CN208152258U - The convenient peace in construction site tears swing room open - Google Patents

The convenient peace in construction site tears swing room open Download PDF

Info

Publication number
CN208152258U
CN208152258U CN201820550982.5U CN201820550982U CN208152258U CN 208152258 U CN208152258 U CN 208152258U CN 201820550982 U CN201820550982 U CN 201820550982U CN 208152258 U CN208152258 U CN 208152258U
Authority
CN
China
Prior art keywords
truss
groove
enclosing
hole
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820550982.5U
Other languages
Chinese (zh)
Inventor
李证吉
赵琬琬
陈国清
南学飞
韩秋石
程伟波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201820550982.5U priority Critical patent/CN208152258U/en
Application granted granted Critical
Publication of CN208152258U publication Critical patent/CN208152258U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of convenient peaces in construction site to tear swing room open, including the first truss enclosing, the two sides of the first truss enclosing are equipped with the second truss enclosing, column there are four being set at the top of first truss enclosing and two the second truss enclosings, the top of four columns is equipped with the same pavilion roofing, multiple seats and backrest are equipped on first truss enclosing and two the second truss enclosings, backrest is adapted with corresponding seat, multiple hinges are fixedly installed on first truss enclosing and two the second truss enclosings, hinge is fixedly connected with corresponding backrest, hinged several connecting rods on first truss enclosing and two the second truss enclosings.The utility model structure is simple, easy to operate, quickly can carry out peace to truss enclosing by simple rotational action and tear open, to conveniently build swing room, can reuse, bring very big convenience.

