CN208136971U - Post-cast strip waterproof construction and basement - Google Patents
Post-cast strip waterproof construction and basement Download PDFInfo
- Publication number
- CN208136971U CN208136971U CN201820655625.5U CN201820655625U CN208136971U CN 208136971 U CN208136971 U CN 208136971U CN 201820655625 U CN201820655625 U CN 201820655625U CN 208136971 U CN208136971 U CN 208136971U
- Authority
- CN
- China
- Prior art keywords
- post
- cast strip
- extruded sheet
- waterproof construction
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 43
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 34
- 238000005266 casting Methods 0.000 claims abstract description 13
- 238000007789 sealing Methods 0.000 claims description 20
- 238000000926 separation method Methods 0.000 claims description 20
- 238000004078 waterproofing Methods 0.000 claims description 19
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 239000012530 fluid Substances 0.000 claims description 3
- 238000002955 isolation Methods 0.000 claims description 2
- 239000002352 surface water Substances 0.000 abstract description 11
- 230000000694 effects Effects 0.000 abstract description 10
- 239000012466 permeate Substances 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 238000003892 spreading Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 8
- 239000011248 coating agent Substances 0.000 description 4
- 238000000576 coating method Methods 0.000 description 4
- 229920000642 polymer Polymers 0.000 description 3
- 230000035882 stress Effects 0.000 description 3
- 238000006424 Flood reaction Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 230000009429 distress Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 230000008961 swelling Effects 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 238000004500 asepsis Methods 0.000 description 1
- 239000000039 congener Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000011049 filling Methods 0.000 description 1
- 230000002209 hydrophobic effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 239000006210 lotion Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000005871 repellent Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model provides a kind of post-cast strip waterproof construction and basement, is related to post-cast strip waterproof technique field, including:Essential bearing stratum, the first raft plate and the second raft plate, post-cast strip, waterstop, seal plate, the first extruded sheet and the second extruded sheet;By the way that post-cast strip is fixed using the first raft plate and the second raft plate, waterstop is set on essential bearing stratum, seal plate is set between first extruded sheet and the second extruded sheet, waterstop and seal plate collective effect effectively prevent the underground water under basement from spreading on post-cast strip, traditional later casting zone water stopping structure existing in the prior art is alleviated before not pouring, underground water, surface water permeate the ground room the technical issues of, realizing late poured band structure can effectively prevent underground water, surface water to penetrate into the indoor technical effect in underground.
Description
Technical field
The utility model relates to post-cast strip waterproof technique fields, more particularly, to a kind of post-cast strip waterproof construction and underground
Room.
Background technique
In recent years, the advanced water-stopping structure used in basement post-pouring zone starts to be widely applied.Advanced water-stopping structure:I.e.
Post-cast strip sealing construction is poured prior to post-cast strip, using a kind of water stop structure knot of the constructions such as default waterstop closing underground water
Structure.It is that when impermeable structure function wouldn't be able to achieve, it is locally advanced to carry out post-cast strip in advance before post-cast strip does not pour simultaneously
Waterproof construction is laid with, and realizes the dual function of waterproof and deformation joint.
The method of post-cast strip advanced water-stopping structure fabrication has very much, usually between component and the water surface or before use office
Portion thickeies and adds external labeling type or middle buried water stop etc..
But traditional later casting zone water stopping structure, a large amount of underground water, surface water, rainwater can be before post-cast strip block
Permeate the ground room from post-cast strip, causes a large amount of ponding of basement, causes environmental pollution to basement, to the subsequent chamber of basement
Interior construction causes great inconvenience, greatly increases pump-out, increases power consumption.
Utility model content
The purpose of this utility model is to provide a kind of post-cast strip waterproof construction and basements, to alleviate in the prior art
Existing traditional later casting zone water stopping structure before not pouring, underground water, surface water permeate the ground room the technical issues of.
Post-cast strip waterproof construction provided by the utility model is used for basement bottom board, including:Essential bearing stratum, the first raft
Plate, the second raft plate, post-cast strip, waterstop, seal plate, the first extruded sheet and the second extruded sheet;
First raft plate is set on essential bearing stratum, is provided with casting area between the first raft plate and the second raft plate, after pour
Band is set in casting area, and post-cast strip is connect with the first raft plate and the second raft plate respectively;
Essential bearing stratum setting is fluted, and waterstop and seal plate are all set in groove, waterstop and essential bearing stratum
Connection, seal plate are set between the first extruded sheet and the second extruded sheet, the first extruded sheet one end and sealing far from seal plate
Band connection, the second extruded sheet are connect far from one end of seal plate with post-cast strip.
Further, the junction of seal plate and the second extruded sheet, which is provided with, floods the convex of water level line for improving seal plate
It rises.
Further, post-cast strip waterproof construction further includes separation net;
Separation net is set as two, and two separation nets are respectively arranged at the two sides of post-cast strip, after separation net is for preventing
The concrete poured outside band enters in post-cast strip.
Further, separation net is set as any one in steel wire or fast-easy closing-up net.
Further, post-cast strip two sides are provided with for the sealing rod under avoiding rainwater from seeping from post-cast strip.
Further, post-cast strip is poured using slightly expanded concrete.
Further, the waterproof layer for avoiding fluid seepage is provided on the surface of essential bearing stratum.
Further, additional waterproofing layer is provided between waterproof layer and essential bearing stratum;
Additional waterproofing layer is located at the lower section of post-cast strip, and additional waterproofing layer and the middle line of post-cast strip are located along the same line;
The width of additional waterproofing layer is greater than the width of post-cast strip.
Further, post-cast strip waterproof construction further includes reinforced steel;
Reinforced steel is set to the two sides of the first extruded sheet and the second extruded sheet.
Basement provided by the utility model, including post-cast strip waterproof construction.
Post-cast strip waterproof construction provided by the utility model is used for basement bottom board, including:Essential bearing stratum, the first raft
Plate and the second raft plate, post-cast strip, waterstop, seal plate, the first extruded sheet and the second extruded sheet;First raft plate is set to basis and holds
On power layer, it is provided with casting area between the first raft plate and the second raft plate, post-cast strip is set in casting area, and post-cast strip point
It is not connect with the first raft plate and the second raft plate;Essential bearing stratum setting is fluted, and waterstop and seal plate are all set in groove,
Waterstop is connect with essential bearing stratum, and seal plate is set between the first extruded sheet and the second extruded sheet, and the first extruded sheet is separate
One end of seal plate and sealing band connection, the second extruded sheet are connect far from one end of seal plate with post-cast strip.By utilizing first
Raft plate and the second raft plate fix post-cast strip, waterstop are arranged on essential bearing stratum, between the first extruded sheet and the second extruded sheet
Seal plate is set, and waterstop and seal plate collective effect effectively prevent the underground water under basement from spreading on post-cast strip, alleviate
Before not pouring, underground water, surface water permeate the ground room for traditional later casting zone water stopping structure existing in the prior art
Technical problem, realizing late poured band structure can effectively prevent underground water, surface water to penetrate into the indoor technical effect in underground.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art
Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below
In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art
Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the overall structure diagram of post-cast strip waterproof construction provided by the embodiment of the utility model;
Fig. 2 is the structural schematic diagram that post-cast strip waterproof construction provided by the embodiment of the utility model has separation net;
Fig. 3 is the structural schematic diagram that post-cast strip waterproof construction provided by the embodiment of the utility model has sealing rod;
Fig. 4 is the structure that post-cast strip waterproof construction provided by the embodiment of the utility model has waterproof layer and additional waterproofing layer
Schematic diagram.
Icon:100- essential bearing stratum;210- the first raft plate;220- the second raft plate;The post-cast strip 300-;310- separation net;
320- sealing rod;400- waterstop;500- seal plate;510- protrusion;The first extruded sheet of 610-;The second extruded sheet of 620-;700-
Waterproof layer;800- additional waterproofing layer;900- reinforced steel.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described
Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally
Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical
Novel protected range.
In the description of the present invention, it should be noted that such as occur term " center ", "upper", "lower", " left side ",
" right side ", "vertical", "horizontal", "inner", "outside" etc., indicated by orientation or positional relationship be orientation based on the figure or
Positional relationship is merely for convenience of describing the present invention and simplifying the description, rather than the device or member of indication or suggestion meaning
Part must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In addition, such as there is term " first ", " second ", " third " are used for description purposes only, be not understood to indicate or imply opposite
Importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, such as there is term
" installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one
Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary
It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition
State the concrete meaning of term in the present invention.
Fig. 1 is the overall structure diagram of post-cast strip waterproof construction provided in this embodiment;Fig. 2 is provided in this embodiment
Post-cast strip waterproof construction has the structural schematic diagram of separation net;Fig. 3 is post-cast strip waterproof construction provided in this embodiment with only
The structural schematic diagram of water bar;Fig. 4 is the knot that post-cast strip waterproof construction provided in this embodiment has waterproof layer and additional waterproofing layer
Structure schematic diagram.
As shown in Figs 1-4, post-cast strip waterproof construction provided in this embodiment is used for basement bottom board, including:Basic holding force
The 100, first raft plate 210 of layer, the second raft plate 220, post-cast strip 300, waterstop 400, seal plate 500, the first extruded sheet 610 and the
Two extruded sheets 620;First raft plate 210 is set on essential bearing stratum 100, is arranged between the first raft plate 210 and the second raft plate 220
Have casting area, post-cast strip 300 is set in casting area, and post-cast strip 300 respectively with the first raft plate 210 and the second raft plate
220 connections;Essential bearing stratum 100 is arranged fluted, and waterstop 400 and seal plate 500 are all set in groove, waterstop 400
It is connect with essential bearing stratum 100, seal plate 500 is set between the first extruded sheet 610 and the second extruded sheet 620, the first extrusion molding
The one end of plate 610 far from seal plate 500 is connect with waterstop 400, and the one end of the second extruded sheet 620 far from seal plate 500 is with after
Pour the connection of band 300.
Specifically, using the first raft plate 210 and the fixed post-cast strip 300 of the second raft plate 220, waterstop 400 is tightly attached to basis
On the outer surface of supporting course 100, waterstop 400 passes through the first extruded sheet 610 and seal plate 500 close to the side of post-cast strip 300
Connection, seal plate 500 are connect by the second extruded sheet 620 with post-cast strip 300 close to one end of post-cast strip 300.
Waterstop 400 has good elasticity, and wearability, resistance to ag(e)ing and tear resistance, adaptive deformation ability is strong, anti-
Aqueous energy is good, underground water, surface water can be effectively prevent to penetrate into basement using waterstop 400.
Seal plate 500 is set as steel plate for sealing water, when underground water, surface water did not had waterstop 400,610 He of the first extruded sheet
Seal plate 500 plays the role of cutting off water penetration path, and underground water, surface water is effectively prevent to penetrate into basement.
Meanwhile first extruded sheet 610 and the second extruded sheet 620 there is good hydrophobic, moisture resistance, effectively solution leak,
Seepage problem.
Post-cast strip waterproof construction provided in this embodiment is used for basement bottom board, including:Essential bearing stratum 100, the first raft
Plate 210, the second raft plate 220, post-cast strip 300, waterstop 400, seal plate 500, the first extruded sheet 610 and the second extruded sheet 620;
First raft plate 210 is set on essential bearing stratum 100, is provided with casting area between the first raft plate 210 and the second raft plate 220,
Post-cast strip 300 is set in casting area, and post-cast strip 300 is connect with the first raft plate 210 and the second raft plate 220 respectively;Basis
Supporting course 100 is arranged fluted, and waterstop 400 and seal plate 500 are all set in groove, waterstop 400 and essential bearing stratum
100 connections, seal plate 500 are set between the first extruded sheet 610 and the second extruded sheet 620, and the first extruded sheet 610 is far from sealing
One end of plate 500 is connect with waterstop 400, and the one end of the second extruded sheet 620 far from seal plate 500 is connect with post-cast strip 300.It is logical
Using the first raft plate 210 and the second raft plate 220 that post-cast strip 300 is fixed, setting waterstop 400 on essential bearing stratum 100 is crossed, the
Seal plate 500 is set between one extruded sheet 610 and the second extruded sheet 620, and waterstop 400 and 500 collective effect of seal plate are effective
It prevents the underground water under basement from spreading on post-cast strip 300, alleviates traditional post-cast strip 300 existing in the prior art and stop
Water-bound before not pouring, underground water, surface water permeate the ground room the technical issues of, realizing 300 structure of post-cast strip can have
Effect prevents underground water, surface water from penetrating into the indoor technical effect in underground.
On the basis of the above embodiments, further, the seal plate in post-cast strip waterproof construction provided in this embodiment
500 and second the junction of extruded sheet 620 be provided with the protrusion 510 that water level line is flooded for improving seal plate 500.
Specifically, the junction of seal plate 500 and the second extruded sheet 620 be provided with protrusion 510 so that seal plate 500 with
The junction setting of first extruded sheet 610 is fluted, and the setting of protrusion 510 improves seal plate 500 and floods water level line, improves sealing
The waterproof ability of plate 500.
Further, post-cast strip waterproof construction further includes separation net 310;Separation net 310 is set as two, and two isolation
Net 310 is respectively arranged at the two sides of post-cast strip 300, and separation net 310 after preventing the concrete outside post-cast strip 300 from entering for pouring
In band 300.
Further, separation net 310 is set as any one in steel wire or fast-easy closing-up net.
Specifically, separation net 310 is arranged in the two sides in post-cast strip 300, when so that pouring, concrete and post-cast strip 300 connect
It connects stronger, while any excess concrete being effectively prevent to enter in the first raft plate 210 and the second raft plate 220.
Separation net 310 can be set to steel wire, may be set to be fast-easy closing-up net, can select according to the actual situation not
Congener separation net 310.
Post-cast strip waterproof construction provided in this embodiment improves seal plate by the way that protrusion 510 is arranged on seal plate 500
500 flood water level line, make the seal plate 500 be less susceptible to be submerged, and improve waterproof performance;By being set in the two sides of post-cast strip 300
Set separation net 310, concrete connect stronger with post-cast strip 300, while any excess concrete being effectively prevent to enter the first raft
In plate 210 and the second raft plate 220.
On the basis of the above embodiments, further, the post-cast strip in post-cast strip waterproof construction provided in this embodiment
300 two sides are provided with for the sealing rod 320 under avoiding rainwater from seeping from post-cast strip 300.
Specifically, sealing rod 320 is arranged in the two sides in post-cast strip 300, sealing rod 320 is set as dilatancy rubber water-proof item
320, when rainwater penetrates into post-cast strip 300,320 water-swellable of sealing rod, sealing rod 320 fills up the gap in post-cast strip 300,
It penetrate into rainwater can not from post-cast strip 300 in basement, the environmental liquids such as rainwater effectively avoided to penetrate by post-cast strip 300
Into basement.
Further, post-cast strip 300 is poured using slightly expanded concrete.
Slightly expanded concrete refers to adds certain swelling agent in common concrete, makes concrete energy during aquation
Certain expansion enough occurs by the effect of swelling agent, to compensate for the contraction of concrete, reaches prevention and treatment distress in concrete,
Improve the purpose of concrete performance.
Slightly expanded concrete can effectively prevent distress in concrete, and the environmental liquids such as rainwater is effectively avoided to pass through post-cast strip 300
On gap penetrate into basement.
300 water sealing structure of post-cast strip provided in this embodiment, by be arranged sealing rod 320,320 water-swellable of sealing rod,
The gap for filling up post-cast strip 300 effectively improves the waterproof performance of post-cast strip 300;It is poured after being poured by using slightly expanded concrete
Band 300 makes the gap in post-cast strip 300 tail off, and improves the waterproof performance of post-cast strip 300.
On the basis of the above embodiments, further, the basis in 300 water sealing structure of post-cast strip provided in this embodiment
The waterproof layer 700 for avoiding fluid seepage is provided on the surface of supporting course 100.
Specifically, also settable waterproof layer 700, waterproof layer 700 may be configured as waterproof on the surface of essential bearing stratum 100
Coating effectively increases the waterproof performance of essential bearing stratum 100.
Water-repellent paint is polymer cement-base waterproof coating, the lotion that it is synthesized by a variety of waterborne polymerics with mixed with various
The high grade cement of additive forms, and the flexibility of polymer (resin) and the rigidity of cement became one so that it impervious and
It is excellent in terms of stability, advantage is easy for construction, comprehensive cost low, short time limit, and asepsis environment-protecting, preferably, waterproof applies
Material is polymer cement-base waterproof coating.
Further, additional waterproofing layer 800 is provided between waterproof layer 700 and essential bearing stratum 100;Additional waterproofing layer
800 are located at the lower section of post-cast strip 300, and additional waterproofing layer 800 and the middle line of post-cast strip 300 are located along the same line;It is additional anti-
The width of water layer 800 is greater than the width of post-cast strip 300.
Specifically, also settable additional waterproofing layer 800, additional waterproofing layer 800 are set to the underface of post-cast strip 300,
Protection post-cast strip 300 is projected on the region of essential bearing stratum 100 again, and the waterproof performance in 800 region of additional waterproofing layer is higher than basis
Supporting course 100, further improves waterproof performance, and additional waterproofing layer 800 may be configured as high waterproof performance coating.
Further, post-cast strip waterproof construction further includes reinforced steel 900;Reinforced steel 900 is set to the first extruded sheet
610 and second extruded sheet 620 two sides.
Specifically, reinforced steel 900, reinforced steel is arranged in the two sides of the first extruded sheet 610 and the second extruded sheet 620
900 can effectively share the weight of seal plate 500, avoid the first extruded sheet 610 and the excessive damage of 620 stress of the second extruded sheet.
The present embodiment provides post-cast strip waterproof constructions further to be mentioned by setting waterproof layer 700 and additional waterproofing layer 800
The waterproof performance of higher baseline supporting course 100;By the setting of reinforced steel 900, effectively shares the first extruded sheet 610 and second and squeeze
The stress of mould plate 620 avoids the first extruded sheet 610 and 620 stress of the second extruded sheet is excessive damages.
Basement provided in this embodiment, including post-cast strip waterproof construction.
Due to the technical effect and the technical effect phase of above-mentioned post-cast strip waterproof construction of basement provided in this embodiment
Together, it is not repeating herein.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model, rather than limits it
System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should
Understand:It is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of
Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new
The range of each embodiment technical solution of type.
Claims (10)
1. a kind of post-cast strip waterproof construction is used for basement bottom board, which is characterized in that including:Essential bearing stratum, the first raft plate,
Second raft plate, post-cast strip, waterstop, seal plate, the first extruded sheet and the second extruded sheet;
The first raft plate is set on the essential bearing stratum, is provided with and is poured between the first raft plate and the second raft plate
Build region, the post-cast strip is set in the casting area, and the post-cast strip respectively with the first raft plate and described
The connection of two raft plates;
The essential bearing stratum setting is fluted, and the waterstop and the seal plate are all set in groove, the waterstop
It is connect with the essential bearing stratum, the seal plate is set between first extruded sheet and second extruded sheet, described
The one end of first extruded sheet far from the seal plate and the sealing band connection, second extruded sheet is far from the seal plate
One end is connect with the post-cast strip.
2. post-cast strip waterproof construction according to claim 1, which is characterized in that the seal plate and second extruded sheet
Junction be provided with the protrusion that water level line is flooded for improving the seal plate.
3. post-cast strip waterproof construction according to claim 1, which is characterized in that further include separation net;
The separation net is set as two, and two separation nets are respectively arranged at the two sides of the post-cast strip, the isolation
Net is for preventing the concrete outside the post-cast strip from entering in the post-cast strip.
4. post-cast strip waterproof construction according to claim 3, which is characterized in that the separation net be set as steel wire or
Any one in fast-easy closing-up net.
5. post-cast strip waterproof construction according to claim 1, which is characterized in that the post-cast strip two sides are provided with for keeping away
Exempt from the sealing rod under rainwater is seeped from the post-cast strip.
6. post-cast strip waterproof construction according to claim 1, which is characterized in that the post-cast strip uses slightly expanded concrete
It pours.
7. post-cast strip waterproof construction according to claim 1, which is characterized in that be arranged on the surface of the essential bearing stratum
There is the waterproof layer for avoiding fluid seepage.
8. post-cast strip waterproof construction according to claim 7, which is characterized in that the waterproof layer and the essential bearing stratum
Between be provided with additional waterproofing layer;
The additional waterproofing layer is located at the lower section of the post-cast strip, and the additional waterproofing layer and the middle line of the post-cast strip are located at
On same straight line;
The width of the additional waterproofing layer is greater than the width of the post-cast strip.
9. post-cast strip waterproof construction according to claim 1, which is characterized in that further include reinforced steel;
The reinforced steel is set to the two sides of first extruded sheet and second extruded sheet.
10. a kind of basement, which is characterized in that including the described in any item post-cast strip waterproof constructions of such as claim 1-9.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820655625.5U CN208136971U (en) | 2018-05-02 | 2018-05-02 | Post-cast strip waterproof construction and basement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820655625.5U CN208136971U (en) | 2018-05-02 | 2018-05-02 | Post-cast strip waterproof construction and basement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208136971U true CN208136971U (en) | 2018-11-23 |
Family
ID=64312554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820655625.5U Expired - Fee Related CN208136971U (en) | 2018-05-02 | 2018-05-02 | Post-cast strip waterproof construction and basement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208136971U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984235A (en) * | 2019-10-28 | 2020-04-10 | 中国一冶集团有限公司 | Construction method of post-cast strip water stop structure |
-
2018
- 2018-05-02 CN CN201820655625.5U patent/CN208136971U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984235A (en) * | 2019-10-28 | 2020-04-10 | 中国一冶集团有限公司 | Construction method of post-cast strip water stop structure |
CN110984235B (en) * | 2019-10-28 | 2021-08-13 | 中国一冶集团有限公司 | Construction method of post-cast strip water stop structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208136971U (en) | Post-cast strip waterproof construction and basement | |
CN204609135U (en) | A kind of new type roof deformation joint structure | |
CN113653242B (en) | Stepped deformation joint engagement structure for high-low roof | |
CN208235812U (en) | Construction joint water proof structure between a kind of outdoor floor and main building wall | |
CN206844380U (en) | A kind of waterproof wall body structure | |
CN206554318U (en) | Wall is built in a kind of room | |
CN210508097U (en) | Novel roof deformation joint structure | |
CN203487508U (en) | Surface layer waterstop structure used for reinforced concrete face board of frozen reservoir | |
CN111997098A (en) | Deformation joint seepage-proofing structure | |
CN210797910U (en) | Prefabricated plate prefabricated with waterproof structure | |
CN210049292U (en) | Advanced water stop pouring belt structure for building | |
CN207079637U (en) | A kind of poured band of outer wall of basement water sealing structure | |
CN217204299U (en) | Water stop structure for post-cast strip of roof of underground chamber | |
CN106013256B (en) | The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall | |
CN210459314U (en) | River beach working condition basement advance stagnant water post-cast strip structure | |
CN107859274A (en) | A kind of waterproof skirting | |
CN209384407U (en) | Outer wall of basement waterproof construction | |
CN209584976U (en) | One kind wearing dike box culvert and dyke seepage control enclosed construction | |
CN107447735B (en) | Hydraulic pressure dam based on side stagnant water component | |
CN110905137A (en) | Stifled formula waterproof system that draws | |
CN209413012U (en) | Exterior wall horizontal joint waterproofing structure | |
CN211447036U (en) | Device for preventing seepage of foundation of river water retaining and storing building | |
CN211816453U (en) | Advanced water-stop post-cast strip with horizontal construction joints arranged on foundation slab | |
CN214090416U (en) | External corner position waterproof construction | |
CN218205305U (en) | Waterproof construction of steel roofing gable position floats |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181123 |