CN208183816U - A kind of default section support pile experimental rig for simulating different bending strengths - Google Patents

A kind of default section support pile experimental rig for simulating different bending strengths Download PDF

Info

Publication number
CN208183816U
CN208183816U CN201721141061.5U CN201721141061U CN208183816U CN 208183816 U CN208183816 U CN 208183816U CN 201721141061 U CN201721141061 U CN 201721141061U CN 208183816 U CN208183816 U CN 208183816U
Authority
CN
China
Prior art keywords
foundation pit
stake
pile
support pile
hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721141061.5U
Other languages
Chinese (zh)
Inventor
郑刚
李溪源
程雪松
雷亚伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201721141061.5U priority Critical patent/CN208183816U/en
Application granted granted Critical
Publication of CN208183816U publication Critical patent/CN208183816U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of default section support pile experimental rigs for simulating different bending strengths, the process continuously destroyed for simulating foundation pit supporting pile, including prefabricated broken pile, gasket, nut, band eye nylon bolt, hinge fastener, hinge and wirerope, the upper half stake and lower half stake are divided by default stake section in the middle part of the prefabricated broken pile, it is connected by the hinge fastener with hinge between the upper half stake on the inside of foundation pit and lower half stake, the band eye nylon bolt is installed respectively in the upper half stake and lower half stake on the outside of foundation pit, bolt eye with eye nylon bolt described in the steel wire penetrating is simultaneously fixed by the gasket and nut.The present utility model can work normally in the excavation of foundation pit stage as common support pile, and the process that foundation pit continuously destroys can be simulated after preset support pile fracture of breaking.

Description

A kind of default section support pile experimental rig for simulating different bending strengths
Technical field
The utility model relates to one of geotechnical engineering experimental rigs, are several in a kind of simulation foundation pit specifically Support pile destroys the device for causing foundation pit continuously to collapse, by this device it can be concluded that the transport mechanism that foundation pit continuously destroys.
Background technique
The ground such as a large amount of great foundation pit collapse accidents, such as Singapore, Hangzhou, Cologne had occurred both at home and abroad in recent years, made At loss very serious.Find that the unstable failure of foundation pit is an extremely complex process, is especially existed according to these accidents In the case that foundation pit is deep, big, flat shape is irregular or supporting construction is complicated, destruction then may be by a certain local failure Cause, and then development evolvement is the mode of a variety of destructions, it is also possible to be drawn by local Support structure damage or local sediment failure It rises, and then causes periphery supporting construction until the mode collapsed on a large scale, the i.e. process of collapsing of deep basal pit are a continuous destructions Process.
According to the record of Singapore's Nicoll Highway subway foundation pit accident destructive process it can be found that growing nearly hundred meters It is since the most weak position (i.e. there are the positions of notch for ground-connecting-wall from for 66kV cable) in part that foundation pit, which collapses,.Incident The same day, ground-connecting-wall indentation, there the 9th support (S335) purlin and support disengage first, and cause herein ground-connecting-wall collapse, It destroys after stopping 2 minutes, collapses and start to develop along foundation pit length direction, until collapsing to except 100m.A large amount of foundation pit accident hairs After life, the investigation and summary of many accidents still can ignore the continuous failure mechanism of accident.
In structural engineering field, for the constructions of structures such as multi-rise building, large-span structure and bridge explosion, earthquake, Continuous collapse research under the emergency cases such as fire, shock have been relatively mature, and research means are also very abundant, including theory pushes away It leads, model test and numerical simulation etc., while many countries and regions are to the progressive collapse-resisting design construction of superstructure Relevant specification and directive document.Compared with the research for continuously destroying problem in Structural Engineering has been achieved with remarkable break-throughs, mesh The research that preceding geotechnical engineering field is continuously destroyed is also seldom, and does not cause due attention also.
(monolithic stability destruction, overturning, bottom heave destroys and skirt destroys for current foundation pit stability disruption mode Deng) obviously it can not reflect the characteristics of deep basal pit continuously destroys and mechanism, while can not also be mentioned for the research of its control method For enough supports, therefore, the generation and Evolution Mechanism that this great underground engineering disasters are continuously destroyed to deep basal pit carry out deep Entering research, extremely it is necessary to the destruction for only disclosing local failure initiation is sent out along the transmitting of foundation depth, width, length direction Mechanism and natural termination mechanism are opened up, and establishes the quantitatively evaluating index and evaluation method of evaluation foundation pit continuous collapse possibility, Energy proposes to prevent the theory and design method of foundation pit supporting construction progressive collapse-resisting.
The problem of due to the continuous destruction of deep basal pit being a large deformation, non-linear, multi- scenarios method, existing limiting equilibrium Method, limit analysis method, conventional the methods of elasto-plastic finite element method and Strength Reduction Method can only mostly be related to foundation pit to destroy Critical state, as the development and differentiation destroyed after starting, these conventional methods are difficult to simulate and describe.Therefore, it is The continuous destruction of research deep basal pit, continuously damage study means are also badly in need of for reasonable large deformation calculation method and model test etc. It explores.
The research of large-scale physical model test, numerical simulation is passed through at present, and by the way that the support pile mould that can break is arranged Intend the process that foundation pit locally collapses, discovery foundation pit locally collapses and can cause the growth of adjacent support pile moment of flexure certain multiple, but Rectangle PVC intensity used in pre-stage test is too big, can not simulate the process of foundation pit continuous collapse, needs further exploratory experiment side Method, to simulate the process of foundation pit continuous collapse.
Utility model content
The purpose of this utility model is to overcome deficiency in the prior art, solve to simulate in model test by foundation pit office Portion's support pile destroys and causes the problem of foundation pit supporting pile continuously destroys along its length, provides a kind of simulation different bending strengths Default section support pile experimental rig, the utility model can work normally in the excavation of foundation pit stage as common support pile, The process that foundation pit continuously destroys can be simulated after preset support pile fracture of breaking.
The purpose of this utility model is achieved through the following technical solutions:
A kind of default section support pile experimental rig for simulating different bending strengths, continuously breaks for simulating foundation pit supporting pile Bad process, including prefabricated broken pile, gasket, nut, band eye nylon bolt, hinge fastener, hinge and wirerope, it is described prefabricated The upper half stake and lower half stake are divided by default stake section in the middle part of broken pile, the upper half stake and lower half stake on the inside of foundation pit Between be connected by the hinge fastener with hinge, installed respectively in the upper half stake and lower half stake on the outside of foundation pit The band eye nylon bolt, the bolt eye with eye nylon bolt described in the steel wire penetrating are simultaneously solid by the gasket and nut It is fixed.
Further, by prefabricated broken pile on the inside of the foundation pit it is different with the stress on the outside of foundation pit be respectively divided into compression-side and by Draw side.
Further, by adjusting failure test while the experimental rig quantity analog difference number support pile.
Further, the prefabricated broken pile is made of aluminum, irony, stainless steel or PVC any material therein Rectangular configuration.
Compared with prior art, beneficial effect brought by the technical solution of the utility model is:
1. by presetting truncation surface, and the compression-side benefit of two-section broken pile is hinged, and tension side utilizes finer wire Rope connection simulates Row Piles Supporting Structure and destroys in initial local support pile and cause the destruction for closing on support pile, realizes continuous The simulation of destruction.
2. the ultimate tensile strength of support pile is simulated by the tensile strength for adjusting wirerope, in combination with actual condition and root It factually tests demand and adjusts the intensity of support pile, and it is continuous broken to realize that support pile is caused under horizontal soil arching effect by local failure It is bad.
3. prefabricated broken pile compression-side is hinged, hinge can both undertake the shearing of this default section part, prevent from being cut It destroys, and can be freely rotated when this section reaches capacity moment of flexure, generation destruction, simulation stake fractures;
4. realizing support pile under moment of flexure control due to simulation that loading effect and Unloading Effect destroy.
5. utility model device overall structure is simple, practical reliable, convenient for operating and being easily achieved, for simulating foundation pit It excavates and support pile local failure causes the model investigation continuously destroyed and has great importance.
Detailed description of the invention
Fig. 1 is utility model diagram and its partial enlargement schematic cross-sectional view;
Fig. 2-1 and Fig. 2-2 is respectively the positive structure diagram of utility model device tension side, compression-side;
Fig. 3 is foundation pit schematic diagram of the utility model in test.
Each device in figure are as follows: 1, gasket, 2, nut, 3, band eye nylon bolt, 4, hinge fastener, 5, hinge, 6, steel wire Rope, 7, the upper half stake, 8, lower half stake
Specific embodiment
The utility model will be further described with reference to the accompanying drawing.
As shown in Figure 1 to Figure 3, a kind of default section support pile experimental rig for simulating different bending strengths, for simulating The process that foundation pit supporting pile continuously destroys, including prefabricated broken pile, gasket 1, nut 2, band eye nylon bolt 3, hinge fastener 4, Hinge 5 and wirerope 6, prefabricated broken pile middle part are divided into the upper half stake 7 and lower half stake 8 by default stake section, are located in foundation pit It is connected by hinge fastener 4 with hinge 5 between the upper half stake 7 and lower half stake 8 of side, the upper half on the outside of foundation pit Installation band eye nylon bolt 3, wirerope 6 pass through the bolt eye with eye nylon bolt 3 and pass through respectively in stake 7 and lower half stake 8 Gasket 1 and nut 2 are fixed.
The application method of utility model device during the test is as follows:
1. upper and lower half stake is docking together, it connect with hinge fastener with hinge, the compression of lower half stake Nut is tightened with the screw eye of the steel wire penetrating band eye nylon bolt of some strength in side, and formation one complete originally practical new Type specific implementation device.
2. the utility model of certain amount is placed on pre-position again, model test soil body is prepared.
3. debugging after setting up test monitoring equipment, carries out testing normal excavation, at this time utility model device and remaining branch Fender pile constitutes cantilever style campshed supporting together, stops excavating after normal excavation to predetermined depth, and carry out every Testing index Detection.
4. controlling preset initial destruction stake to destroy, simulation foundation pit part support pile collapses, and causes several basic realities It is broken with new device, until continuous collapse stops.
In specific implementation process, the utility model selects rectangle PVC by certain rigidity likelihood ratio, and it is disconnected to preset support pile Face, and define by pile body stress that prefabricated broken pile is located on the inside of foundation pit, outside is respectively compression-side, tension side, in foundation pit test Normal to excavate the stage, tension side is transmitted between broken pile up and down by the axle power between broken pile above and below wire rope transfers, compression-side by hinge The utility model of certain amount is disposed adjacent at default local failure position by axle power and shearing, i.e., intact with remaining Support pile has together constituted with cantilever style Row Piles Supporting Structure;It is disconnected by controlling the support pile that can break after the normal excavation stage It splits and support pile destruction in foundation pit part is simulated, thus cause the growth for destroying close position the utility model pile body stress, Tension side wirerope is broken, and the utility model the upper half stake is collapsed into foundation pit, has caused foundation pit branch by the destruction of local support pile The continuous collapse of fender pile is finally stopped until collapsing.
The above are the application methods of experimental rig simulation foundation pit local failure, are strained by pasting on the utility model Piece can be used for measuring bending;By monitoring stake, soil pressure cell, the default support pile that can break in the utility model and test It is used in conjunction with, can successfully simulate the transmitting and termination that foundation pit continuously destroys, obtain the machine that load transmits when foundation pit continuously destroys Reason.
Compared with existing experimental rig, difference is the utility model:
It is connected by presetting stake section, and by two sections of stakes, that is, upper and lower half stake tension side using seizing wire, it is combinable Actual condition and the intensity that support pile is adjusted according to experiment demand, wirerope are securely fixed in stake section two sides using nut Stake surface, can avoid the sliding in tension.And the compression-side of prefabricated broken pile is hinged, it is disconnected that hinge can both undertake this default stake Shearing at face prevents sheared destruction, and can be freely rotated when this section reaches capacity moment of flexure, generation destruction, simulates stake It fractures, this is that existing model support pile institute is irrealizable.Existing foundation pit tests common support pile and often uses aluminum or hard PVC Rectangular tube simulation, but complete PVC Model Pile intensity is higher, it can not be suffered in the continuous damage model test of campshed supporting foundation pit To load within the scope of destroy.And the utility model may be implemented initial local support pile and destroy the neighbouring support pile of initiation It destroys, that is, realizes continuous crash simulation, and support pile may be implemented under horizontal soil arching effect by the continuous of local failure initiation It destroys.
Utility model device is ingenious in design, simple but powerful, convenient for operation, tests the repeatability of process It is good, it can satisfy the needs of various sand class excavation models tests.
Although the test process of the utility model is described above, the utility model uses function not office It is limited to above-mentioned specific embodiment, the above mentioned embodiment is only schematical, is not restrictive, this field Those of ordinary skill under the enlightenment of the utility model, do not departing from the utility model aims and claimed model In the case of enclosing, it can also be used for the model test that other supporting construction foundation pits continuously destroy, it is practical new that these belong to this The protection scope of type.

