pressure section (1), ecological drainage tunnel work lock chamber (2), ecological drainage tunnel without pressure by ecological drainage tunnel from upstream to downstream
Section (3) connection composition, ecological drainage tunnel are discharged water with ecological drainage tunnel vertical shaft (5) upstream end by ecology without pressure section (3) downstream
Hole eddy flow volute chamber (4) connection.
3. the structure that diversion tunnel as described in claim 1 and ecological drainage tunnel combine, it is characterised in that: the diversion tunnel (II)
It is successively made of from upstream to downstream inlet of diversion tunnel section (6), diversion tunnel work lock chamber (7), diversion tunnel block section (8) connection,
Ecological drainage tunnel vertical shaft (5) downstream is protruded into diversion tunnel block section (8) and is communicated therewith.
4. the structure that diversion tunnel as claimed in claim 3 and ecological drainage tunnel combine, it is characterised in that: the diversion tunnel blocks
Section (8) and ecological drainage tunnel vertical shaft (5) connectivity part tract are equipped with diversion tunnel coarctation segment (9), diversion tunnel coarctation segment (9) and water conservancy diversion
Hole block section (8) connection, and the cross dimensions of diversion tunnel coarctation segment (9) is less than the cross dimensions of diversion tunnel block section (8).
5. the structure that diversion tunnel as claimed in claim 2 and ecological drainage tunnel combine, it is characterised in that: the diversion tunnel (II)
Without section (3) cross section is pressed, for gateway opening shape, ecological drainage tunnel has pressure section (1) and ecological drainage tunnel vertical shaft (5) with ecological drainage tunnel
Cross section is circle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820643198.9U CN208219579U (en) | 2018-05-02 | 2018-05-02 | The structure that a kind of diversion tunnel and ecological drainage tunnel combine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820643198.9U CN208219579U (en) | 2018-05-02 | 2018-05-02 | The structure that a kind of diversion tunnel and ecological drainage tunnel combine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208219579U true CN208219579U (en) | 2018-12-11 |
Family
ID=64510110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820643198.9U Active CN208219579U (en) | 2018-05-02 | 2018-05-02 | The structure that a kind of diversion tunnel and ecological drainage tunnel combine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208219579U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115613529A (en) * | 2022-10-28 | 2023-01-17 | 中国电建集团贵阳勘测设计研究院有限公司 | Arrangement structure of high-head ecological flow sluicing tunnel |
-
2018
- 2018-05-02 CN CN201820643198.9U patent/CN208219579U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115613529A (en) * | 2022-10-28 | 2023-01-17 | 中国电建集团贵阳勘测设计研究院有限公司 | Arrangement structure of high-head ecological flow sluicing tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201874614U (en) | Drainage structure for emptying overhaul of derivation tunnel | |
CN103174430B (en) | Shallow-buried large-span water conveying tunnel three-stage five-step digging method | |
CN104032714A (en) | Once-closure and staging-closure combined dam type power plant construction diversion method | |
CN103215922A (en) | High-pressure high-flow centralized leakage grouting leaking stoppage method | |
CN107858990B (en) | Diversion construction method of arrangement structure of canyon area high dam ditch water treatment engineering | |
CN212077859U (en) | Tunnel structure capable of being used for diversion, flood discharge and emptying | |
CN208219579U (en) | The structure that a kind of diversion tunnel and ecological drainage tunnel combine | |
CN108330933A (en) | The structure and its construction method and application that a kind of diversion tunnel and ecological drainage tunnel combine | |
CN214245624U (en) | Vertical shaft rotational flow flood discharge tunnel | |
CN110195597A (en) | A kind of water-storage chamber and construction method suitable for TBM construction | |
CN103290804B (en) | Method and the structure of downstream ecology flow are provided after lock under water conservancy diversion outlet structure escape works | |
CN102051870A (en) | Flexible interlink steel gate and supporting opening and closing device thereof | |
CN210562059U (en) | Multifunctional ecological water supply tunnel structure for ultra-high rock-fill dam | |
CN210216332U (en) | Retaining dam structure for overhauling whole tunnel section of hydroelectric engineering diversion tunnel in canyon region | |
CN210975737U (en) | Reservoir dam body culvert pipe transformation structure | |
CN210263095U (en) | Full-tunnel section maintenance cofferdam structure of diversion tunnel in early and middle period | |
CN206721845U (en) | A kind of diversion tunnel | |
CN207597336U (en) | The arrangement of Canyon Area high dam ditch engineering of water treatment | |
CN210562058U (en) | Ecological diversion tunnel structure capable of being used for flood season of main flood of ultra-high rock-fill dam | |
CN103114601A (en) | Cut-off method of rapid-hardening high-spray grouting of strong leakage stratum and device thereof | |
CN207919510U (en) | Diversion tunnel blocks arrangement using lock under permanent plug first section joint gate | |
CN207130701U (en) | Compound water flowing out structure for Hydraulic and Hydro-Power Engineering | |
CN112982319A (en) | Structure and method for conducting diversion, emptying and water taking through dam foundation culvert | |
CN202730719U (en) | Rock-fill dam measuring weir | |
CN112064601A (en) | Diversion tunnel and emptying tunnel combined structure for extra-high rock-fill dam and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |