CN208121848U - A kind of hydraulic engineering efficient dredging boat - Google Patents

A kind of hydraulic engineering efficient dredging boat Download PDF

Info

Publication number
CN208121848U
CN208121848U CN201820183892.7U CN201820183892U CN208121848U CN 208121848 U CN208121848 U CN 208121848U CN 201820183892 U CN201820183892 U CN 201820183892U CN 208121848 U CN208121848 U CN 208121848U
Authority
CN
China
Prior art keywords
fixed
hull
hydraulic engineering
locating rod
dewatering equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820183892.7U
Other languages
Chinese (zh)
Inventor
姚超坤
孙启涛
陈泽南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin BesTech Marine Engineering Consultant Co., Ltd.
Original Assignee
Wenzhou Yuan Tuo Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Yuan Tuo Machinery Technology Co Ltd filed Critical Wenzhou Yuan Tuo Machinery Technology Co Ltd
Priority to CN201820183892.7U priority Critical patent/CN208121848U/en
Application granted granted Critical
Publication of CN208121848U publication Critical patent/CN208121848U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a kind of hydraulic engineering efficient dredging boats,Including hull,Operating room,Upending frame,Hoist engine,Store up hopper dredger,Sludge dewatering equipment,Slush pump,Mud crushing device,The upending frame inclination is fixed at the hull aft on upper end face,Fixed pulley is fixed on the upending frame,The sludge dewatering equipment passes through sludge pipe and sewage pipe respectively and connect with the storage hopper dredger and slush pump,The hull aft end is equipped with limiting device,The mud crushing device is by the first locating rod,Second locating rod,Y type connecting rod,Seal box,First rotating electric machine,Second rotating electric machine,Broken cylinder,First rotating shaft,Second shaft,First broken blade,Second broken blade collectively forms,Mud suction mouth is provided on the broken cylinder,The mud suction mouth is tightly connected by dredging tube and bellows and slush pump,The hoist engine is connect by wirerope with the seal box.The utility model has the beneficial effects that of simple structure and strong practicability.

Description

A kind of hydraulic engineering efficient dredging boat
Technical field
The utility model relates to hydraulic engineering technical field, especially a kind of hydraulic engineering efficient dredging boat.
Background technique
Hydraulic engineering is the engineering built to eliminate water damage and development and utilization water resource, is divided into flood control by its service object Engineering, farmland water conservancy works, hydraulic power project, navigation channel and port engineering, water supply and drainage system, environmental bydraulic engineering engineering, sea Project of cultivation etc. is applied, can simultaneously be the hydraulic engineering of the plurality of target services such as flood control, water supply, irrigation, power generation, referred to as comprehensively utilize Hydraulic engineering needs to remove subaqueous deposit using the dredging for carrying out river to Accrete clearing device during hydraulic engineering carries out Object.But all there is a series of defects, such as hydraulic engineering to be filled with dredging with Accrete clearing device for common hydraulic engineering in the market It sets and is not enough in dredging, the mud accumulation of bottom of river channel is not easy to clear up, and the mud after the completion of dredging is aboard ship inconvenient to transport It is defeated to get off, the efficiency of dredging is affected, operator is being easy the problem of slipping, the presence of these problems shadows on Accrete clearing device The use for having rung hydraulic engineering Accrete clearing device in the market can not meet the demand used, for this purpose, it is proposed that a kind of cleaning is imitated The higher hydraulic engineering dredger of rate.
Utility model content
Purpose of the utility model is to solve the above problems, devise a kind of hydraulic engineering efficient dredging boat.
Realize that above-mentioned purpose the technical solution of the utility model is a kind of hydraulic engineering efficient dredging boat, including hull, Operating room, upending frame, hoist engine, storage hopper dredger, sludge dewatering equipment, slush pump, mud crushing device, the operating room, upending frame, Hoist engine, sludge dewatering equipment, slush pump are located on the hull, and the storage hopper dredger is located in the hull, and the upending frame inclines It is tiltedly fixed at the hull aft on upper end face, is fixed with fixed pulley on the upending frame, on the hull and be located at institute It states and is equipped with sludge dewatering equipment on the left of upending frame, the sludge dewatering equipment and the storage hopper dredger are by protruding into the sludge pipe of the hull It connects, on the hull and is located on the right side of the sludge dewatering equipment equipped with slush pump, the slush pump and the sludge dewatering equipment It is connect by sewage pipe with the sludge dewatering equipment input terminal, the hull aft end is equipped with limiting device, the limiting device By be fixed on the hull first crossbar, be fixed on the first crossbar extension end first limit hollow, be fixed on On the hull and be located at the first crossbar side second crossbar, be fixed on the second crossbar extension end second limit Hollow collectively forms, and the limiting device is flexibly connected with the mud crushing device, and the mud crushing device is by inserting It is described first limit hollow in the first locating rod, be inserted into it is described second limit hollow in the second locating rod, with First locating rod and the Y type connecting rod of second locating rod connection, the sealing that is fixedly connected with the Y type connecting rod Case, the first rotating electric machine being fixed in the seal box and the second rotating electric machine, the broken cylinder for being fixed on the seal box end, In the broken cylinder and with first rotating electric machine output axis connection first rotating shaft, be located at the broken cylinder in and with Second shaft of the second rotating electric machine output axis connection, the first broken blade, the suit being sleeved in the first rotating shaft The second broken blade in second shaft collectively forms, and on the broken cylinder and is located at the first rotating shaft and described the Be provided with mud suction mouth between two shafts, be equipped with the dredging tube being tightly connected with the mud suction mouth at the mud suction mouth, the dredging tube and It is connected between the slush pump by sylphon seal, the hoist engine is fixed on the hull and is located at the sludge dewatering equipment Left side, the hoist engine are connect by wirerope with the seal box, and described wirerope one end is fixed on the hoist engine separately One end is fixed on the seal box and passes through the fixed pulley.
The first rotating shaft is set with the first sealing bearing through the portion outboard of the seal box.
Second shaft is set with the second sealing bearing through the portion outboard of the seal box.
The sludge dewatering equipment is Centrifugal sludge dehydration machine.
The water outlet of the sludge dewatering equipment is equipped with drainpipe, and the extension end of the drainpipe is fixed on outside the hull Side.
Seal box upper end two sides are fixed with lifting lug, and the wirerope is fixed on the lifting lug.
The broken cylinder bottom end is openning shape, and the first rotating shaft and second shaft lower end are stretched out described broken Cylinder.
First locating rod and second locating rod bottom end are externally threaded, and first locating rod bottom end is equipped with The first stop nut being threadedly engaged with first locating rod, second locating rod bottom end are equipped with and second locating rod The second stop nut being threadedly engaged.
