CN208182248U CN201820451765.0U CN201820451765U CN208182248U CN 208182248 U CN208182248 U CN 208182248U CN 201820451765 U CN201820451765 U CN 201820451765U CN 208182248 U CN208182248 U CN 208182248U
Authority
CN
China
Prior art keywords
timber
bundling station
mentioned
unloading
bundling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820451765.0U
Other languages
Chinese (zh)
Inventor
谭传斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Huaya Bee Ware Co Ltd
Original Assignee
Hubei Huaya Bee Ware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Huaya Bee Ware Co Ltd filed Critical Hubei Huaya Bee Ware Co Ltd
Priority to CN201820451765.0U priority Critical patent/CN208182248U/en
Application granted granted Critical
Publication of CN208182248U publication Critical patent/CN208182248U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Basic Packing Technique (AREA)

Abstract

The utility model relates to Wood Transportation technology, timber stacking knot installation includes unloading platform and stacking strapper;Unloading platform front end upper end is equipped with unloading groove, and unloading groove bottom wall is the inclined-plane of forward end inclined downward;Piling up strapper includes elevating mechanism and bundling station;Elevating mechanism is located at the front end of unloading platform, and driving end is upward;Bundling station is transversely mounted on the driving end of elevating mechanism, and bundling station is located at the position of forward end and corresponding unloading groove close to unloading platform, and end face is to the inclined-plane of its front end inclined downward thereon;The forward end of bundling station is equipped with multiple gear beams straight up;What the upper surface of bundling station was spaced side by side is equipped with a plurality of binding groove extended along the longitudinal direction.Wood Transportation system includes airline and timber stacking knot installation, and airline is to be placed on timber storage area for the timber tied up at bundling station lifting.Advantage: piling up equipment and be related to rationally, and easy for operation, transportation system is conducive to the packing and transport of timber.

Description

A kind of timber stacking knot installation and Wood Transportation system
Technical field
The utility model relates to Wood Transportation technology, in particular to a kind of timber stacking knot installation and Wood Transportation system System.
Background technique
In timber mill, it will usually be conveyed through the wood come and unload in suitable place, then worker manually ties It pricks, finally stores the production and processing area of the Wood Transportation after tying up to next stage or storage area, whole process relies on artificial behaviour Make, efficiency is lower, and labor intensity of workers is also larger, and production cost is higher.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of timber stacking knot installation and Wood Transportation system, Effectively overcome the defect of the prior art.
The technical solution that the utility model solves above-mentioned technical problem is as follows:
A kind of timber stacking knot installation, including unloading platform and stacking strapper are provided;
Above-mentioned unloading platform is fixed on ground, and the upper center of front end is equipped with unloading groove, the bottom of above-mentioned unloading groove Wall is to the inclined-plane of its front end inclined downward, and the front end on the inclined-plane extends to the forward end of above-mentioned unloading platform;
Above-mentioned stacking strapper includes elevating mechanism and bundling station;
Above-mentioned elevating mechanism is fixed on ground, and is located at the front end of above-mentioned unloading platform, and driving end is upward;
Above-mentioned bundling station is bar shaped, and is transversely mounted on the driving end of above-mentioned elevating mechanism, and above-mentioned bundling station, which is located at, to be leaned on The position of the forward end of nearly above-mentioned unloading platform and corresponding above-mentioned unloading groove, end face is to the oblique of its front end inclined downward thereon Face;
What the forward end of above-mentioned bundling station was spaced side by side in left-right direction is equipped with multiple vertically set gear beams;
What the upper surface of above-mentioned bundling station was spaced side by side is equipped with a plurality of binding groove extended along the longitudinal direction, above-mentioned binding groove Both ends extend respectively to the front and back end end of above-mentioned bundling station, to place the rope of bundling of wood in above-mentioned binding groove, and The front and back end of corresponding above-mentioned binding groove is stretched out at the both ends of rope respectively;
Above-mentioned elevating mechanism can be by driving end that above-mentioned bundling station is driven to move up and down to the upper surface of above-mentioned bundling station End is flushed with the bottom wall front height of above-mentioned unloading groove, or is moved downward to the upper surface rear height of above-mentioned bundling station and is lower than The bottom wall front height of above-mentioned unloading groove.
The beneficial effects of the utility model are: timber stacking knot installation simple structure and reasonable design, unloads convenient for timber Quick stacking afterwards is tied up, and production and transport efficiency is improved.
Based on the above technical solution, the utility model can also do following improvement.
Further, the left and right ends of above-mentioned bundling station are respectively fixed with erecting bed, the relatively close side of above-mentioned erecting bed It is vertical to be equipped with the push plate being parallel to each other, the upper end face contact of the lower end of above-mentioned push plate and above-mentioned bundling station, on above-mentioned erecting bed It is respectively equipped with and is connected respectively with corresponding above-mentioned push plate with the one-to-one pushing mechanism of above-mentioned push plate, above-mentioned pushing mechanism, and Corresponding above-mentioned push plate can be pushed to move toward or away from one another along the left and right directions of above-mentioned bundling station.
Beneficial effect using above-mentioned further scheme is that design is reasonable, drives corresponding push plate to move by pushing mechanism It is dynamic, can be concordant to end by the timber stacking in bundling station, transport is tied up conducive to subsequent.
Further, above-mentioned pushing mechanism is hydraulic stem.
Beneficial effect using above-mentioned further scheme is it using more convenient.
Further, multiple above-mentioned binding grooves are located between two neighboring above-mentioned gear beam.
Beneficial effect using above-mentioned further scheme be binding groove design be conducive to timber stacking it is good after pass through rope into Row is tied up, very convenient.
Further, above-mentioned elevating mechanism is hydraulic shearing type lifting platform.
Beneficial effect using above-mentioned further scheme is it using more convenient.
Further, above-mentioned gear beam and above-mentioned bundling station are integrally formed.
Beneficial effect using above-mentioned further scheme is that structural strength is higher, durable.
A kind of Wood Transportation system is also provided, including airline and above-mentioned timber stacking knot installation, above-mentioned airline is before Rear direction is erected on the front ground of above-mentioned timber stacking knot installation, and its front end is equipped with timber storage area, above-mentioned airline The timber tied up at above-mentioned bundling station lifting is placed on above-mentioned timber storage area.
Beneficial effect is that transportation system's design is simple, rationally, can efficiently be unloaded timber, be piled up and rear reforwarding It is defeated.
Detailed description of the invention
Fig. 1 is the cross-sectional view of the timber stacking knot installation of the utility model;
Fig. 2 is the shaft side figure of bundling station in the timber stacking knot installation of the utility model;
Fig. 3 is the timber stacking knot installation of the utility model and the structural schematic diagram of Wood Transportation system.
In attached drawing, parts list represented by the reference numerals are as follows:
1, unloading platform, 2, stacking strapper, 3, airline, 11, unloading groove, 21, elevating mechanism, 22, bundling station, 23, peace Fill platform, 221, gear beam, 222, binding groove, 231, push plate, 232, pushing mechanism.
Specific embodiment
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining that this is practical It is novel, it is not intended to limit the scope of the utility model.
Embodiment one: as illustrated in fig. 1 and 2, the timber stacking knot installation of the present embodiment includes that unloading platform 1 and stacking are tied up Machine 2;
Above-mentioned unloading platform 1 is fixed on ground, and the upper center of front end is equipped with unloading groove 11, above-mentioned unloading groove 11 Bottom wall be to the inclined-plane of its front end inclined downward, and the front end on the inclined-plane extends to the forward end of above-mentioned unloading platform 1;
Above-mentioned stacking strapper 2 includes elevating mechanism 21 and bundling station 22;
Above-mentioned elevating mechanism 21 is fixed on ground, and is located at the front end of above-mentioned unloading platform 1, and driving end is upward;
Above-mentioned bundling station 22 is bar shaped, and laterally (being exactly laterally left and right directions) is mounted on the drive of above-mentioned elevating mechanism 21 On moved end, above-mentioned bundling station 22 is located at the position of forward end and corresponding above-mentioned unloading groove 11 close to above-mentioned unloading platform 1, Upper surface is to the inclined-plane of its front end inclined downward;
What the forward end of above-mentioned bundling station 22 was spaced side by side in left-right direction is equipped with multiple vertically set gear beams 221;
What the upper surface of above-mentioned bundling station 22 was spaced side by side is equipped with a plurality of binding groove 222 extended along the longitudinal direction, above-mentioned The both ends of binding groove 222 extend respectively to the front and back end end of above-mentioned bundling station 22, tie up in above-mentioned binding groove 222 to place The rope of timber, and the front and back end of corresponding above-mentioned binding groove 222 is stretched out at the both ends of rope respectively;
Above-mentioned elevating mechanism 21 can be upper to above-mentioned bundling station 22 by driving end that above-mentioned bundling station 22 be driven to move up and down End face rear end is flushed with the bottom wall front height of above-mentioned unloading groove 11, or after being moved downward to the upper surface of above-mentioned bundling station 22 End height is lower than the bottom wall front height of above-mentioned unloading groove 11.
Before timber is tied up, the timber that vehicle transport is come removal on unloading platform 1 is driven by elevating mechanism 21 later Dynamic bundling station 22 is moved to its front end and flushes with the bottom wall front end for groove 11 of unloading, and in next step, is set by artificial or other auxiliary It is standby will one by one wood it is horizontal, and successively pushed down by the unloading groove 11 on 1, timber is successively along the bottom of slope inclined-plane of unloading groove 11 It tumbles to 22 upper surface of bundling station, because 22 upper surface of bundling station is inclined-plane, timber is sequentially in gravity in bundling station 22 And under external force double acting Automatic Code put well (it should be strongly noted that pile up simultaneously, to gradually pass through elevating mechanism 21 driving Bundling station 22 moves down, every time the height of mobile one layer of timber, until piling up the timber of a bundle of quantity in bundling station 22), In next step, rope is manually passed through in each binding groove 222, and timber bundled in bundling station 22 is tied up i.e. later Can, entire to pile up process without human intervention, the direction that worker only needs timely correction timber to tumble is very convenient.
It should be strongly noted that above-mentioned bundling station 222 and the gap of 1 front end of unloading platform are smaller, not will cause timber by The situation that the gap location is fallen.
Preferably, the left and right ends of above-mentioned bundling station 22 are respectively fixed with erecting bed 23, above-mentioned erecting bed 23 is relatively close Side be equipped with the push plate 231 that is parallel to each other vertically, the lower end of above-mentioned push plate 231 and the upper surface of above-mentioned bundling station 22 connect It touches, is respectively equipped on above-mentioned erecting bed 23 and divides with the one-to-one pushing mechanism 232 of above-mentioned push plate 231, above-mentioned pushing mechanism 232 It is not connected with corresponding above-mentioned push plate 231, and corresponding above-mentioned push plate 231 can be pushed to move along the left and right directions of above-mentioned bundling station 22 Dynamic breathing is close to or far from entire design can limit 22 both ends of bundling station by push plate 231, it is ensured that timber can be good The push plate 231 into 22 both ends of bundling station between, also, according to the timber of different dimensions lengths, pile up it is good after, can pass through The pushing mechanism 232 at 22 both ends of bundling station is synchronous or individually drives corresponding push plate 231 mobile towards timber, and then by timber End is concordant, ties up and transports conducive to subsequent.
It should be noted that the both ends of above-mentioned bundling station 22 should be extended to respectively outside the both ends of unloading cut 11, so that timber It can smoothly tumble to bundling station 22.
Preferably, above-mentioned pushing mechanism 232 is hydraulic stem, using more convenient, being also possible to cylinder or other has With the equipment or mechanism of similar functions.
Preferably, multiple above-mentioned binding grooves 222 are located between two neighboring above-mentioned gear beam 221, it is reasonably distributed, benefit In well passing through for rope.
What multiple above-mentioned binding grooves 222 were equidistantly spaced in left-right direction is distributed in above-mentioned 22 upper end of bundling station, above-mentioned gear Beam 221 is equally that is be equidistantly spaced the be distributed in forward end of above-mentioned bundling station 22, gear beam 221 is at least provided with 2, binding groove 222 at least provided with one.
Preferably, above-mentioned elevating mechanism 21 is hydraulic shearing type lifting platform, and it is easy for operation, conducive to compared with heavy object Lifting.
Preferably, above-mentioned gear beam 221 is integrally formed with above-mentioned bundling station 22, structural strength is higher, and side is effectively to rolling The timber for falling on 22 upper surface of bundling station carries out limit blocking, makes its good autonomous stacking.
Angle α, and 0 ° of 45 ° of < α < are formed between the bottom wall and horizontal plane of above-mentioned unloading groove 11, angle design is closed Reason, slow safe conducive to timber tumble.
Angle β, and 0 ° of 45 ° of < β < are formed between above-mentioned 22 upper surface of bundling station and sleep, the angle design is reasonable, benefit Slow safe in timber tumbles.
The rear portion of above-mentioned 1 upper surface of unloading platform can be designed as inclined-plane, and the rear end lower section of the inclined-plane towards unloading platform 1 is inclined Tiltedly, and the rear end on the inclined-plane extends at ground, and haulage vehicle can be travelled to unloading groove 11 by the inclined-plane and be unloaded, non- It is often convenient, practical.
Embodiment two: as shown in figure 3, the Wood Transportation system of the present embodiment includes the wood in airline 3 and such as embodiment one Material piles up knot installation, and above-mentioned airline 3 is erected at along the longitudinal direction on the front ground of above-mentioned timber stacking knot installation, and its Front end is equipped with timber storage area, and above-mentioned airline 3 is to be placed on above-mentioned wood for the timber tied up at above-mentioned bundling station 22 lifting Material storage area.
Above-mentioned airline 3 generally comprises airline main body and two tracks being parallel to each other, and two parallel tracks are set to stacking The front end two sides of strapper 2, and extend to its front, airline main body is moveably mounted on two tracks, has hang thereon Hook and lifting rope, take-up winder thereon can be moved up and down by the suspension hook that folding and unfolding lifting rope connect come lower section with lifting rope free end, And take-up winder can be along the crossbeam transverse shifting of airline upper end, to be realized by track, crossbeam and take-up winder Suspension hook X Y tri- axis direction of Z mobile lifting.
Above-mentioned timber storage area can be white space on the ground, be used to store the timber tied up, Or the transfer of bundled timber is carried out in the timber storage area.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (7)