Claims (4)

1. a kind of default section support pile experimental rig for simulating different bending strengths, is continuously destroyed for simulating foundation pit supporting pile Process, which is characterized in that including prefabricated broken pile, gasket, nut, band eye nylon bolt, hinge fastener, hinge and steel wire Rope, the prefabricated broken pile middle part are divided into the upper half stake and lower half stake by default stake section, the upper half on the inside of foundation pit It is connected by the hinge fastener with hinge between stake and lower half stake, the upper half stake and lower half on the outside of foundation pit The band eye nylon bolt is installed respectively, the bolt eye with eye nylon bolt described in the steel wire penetrating simultaneously passes through described in stake Gasket and nut are fixed.
2. a kind of default section support pile experimental rig for simulating different bending strengths, feature exist according to claim 1 In, it is different with the stress on the outside of foundation pit on the inside of foundation pit by prefabricated broken pile, it is respectively divided into compression-side and tension side.
3. a kind of default section support pile experimental rig for simulating different bending strengths, feature exist according to claim 1 In by adjusting failure test while the experimental rig quantity analog difference number support pile.
4. a kind of default section support pile experimental rig for simulating different bending strengths, feature exist according to claim 1 In the prefabricated broken pile is the rectangular configuration being made of aluminum, irony, stainless steel or PVC any material therein.
CN201721141061.5U 2017-09-07 2017-09-07 A kind of default section support pile experimental rig for simulating different bending strengths Active CN208183816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721141061.5U CN208183816U (en) 2017-09-07 2017-09-07 A kind of default section support pile experimental rig for simulating different bending strengths

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721141061.5U CN208183816U (en) 2017-09-07 2017-09-07 A kind of default section support pile experimental rig for simulating different bending strengths

Publications (1)

Publication Number Publication Date
CN208183816U true CN208183816U (en) 2018-12-04

Family

ID=64441572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721141061.5U Active CN208183816U (en) 2017-09-07 2017-09-07 A kind of default section support pile experimental rig for simulating different bending strengths

Country Status (1)

Country Link
CN (1) CN208183816U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761785A (en) * 2017-09-07 2018-03-06 天津大学 A kind of default section support pile experimental rig for simulating different bending strengths

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761785A (en) * 2017-09-07 2018-03-06 天津大学 A kind of default section support pile experimental rig for simulating different bending strengths

Similar Documents

Publication Publication Date Title
CN110926538B (en) Can monitor extendible stock device of multistage stress displacement control of warm and humid water pressure
CN201650298U (en) Plane strain type model testing device capable of simulating the tunnel full-face excavation
CN113803083A (en) Underground engineering surrounding rock strength-energy support design method
Fu et al. Stress state and failure path of a tension tower in a transmission line under multiple loading conditions
CN107326817B (en) Energy-consuming type rolling stone protection system and design method thereof
CN105241656A (en) Physical simulation experiment system and method of deep-tunnel high-resistance extensible anchor pole support
CN107036917A (en) The Experimental Method in Laboratory of deep wall rock rock burst Burst Tendency
WO2022042761A1 (en) Npr anchor rod monitoring and control system and method for rock slope collapse disaster
CN112464340A (en) Rock burst roadway support design method based on comprehensive impact risk index evaluation
CN206974804U (en) A kind of experimental rig for impact loading bottom tool broken rock
Zhou et al. Development of a novel resilient anchor cable and its large shear deformation performance
CN208183816U (en) A kind of default section support pile experimental rig for simulating different bending strengths
CN113217053A (en) Self-adaptive large-deformation prestressed anchor rod
CN107367598A (en) By instructing the support pile experimental rig destroyed and method in excavation models experiment
CN113187505B (en) Rock burst resistance supporting and monitoring equipment based on surrounding rock strain softening characteristic
CN107605510B (en) Dragline type steel grid arch frame and construction method thereof
CN107761785A (en) A kind of default section support pile experimental rig for simulating different bending strengths
CN207148105U (en) By instructing the support pile experimental rig destroyed in excavation models experiment
CN108589739A (en) It is anti-buckling to support the modularization foundation pit supporting system being combined with beam string
CN205067080U (en) Extending anchor bolt support's of deep tunnel high resistant physical simulation experimental system
CN113653506B (en) Control method for high-stress soft rock tunnel bottom plate
CN204898508U (en) Circular steel tube pier of bucking power consumption structure is prevented in root setting
Peng Research on the breaking mechanism of bolts and cables in the gateway driven along a small coal pillar in the Datong mining area and the corresponding control technology
CN208280145U (en) It is anti-buckling to support the modularization foundation pit supporting system combined with beam string
Villaescusa et al. Dynamic testing of combined rock bolt and mesh schemes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant