CN208202282U - A kind of smallpox light trough construction - Google Patents

A kind of smallpox light trough construction Download PDF

Info

Publication number
CN208202282U
CN208202282U CN201820507018.4U CN201820507018U CN208202282U CN 208202282 U CN208202282 U CN 208202282U CN 201820507018 U CN201820507018 U CN 201820507018U CN 208202282 U CN208202282 U CN 208202282U
Authority
CN
China
Prior art keywords
plate
bearing plate
light trough
top plate
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820507018.4U
Other languages
Chinese (zh)
Inventor
乔辉
余洋
陈容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yuan Ben Interior Architectural Design Co Ltd
Original Assignee
Shenzhen Yuan Ben Interior Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Yuan Ben Interior Architectural Design Co Ltd filed Critical Shenzhen Yuan Ben Interior Architectural Design Co Ltd
Priority to CN201820507018.4U priority Critical patent/CN208202282U/en
Application granted granted Critical
Publication of CN208202282U publication Critical patent/CN208202282U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a kind of smallpox light trough constructions, including top plate, lateral plate component, the first sunpender group and the second sunpender group for being installed on top wall and being used for fixed side panel component, and it is respectively fixedly connected with the first bearing plate and the second bearing plate in the first sunpender group and the second sunpender group, the top plate two sides tip upside down on the upper surface of first bearing plate and second bearing plate respectively;Baffle and the through-hole close to the baffle are equipped on first bearing plate and second bearing plate, baffle is threaded with the screw knob screwed out towards top plate side;When screw knob screws out at two in the first bearing plate and second bearing plate, the top plate is clamped and fastened between the screw knob of two sides by level.Reduce between top sunpender quantity and top plate, bearing plate contradicted using screw knob it is fixed by way of, solve other structures smallpox light trough because working procedure caused by sunpender quantity is more is cumbersome, the lower problem of efficiency.

Description

A kind of smallpox light trough construction
Technical field
The utility model relates to home decoration fields, more specifically, it relates to which a kind of smallpox light trough constructs.
Background technique
With the development of national economy, social progress, people's living standard and esthetic requirement stepping up and setting Horizontal promotion etc. is counted, the indoor design trend of various forms style continues to bring out, it weeds out the old and bring forth the new, cooperation interior decoration aesthetic feeling The various smallpox moulding of aesthetic feeling of the design are also more and more creative.Especially smallpox light trough design indoors in be widely used, at For no matter the basic structure configuration of personal household or public floor.
In the prior art, the smallpox light trough of the wood-base fibre and particle panel material or keel framework structure fabrication that either use, they Primary structure have ceiling, sunpender and side portion structure etc..Currently, there is the Chinese utility model application No. is CN202370147U Patent discloses a kind of smallpox light trough construction of lightgage steel joist skeleton that can prevent fires.
But these Ceiling light slots are in construction disassembly process since its ceiling and side portion structure are all during installation at present Top wall is fixed on by sunpender to need to dig more mounting holes at the top of wall, directly lead so sunpender quantity is more Cause working procedure cumbersome, difficulty of construction is big.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of smallpox light trough constructions, because of it For fixing the sunpender negligible amounts of smallpox light trough skeleton, the difficulty of construction of smallpox light trough skeleton is reduced, having makes work of constructing The more efficient advantage of sequence.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of smallpox light trough construction including top plate, lateral plate component, is installed on top wall and for fixed side panel component First sunpender group and the second sunpender group, and be respectively fixedly connected in the first sunpender group and the second sunpender group first Bearing plate and the second bearing plate;
The top plate two sides tip upside down on the upper surface of first bearing plate and second bearing plate respectively;Described It is equipped with baffle on one bearing plate and second bearing plate and the through-hole close to the baffle, the baffle are threaded with The screw knob screwed out towards top plate side;Screw knob screws out at two in the first bearing plate and second bearing plate When, the top plate is clamped and fastened between the screw knob of two sides by level.
By using above-mentioned technical proposal, as the core part for supporting entire Ceiling light slot structure, it is ensured that make first to hold Weight plate and the second bearing plate are installed by the first sunpender group and the second sunpender group with top wall secured;When top plate is directly buckled to When being mounted on the upper surface of the first bearing plate and the second bearing plate, can by the screw knob on butterfly come to top plate Horizontal position when between one bearing plate and the second bearing plate is finely adjusted, with the two sides that are held on for ensuring that top plate can be consolidated Between screw knob, such top plate only need to be by the clamping of baffle and screw knob on the first bearing plate and the second bearing plate It achieves that and is directly fixed, top plate is fixed without additionally installing top sunpender, so as to avoid being needed before construction Additional hanger erection hole is dug, keeps whole installation process faster;It during installation, can be first when top plate is an entire plate Top plate is propped up with waddy and is placed on the first bearing plate and the second bearing plate, then top plate with the first bearing plate and Two bearing plates, which are lifted, passes through the first sunpender group and the second sunpender group and top wall for the first bearing plate and the second bearing plate Body is fixed, and carries out the operation fixed to top plate again later.
Further: boom body that the first sunpender group hangs the Y-shaped structure that group body includes with described second and described Upper surface of the two " V " shape ends of boom body respectively with the first bearing plate and the second bearing plate is connected and fixed.
By using above-mentioned technical proposal, held simultaneously to first by two " V " shape ends of the boom body of Y-shaped structure Weight plate and the second bearing plate are fixed, and the first bearing plate and the second bearing plate is made to pass through the first sunpender group and second sunpender Group is installed stronger with top wall, it is ensured that the stability of entire Ceiling light slot structure.
Further: the baffle is wedge block, and the one side of the baffle towards the top plate side is perpendicular.
By using above-mentioned technical proposal, baffle be wedge shape make its when clamp top plate with it is bigger it is anti-shearing by force Degree;During the installation process, when the of different size of the top plate due to different size or when there is installation error, the width of top plate can It can just be held between the baffle of two sides and not have to back-out screw knob, at this point, the face for clamping top plate on baffle is vertical Plane can preferably fit with the side plane of top plate, so that top plate is more firmly clamped.
Further: the top plate includes from the vertically extending support side plate in two sides, while screw knob direction support Side plate.
By using above-mentioned technical proposal, mainboard side, which extends vertically, to be formed side plate and makes top plate lateral area bigger, is more held It is easily clamped by baffle and screw knob, convenient for fixing.
Further: screw knob includes gasket, and the gasket is equipped with "T"-shaped protrusion and the screw knob towards institute The "T"-shaped card slot opened up on one end of baffle is stated to plug together.
By using above-mentioned technical proposal, one end setting cross section of screw knob is greater than the pad of screw knob cross section Piece prevents from damaging since pressure is excessive to reduce the pressure when rotation is tightened or screw knob contacts at top plate side The side of top plate;"T"-shaped protrusion and screw knob on gasket are towards dismountable plug together of "T"-shaped card slot on baffle one end Screw knob can be installed into tapped through hole when in order to install.
Further: the cross section of first bearing plate and second bearing plate is dome-shaped.
By using above-mentioned technical proposal, compared to the bearing plate that cross section is plane, cross section is the load-bearing of dome-shaped Plate is stronger in the bending strength of vertical direction.
Further: being equipped on the lateral surface of the top plate, first bearing plate and second bearing plate Reinforcing rib.
By using above-mentioned technical proposal, so that top plate, first bearing plate and second bearing plate are vertical Bending strength on direction further increases, and keeps entire Ceiling light slot structure more stable.
Further: the inner concave of the top plate is provided with light trough at the two close end support side plate, the light trough with it is described Top plate integrally connected.
By using above-mentioned technical proposal, light trough places lamps and lanterns for installing, and light trough and top plate integrally connected are avoidable logical The process that light trough is installed to top plate by other component or process is crossed, installation steps is saved, improves installation effectiveness.
Further: the top plate is rectangular slab, and the top plate is divided at least two area phases along its length Same scoreboard.
By using above-mentioned technical proposal, when due to installing bearing plate, it is necessary to top plate is installed, because monolith top plate The area formed between area ratio bearing plate is big, it is contemplated that there may be monolith top plates to be put into two bearing plates in practice of construction Between the big problem of difficulty, so monolith top plate is split as muti-piece scoreboard in order to install.
Further: the lateral plate component includes the first side plate, the second side plate and the first screw, and first side Plate and second side plate include that one end extends vertically the second support side plate and third support side plate to be formed, first spiral shell Nail is for fixing second support side plate and the third support side plate with wall.
By using above-mentioned technical proposal, during installation directly by the first side plate, the second side plate one end-rack of plane in The upper surface of one bearing plate and second bearing plate, the second support side plate and third support side plate of the other end pass through respectively First screw is fixed with wall, quick and easy for installation.
In conclusion the utility model has the following beneficial effects:
First, by the quantity for the top sunpender for reducing fixed smallpox light trough skeleton, to reduce needs on wall top The mounting hole for fixed derrick that portion is dug, reduces working procedure, improves installation effectiveness.
Second, be equipped with the screw knob that is threadedly engaged on baffle and baffle by opening up on bearing plate, in top plate, the Reinforcing rib is opened up on the lateral surface of one bearing plate and second bearing plate, makes the opposite position that top plate is adjusted during installation It sets, is adapted to the top plate of different size, while making the engagement of each section component even closer, be more firmly mounted.
Detailed description of the invention
Fig. 1 is a kind of structure chart of smallpox light trough construction of embodiment;
Fig. 2 is hair big figure in the portion A in Fig. 1;
Fig. 3 is equal shaft side figures when mounting of roof plate is between the first bearing plate and the second bearing plate in embodiment.
Appended drawing reference: 1, top plate;2, the first sunpender group;3, the second sunpender group;4, the first bearing plate;5, the second bearing plate; 6, the first side plate;7, the second side plate;8, baffle;9, boom body;10, screw knob;101, "T"-shaped protrusion;102, "T"-shaped card Slot, 11, gasket;12, reinforcing rib;13, light trough;14, through-hole;15, the first support side plate;16, the second support side plate;17, third Support side plate;18, the first screw;98, scoreboard.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
The present embodiment is related to a kind of smallpox light trough construction, as shown in Figure 1, including top plate 1, the first sunpender group 2, the second sunpender The 3, first bearing plate 4 of group, the second bearing plate 5 and lateral plate component.Wherein the first sunpender group 2, the second sunpender group 3 include " Y " Two " V " shape ends of the boom body 9 of shape structure and boom body 9 upper table with the first bearing plate 4 and the second bearing plate 5 respectively Face is connected and fixed, the first sunpender group 2, the second sunpender group 3 the other end fixed vertically with top wall respectively.
After installing the first bearing plate 4 and the second bearing plate 5, start that top plate 1 is installed, since top plate 1 is that back-off is mounted on The centre of first bearing plate 4 and the second bearing plate 5, so the mounting area of top plate 1 is greater than the first bearing plate 4 and the second load-bearing The area of plane between plate 5 is successively pacified to facilitate installation, top plate 1 is divided into the identical scoreboard 98 of muti-piece area Dress makes two support side plates 15 at 1 both ends of top plate be put into the baffle 8 of the first bearing plate 4 and the second bearing plate 5 when installing top plate 1 Between, and make top plate 1 horizontal as far as possible, after placing top plate 1, it can continue to adjust the screw knob being set on baffle 8 10, screw knob 10 passes through with the tapped through hole being opened on baffle 8 to be threadedly engaged and can be manually rotated, while in order to prevent When screw knob 10 is contacted on 15 lateral surface of support side plate, cause screw knob 10 to support-side since its contact area is smaller The pressure of plate 15 increases and damages 15 surface of support side plate, and the gasket of sliding clamping is provided on screw knob 10, passes through tune Save screw knob 10 come to the top plate 1 being installed between the first bearing plate 4 and the second bearing plate 5 position and levelness carry out it is micro- It adjusts, is held on top plate 1 between the first bearing plate 4 and two block baffles 8 of the second bearing plate 5 by level.
After installing top plate 1, start installation side plate component, lateral plate component includes the first side plate 6, the second side plate 7 and the First side plate 6 and the second side plate 7 are first the direct frame in one end of plane in the first bearing plate 4 and the second load-bearing by one screw 18 On the upper surface of plate 5, then by the second support side plate 16 and third support-side of 7 other end of the first side plate 6 and the second side plate Plate 17 is fixedly mounted by the first screw 18 with wall respectively;It finally can be used hand to put in be opened in the first bearing plate 4 and second and hold The through-hole of 5 lower surface of weight plate, screw knob 10 on butterfly 8 adjust the position of top plate 1, are allowed to clamped more firm Gu.
As depicted in figs. 1 and 2, tapped through hole is offered on baffle 8, screw knob 10 passes through tapped through hole and contacts at branch Side plate 15 is supportted, support side plate 15 is held in order to push up and clamps top plate 1;Baffle 8 is perpendicular close to an end face of gasket 11, separately One end face is inclined-plane, can increase the structural strength of baffle 8 in this way, by can be manually rotated 10 adjustable baffle plate 8 of screw knob and branch Support the spacing of side plate 15.
Moreover, screw knob 10 is towards on the "T"-shaped card slot 102 and gasket 11 opened up on one end of support side plate 15 "T"-shaped raised 101 are clamped by removable mode and plug together, and screw knob 10 can screw in tapped through hole when to install, simultaneously Gasket 11 increases the contact area between screw knob 10 and support side plate 15, reduces between screw knob 10 and support side plate 15 Pressure, avoid damaging the side of top plate 1 because pressure is excessive in rotary course.
As shown in figure 3, the lateral surface of top plate 1, the first bearing plate 4 and the second bearing plate 5 is offered along length side To reinforcing rib 12, and be provided with through-hole 14 on the first bearing plate 4 and the second bearing plate 5, be used for last installation side plate component When, with hand by 14 screw thread knob 10 of through-hole with fixed side panel component.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.It should refer to Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (10)

1. a kind of smallpox light trough construction, including top plate (1), lateral plate component, it is installed on top wall and for fixed side panel component The first sunpender group (2) and the second sunpender group (3), and be respectively fixedly connected in the first sunpender group (2) and described second The first bearing plate (4) and the second bearing plate (5) of sunpender group (3), which is characterized in that top plate (1) two sides are buckled to respectively In the upper surface of first bearing plate (4) and second bearing plate (5);
Baffle (8) is equipped on first bearing plate (4) and second bearing plate (5) and close to the baffle (8) Through-hole (14), the baffle (8) are threaded with the screw knob (10) screwed out towards top plate (1) side;When the first bearing plate (4) With when screw knob (10) screws out at two in second bearing plate (5), the top plate (1) is clamped and fastened on two by level Between the screw knob (10) of side.
2. a kind of smallpox light trough construction according to claim 1, it is characterised in that: the first sunpender group (2) with it is described The boom body (9) for the Y-shaped structure that second sunpender group (3) includes and two " V " shape ends difference of the boom body (9) It is connected and fixed with the upper surface of the first bearing plate (4) and the second bearing plate (5).
3. a kind of smallpox light trough construction according to claim 1, it is characterised in that: the baffle (8) is wedge block, described The one side of baffle (8) towards the top plate (1) side is perpendicular.
4. any one smallpox light trough construction according to claim 1 or 2 or 3, it is characterised in that: top plate (1) packet It includes from the vertically extending support side plate in two sides (15), the screw knob (10) is towards the support side plate (15).
5. a kind of smallpox light trough construction according to claim 1, it is characterised in that: the screw knob (10) includes gasket (11), "T"-shaped raised (101) and the screw knob (10) on the gasket (11) are opened in towards the baffle (8) The "T"-shaped card slot (102) opened up on one end plugs together.
6. a kind of smallpox light trough construction according to claim 1, it is characterised in that: first bearing plate (4) and institute The cross section for stating the second bearing plate (5) is dome-shaped.
7. a kind of construction of smallpox light trough described according to claim 1 or 5 or 6, it is characterised in that: the top plate (1), described the Reinforcing rib (12) is equipped on the lateral surface of one bearing plate (4) and second bearing plate (5).
8. a kind of smallpox light trough construction according to claim 1, it is characterised in that: the inner concave of the top plate (1) is close It is provided at both ends support side plate (15) light trough (13), the light trough (13) and the top plate (1) integrally connected.
9. a kind of smallpox light trough construction according to claim 1 or 8, it is characterised in that: the top plate (1) is rectangular slab, And the top plate (1) is divided into the identical scoreboard of at least two areas (98) along its length.
10. a kind of smallpox light trough construction according to claim 1, it is characterised in that: the lateral plate component includes the first side Plate (6), the second side plate (7) and the first screw (18), and first side plate (6) and second side plate (7) they include it One end extends vertically the second support side plate (16) and third support side plate (17) to be formed, and first screw (18) is used for institute It states the second support side plate (16) and the third support side plate (17) is fixed with wall.
CN201820507018.4U 2018-04-10 2018-04-10 A kind of smallpox light trough construction Expired - Fee Related CN208202282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820507018.4U CN208202282U (en) 2018-04-10 2018-04-10 A kind of smallpox light trough construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820507018.4U CN208202282U (en) 2018-04-10 2018-04-10 A kind of smallpox light trough construction

Publications (1)

Publication Number Publication Date
CN208202282U true CN208202282U (en) 2018-12-07

Family

ID=64526030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820507018.4U Expired - Fee Related CN208202282U (en) 2018-04-10 2018-04-10 A kind of smallpox light trough construction

Country Status (1)

Country Link
CN (1) CN208202282U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878740A (en) * 2020-08-22 2020-11-03 深圳市元本室内建筑设计有限公司 Indoor energy-saving lamp
CN113266785A (en) * 2021-05-21 2021-08-17 中建深圳装饰有限公司 Keel-free arc ceiling lamp groove and mounting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878740A (en) * 2020-08-22 2020-11-03 深圳市元本室内建筑设计有限公司 Indoor energy-saving lamp
CN111878740B (en) * 2020-08-22 2021-07-06 深圳市元本室内建筑设计有限公司 Indoor energy-saving lamp
CN113266785A (en) * 2021-05-21 2021-08-17 中建深圳装饰有限公司 Keel-free arc ceiling lamp groove and mounting method

Similar Documents

Publication Publication Date Title
CN208202282U (en) A kind of smallpox light trough construction
CN112627460B (en) Adjustable integral bathroom chassis and installation method
CN207686342U (en) A kind of assembled architecture wall support device
CN218040669U (en) Basement cable testing bridge is with jib of being convenient for adjust height
CN216390335U (en) Large arc-shaped cable bridge
CN206376428U (en) A kind of omnidirectional adjusts ceiling system
CN213584987U (en) Assembled glass fiber reinforced plastic bridge
CN211018136U (en) Support is used in installation of cable testing bridge
CN208251487U (en) A kind of adjustable supporter
CN209585777U (en) A kind of connection structure of electric power pylon connection steel
CN217402394U (en) Special bearing embedded box for ceiling fan lamp
CN207758600U (en) Outdoor wall-mounted charging pile
CN211923143U (en) Curtain that fastening nature is strong
CN209637165U (en) A kind of wall decoration structure
CN216883665U (en) Vertical serging clamp
CN215106458U (en) Light-duty firm light steel house ceiling structure
CN219498822U (en) Hanging type cable bridge bracket arm
CN221001696U (en) Archaize building rafter and mounting structure thereof
CN219436573U (en) Cable bridge convenient to installation
CN217027498U (en) A throat formula building carrier plate mounting structure for on tubular beam
CN216076131U (en) Assembly type transverse niche structure
CN221035557U (en) Assembled furred ceiling lamp groove fossil fragments fast adjustment hangs piece
CN215368167U (en) Indoor suspended ceiling convenient to install
CN216616458U (en) Concatenation formula glass curtain wall
CN210468665U (en) Suspension fixing structure for cable bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207

Termination date: 20200410

CF01 Termination of patent right due to non-payment of annual fee