Description

The convenient peace in construction site tears swing room open
Technical field
The utility model relates to the convenient peaces of lobby technical field more particularly to a kind of construction site to tear swing room open.
Background technique
With economic continuous development, a large amount of infrastructure is built out, and more and more civil engineerings, which enter, to be applied Work, building site are generally provided with simple lobby, for worker's rest, sun-rain-shading, drink water and smoke, current simple lobby one As be all a shed for rest area temporarily to be set up using fastener type steel pipe or using foldable shed for sale in the market, it is above-mentioned to do Method is inconvenient to pacify to tear open, and each building site requires specially to set up, and can not reuse, uneconomical, while not being able to satisfy building site It answers scene to need the demand of anti-falling object from high altitude, thus it is proposed that a kind of convenient peace in construction site tears swing room open, is solved with this The certainly above problem.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and the convenient peace in construction site proposed Tear swing room open.
To achieve the goals above, the utility model uses following technical solution:
The convenient peace in construction site tears swing room, including the first truss enclosing open, and the two sides of the first truss enclosing are equal Equipped with the second truss enclosing, set at the top of the first truss enclosing and two the second truss enclosings there are four column, four columns Top is equipped with the same pavilion roofing, is equipped with multiple seats on the first truss enclosing and two the second truss enclosings and seat leans on Back, backrest are adapted with corresponding seat, are fixedly installed on the first truss enclosing and two the second truss enclosings more A hinge, hinge are fixedly connected with corresponding backrest, if hinged on the first truss enclosing and two the second truss enclosings Involvement extension bar, connecting rod and corresponding backrest are hinged, are fixedly mounted on the first truss enclosing there are two the first fixed block, the It is fixedly installed with the second fixed block on two truss enclosings, two the second fixed blocks side close to each other is respectively with corresponding first Fixed block contact, and two the second fixed blocks side close to each other offers the first groove, is slidably installed in the first groove There is the first pin rod, one end that two the first pin rods are located remotely from each other is respectively welded at the side that two the first fixed blocks are located remotely from each other, The bottom of first pin rod offers the second groove, and third groove is offered in the bottom interior wall of the first groove, is slided in third groove Dynamic to be equipped with the second pin rod, the top of the second pin rod extends in corresponding second groove, and the second pin rod and corresponding second The inner wall of groove is slidably connected, and the bottom end of the second pin rod offers thread groove, and thread groove internal screw thread is equipped with screw rod, and second Cavity is offered on fixed block, first through hole is offered in the top inner wall of cavity, and the bottom end of screw rod extends to corresponding cavity It is interior and be welded with the first tapered gear, and screw rod is rotatably installed in corresponding first through hole, two cavitys be located remotely from each other one The second through-hole is offered on the inner wall of side, and shaft, two shafts one end difference close to each other are rotatably equipped in the second through-hole The second tapered gear is extended in corresponding cavity and is welded with, the second tapered gear is engaged with corresponding first tapered gear.
Preferably, one end that two shafts are located remotely from each other extends respectively to outside corresponding second through-hole, and two shaft phases Mutually separate one end is welded with handle.
Preferably, sliding slot is offered on the side inner wall that two third grooves are located remotely from each other, is slidably fitted in sliding slot Sliding block, two sliding block sides close to each other are respectively welded on corresponding second pin rod.
Preferably, third through-hole is offered on the sliding block, is fixedly installed in the top inner wall and bottom interior wall of sliding slot The same slide bar, sliding bar are mounted in corresponding third through-hole.
Preferably, turning set is equipped with bearing on the screw rod, and the outer ring of bearing is fixedly mounted on corresponding first through hole On inner wall.
Preferably, it is opened up on the inner wall of second through-hole there are two ring groove, equal rotation peace in two ring grooves Equipped with ring-like fixture block, two ring-like fixture blocks are fixedly mounted in corresponding shaft.
Compared with prior art, the utility model has the beneficial effects that:
Pass through pavilion roofing, column, handle, shaft, the second through-hole, the second tapered gear, cavity, the first tapered gear, spiral shell Bar, first through hole and thread groove match, and first remove pavilion roofing, then dismantle four columns, then swing handle, handle grip Turn axis rotates in corresponding second through-hole, while shaft drives the second tapered gear to rotate in corresponding cavity, so that First tapered gear is rotated in the cavity by the second tapered gear band is dynamic, while the first tapered gear band moves screw rod corresponding the It is rotated simultaneously in one through-hole and thread groove, passes through the second pin rod, screw rod, third groove, the second groove, the first pin rod, first Groove and the second truss enclosing match, and the second pin rod drives the slide downward in corresponding third groove, while the by screw rod Two pin rods drive sliding to exit corresponding second groove by screw rod, so that fixation quilt of first pin rod in corresponding first groove It releases, then pulls the second truss enclosing, so that corresponding first groove is exited in the sliding of the first pin rod, the second truss enclosing is split Under, then another the second truss enclosing is dismantled according to identical step.
The utility model structure is simple, easy to operate, by simple rotational action can quickly to truss enclosing into Row peace is torn open, to conveniently build swing room, can be reused, brought very big convenience.
Detailed description of the invention
Fig. 1 be the utility model proposes convenient pacify in construction site tear the positive structure diagram of swing room open;
Fig. 2 be the utility model proposes convenient pacify in construction site tear the overlooking structure diagram of swing room open;
Fig. 3 be the utility model proposes construction site it is convenient pacify tear open swing room part A structural schematic diagram;
Fig. 4 be the utility model proposes construction site it is convenient pacify tear open swing room part B structural schematic diagram;
Fig. 5 be the utility model proposes construction site it is convenient pacify tear open swing room C portion structural schematic diagram;
Fig. 6 be the utility model proposes construction site it is convenient pacify tear open swing room the part D structural schematic diagram.
In figure:1 first truss enclosing, 2 second truss enclosings, 3 columns, 4 pavilion roofings, 5 seats, 6 backrests, 7 are closed Page, 8 connecting rods, 9 first fixed blocks, 10 second fixed blocks, 11 first grooves, 12 first pin rods, 13 second grooves, 14 thirds are recessed Slot, 15 second pin rods, 16 thread grooves, 17 screw rods, 18 cavitys, 19 first through hole, 20 first tapered gears, 21 second through-holes, 22 shafts, 23 second tapered gears.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-6, the convenient peace in construction site tears swing room, including the first truss enclosing 1, the first truss enclosing 1 open Two sides be equipped with the second truss enclosing 2, the top of the first truss enclosing 1 and two the second truss enclosings 2 sets that there are four columns 3, the top of four columns 3 is equipped with the same pavilion roofing 4, is equipped on the first truss enclosing 1 and two the second truss enclosings 2 more A seat 5 and backrest 6, backrest 6 are adapted with corresponding seat 5, and the first truss enclosing 1 and two the second truss enclose Multiple hinges 7 are fixedly installed on gear 2, hinge 7 is fixedly connected with corresponding backrest 6, the first truss enclosing 1 and two Hinged several connecting rods 8 on a second truss enclosing 2, connecting rod 8 and corresponding backrest 6 are hinged, the first truss enclosing 1 Upper fixed installation is fixedly installed with the second fixed block 10 there are two the first fixed block 9 on the second truss enclosing 2, two second solid Determine the side close to each other of block 10 to contact with corresponding first fixed block 9 respectively, and two the second fixed blocks 10 are close to each other Side offers the first groove 11, and the first pin rod 12 is slidably fitted in the first groove 11, and two the first pin rods 12 are mutually remote From one end be respectively welded at the side that two the first fixed blocks 9 are located remotely from each other, it is recessed that the bottom of the first pin rod 12 offers second Slot 13 offers third groove 14 in the bottom interior wall of first groove 11, the second pin rod 15 is slidably fitted in third groove 14, The top of second pin rod 15 extends in corresponding second groove 13, and the inner wall of the second pin rod 15 and corresponding second groove 13 It is slidably connected, the bottom end of the second pin rod 15 offers thread groove 16, and 16 internal screw thread of thread groove is equipped with screw rod 17, and second is solid Determine to offer cavity 18 on block 10, offer first through hole 19 in the top inner wall of cavity 18, the bottom end of screw rod 17 extends to pair In the cavity 18 answered and it is welded with the first tapered gear 20, and screw rod 17 is rotatably installed in corresponding first through hole 19, two The second through-hole 21 is offered on the side inner wall that cavity 18 is located remotely from each other, and is rotatably equipped with shaft 22 in the second through-hole 21, two A shaft 22 one end close to each other extends respectively in corresponding cavity 18 and is welded with the second tapered gear 23, the second cone Type gear 23 is engaged with corresponding first tapered gear 20, by pavilion roofing 4, column 3, handle, shaft 22, the second through-hole 21, Second tapered gear 23, cavity 18, the first tapered gear 20, screw rod 17, first through hole 19 and thread groove 16 match, and first tear open Except pavilion roofing 4, four columns 3 are then dismantled, then swing handle, handle grip turn axis 22 turns in corresponding second through-hole 21 It is dynamic, while shaft 22 drives the second tapered gear 23 to rotate in corresponding cavity 18, so that the first tapered gear 20 is by second The tapered drive of gear 23 rotates in cavity 18, while the first tapered gear 20 drives screw rod 17 in corresponding 19 He of first through hole Is rotated in thread groove 16 simultaneously, by the second pin rod 15, screw rod 17, third groove 14, the second groove 13, the first pin rod 12, First groove 11 and the second truss enclosing 2 match, the second pin rod 15 by screw rod 17 drive in corresponding third groove 14 to Lower slider, while the second pin rod 15 drives sliding to exit corresponding second groove 13 by screw rod 17, so that the first pin rod 12 is right The fixation in the first groove 11 answered is released from, and then pulls the second truss enclosing 2, so that correspondence is exited in the sliding of the first pin rod 12 The first groove 11, the second truss enclosing 2 is removed, then dismantle another the second truss enclosing 2 according to identical step, this Utility model structure is simple, easy to operate, quickly can carry out peace to truss enclosing by simple rotational action and tear open, thus Swing room is conveniently built, can be reused, very big convenience has been brought.
In the utility model, one end that two shafts 22 are located remotely from each other is extended respectively to outside corresponding second through-hole 21, and One end that two shafts 22 are located remotely from each other is welded with handle, opens up on the side inner wall that two third grooves 14 are located remotely from each other There is sliding slot, sliding block is slidably fitted in sliding slot, two sliding block sides close to each other are respectively welded at corresponding second pin rod 15 On, third through-hole is offered on sliding block, the same slide bar is fixedly installed in the top inner wall and bottom interior wall of sliding slot, and slide bar is sliding Dynamic to be mounted in corresponding third through-hole, turning set is equipped with bearing on screw rod 17, and the outer ring of bearing is fixedly mounted on corresponding the It on the inner wall of one through-hole 19, is opened up on the inner wall of the second through-hole 21 there are two ring groove, equal rotation peace in two ring grooves Equipped with ring-like fixture block, two ring-like fixture blocks are fixedly mounted in corresponding shaft 22, by pavilion roofing 4, column 3, handle, are turned Axis 22, the second through-hole 21, the second tapered gear 23, cavity 18, the first tapered gear 20, screw rod 17, first through hole 19 and screw thread Groove 16 matches, and first removes pavilion roofing 4, then dismantles four columns 3, then swing handle, handle grip turn axis 22 is right Rotation in the second through-hole 21 answered, while shaft 22 drives the second tapered gear 23 to rotate in corresponding cavity 18, so that the One tapered gear 20 is driven by the second tapered gear 23 and rotates in cavity 18, while the first tapered gear 20 drives screw rod 17 It is rotated simultaneously in corresponding first through hole 19 and thread groove 16, passes through the second pin rod 15, screw rod 17, third groove 14, Two grooves 13, the first pin rod 12, the first groove 11 and the second truss enclosing 2 match, and the second pin rod 15 is driven by screw rod 17 Slide downward in corresponding third groove 14, while the second pin rod 15 drives sliding to exit corresponding second groove by screw rod 17 13, so that fixation of first pin rod 12 in corresponding first groove 11 is released from, the second truss enclosing 2 is then pulled, so that Corresponding first groove 11 is exited in the sliding of first pin rod 12, and the second truss enclosing 2 is removed, and then dismantles according to identical step Another the second truss enclosing 2, the utility model structure is simple, easy to operate, can be quickly by simple rotational action Peace is carried out to truss enclosing to tear open, to conveniently build swing room, can be reused, brought very big side Just.
Working principle:When disassembly is desired, pavilion roofing 4 is first removed, then dismantles four columns 3, then swing handle, Handle grip turn axis 22 rotates in corresponding second through-hole 21, while shaft 22 drives the second tapered gear 23 in corresponding chamber Rotation in body 18 rotates in cavity 18 so that the first tapered gear 20 is driven by the second tapered gear 23, while first is tapered Gear 20 drives screw rod 17 to rotate simultaneously in corresponding first through hole 19 and thread groove 16, so that the second pin rod 15 is by screw rod 17 drive the slide downwards in corresponding third groove 14, while the second pin rod 15 drives sliding to exit corresponding the by screw rod 17 Two grooves 13 then pull the second truss enclosing so that fixation of first pin rod 12 in corresponding first groove 11 is released from 2, so that corresponding first groove 11 is exited in the sliding of the first pin rod 12, the second truss enclosing 2 is removed, then according to identical step Suddenly another the second truss enclosing 2 is dismantled.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. the convenient peace in construction site tears swing room, including the first truss enclosing (1) open, which is characterized in that first truss The two sides of enclosing (1) are equipped with the second truss enclosing (2), the top of the first truss enclosing (1) and two the second truss enclosings (2) If the top of four columns (3) is equipped with the same pavilion roofing (4) there are four column (3), the first truss enclosing (1) and two the Multiple seats (5) and backrest (6) are equipped on two truss enclosings (2), backrest (6) is mutually fitted with corresponding seat (5) Match, be fixedly installed with multiple hinges (7) on the first truss enclosing (1) and two the second truss enclosings (2), hinge (7) with it is right The backrest (6) answered is fixedly connected, hinged several connections on the first truss enclosing (1) and two the second truss enclosings (2) Bar (8), connecting rod (8) hingedly, on the first truss enclosing (1) are fixedly mounted solid there are two first with corresponding backrest (6) Determine block (9), be fixedly installed with the second fixed block (10) on the second truss enclosing (2), two the second fixed blocks (10) are close to each other Side contacted respectively with corresponding first fixed block (9), and two the second fixed block (10) sides close to each other open up Have the first groove (11), is slidably fitted with the first pin rod (12) in the first groove (11), two the first pin rods (12) are located remotely from each other One end be respectively welded at the side that two the first fixed blocks (9) are located remotely from each other, the bottom of the first pin rod (12) offers second Groove (13) offers third groove (14) in the bottom interior wall of the first groove (11), is slidably fitted in third groove (14) Second pin rod (15), the top of the second pin rod (15) extend in corresponding second groove (13), and the second pin rod (15) with it is right The inner wall for the second groove (13) answered is slidably connected, and the bottom end of the second pin rod (15) offers thread groove (16), thread groove (16) internal screw thread is equipped with screw rod (17), is offered on the second fixed block (10) cavity (18), in the top inner wall of cavity (18) It offers first through hole (19), the bottom end of screw rod (17) extends in corresponding cavity (18) and is welded with the first tapered gear (20), and screw rod (17) is rotatably installed in corresponding first through hole (19), the side inner wall that two cavitys (18) are located remotely from each other On offer the second through-hole (21), is rotatably equipped with shaft (22) in the second through-hole (21), two shafts (22) are close to each other One end extend respectively in corresponding cavity (18) and be welded with the second tapered gear (23), the second tapered gear (23) with it is right The tapered gear of first answered (20) engagement.
2. the convenient peace in construction site according to claim 1 tears swing room open, which is characterized in that two shaft (22) phases Mutually separate one end extends respectively to corresponding second through-hole (21) outside, and one end that two shafts (22) are located remotely from each other is welded There is handle.
3. the convenient peace in construction site according to claim 1 tears swing room open, which is characterized in that two third grooves (14) sliding slot is offered on the side inner wall being located remotely from each other, sliding block is slidably fitted in sliding slot, and two sliding blocks are close to each other Side is respectively welded on corresponding second pin rod (15).
4. the convenient peace in construction site according to claim 3 tears swing room open, which is characterized in that opened up on the sliding block There is third through-hole, is fixedly installed with the same slide bar in the top inner wall and bottom interior wall of sliding slot, sliding bar is mounted on correspondence Third through-hole in.
5. the convenient peace in construction site according to claim 1 tears swing room open, which is characterized in that on the screw rod (17) Turning set is equipped with bearing, and the outer ring of bearing is fixedly mounted on the inner wall of corresponding first through hole (19).
6. the convenient peace in construction site according to claim 1 tears swing room open, which is characterized in that second through-hole (21) it is opened up on inner wall there are two ring groove, is rotatably equipped with ring-like fixture block, two ring-like cards in two ring grooves Block is fixedly mounted on corresponding shaft (22).
CN201820550982.5U 2018-04-18 2018-04-18 The convenient peace in construction site tears swing room open Expired - Fee Related CN208152258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820550982.5U CN208152258U (en) 2018-04-18 2018-04-18 The convenient peace in construction site tears swing room open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820550982.5U CN208152258U (en) 2018-04-18 2018-04-18 The convenient peace in construction site tears swing room open

Publications (1)

Publication Number Publication Date
CN208152258U true CN208152258U (en) 2018-11-27

Family

ID=64378315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820550982.5U Expired - Fee Related CN208152258U (en) 2018-04-18 2018-04-18 The convenient peace in construction site tears swing room open

Country Status (1)

Country Link
CN (1) CN208152258U (en)

Similar Documents

Publication Publication Date Title
CN208152258U (en) The convenient peace in construction site tears swing room open
CN208518094U (en) A kind of steel connection structure of high stability
CN206279755U (en) A kind of scaffold of adjustable angle
CN108708666B (en) A kind of integrated safe aluminum alloy casement window family of built-in rolling screen window
CN110043067A (en) A kind of steelframe room being rapidly assembled and disassembled
CN108580736A (en) A kind of decompressor of wing nut production
CN207344845U (en) A kind of mixing stirring device for concrete processing
CN208310397U (en) A kind of color steel plate warning fence
CN207915346U (en) oil pipe spanner
CN208251534U (en) Stone plate adjustable wall decoration structure
CN111395313B (en) Concrete embedded pile for reinforcing soft foundation
CN208792498U (en) A kind of building structure of achievable quick assembling and dismounting
CN210767969U (en) Building strutting arrangement with adjustable
CN110899556A (en) Portable bending device for reinforcing steel bars
CN212170730U (en) Drilling equipment is used in production of door and window wooden frame
CN203317516U (en) Powerful top pressure-type locker for concrete formworks
CN209261335U (en) A kind of double-layer seal inflation base camp tent
CN209146714U (en) A kind of aluminium connection structure
CN209238731U (en) A kind of uncoiler material force feed structure
CN207211922U (en) Multifunction remote-control children's play tent
CN207567764U (en) A kind of building anchor bolt
CN208208187U (en) External wall label suspended structure
CN108454387A (en) A kind of solar panels new energy electric motor vehicle
CN208122386U (en) Wayside pavilion shade structures in a kind of park Study of Platycladus orientalis-Robinia pseudoacacia
CN208416285U (en) Steel door frame of section bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181127