CN208168934U CN201820527570.XU CN201820527570U CN208168934U CN 208168934 U CN208168934 U CN 208168934U CN 201820527570 U CN201820527570 U CN 201820527570U CN 208168934 U CN208168934 U CN 208168934U
Authority
CN
China
Prior art keywords
pipe
gas
valve
gas cylinder
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820527570.XU
Other languages
Chinese (zh)
Inventor
范雲鹤
刘彥含
翁杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaitian Construction Development Group Co ltd
Original Assignee
Ou Yanghuahong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ou Yanghuahong filed Critical Ou Yanghuahong
Priority to CN201820527570.XU priority Critical patent/CN208168934U/en
Application granted granted Critical
Publication of CN208168934U publication Critical patent/CN208168934U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model provides a kind of inflation starting formula tunnel drainage system,Including drilling,Siphon pipe,Gutter,Inflate starter,The position setting drilling for needing to drain in tunnel surrounding,The water inlet of siphon pipe is placed in drilling,The water outlet of siphon pipe is placed in closed water tank,Inflating starter includes water tank,Exhaust pipe,Valve A,Drainpipe,Valve B,Gas cylinder A,Gas cylinder B,Diversion pipe,Branch pipe,Pressure gauge,Gas-guide tube,Valve C,Gas cylinder A fills sodium bicarbonate solution,Gas cylinder B fills citric acid solution,It is connected between gas cylinder A and gas cylinder B by diversion pipe,Pressure gauge is equipped among diversion pipe,Branch pipe is connected on diversion pipe,The arrival end of gas-guide tube is placed within gas cylinder A,The outlet end of gas-guide tube is connect with water tank bottom,Valve C is mounted on gas-guide tube,Exhaust pipe is mounted on the top of water tank,Valve A is mounted on exhaust pipe,The arrival end of drainpipe is connected to the bottom of water tank,Valve B is mounted on the exit of drainpipe.

Description

A kind of inflation starting formula tunnel drainage system
Technical field
The invention belongs to Tunnel Engineering fields, draining more particularly to a kind of inflation starting formula tunnel suitable for massif tunnel Road drainage system.
Background technique
It is influenced by complicated geological environment and hydrogeologic condition, the construction in tunnel and operation process still face much at present Engineering disease problem.Wherein, the water leakage defect in tunnel is exactly the problem of the operation of puzzlement tunnel and maintenance.It seeps for a long time in tunnel Leak can generate erosion damage to tunnel-liner, and percolating water can also generate emollescence to tunnel surrounding, reduce the strong of country rock Degree, causes wall rock destabilization to destroy.Tunnel Water Leakage, which drops onto road surface, will cause surface gathered water or icing, influence traffic circulation.Mesh Preceding drainage measure destroys lining cutting globality larger, and draining range is smaller, and long-term is ineffective, for maintenance cost compared with It is high.In recent years it is proposed that tunnel siphon drainage technology, arranges that convenient, water-collecting capacity is strong with drainage hole, cuts drainage effect Well, the advantages that engineering construction speed is fast, however in the engineering using tunnel siphon drainage method, it needs to keep at the top of siphon pipe Certain vacuum degree, but due to the gas being dissolved in water can be precipitated under negative pressure, outside air penetrates into siphon pipe etc., Part siphon pipe usually causes vacuum degree to decline because air is accumulated in pipe, and part siphon pipe can temporarily be in and stop working State will lead to that siphon drainage is difficult in maintenance or even entire siphon drainge system if siphon pipe is in for a long time and arrheas state It interrupts, siphon starting becomes abnormal difficult.In addition, tunnel siphon drainage technology generally uses diameter 4mm siphon pipe below, rainbow Suction pipe caliber is smaller, is easy to appear silt silting situation, equally will cause siphon interruption, is difficult to restart after interruption.
Summary of the invention
The present invention technological deficiency difficult in maintenance for existing tunnel siphon drainage provides a kind of inflation starting formula tunnel row Siphon starting can be repeated in tunnel siphon drainge system use process, solve in drainage procedure because of siphon pipe for water system Interior air accumulates and needs the problem of safeguarding and restarting siphon, also solves the problems, such as silt silting in siphon pipe, meets tunnel The needs effectively drained, level of ground water rises in real-time control tunnel surrounding.
The technical scheme is that:A kind of inflation starting formula tunnel drainage system, including drilling, siphon pipe, gutter, fill Gas starter, the position setting drilling for needing to drain in tunnel surrounding, the water inlet of siphon pipe are placed in drilling, siphon pipe Water outlet be placed in closed water tank, the elevation of tank top is lower than the elevation of foot of hole, and inflation starter is located at tunnel On roadbed side slope outside road, inflation starter include water tank, exhaust pipe, valve A, drainpipe, valve B, gas cylinder A, gas cylinder B, Diversion pipe, branch pipe, pressure gauge, gas-guide tube, valve C, gas cylinder A fill sodium bicarbonate solution, and gas cylinder B fills citric acid solution, gas It being connected between bottle A and gas cylinder B by diversion pipe, the both ends of diversion pipe are all located at liquid level hereinafter, equipped with pressure gauge among diversion pipe, Branch pipe is connected on diversion pipe, and the air inlet of branch pipe is more than liquid level, and the arrival end of gas-guide tube is placed within gas cylinder A, gas-guide tube Arrival end more than liquid level, the outlet end of gas-guide tube is connect with water tank bottom, and valve C is mounted on gas-guide tube, water tank setting On roadbed slope, exhaust pipe is mounted on the top of water tank, and valve A is mounted on exhaust pipe, and the arrival end of drainpipe is connected to The bottom of water tank, valve B are mounted on the exit of drainpipe.
Further, the diameter of the siphon pipe is 4mm.
Further, the diameter of the gas-guide tube is 10mm.
Further, the quantity that siphon pipe is placed in the water tank is 100-200 root.
It inflates starting formula tunnel drainage system when first used, closes valve A, close valve C, valve B is opened, from valve It inversely pours water at B to drainpipe, after the gas in siphon pipe is discharged, stopping inversely being poured water, and is opened valve A, is recorded drainpipe Initial drain discharge;
When the drain discharge of drainpipe drops to the 30%-50% of initial drain discharge, valve B is closed, squeezes gas cylinder B, Citric acid solution is set to flow into gas cylinder A by diversion pipe, citric acid and reaction of sodium bicarbonate generate carbon dioxide gas, and gas passes through Branch pipe enters gas cylinder B, and the air pressure in gas cylinder A and gas cylinder B is made to reach balance;
When pressure gauge is shown as 150kpa, valve C is opened, gas is filled with water tank, and liquid level in water tank is caused to generate concussion;
After the liquid level of water tank shakes 10-20 minutes, valve C is closed, valve B is opened, at the beginning of the draining for recording new drainpipe Beginning flow.
Beneficial effects of the present invention are mainly manifested in:
1, the present invention is filled with water tank initiation liquid level concussion by high pressure gas to start siphon, solves the accumulation of siphon pipe air It is the problem of with silt silting, simple and reliable not by other electrical equipments.
2, material of the present invention simply easily obtains, and is not interfered by other external conditions, applied widely, is suitable for remote districts Field massif tunnel.
3, the present invention generates gas using chemical reaction, can be used for multiple times, operating method is simple, can also start simultaneously More siphon pipes, rapidly and efficiently start siphon.
4, the design of gas generating system of the invention ensure that gas continuously flows into water tank, gas cylinder A and gas cylinder B Interior air pressure remains dynamic equilibrium, keeps whole device reliable and stable.
Detailed description of the invention
Fig. 1 is the overall structure diagram that a kind of inflation of the invention starts formula tunnel drainage system;
Fig. 2 is the tunnel cross section schematic diagram that a kind of inflation of the invention starts formula tunnel drainage system;
Fig. 3 is the structural schematic diagram for the inflation starter that a kind of inflation of the invention starts formula tunnel drainage system;
In figure:Drilling 1, siphon pipe 2, gutter 4, tunnel 5, massif 6, roadbed side slope 7, inflation starter 3, water tank 31, Exhaust pipe 32, valve A 33, drainpipe 34, valve B 35, gas cylinder A 81, gas cylinder B 82, diversion pipe 83, pressure gauge 84, air guide Pipe 85, valve C 86, branch pipe 87.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate this hair It is bright rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, art technology Personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Fixed range.
Embodiment 1
As shown in Figure 1, Figure 2, Figure 3 shows, the present embodiment provides a kind of inflation starting formula tunnel drainage systems, including drilling 1, rainbow Suction pipe 2, gutter 4, inflation starter 3, the position setting drilling 1 for needing to drain in 5 country rock of tunnel, the water inlet of siphon pipe 2 Mouth is placed in drilling 1, and the water outlet of siphon pipe 2 is placed in closed water tank 31, and the elevation at 31 top of water tank is lower than 1 bottom of drilling Elevation, inflation starter 3 be located on the roadbed side slope 7 outside tunnel 5;Inflating starter 3 includes water tank 31, exhaust pipe 32, valve A 33, drainpipe 34, valve B 35, gas cylinder A 81, gas cylinder B 82, diversion pipe 83, branch pipe 87, pressure gauge 84, air guide Pipe 85, valve C 86, gas cylinder A 81 fill sodium bicarbonate solution, and gas cylinder B 82 fills citric acid solution, gas cylinder A 81 and gas cylinder B It being connected between 82 by diversion pipe 83, the both ends of diversion pipe 83 are all located at liquid level hereinafter, being equipped with pressure gauge 84 among diversion pipe 83, Branch pipe 87 is connected on diversion pipe 83, and for the air inlet of branch pipe 87 more than liquid level, the arrival end of gas-guide tube 85 is placed in gas cylinder A 81 Within, more than liquid level, the outlet end of gas-guide tube 85 is connect the arrival end of gas-guide tube 85 with 31 bottom of water tank, and valve C 86 is installed On gas-guide tube 85, water tank 31 is arranged on roadbed slope 7, and exhaust pipe 32 is mounted on the top of water tank 31, and valve A 33 is installed On exhaust pipe 32, the arrival end of drainpipe 34 is connected to the bottom of water tank 31, and valve B 35 is mounted on the outlet of drainpipe 34 Place.The diameter of siphon pipe 2 is 4mm.The diameter of gas-guide tube 85 is 10mm.The quantity that siphon pipe 2 is placed in water tank 31 is 100. The sodium bicarbonate solution of gas cylinder A 81 is 500 grams of sodium bicarbonates and 2 liters of water mixing, and the citric acid solution of gas cylinder B 82 is 500 grams Citric acid and 1 kilogram of water mixing, according to chemical reaction equation;3NaHCO3+C6H8O7=C6H5O7Na3+3CO2+3H2O, sodium bicarbonate After reacting completely with citric acid, under room temperature, normal pressure, it can produce 133 liters of carbon dioxide.Every time to soft soil foundation drainage system into After row maintenance by gas pressuriztion, sodium bicarbonate is supplemented into gas cylinder A 81, supplements citric acid into gas cylinder B 82.
It inflates starting formula tunnel drainage system when first used, closes valve A 33, close valve C 86, open valve B 35, it inversely pours water from valve B 35 to drainpipe 34, after the gas in siphon pipe 2 is discharged, stopping inversely being poured water, and opens valve A 33, siphonage start, and underground water flows out tunnel 5 followed by siphon pipe 2, water tank 31, drainpipe 34 in 5 country rock of tunnel, Record the initial drain discharge of drainpipe 34;
When the drain discharge of drainpipe 34 drops to the 30%-50% of initial drain discharge, valve B 35 is closed, squeezes gas Bottle B 82, makes citric acid solution flow into gas cylinder A 81 by diversion pipe 83, and citric acid and reaction of sodium bicarbonate generate carbon dioxide Gas, gas enter gas cylinder B 82 by branch pipe 87, the air pressure in gas cylinder A 81 and gas cylinder B 82 are made to reach balance;
When pressure gauge 84 is shown as 150kpa, valve C 86 is opened, gas is filled with water tank 31, causes liquid level in water tank 31 Concussion is generated, the variation of Wave crest and wave trough formula, when pressure is lower suddenly in siphon pipe 2, what siphon was interrupted is presented in pressure in water tank 31 Air in siphon pipe 2 is sucked out, and the siphon pipe 2 of silt silting is influenced by the pressure change of vibrating type, makes silt with water flow It flows out outside siphon pipe 2, after gas flows out gas cylinder A 81,81 pressure of gas cylinder A reduces, and citric acid solution is pressed by diversion pipe 83 Enter gas cylinder A 81, continuing to react generates gas, and the gas for entering water tank 31 from gas-guide tube 85 causes after liquid level shakes from row Tracheae 32 flows out water tank 31;
After the liquid level of water tank 31 shakes 10-20 minutes, valve C 86 is closed, valve B 82 is opened, records new drainpipe 34 draining initial flow.

Claims (2)

1. a kind of inflation starting formula tunnel drainage system, which is characterized in that including drilling, siphon pipe, gutter, inflation starting dress It sets, the position setting drilling for needing to drain in tunnel surrounding, the water inlet of siphon pipe is placed in drilling, the water outlet of siphon pipe It is placed in closed water tank, the elevation of tank top is lower than the elevation of foot of hole, and inflation starter is located at the road outside tunnel In base side slope;Inflating starter includes water tank, exhaust pipe, valve A, drainpipe, valve B, gas cylinder A, gas cylinder B, diversion pipe, branch Pipe, pressure gauge, gas-guide tube, valve C, gas cylinder A fill sodium bicarbonate solution, and gas cylinder B fills citric acid solution, gas cylinder A and gas cylinder B Between connected by diversion pipe, the both ends of diversion pipe are all located at liquid level hereinafter, being equipped with pressure gauge among diversion pipe, branch pipe is connected to On diversion pipe, more than liquid level, the arrival end of gas-guide tube is placed within gas cylinder A the air inlet of branch pipe, and the arrival end of gas-guide tube exists More than liquid level, the outlet end of gas-guide tube is connect with water tank bottom, and valve C is mounted on gas-guide tube, and water tank is arranged in roadbed slope On, exhaust pipe is mounted on the top of water tank, and valve A is mounted on exhaust pipe, and the arrival end of drainpipe is connected to the bottom of water tank, Valve B is mounted on the exit of drainpipe.
2. inflation starting formula tunnel drainage system as described in claim 1, which is characterized in that the diameter of the siphon pipe is 4mm, the quantity that siphon pipe is placed in the water tank is 100-200 root.
CN201820527570.XU 2018-04-13 2018-04-13 A kind of inflation starting formula tunnel drainage system Expired - Fee Related CN208168934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820527570.XU CN208168934U (en) 2018-04-13 2018-04-13 A kind of inflation starting formula tunnel drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820527570.XU CN208168934U (en) 2018-04-13 2018-04-13 A kind of inflation starting formula tunnel drainage system

Publications (1)

Publication Number Publication Date
CN208168934U true CN208168934U (en) 2018-11-30

Family

ID=64370617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820527570.XU Expired - Fee Related CN208168934U (en) 2018-04-13 2018-04-13 A kind of inflation starting formula tunnel drainage system

Country Status (1)

Country Link
CN (1) CN208168934U (en)

Similar Documents

Publication Publication Date Title
CN108547662B (en) A kind of tunnel drainage system and method
CN100590323C (en) Controllable siphon discharging device and operation method for reservoir drainage or flood discharge
CN109707444B (en) Automatic start-up formula tunnel drainage system
CN111365070B (en) Tunnel drain pipe crystallization prevention and control system and prevention and control method
CN108560693B (en) Side slope siphon drainge system starter and method
CN101787702A (en) Effective vacuum dewatering method
CN109707443A (en) A kind of renewable type tunnel drainage system and method
CN105909978A (en) Floating ball type anti-leakage gas drainer
CN108301395A (en) A kind of slope drainage system and method
CN110847961A (en) Tunnel drainage system
WO2021097936A1 (en) River bank slope water drainage system
CN111794238B (en) Grouting structure for filling soluble crystals and construction method
CN108442970A (en) A kind of inflation dredged tunnel drainage system and method
CN208168934U (en) A kind of inflation starting formula tunnel drainage system
CN108316972A (en) A kind of inflation startup formula tunnel drainage system and method
CN108517880A (en) Slope drainage system gas pressure startup device and method
CN107956893A (en) Anchor room drain valve, drainage system and water discharge method using the drain valve after a kind of tunnel anchorage
CN102061939B (en) Automatic drainer
CN207687375U (en) Anchor room drain valve and its drainage system after a kind of tunnel anchorage
CN108547661B (en) A kind of tunnel drainage system and method for reverse pressure water renewable type
CN108330947A (en) Slope drainage system inflates starter and method
CN112281884A (en) Well point dewatering device and operation method thereof
CN109707445B (en) Dredgeable tunnel drainage system and method
CN201554496U (en) Automatic drainer
CN206299575U (en) A kind of water supply system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190806

Address after: 610000 Room 302, 3rd Floor, Unit 2, Building 9, No. 2, Wuxing Second Road, Wuhou District, Chengdu City, Sichuan Province

Patentee after: Kaitian Construction Development Group Co.,Ltd.

Address before: 362000 No. 559 Success Street, Nan'an City, Quanzhou City, Fujian Province

Patentee before: OuYang Huahong

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

CF01 Termination of patent right due to non-payment of annual fee