1. a kind of timber stacking knot installation, it is characterised in that: including unloading platform (1) and pile up strapper (2);
The unloading platform (1) is fixed on ground, and the upper center of front end is equipped with unloading groove (11), the unloading groove (11) bottom wall is to the inclined-plane of its front end inclined downward, and the front end on the inclined-plane extends to the front end end of the unloading platform (1) Portion;
The stacking strapper (2) includes elevating mechanism (21) and bundling station (22);
The elevating mechanism (21) is fixed on ground, and is located at the front end of the unloading platform (1), and driving end is upward;
The bundling station (22) is bar shaped, and is transversely mounted on the driving end of the elevating mechanism (21), the bundling station (22) be located at the forward end close to the unloading platform (1) and the position of corresponding unloading groove (11), thereon end face be to The inclined-plane of its front end inclined downward;
What the forward end of the bundling station (22) was spaced side by side in left-right direction is equipped with multiple vertically set gear beams (221);
What the upper surface of the bundling station (22) was spaced side by side is equipped with a plurality of binding groove (222) extended along the longitudinal direction, described The both ends of binding groove (222) extend respectively to the front and back end end of the bundling station (22), and the binding groove (222) is interior to put The rope of bundling of wood is set, and the front and back end of the corresponding binding groove (222) is stretched out at the both ends of rope respectively;
The elevating mechanism (21) can drive the bundling station (22) to be moved downward to the bundling station (22) by driving end Upper end surface rear end is flushed with the bottom wall front height of unloading groove (11), or is moved downward to the upper of the bundling station (22) Bottom wall front height of the end face rear height lower than unloading groove (11).
2. a kind of timber stacking knot installation according to claim 1, it is characterised in that: the left and right of the bundling station (22) Both ends are respectively fixed with erecting bed (23), and the relatively close side of the erecting bed (23) is equipped with the push plate being parallel to each other vertically (231), the upper end face contact of the lower end Yu the bundling station (22) of the push plate (231) is set respectively on the erecting bed (23) Have and described is pushed away with corresponding respectively with the one-to-one pushing mechanism (232) of the push plate (231), the pushing mechanism (232) Plate (231) connection, and the corresponding push plate (231) can be pushed adjacent to each other along the left and right directions movement of the bundling station (22) Or it is separate.
3. a kind of timber stacking knot installation according to claim 2, it is characterised in that: the pushing mechanism (232) is Hydraulic stem.
4. a kind of timber stacking knot installation according to claim 1, it is characterised in that: multiple binding grooves (222) It is located between the two neighboring gear beam (221).
5. a kind of timber stacking knot installation according to claim 1, it is characterised in that: the elevating mechanism (21) is liquid Compression shear cut type lifting platform.
6. a kind of timber stacking knot installation according to any one of claims 1 to 5, it is characterised in that: the gear beam (221) it is integrally formed with the bundling station (22).
7. a kind of Wood Transportation system, it is characterised in that: including airline (3) and such as timber as claimed in any one of claims 1 to 6 Knot installation is piled up, the airline (3) is erected at along the longitudinal direction on the front ground of the timber stacking knot installation, and its Front end is equipped with timber storage area, and the airline (3) is to be placed on institute for the timber tied up at the bundling station (22) lifting State timber storage area.
CN201820451765.0U 2018-04-02 2018-04-02 A kind of timber stacking knot installation and Wood Transportation system Expired - Fee Related CN208182248U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820451765.0U CN208182248U (en) 2018-04-02 2018-04-02 A kind of timber stacking knot installation and Wood Transportation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820451765.0U CN208182248U (en) 2018-04-02 2018-04-02 A kind of timber stacking knot installation and Wood Transportation system

