CN208122134U - A kind of angle-style eaves structure and building eaves and building - Google Patents

A kind of angle-style eaves structure and building eaves and building Download PDF

Info

Publication number
CN208122134U
CN208122134U CN201820528098.1U CN201820528098U CN208122134U CN 208122134 U CN208122134 U CN 208122134U CN 201820528098 U CN201820528098 U CN 201820528098U CN 208122134 U CN208122134 U CN 208122134U
Authority
CN
China
Prior art keywords
eaves
angle
style
mounting plate
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820528098.1U
Other languages
Chinese (zh)
Inventor
王茜
王睿
肖新汉
沈涛
孙嘉伟
曹洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Overseas Decoration Engineering Co Ltd
Original Assignee
Shenzhen Overseas Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Overseas Decoration Engineering Co Ltd filed Critical Shenzhen Overseas Decoration Engineering Co Ltd
Priority to CN201820528098.1U priority Critical patent/CN208122134U/en
Application granted granted Critical
Publication of CN208122134U publication Critical patent/CN208122134U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a kind of angle-style eaves structure and building eaves and building, wherein the angle-style eaves structure includes:Connecting plate extends in a first direction setting;First mounting plate, one end are fixedly connected with connecting plate, and the other end is extended along with first direction in the second direction of angle;And second mounting plate, one end is fixedly connected with connecting plate, the other end is extended in a second direction, the second mounting plate in a first direction with the first mounting plate interval be arranged, and the second mounting plate in a second direction on length less than the first mounting plate in a second direction on length.So set, being convenient for the building of building eaves, and then be conducive to improve the building efficiency of building.

