CN208122230U - A kind of extra cement collection device of building construction - Google Patents

A kind of extra cement collection device of building construction Download PDF

Info

Publication number
CN208122230U
CN208122230U CN201820451207.4U CN201820451207U CN208122230U CN 208122230 U CN208122230 U CN 208122230U CN 201820451207 U CN201820451207 U CN 201820451207U CN 208122230 U CN208122230 U CN 208122230U
Authority
CN
China
Prior art keywords
support plate
cement
guide cylinder
building construction
collection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820451207.4U
Other languages
Chinese (zh)
Inventor
王海鱼
王成建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN201820451207.4U priority Critical patent/CN208122230U/en
Application granted granted Critical
Publication of CN208122230U publication Critical patent/CN208122230U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to building construction engineering device technique fields, the extra cement collection device of especially a kind of building construction, support plate including vertical display, support plate one side quadrangle is respectively provided with a supporting leg, the leg ends are equipped with idler wheel, run through to plug among the support plate and is fixed with guide cylinder, the guide cylinder inside middle is placed with pushing block, the pushing block is equipped with far from the side of supporting leg and adjusts bolt, the spring other end is connected with telescopic block, the guide cylinder is equipped with limited cover far from the one end for adjusting bolt, the telescopic block runs through limited cover far from one end of spring, and the perforative one end of telescopic block is connected with scraper plate, the support plate bottom end is connected with collecting box, the collecting box is located at immediately below scraper plate.By the present apparatus, quickly the cement that brickwork joint overflows can be scraped, while guaranteeing that the cement (cemented) joint depth is consistent, convenient for the subsequent finishing of metope, while the cement scraped can reuse, and save resource.

Description

A kind of extra cement collection device of building construction
Technical field
The utility model relates to building construction engineering device technique fields more particularly to a kind of extra cement of building construction to collect Device.
Background technique
Building construction refers to builds the buildings such as house, including residential building, work on the soil for completing infrastructure construction Industry workshop, business premises, office building and other single purpose buildings.Building construction, which has to pass through, a set of requires rigorous report to build program Rear is implementable.Generally there are two types of point-scores, i.e. structure type and structural system for the classification of building structure.
Building construction is piled up by brick, is sticked together between brick and brick by cement, and upper layer is worked as It when brick is stacked on underlying block, has extra cement and is overflowed between brickwork joint, if cleaning up the water of spilling not in time Mud, cement will be set in block side, influence subsequent wall surfacing and painting, and present worker is only flat simply by cleaver The cement of spilling is struck off in face, and effect is simultaneously bad, and the cement on brickwork joint can be caused deep mixed.
Utility model content
Purpose of the utility model is to solve the disadvantages for the cement cleaning inconvenience that brickwork joint in the prior art overflows, and The extra cement collection device of a kind of building construction proposed.
To achieve the goals above, the utility model uses following technical solution:
A kind of building construction is designed with extra cement collection device, the support plate including vertical display, the support plate one Face quadrangle is respectively provided with a supporting leg, and the leg ends are equipped with idler wheel, runs through to plug being fixed with guide cylinder among the support plate, The guide cylinder inside middle is placed with pushing block, and the pushing block is equipped with far from the side of supporting leg and adjusts bolt, the adjusting bolt It is threaded in guide cylinder end, the pushing block other side is connected with spring, and the spring other end is connected with telescopic block, described Guide cylinder is equipped with limited cover far from the one end for adjusting bolt, and the telescopic block runs through limited cover far from one end of spring, and flexible The perforative one end of block is connected with scraper plate, and the support plate bottom end is connected with collecting box, and the collecting box is located at immediately below scraper plate.
When use, the present apparatus is attached on the metope covered, is attached to idler wheel on brick, makes scraper plate face brickwork joint water Mud position, then pushes support plate, moves scraper plate along brickwork joint, is scraped the cement at brickwork joint by scraper plate, the cement scraped It falls inside collecting box, according to the brickwork joint of different spacing, rotation adjusts bolt, the pressure that adjustment spring is subject to, to adjust Scraper plate is applied to the power on cement, scrapes the cement (cemented) joint of the different depths.By the present apparatus, the water that can quickly overflow brickwork joint Mud scrapes, while guaranteeing that the cement (cemented) joint depth is consistent, and convenient for the subsequent finishing of metope, while the cement scraped can reuse, Save resource.
Preferably, the collecting box is fastened on support plate upper bottom portion by clamping screw, is convenient to clean inside collecting box Cement.
Preferably, the limited cover is threaded in guide cylinder end, easy to disassemble and maintenance.
Preferably, the scraper plate end is ellipsoidal structure, facilitates scraper plate to protrude into brickwork joint, while guaranteeing the cement (cemented) joint scraped It is more beautiful.
The utility model proposes a kind of extra cement collection device of building construction, beneficial effect is:By this dress It sets, quickly the cement that brickwork joint overflows can be scraped, while guaranteeing that the cement (cemented) joint depth is consistent, convenient for the subsequent finishing of metope, The cement scraped simultaneously can reuse, and save resource.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure:Brick 1, idler wheel 2, supporting leg 3, limited cover 4, support plate 5, scraper plate 6, telescopic block 7, adjust bolt 8, pushing block 9, Spring 10, clamping screw 11, collecting box 12, guide cylinder 13.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1, the extra cement collection device of a kind of building construction, the support plate 5 including vertical display, support plate 5 Quadrangle is respectively provided with a supporting leg 3 on one side, and 3 end of supporting leg is equipped with idler wheel 2, runs through to plug being fixed with guide cylinder 13 among support plate 5, 13 inside middle of guide cylinder is placed with pushing block 9, and pushing block 9 is equipped with far from the side of supporting leg 3 and adjusts bolt 8, adjusts 8 screw thread of bolt and connects It connects in 13 end of guide cylinder, 9 other side of pushing block is connected with spring 10, and 10 other end of spring is connected with telescopic block 7, and guide cylinder 13 is remote It is equipped with limited cover 4 from the one end for adjusting bolt 8, limited cover 4 is threaded in 13 end of guide cylinder, and easy to disassemble and maintenance is stretched Contracting block 7 runs through limited cover 4 far from one end of spring 10, and the perforative one end of telescopic block 7 is connected with scraper plate 6, and 6 end of scraper plate is ellipse Circular configuration facilitates scraper plate 6 to protrude into brickwork joint, while guaranteeing that the cement (cemented) joint scraped is more beautiful, and 5 bottom end of support plate is connected with collection Case 12, collecting box 12 are located at immediately below scraper plate 6, and collecting box 12 is fastened on 5 upper bottom portion of support plate by clamping screw 11, convenient for clear Manage the cement inside collecting box 12.
When use, the present apparatus is attached on the metope covered, is attached to idler wheel 2 on brick 1, makes 6 face brick of scraper plate Cement position is stitched, support plate 5 is then pushed, moves scraper plate 6 along brickwork joint, the cement at brickwork joint is scraped by scraper plate 6, is scraped Cement fall inside collecting box 12, according to the brickwork joint of different spacing, rotation adjusts bolt 8, the pressure that adjustment spring 10 is subject to Power scrapes the cement (cemented) joint of the different depths to adjust the power that scraper plate 6 is applied on cement.By the present apparatus, can quickly by The cement that brickwork joint overflows scrapes, while guaranteeing that the cement (cemented) joint depth is consistent, convenient for the subsequent finishing of metope, while the cement energy scraped It enough reuses, saves resource.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (4)

1. a kind of extra cement collection device of building construction, which is characterized in that the support plate (5) including vertical display, it is described Support plate (5) one side quadrangle is respectively provided with a supporting leg (3), and supporting leg (3) end is equipped with idler wheel (2), in the support plate (5) Between be fixed with guide cylinder (13) through plugging, guide cylinder (13) inside middle is placed with pushing block (9), and the pushing block (9) is remote Side from supporting leg (3), which is equipped with, adjusts bolt (8), and the adjusting bolt (8) is threaded in guide cylinder (13) end, described to push away Block (9) other side is connected with spring (10), and spring (10) other end is connected with telescopic block (7), and the guide cylinder (13) is remote Limited cover (4) are equipped with from the one end for adjusting bolt (8), the telescopic block (7) runs through limited cover far from the one end of spring (10) (4), and telescopic block (7) perforative one end is connected with scraper plate (6), and support plate (5) bottom end is connected with collecting box (12), described Collecting box (12) is located at immediately below scraper plate (6).
2. a kind of extra cement collection device of building construction according to claim 1, which is characterized in that the collecting box (12) support plate (5) upper bottom portion is fastened on by clamping screw (11).
3. a kind of extra cement collection device of building construction according to claim 1, which is characterized in that the limited cover (4) it is threaded in guide cylinder (13) end.
4. a kind of extra cement collection device of building construction according to claim 1, which is characterized in that the scraper plate (6) end is ellipsoidal structure.
CN201820451207.4U 2018-03-29 2018-03-29 A kind of extra cement collection device of building construction Expired - Fee Related CN208122230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820451207.4U CN208122230U (en) 2018-03-29 2018-03-29 A kind of extra cement collection device of building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820451207.4U CN208122230U (en) 2018-03-29 2018-03-29 A kind of extra cement collection device of building construction

Publications (1)

Publication Number Publication Date
CN208122230U true CN208122230U (en) 2018-11-20

Family

ID=64194261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820451207.4U Expired - Fee Related CN208122230U (en) 2018-03-29 2018-03-29 A kind of extra cement collection device of building construction

Country Status (1)

Country Link
CN (1) CN208122230U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110228122A (en) * 2019-05-22 2019-09-13 徐州新通预制构件制造有限公司 Subway segment arc surface floating device
CN111648558A (en) * 2020-05-29 2020-09-11 福建德超建设工程有限公司 Municipal works are with outer wall base mopping device that flushes
CN112459507A (en) * 2020-12-01 2021-03-09 葛玉力 Building wall construction process
CN112854493A (en) * 2021-01-07 2021-05-28 刘闪闪 Construction method of prefabricated outer wall abutted seam drain pipe of fabricated concrete building
CN113550540A (en) * 2021-08-03 2021-10-26 孙卫星 A ceramic tile pastes real device for building decoration

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110228122A (en) * 2019-05-22 2019-09-13 徐州新通预制构件制造有限公司 Subway segment arc surface floating device
CN111648558A (en) * 2020-05-29 2020-09-11 福建德超建设工程有限公司 Municipal works are with outer wall base mopping device that flushes
CN112459507A (en) * 2020-12-01 2021-03-09 葛玉力 Building wall construction process
CN112459507B (en) * 2020-12-01 2022-07-19 浙江至方建设有限公司 Building wall construction process
CN112854493A (en) * 2021-01-07 2021-05-28 刘闪闪 Construction method of prefabricated outer wall abutted seam drain pipe of fabricated concrete building
CN112854493B (en) * 2021-01-07 2022-05-17 刘闪闪 Construction method of prefabricated outer wall abutted seam drain pipe of fabricated concrete building
CN113550540A (en) * 2021-08-03 2021-10-26 孙卫星 A ceramic tile pastes real device for building decoration
CN113550540B (en) * 2021-08-03 2024-04-16 孙卫星 Floor tile compaction device for building decoration

Similar Documents

Publication Publication Date Title
CN208122230U (en) A kind of extra cement collection device of building construction
CN102121315B (en) Construction method for reserved hole of tightly-fixed steel sleeve
CN208415869U (en) A kind of wall plaster device with environmental protection
CN102644362A (en) Architectural decoration plastering construction method
CN108468413A (en) A kind of air-entrained concrete building block exempts from anti-hollowing construction method of plastering
CN102605938B (en) Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs
CN207863391U (en) A kind of construction and decoration scoop for clearing up ground
CN204212408U (en) A kind of hole to be provided filling-up hole template
CN203961227U (en) Plane floating screed bar for wall plastering
CN209308409U (en) It is a kind of for pouring the quick assembling steel form of steel reinforced concrete rectangular column
CN204427924U (en) A kind of cleaner for clean window
CN209637149U (en) Light energy saving brick
CN204357080U (en) Troweling machine for building
CN205777472U (en) A kind of steel wood veneer template
CN204238529U (en) Building site troweling machine
CN209648628U (en) A kind of indoor design is with helping spike devices
CN204174899U (en) A kind of floor tile slurry scraper
CN203795854U (en) Preformed hole formwork fixing device for bare concrete floor
CN208907203U (en) A kind of cast-in-place curb stone equipment
CN208857852U (en) A kind of waterproof layer protective device
CN108396946B (en) A plastering device for building indoor wall cement grinds flat
CN206436344U (en) A kind of cement plate scraping device
CN206245692U (en) A kind of trowel easy for removal and installation
CN205296610U (en) Limit structure is received to waterproofing membrane facade flashing
CN206267365U (en) Shower house side plate fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181120

CF01 Termination of patent right due to non-payment of annual fee