Publications (1)

Publication Number Publication Date
CN208182248U true CN208182248U (en) 2018-12-04

Family

ID=64435153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820451765.0U Expired - Fee Related CN208182248U (en) 2018-04-02 2018-04-02 A kind of timber stacking knot installation and Wood Transportation system

Country Status (1)

Country Link
CN (1) CN208182248U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502578A (en) * 2018-04-02 2018-09-07 湖北华亚蜂具木业有限公司 A kind of timber stacking knot installation and Wood Transportation system
CN117485666A (en) * 2023-12-27 2024-02-02 四川万圣通精密机械制造有限公司 Steel pipe bundling and transferring integrated equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502578A (en) * 2018-04-02 2018-09-07 湖北华亚蜂具木业有限公司 A kind of timber stacking knot installation and Wood Transportation system
CN117485666A (en) * 2023-12-27 2024-02-02 四川万圣通精密机械制造有限公司 Steel pipe bundling and transferring integrated equipment
CN117485666B (en) * 2023-12-27 2024-03-19 四川万圣通精密机械制造有限公司 Steel pipe bundling and transferring integrated equipment

Similar Documents

Publication Publication Date Title
CN107428345B (en) Proppant storage and transportation system and method
CN208182248U (en) A kind of timber stacking knot installation and Wood Transportation system
CN205367140U (en) Automatic of use marshalling pusher of pile up neatly system
CN107662800A (en) A kind of intelligent storage carrier and intelligent warehousing system
CN106144672A (en) A kind of bag-pack cement loading machine
CN203959126U (en) A kind of multi-mode gig
CN108502578A (en) A kind of timber stacking knot installation and Wood Transportation system
CN208531740U (en) Code bag loading apparatus
CN103818671B (en) Put down into formula refuse transfer station and its operational method of clearing
CN204150313U (en) A kind of concrete segment finished product packing system
CN203419386U (en) Vertical type air bottle bulk packaging lattice
CN105016258A (en) Hand holding type combined fork arm carrier
CN205737747U (en) Processing tomato results roping wagon box
CN204778677U (en) Fork truck&#39;s slide formula combination yoke
CN104986696B (en) The chute type combination yoke of fork truck
CN204778631U (en) Combination yoke fork truck
CN105016250B (en) Combine yoke light roadster
CN206108447U (en) Bagged water mud carloader
CN104973542A (en) Combined fork arm type telescopic arm forklift truck
CN209099082U (en) A kind of coal mining tractor is auxiliary to send track laying device
CN105173787A (en) Material tip discharger of open-top container
CN105060179B (en) The combination yoke of fork truck
CN204778676U (en) Flexible arm fork truck of combination yoke
CN207737298U (en) Refractory material kiln car transports electric trailer and is cut somebody&#39;s hair car puller with sloping block type
CN202575428U (en) Ceramic tile stack and ceramic tile stacking equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181204