Description

A kind of angle-style eaves structure and building eaves and building
Technical field
The utility model relates to building technical field, in particular to a kind of angle-style eaves structure, building eaves and build Build object.
Background technique
With the development of economy, the arrying main body of scientific and technical progress, building is replaced by original mixed mud structure It is thus significantly shortened for steel frame construction since the speed that steel frame construction is built is significantly larger than building for mixed mud structure The construction period of building.
However, since steelframe needs a part hanging, which increases building eaves when building building eaves The difficulty built, and then influence the building efficiency of building.
Summary of the invention
The main purpose of the utility model is to provide a kind of angle-style eaves structure, it is intended to which reduce building eaves builds difficulty Degree, to improve the building efficiency of building.
To achieve the above object, the utility model proposes a kind of angle-style eaves structure, it is described for the eaves of building To be fixedly connected with the metal plate of building eaves, the angle-style eaves structure includes angle-style eaves structure:
Connecting plate extends in a first direction setting;
First mounting plate, one end are fixedly connected with the connecting plate, and the other end is along the second direction vertical with first direction It is extended;And
Second mounting plate, one end are fixedly connected with the connecting plate, and the other end is extended in a second direction, and described second Mounting plate in a first direction with first mounting plate interval be arranged, and second mounting plate in a second direction on length Degree be less than first mounting plate in a second direction on length.
Preferably, the connecting plate is provided with dovetail far from the side of first mounting plate and second mounting plate Slot, the dovetail groove cooperate to the positioning protrusion on the load-bearing steel pipe with building eaves.
Preferably, the connecting plate is provided with limit convex far from the side of first mounting plate and second mounting plate It rises, the width of the retention bead gradually increases adjacent to one end of the connecting plate to its one end far from the connecting plate from it Greatly, the retention bead cooperates to the locating slot on the load-bearing steel pipe with building eaves.
Preferably, the angle-style eaves structure further includes joint steel pipe, the joint steel pipe and the connecting plate are far from institute It states the first mounting plate to be fixedly connected with the side of second mounting plate, and to the fixed company of load-bearing steel pipe with building eaves It connects.
Preferably, the angle-style eaves structure further includes two first stiffening plates of L-shaped setting, each described first reinforces Plate is divided into the side of first mounting plate, and each first stiffening plate respectively with first mounting plate, connect Plate and joint steel pipe are fixedly connected.
Preferably, the angle-style eaves structure further includes two second stiffening plates of L-shaped setting, each described second reinforces Plate is divided into the side of second mounting plate, and each second stiffening plate respectively with second mounting plate, connect Plate and joint steel pipe are fixedly connected.
Preferably, first mounting plate is provided through close to or far from the side of second mounting plate along the Multiple first installation through-holes that two directions are intervally arranged;
The close or side far from first mounting plate of second mounting plate is provided through in a second direction Multiple second installation through-holes being intervally arranged;
The connecting plate is provided through between first direction adjacent to the side of first mounting plate and the second mounting plate Every multiple third installation through-holes of arrangement;
Multiple first installation through-holes, multiple second installation through-holes and multiple third installation through-holes are used To be fixedly connected with the metal plate of building eaves.
Preferably, first mounting hole in the first mounting hole described in arbitrary neighborhood two is waist-shaped hole setting;Arbitrarily Second mounting hole in adjacent two second mounting hole is waist-shaped hole setting;Third mounting hole described in arbitrary neighborhood two In a third mounting hole be waist-shaped hole setting.
The utility model also proposes a kind of building eaves comprising load-bearing steel pipe, multiple metal plates and multiple angle-style Eaves structure, multiple angle-style eaves structures are intervally arranged along the length direction of the load-bearing steel pipe, each metal It is direct that plate is fixedly installed in the adjacent two angle-style eaves structure, wherein the angle-style eaves structure includes:
Connecting plate extends in a first direction setting;
First mounting plate, one end are fixedly connected with the connecting plate, and the other end is along the second direction vertical with first direction It is extended;And
Second mounting plate, one end are fixedly connected with the connecting plate, and the other end is extended in a second direction, and described second Mounting plate in a first direction with first mounting plate interval be arranged, and second mounting plate in a second direction on length Degree be less than first mounting plate in a second direction on length.
The utility model also proposes a kind of building comprising steelframe wall and building eaves, the building room Eaves is fixedly connected with the steelframe wall, and the building eaves include load-bearing steel pipe, multiple metal plates and multiple angle-style rooms Eaves structure, multiple angle-style eaves structures are intervally arranged along the length direction of the load-bearing steel pipe, each metal plate It is direct to be fixedly installed in the adjacent two angle-style eaves structure, wherein the angle-style eaves structure includes:
Connecting plate extends in a first direction setting;
First mounting plate, one end are fixedly connected with the connecting plate, and the other end is along the second direction vertical with first direction It is extended;And
Second mounting plate, one end are fixedly connected with the connecting plate, and the other end is extended in a second direction, and described second Mounting plate in a first direction with first mounting plate interval be arranged, and second mounting plate in a second direction on length Degree be less than first mounting plate in a second direction on length.
The fixed company of carrying steel pipe that technical solutions of the utility model pass through setting angle-style eaves structure, and building eaves It connects, to form building eaves.So set, being on the one hand convenient in this way since the size of the angle-style eaves structure is smaller Angle-style eaves structure described in handling, consequently facilitating the building of building eaves;On the other hand also it is effectively shortened building room The hanging length of the carrying steel pipe of eaves, consequently facilitating building steel frame construction is built.Thus there is the structure convenient for building It builds, improves the building efficiency of building.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, the structure that can also be shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the partial structure diagram of one embodiment of the utility model building eaves;
Fig. 2 is the structural schematic diagram of angle-style eaves structure in Fig. 1.
Drawing reference numeral explanation:
Label Title Label Title
100 Building eaves 112 Retention bead
10 Angle-style eaves structure 14 Joint steel pipe
20 Load-bearing steel pipe 15 First stiffening plate
30 Metal plate 16 Second stiffening plate
11 Connecting plate 121 First mounting hole
12 First mounting plate 131 Second mounting hole
13 Second mounting plate 113 Third mounting hole
111 Dovetail groove
The embodiments will be further described with reference to the accompanying drawings for the realization, functional characteristics and advantage of the utility model aim.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, fall within the protection scope of the utility model.
It is to be appreciated that the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and cannot It is interpreted as its relative importance of indication or suggestion or implicitly indicates the quantity of indicated technical characteristic.Define as a result, " the One ", the feature of " second " can explicitly or implicitly include at least one of the features.In addition, the skill between each embodiment Art scheme can be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when technical solution It will be understood that the combination of this technical solution is not present in conjunction with there is conflicting or cannot achieve when, also not in the utility model It is required that protection scope within.
In order to improve the building efficiency of building, the utility model proposes a kind of angle-style eaves structure, the angle-style eaves Structure is used for building eaves, to be fixedly connected with the metal plate of building eaves, referring to Fig.1 and 2, Fig. 1 is shown The structural schematic diagram of one embodiment of building eaves of the utility model;Fig. 2 shows the structures of angle-style eaves structure in Fig. 1 Schematic diagram.
The angle-style eaves structure 10 includes connecting plate 11, the first mounting plate 12 and the second mounting plate 13;Wherein, described Connecting plate 11 extends in a first direction setting;One end of first mounting plate 12 is fixedly connected with the connecting plate 11, described The other end of first mounting plate 12 is extended along the second direction of vertical first direction;One end of second mounting plate 13 with The connecting plate 11 is fixedly connected, and the other end of second mounting plate 13 is extended in a second direction, second installation Plate 13 is spaced with first mounting plate 12 in a first direction to be arranged, and second mounting plate 13 is in a second direction Length of the length less than the first mounting plate 12 in a second direction.
It should be noted that the connecting plate 11 prolongs since the connecting plate 11 extends in a first direction setting Stretching direction is first direction;Likewise, since first mounting plate 12 and second mounting plate 13 are each along second party To extension, therefore, the extending direction of the extending direction of first mounting plate 12 and second mounting plate 13 is second party To.And first direction and second party are in angle setting, that is to say, that the connecting plate 11 respectively with first mounting plate 12 It is arranged with second mounting plate 13 in angle, corner dimension and institute between the connecting plate 11 and first mounting plate 12 Stating the corner dimension between connecting plate 11 and second mounting plate 13 is 0 ~ 90 °, preferably, the connecting plate 11 respectively with First mounting plate 12 and second mounting plate 13 are in 90 ° of angle settings.In addition, the needs of angle-style eaves structure 10 are held Certain weight is carried, this, which allows for the angle-style eaves structure 10, itself needs certain bearing capacity, i.e., the described angle-style room Eaves structure 10 needs to be made of the bigger material of intensity, such as metallic steel, steel alloy etc. are just not listed one by one herein ?;The molding mode of the angle-style eaves structure 10 also there are many kinds of, such as casting, laser cutting, welding etc., herein just not It enumerates.
In construction of buildings eaves 100, by the connecting plate 11 of the angle-style eaves structure 10 and eaves can be built Carrying steel pipe is fixedly connected, while guaranteeing that the first mounting plate 12 of each angle-style eaves structure 10 is to be located at the second mounting plate 13 top allows for first mounting plate 12 far from one end of the connecting plate 11 in this way and is above institute in a second direction State what the second mounting plate 13 was arranged far from one end of the connecting plate 11, so that building eaves 100 are in cornice shape.It compares For constructing eaves by using longer steel pipe in the prior art, the use angle-style eaves structure 10 in the application is constructed Building eaves are more convenient, quick, and then are conducive to improve the efficiency of construction of buildings eaves 100.
In addition, when multiple angle-style eaves structures 10 are along between the length direction of the carrying steel pipe of building eaves 100 When setting, the carrying steel pipe of the building eaves 100 is just divided into multistage by multiple angle-style eaves structures 10, this is allowed for The length of the metal plate 30 of building eaves 100 can reduce, since the length of the metal plate 30 of building eaves 100 reduces, This weight for allowing for the metal plate 30 of building eaves 100 also reduces, and then is convenient for the carrying and installation of metal plate 30, The construction of building eaves 100 has been further facilitated in this way.
It should be noted that the connection type of the angle-style eaves structure 10 and the load-bearing steel pipe 20 of building eaves 100 There are many kinds of, the two can be by welding, being bolted, rivet and other connection types are connected and fixed, preferably, the angle Type eaves structure 10 and the load-bearing steel pipe 20 of building eaves 100 are connected and fixed by the way of welding, and welding has connectivity Can good, good integrity, allow in this way the angle-style eaves structure 10 connect with building eaves 100 it is stronger.
The angle-style eaves structure 10 is fixedly connected with the carrying steel pipe of building eaves 100 for convenience, practical at this In a novel embodiment, the connecting plate 11 is arranged far from the side of first mounting plate 12 and second mounting plate 13 There is dovetail groove 111, is correspondingly arranged on positioning protrusion on the load-bearing steel pipe 20 of building eaves 100.In the angle-style eaves structure 10 with building eaves load-bearing steel pipe 20 be fixedly connected when, first by the connecting plate 11 dovetail groove 111 and building eaves Positioning protrusion cooperation on 100 load-bearing steel pipe 20, has thus been convenient for the angle-style eaves structure 10 and building eaves 100 Load-bearing steel pipe 20 position, and then have being fixedly connected convenient for the angle-style eaves structure 10 and building eaves 100.
It obviously, can also be in other way by the load-bearing steel of the angle-style eaves structure 10 and building eaves 100 Pipe 20 is positioned, and in the other embodiments of the utility model, the connecting plate 11 is far from first mounting plate 12 and institute The side for stating the second mounting plate 13 is provided with retention bead 112, and the width of the retention bead 112 is from it adjacent to the connecting plate 11 one end is gradually increased to its one end far from the connecting plate 11, the retention bead 112 to building eaves 100 Load-bearing steel pipe 20 on locating slot cooperation.So set, making the retention bead 112 is same as locating slot can be described Angle-style eaves structure 10 plays positioning action when being fixedly connected with the load-bearing steel pipe 20 of building eaves 100.
It is worth noting that, dovetail groove 111 and retention bead 112 can be set simultaneously on the connecting plate 11, it is corresponding , for setting positioning protrusion and locating slot on the load-bearing steel pipe 20 of building eaves 100, the angle-style room can be made in this way It is positioned between eaves structure 10 and the load-bearing steel pipe 20 of building eaves 100 more accurate.
It is, of course, also possible in other way by the load-bearing steel of the angle-style eaves structure 10 and building eaves 100 Pipe 20 is positioned, for example, the first magnetic part is arranged on the connecting plate 11, in the load-bearing steel pipe 20 of building eaves 100 The second magnetic part of upper setting, and second magnetic part is different with the magnetism of first magnetic part, allows for so described Before angle-style eaves structure 10 is fixedly connected with the load-bearing steel pipe 20 of building eaves 100, first magnetic part can be passed through With the magnetic absorption of second magnetic part and positioned, thus have convenient for the angle-style eaves structure 10 and building room The load-bearing steel pipe 20 of eaves 100 is fixedly connected.
It is stronger in order to connect the connecting plate 11 with the load-bearing steel pipe 20 of building eaves 100, it is practical at this In a novel embodiment, the angle-style eaves structure 10 further includes a joint steel pipe 14, the joint steel pipe 14 and the company Fishplate bar 11 is fixedly connected far from first mounting plate 12 with the side of second mounting plate 13, and to building eaves 100 load-bearing steel pipe 20 is fixedly connected.So set, increasing holding for the angle-style eaves structure 10 and building eaves 100 The direct contact area of weight steel pipe 20, so that the load-bearing steel pipe 20 of the angle-style eaves structure 10 and building eaves 100 What is be directly connected to is stronger.
It should be noted that the joint steel pipe 14 can be rectangular steel tube, triangle steel pipe, round steel pipe etc., This is just not listed one by one, since the load-bearing steel pipe 20 of building eaves 100 is generally rectangular steel tube, the connection steel Pipe 14 is preferably rectangular steel tube, is had in this way convenient between the joint steel pipe 14 and the load-bearing steel pipe 20 of building eaves 100 Connection.
In addition, it should also be noted that when being provided with dovetail groove 111 and/or retention bead 112 on the connecting plate 11, The dovetail groove 111 and/or retention bead 112 are then located at one end of the joint steel pipe 14, avoid the connection in this way Steel pipe 14 influences the positioning between the angle-style eaves structure 10 and the load-bearing steel pipe 20 of building eaves 100.
It should be noted that the angle-style eaves structure 10 is fixedly connected to the metal plate 30 with building eaves 100, This allows for the angle-style eaves structure 10 and needs to carry certain weight, in consideration of it, in an embodiment of the utility model, The angle-style eaves structure 10 further includes two first stiffening plates 15 of L-shaped setting, and each first stiffening plate 15 is divided into The side of first mounting plate 12, and each first stiffening plate 15 respectively with first mounting plate 12, connecting plate 11 and joint steel pipe 14 be fixedly connected.So set, not only increasing first mounting plate 12 and the connecting plate 11 Intensity while also making institute so that connecting stronger between first mounting plate 12 and the connecting plate 11 State connected between connecting plate 11 and the joint steel pipe 14 it is stronger.
Further, the angle-style eaves structure 10 further includes two second stiffening plates 16 of L-shaped setting, and each described Two stiffening plates 16 are divided into the side of second mounting plate 13, and each second stiffening plate 16 is respectively with described second Mounting plate 13, connecting plate 11 and joint steel pipe 14 are fixedly connected.So set, not only increasing 13 He of the second mounting plate The intensity of the connecting plate 11, so that being connected between second mounting plate 13 and the connecting plate 11 more firm Gu while also to connect between the connecting plate 11 and the joint steel pipe 14 stronger.
It should say, two first stiffening plates 15 and the two L-shaped settings of second stiffening plate 16, this is allowed for Each first stiffening plate 15 can be connected between first mounting plate 12 and the connecting plate 11 it is stronger, together When but also each second stiffening plate 16 can be directly connected to more with second mounting plate 13 and the experienced step Securely.
It should be noted that the connection type of the angle-style eaves structure 10 and the metal plate 30 of building eaves 100 has Many kinds, such as welding, screwing, rivet, are just not listed one by one herein, in an embodiment of the utility model In, the angle-style eaves structure 10 is connect with the metal plate 30 of building eaves 100 using screw, specifically, first peace Loading board 12 close to or far from second mounting plate 13 side be provided through be intervally arranged in a second direction it is multiple First mounting hole 121;The side of close or separate first mounting plate 12 of second mounting plate 13 is provided through Multiple second mounting holes 131 being intervally arranged in a second direction;The connecting plate 11 is adjacent to first mounting plate 12 and second The side of mounting plate 13 is provided through the multiple third mounting holes 113 being intervally arranged along first direction.So set, to build The metal plate 30 for building object eaves 100 can be by screw and first mounting hole or second mounting hole or described the The connection of three mounting holes.
Further, first mounting hole 121 in the first mounting hole 121 described in arbitrary neighborhood two sets for waist-shaped hole It sets;Second mounting hole 131 in second mounting hole 131 described in arbitrary neighborhood two is waist-shaped hole setting;Arbitrary neighborhood two A third mounting hole 113 in the third mounting hole 113 is waist-shaped hole setting.So set, being conveniently adjusted building The metal plate 30 of eaves 100 and the first mounting plate 12 of angle-style eaves structure 10 or the second mounting plate 13 or connecting plate 11 Relative position, and then it is convenient for being fixedly connected between the angle-style eaves structure 10 and the metal plate 30 of building eaves 100.
The utility model also proposes a kind of building eaves 100, which includes load-bearing steel pipe 20, multiple Metal plate 30 and multiple angle-style eaves structures, the specific structure of the angle-style eaves structure 10 is referring to above-described embodiment, due to this Building eaves 100 use whole technical solutions of above-mentioned all embodiments, therefore at least with the technology of above-described embodiment All beneficial effects brought by scheme, this is no longer going to repeat them.Wherein, multiple angle-style eaves structures 10 are along described The length direction of load-bearing steel pipe is intervally arranged, and each metal plate 30 is fixedly installed in the adjacent two angle-style eaves structure 10 Directly.
The utility model also proposes a kind of building, which includes steelframe wall and building eaves, the building The specific structure of eaves is referring to above-described embodiment, since this building uses whole technical solutions of above-mentioned all embodiments, Therefore at least there are all beneficial effects brought by the technical solution of above-described embodiment, this is no longer going to repeat them.
The above is only the preferred embodiment of the present invention, and therefore it does not limit the scope of the patent of the utility model, It is all under the inventive concept of the utility model, equivalent structure made based on the specification and figures of the utility model becomes It changes, or directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.