The broken cylinder is equipped with fixed strut, and the fixed strut is equipped with underwater high-definition camera and underwater searchlighting Lamp.
Filter screen is equipped at the mud suction mouth.
A kind of hydraulic engineering efficient dredging boat made using the technical solution of the utility model, can carry out brokenly mud It is extracted out, then is collected into after being dehydrated by sludge dewatering equipment in storage hopper dredger by sludge pump after broken, improved sludge saturation, it is clear to improve mud The efficiency of reason, by the cooperation of hoist engine, upending frame, locating rod and position-limiting drum make sludge clear up and collect it is more convenient, can be Different depth river carries out sludge cleaning work, and structure is simple, easy to use.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of hydraulic engineering efficient dredging boat described in the utility model;
Fig. 2 is a kind of schematic elevation view of hydraulic engineering efficient dredging boat described in the utility model;
Fig. 3 is a kind of schematic rear view of hydraulic engineering efficient dredging boat described in the utility model;
Fig. 4 is the partial enlarged view in Fig. 1 described in the utility model at C;
Fig. 5 is a kind of right view of hydraulic engineering efficient dredging boat described in the utility model;
Fig. 6 is the partial enlarged view in Fig. 3 described in the utility model at D;
Fig. 7 is the schematic diagram of pulverization cylinder described in the utility model;
Fig. 8 is the schematic diagram of Y type connecting rod described in the utility model;
In figure, 1, hull;2, operating room;3, upending frame;4, hoist engine;5, hopper dredger is stored up;6, sludge dewatering equipment;7, fixed sliding Wheel;8, sludge pipe;9, slush pump;10, sewage pipe;11, first crossbar;12, the first limit hollow;13, second crossbar;14, Second limit hollow;15, the first locating rod;16, the second locating rod;17, Y type connecting rod;18, seal box;19, the first rotation Motor;20, the second rotating electric machine;21, it is crushed cylinder;22, first rotating shaft;23, the second shaft;24, the first broken blade;25, Sledging blade;26, mud suction mouth;27, dredging tube;28, bellows;29, the first sealing bearing;30, the second sealing bearing;31, Drainpipe;32, lifting lug;33, the first stop nut;34, the second stop nut;35, fixed strut;36, underwater high-definition camera; 37, underwater searchlight;38, filter screen.
Specific embodiment
The utility model is specifically described with reference to the accompanying drawing, as shown in figures 1-8, a kind of hydraulic engineering high-efficient cleaning Silt ship, including hull 1, operating room 2, upending frame 3, hoist engine 4, storage hopper dredger 5, sludge dewatering equipment 6, slush pump, the broken dress of mud It sets, the operating room 2, upending frame 3, hoist engine 4, sludge dewatering equipment 6, slush pump are located on the hull 1, the storage hopper dredger 5 In the hull 1, the inclination of upending frame 3 is fixed at 1 stern of hull on upper end face, on the upending frame 3 It is fixed with fixed pulley 7, on the hull 1 and is located on the left of the upending frame 3 and is equipped with sludge dewatering equipment 6, the sludge dewatering equipment 6 It is connect with the storage hopper dredger 5 by protruding into the sludge pipe 8 of the hull 1, on the hull 1 and is located at the sludge dewatering equipment 6 Right side is equipped with slush pump 9, and the slush pump 9 is inputted with the sludge dewatering equipment 6 by sewage pipe 10 and the sludge dewatering equipment 6 End connection, 1 stern end of hull are equipped with limiting device, and the limiting device is by the first crossbar that is fixed on the hull 1 11, it is fixed on the first limit hollow 12 of 11 extension end of first crossbar, is fixed on the hull 1 and is located at described the The second crossbar 13 of one cross bar, 11 side, the second limit common structure of hollow 14 for being fixed on 13 extension end of second crossbar At the limiting device is flexibly connected with the mud crushing device, and the mud crushing device is by being inserted into first limit Position hollow 12 in the first locating rod 15, be inserted into it is described second limit hollow 14 in the second locating rod 16, with it is described First locating rod 15 and the Y type connecting rod 17 of second locating rod 16 connection, be fixedly connected with the Y type connecting rod 17 it is close Joint sealing 18, the first rotating electric machine 19 being fixed in the seal box 18 and the second rotating electric machine 20 are fixed on the seal box The broken cylinder 21 at 18 ends, the first rotating shaft in the broken cylinder 21 and with first rotating electric machine 19 output axis connection 22, in the broken cylinder 21 and with the second shaft 23 of second rotating electric machine 20 output axis connection, be sleeved on it is described The first broken blade 24 in first rotating shaft 22, the second broken blade 25 being sleeved in second shaft 23 collectively form, Mud suction mouth 26, the mud suction mouth 26 are provided on the broken cylinder 21 and between the first rotating shaft 22 and second shaft 23 Place is equipped with the dredging tube 27 being tightly connected with the mud suction mouth 26, passes through bellows between the dredging tube 27 and the slush pump 9 28 are tightly connected, and the hoist engine 4 is fixed on the hull 1 and is located at 6 left side of sludge dewatering equipment, the hoist engine 4 It is connect by wirerope with the seal box 18, described wirerope one end is fixed on the other end on the hoist engine 4 and is fixed on institute It states on seal box 18 and passes through the fixed pulley 7;The first rotating shaft 22 is set with through the portion outboard of the seal box 18 First sealing bearing 29;Second shaft 23 is set with the second sealing bearing 30 through the portion outboard of the seal box 18; The sludge dewatering equipment 6 is Centrifugal sludge dehydration machine;The water outlet of the sludge dewatering equipment 6 is equipped with drainpipe 31, described The extension end of drainpipe 31 is fixed on 1 outside of hull;The 18 upper end two sides of seal box are fixed with lifting lug 32, the steel wire Rope is fixed on the lifting lug 32;21 bottom end of broken cylinder is openning shape, the first rotating shaft 22 and second shaft 23 The broken cylinder 21 is stretched out in lower end;First locating rod 15 and 16 bottom end of the second locating rod are externally threaded, institute It states 15 bottom end of the first locating rod and is equipped with the first stop nut 33 being threadedly engaged with first locating rod 15, second positioning 16 bottom end of bar is equipped with the second stop nut 34 being threadedly engaged with second locating rod 16;The broken cylinder 21, which is equipped with, to be fixed Strut 35, the fixed strut 35 are equipped with underwater high-definition camera 36 and underwater searchlight 37;It is equipped at the mud suction mouth 26 Filter screen 38.
The characteristics of the present embodiment is that upending frame inclination is fixed at hull aft on upper end face, fixed on upending frame There is a fixed pulley, on hull and is located on the left of upending frame and is equipped with sludge dewatering equipment, sludge dewatering equipment and storage hopper dredger are by protruding into hull Sludge pipe connection, on hull and be located on the right side of sludge dewatering equipment and be equipped with slush pump, slush pump and sludge dewatering equipment pass through blowdown Pipe is connect with dewaterer input terminal, hull aft end equipped with limiting device, limiting device by be fixed on hull first crossbar, The the first limit hollow for being fixed on first crossbar extension end, the second cross for being fixed on hull and being located at first crossbar side Bar, the second limit hollow for being fixed on second crossbar extension end collectively form, and limiting device and the activity of mud crushing device connect It connects, mud crushing device is by the first locating rod being inserted into the first position-limiting drum, the second positioning being inserted into the second position-limiting drum Bar, the seal box being fixedly connected with Y type connecting rod, is fixed on the Y type connecting rod connecting with the first locating rod and the second locating rod The first rotating electric machine and the second rotating electric machine in seal box, the broken cylinder for being fixed on seal box end, be located in broken cylinder and with First rotating electric machine exports the first rotating shaft of axis connection, exports the second of axis connection in broken cylinder and with the second rotating electric machine Shaft, the first broken blade being sleeved in first rotating shaft, the second broken blade being sleeved in the second shaft collectively form, and break It is provided with mud suction mouth on broken cylinder and between first rotating shaft and the second shaft, is equipped with the suction mud being tightly connected with mud suction mouth at mud suction mouth Pipe is connected between dredging tube and slush pump by sylphon seal, and hoist engine is fixed on hull and is located on the left of sludge dewatering equipment, Hoist engine is connect by wirerope with seal box, and wirerope one end is fixed on the other end on hoist engine and is fixed on seal box and wears Cross fixed pulley.A kind of hydraulic engineering efficient dredging boat made using the technical solution of the utility model, can carry out mud It is extracted out, then is collected into after being dehydrated by sludge dewatering equipment in storage hopper dredger by sludge pump after broken, improved sludge saturation, improve mud The efficiency of cleaning, by the cooperation of hoist engine, upending frame, locating rod and position-limiting drum make sludge clear up and collect it is more convenient, can Sludge cleaning work is carried out in different depth river, structure is simple, easy to use.
In the present embodiment, the wirerope on hoist engine is connect by fixed pulley with mud crushing device, works as hoist engine When rotating Panasonic's wirerope, the decline of mud crushing device, the first locating rod and the second locating rod are in the first limit hollow and the It moves along a straight line under the limitation of two limit hollows, mud crushing device straight line is made to sink, underwater searchlight is opened, and underwater high definition is taken the photograph As underwater image information is sent operating room, controllable mud cleaning work in operating room, the first rotating electric machine and second by head Rotating electric machine rotation drives first rotating shaft and the rotation of the second shaft, the first crushing cutter in first rotating shaft and the second shaft respectively Piece and the second broken blade, which stir river bed sludge and Other Waste, to be crushed, and slush pump passes through bellows and dredging tube from mud suction mouth Sludge is sucked through sewage pipe and is discharged in sludge dewatering equipment by place, and sludge dewatering equipment separates sludge and water, the dirt after separation Mud is discharged into storage hopper dredger by sludge pipe, water by drainpipe discharge hull outside, after mud cleaning, by hoist engine by mud Crushing device lifting, mud crushing device rise to maximum height by limiting device stabilization.
Above-mentioned technical proposal only embodies the optimal technical scheme of technical solutions of the utility model, the technology of the art Personnel embody the principles of the present invention to some variations that some of them part may be made, and belong to the utility model Protection scope within.

Claims (10)

1. a kind of hydraulic engineering efficient dredging boat, including hull (1), operating room (2), upending frame (3), hoist engine (4), storage mud Storehouse (5), sludge dewatering equipment (6), slush pump, mud crushing device, in feature in the operating room (2), upending frame (3), volume Machine (4), sludge dewatering equipment (6), slush pump to be raised to be located on the hull (1), the storage hopper dredger (5) is located in the hull (1), Upending frame (3) inclination is fixed at the hull (1) stern on upper end face, is fixed on the upending frame (3) and is determined cunning It takes turns (7), on the hull (1) and is located on the left of the upending frame (3) equipped with sludge dewatering equipment (6), the sludge dewatering equipment (6) It is connect with storage hopper dredger (5) by protruding into the sludge pipe (8) of the hull (1), on the hull (1) and is located at the sludge Slush pump (9) are equipped on the right side of dewaterer (6), the slush pump (9) and the sludge dewatering equipment (6) pass through sewage pipe (10) and institute The connection of sludge dewatering equipment (6) input terminal is stated, hull (1) stern end is equipped with limiting device, and the limiting device is by being fixed on First crossbar (11) on the hull (1), the first limit hollow (12) for being fixed on the first crossbar (11) extension end, It is fixed on the hull (1) and is located at the second crossbar (13) of the first crossbar (11) side, be fixed on second cross Second limit hollow (14) of bar (13) extension end collectively forms, and the limiting device and the mud crushing device activity connect Connect, the mud crushing device by be inserted into it is described first limit hollow (12) in the first locating rod (15), be inserted into institute State the second locating rod (16) and first locating rod (15) and second locating rod in the second limit hollow (14) (16) connect Y type connecting rod (17), be fixedly connected with the Y type connecting rod (17) seal box (18), be fixed on it is described close The first rotating electric machine (19) and the second rotating electric machine (20) in joint sealing (18), the broken cylinder for being fixed on the seal box (18) end (21), it is located in the broken cylinder (21) and exports with first rotating electric machine (19) first rotating shaft (22), the position of axis connection In the broken cylinder (21) and with the second shaft (23) of second rotating electric machine (20) output axis connection, be sleeved on it is described The first broken blade (24) in first rotating shaft (22), the second broken blade (25) being sleeved on second shaft (23) are altogether With constituting, mud suction mouth is provided on the broken cylinder (21) and between the first rotating shaft (22) and second shaft (23) (26), the dredging tube (27) being tightly connected with the mud suction mouth (26), the dredging tube (27) are equipped at the mud suction mouth (26) It is tightly connected between the slush pump (9) by bellows (28), the hoist engine (4) is fixed on the hull (1) and position On the left of the sludge dewatering equipment (6), the hoist engine (4) is connect by wirerope with the seal box (18), the steel wire Rope one end is fixed on the other end on the hoist engine (4) and is fixed on the seal box (18) and passes through the fixed pulley (7).
2. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that the first rotating shaft (22) The first sealing bearing (29) is set with through the portion outboard of the seal box (18).
3. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that second shaft (23) The second sealing bearing (30) is set with through the portion outboard of the seal box (18).
4. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that the sludge dewatering equipment It (6) is Centrifugal sludge dehydration machine.
5. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that the sludge dewatering equipment (6) water outlet is equipped with drainpipe (31), and the extension end of the drainpipe (31) is fixed on the outside of the hull (1).
6. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that on the seal box (18) End two sides are fixed with lifting lug (32), and the wirerope is fixed on the lifting lug (32).
7. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that broken cylinder (21) bottom End is openning shape, and the broken cylinder (21) is stretched out in the first rotating shaft (22) and second shaft (23) lower end.
8. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that first locating rod (15) it is externally threaded with second locating rod (16) top, the first locating rod (15) top is equipped with and described first The first stop nut (33) that locating rod (15) is threadedly engaged, the second locating rod (16) top are equipped with and second positioning The second stop nut (34) that bar (16) is threadedly engaged.
9. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that on the broken cylinder (21) Equipped with fixed strut (35), the fixed strut (35) is equipped with underwater high-definition camera (36) and underwater searchlight (37).
10. a kind of hydraulic engineering efficient dredging boat according to claim 1, which is characterized in that the mud suction mouth (26) Place is equipped with filter screen (38).
CN201820183892.7U 2018-02-02 2018-02-02 A kind of hydraulic engineering efficient dredging boat Expired - Fee Related CN208121848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820183892.7U CN208121848U (en) 2018-02-02 2018-02-02 A kind of hydraulic engineering efficient dredging boat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820183892.7U CN208121848U (en) 2018-02-02 2018-02-02 A kind of hydraulic engineering efficient dredging boat

Publications (1)

Publication Number Publication Date
CN208121848U true CN208121848U (en) 2018-11-20

Family

ID=64206819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820183892.7U Expired - Fee Related CN208121848U (en) 2018-02-02 2018-02-02 A kind of hydraulic engineering efficient dredging boat

Country Status (1)

Country Link
CN (1) CN208121848U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653279A (en) * 2018-12-07 2019-04-19 朱海斌 A kind of cutter suction dredger and mud administering method
CN110130430A (en) * 2019-04-04 2019-08-16 浙江天姥建设发展有限公司 Channel cleanout device with agitating function
CN112502224A (en) * 2020-11-23 2021-03-16 李登峰 A sediment removal device for hydraulic engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653279A (en) * 2018-12-07 2019-04-19 朱海斌 A kind of cutter suction dredger and mud administering method
CN109653279B (en) * 2018-12-07 2020-12-18 朱海斌 Cutter suction dredger and sludge treatment method
CN110130430A (en) * 2019-04-04 2019-08-16 浙江天姥建设发展有限公司 Channel cleanout device with agitating function
CN112502224A (en) * 2020-11-23 2021-03-16 李登峰 A sediment removal device for hydraulic engineering

Similar Documents

Publication Publication Date Title
CN108130930A (en) A kind of hydraulic engineering efficient dredging boat
CN208121848U (en) A kind of hydraulic engineering efficient dredging boat
CN107059970B (en) Lake sludge cleaning device and cleaning method thereof
CN203891097U (en) Riverway cleaning ship for water conservancy projects
CN209339214U (en) A kind of hydraulic engineering environment-friendly type dredger
CN205113652U (en) A rubbish clearing boat for ocean environmental protection
CN205577003U (en) Dredging device for water conservancy project
CN203172869U (en) Remote control type water surface garbage cleaning ship
CN204279886U (en) A kind of sieving garbage contamination removing ship
CN102776910B (en) Engineering machine for dredging and cleaning river course
CN203174656U (en) Channel cleanout device
CN208792397U (en) A kind of hydraulic engineering channel cleanout device that anti-collision effect is good
CN208472812U (en) A kind of hydraulic engineering channel cleanout device
CN108824534A (en) A kind of hydraulic engineering Accrete clearing device
CN109572947A (en) A kind of sea drift vessel for collecting refuse from open
CN202899194U (en) Main buoyancy tanks of riverway dredging engineering machinery
CN105905287A (en) Omnidirectional offshore environment-friendly cleaning equipment
CN202899195U (en) Hydraulic propeller thruster for riverway dredging engineering machinery
CN202899184U (en) Bucket special for sludge
CN109552571A (en) Water plant salvages processing garbage on water automatically and salvages dual-purpose ship automatically
CN207073156U (en) Riverway waste cleaning ship
CN202706091U (en) On-water locating and stabilizing mechanism of riverway dredging engineering machinery
CN203768885U (en) Device for cleaning rubbish on water
CN102390493B (en) Garbage salvage ship
CN212405304U (en) Fishpond dredging device capable of being operated with water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190509

Address after: 300 457 days in No. 3-A workshop of Innovation Pioneer Park, 4668 Xinbei Road, Tanggu Marine Science Park, Binhai New Area, Tianjin

Patentee after: Tianjin BesTech Marine Engineering Consultant Co., Ltd.

Address before: 325000 room 218, Industrial Park Road, grape shed High-tech Industrial Park, Wenzhou, Zhejiang, China, 4

Patentee before: Wenzhou yuan Tuo Machinery Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181120

Termination date: 20200202