Claims (10)

1. a kind of angle-style eaves structure is used for building eaves, the angle-style eaves structure is to the metal with building eaves Plate is fixedly connected, which is characterized in that the angle-style eaves structure includes:
Connecting plate extends in a first direction setting;
First mounting plate, one end are fixedly connected with the connecting plate, and the other end prolongs along with first direction in the second direction of angle Stretch setting;And
Second mounting plate, one end are fixedly connected with the connecting plate, and the other end is extended in a second direction, second installation Plate in a first direction with first mounting plate interval be arranged, and second mounting plate in a second direction on length it is small In first mounting plate in a second direction on length.
2. angle-style eaves structure as described in claim 1, which is characterized in that the connecting plate far from first mounting plate and The side of second mounting plate is provided with dovetail groove, and the dovetail groove is to the positioning on the load-bearing steel pipe with building eaves Male cooperation.
3. angle-style eaves structure as claimed in claim 1 or 2, which is characterized in that the connecting plate is far from first installation The side of plate and second mounting plate is provided with retention bead, and the width of the retention bead is from it adjacent to the connecting plate One end is gradually increased to its one end far from the connecting plate, and the retention bead is on the load-bearing steel pipe with building eaves Locating slot cooperation.
4. angle-style eaves structure as described in claim 1, which is characterized in that the angle-style eaves structure further includes connection steel Pipe, the joint steel pipe are fixedly connected with the connecting plate far from the side of first mounting plate and second mounting plate, And it is fixedly connected to the load-bearing steel pipe with building eaves.
5. angle-style eaves structure as claimed in claim 4, which is characterized in that the angle-style eaves structure further includes L-shaped sets Two first stiffening plates set, each first stiffening plate are divided into the side of first mounting plate, and each described One stiffening plate is fixedly connected with first mounting plate, connecting plate and joint steel pipe respectively.
6. angle-style eaves structure as claimed in claim 4, which is characterized in that the angle-style eaves structure further includes L-shaped sets Two second stiffening plates set, each second stiffening plate are divided into the side of second mounting plate, and each described Two stiffening plates are fixedly connected with second mounting plate, connecting plate and joint steel pipe respectively.
7. angle-style eaves structure as described in claim 1, which is characterized in that first mounting plate is close or far from described The side of second mounting plate is provided through multiple first installation through-holes being intervally arranged in a second direction;
The close or side far from first mounting plate of second mounting plate is provided through to be spaced in a second direction Multiple second installation through-holes of arrangement;
The connecting plate is provided through adjacent to the side of first mounting plate and the second mounting plate and arranges along first direction interval Multiple third installation through-holes of cloth;
Multiple first installation through-holes, multiple second installation through-holes and multiple third installation through-holes to The metal plate of building eaves is fixedly connected.
8. angle-style eaves structure as claimed in claim 7, which is characterized in that one in the first mounting hole described in arbitrary neighborhood two First mounting hole is waist-shaped hole setting;
Second mounting hole in second mounting hole described in arbitrary neighborhood two is waist-shaped hole setting;
A third mounting hole in third mounting hole described in arbitrary neighborhood two is waist-shaped hole setting.
9. a kind of building eaves, which is characterized in that the building eaves include load-bearing steel pipe, multiple metal plates and multiple Angle-style eaves structure as claimed in any of claims 1 to 8 in one of claims, multiple angle-style eaves structures are along the load-bearing steel The length direction of pipe is intervally arranged, and it is direct that each metal plate is fixedly installed in the adjacent two angle-style eaves structure.
10. a kind of building, which is characterized in that described including steelframe wall and building eaves as claimed in claim 9 Building eaves are fixedly connected with the steelframe wall.
CN201820528098.1U 2018-04-14 2018-04-14 A kind of angle-style eaves structure and building eaves and building Active CN208122134U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820528098.1U CN208122134U (en) 2018-04-14 2018-04-14 A kind of angle-style eaves structure and building eaves and building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820528098.1U CN208122134U (en) 2018-04-14 2018-04-14 A kind of angle-style eaves structure and building eaves and building

Publications (1)

Publication Number Publication Date
CN208122134U true CN208122134U (en) 2018-11-20

Family

ID=64191312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820528098.1U Active CN208122134U (en) 2018-04-14 2018-04-14 A kind of angle-style eaves structure and building eaves and building

Country Status (1)

Country Link
CN (1) CN208122134U (en)

Similar Documents

Publication Publication Date Title
CN208122134U (en) A kind of angle-style eaves structure and building eaves and building
CN211421409U (en) Cross toper box support node
CN211472883U (en) Assembled reinforced steel structure beam column joint connecting device
CN209066857U (en) A kind of Modularized aluminum alloy of spigot-and-socket-wood gang form system
CN215055192U (en) Scaffold frame external corner position adjustable support encorbelments
CN211973846U (en) Be applied to anchor case structure in steel construction
CN204435848U (en) U-shaped aluminum alloy pattern plate
CN115772961A (en) Stable steel structure floor support plate
CN206529885U (en) A kind of easily steel attachment structure
CN208472949U (en) A kind of integrated-type steel moald-cavity convenient for site operation
CN210739944U (en) Square tube with high strength
CN207597728U (en) A kind of roofing bottom plate fixing structure
CN204554333U (en) A kind of Z-shape steel
CN214993028U (en) Steel box girder support baffle
CN219298478U (en) Cross connecting piece of assembled building
CN210238930U (en) Sheet metal part structure unit
CN211571988U (en) Adjustable steel net rack structure
CN217734813U (en) Connecting piece and scaffold for building construction
CN215484334U (en) A flexible pendant is adjusted to modularization three-dimensional for honeycomb rock plate
CN215997101U (en) Half honeycomb board and honeycomb unit
CN220954649U (en) Spliced concrete building template for civil engineering
CN214402524U (en) Aluminum composite board mounting structure
CN214995096U (en) But fast assembly's building engineering bearing plate
CN207063505U (en) A kind of forms for concrete
CN211949160U (en) Suspended ceiling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant