CN208073460U - A kind of drilling gas gushes out initial velocity analyzer calibrating installation - Google Patents

A kind of drilling gas gushes out initial velocity analyzer calibrating installation Download PDF

Info

Publication number
CN208073460U
CN208073460U CN201820371117.4U CN201820371117U CN208073460U CN 208073460 U CN208073460 U CN 208073460U CN 201820371117 U CN201820371117 U CN 201820371117U CN 208073460 U CN208073460 U CN 208073460U
Authority
CN
China
Prior art keywords
gas
initial velocity
drilling
velocity analyzer
calibrating installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820371117.4U
Other languages
Chinese (zh)
Inventor
卓勤源
宋正国
张茂宇
于志刚
武大桥
周豆豆
游春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinese Academy of Sciences CAS
Original Assignee
Chinese Academy of Sciences CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinese Academy of Sciences CAS filed Critical Chinese Academy of Sciences CAS
Priority to CN201820371117.4U priority Critical patent/CN208073460U/en
Application granted granted Critical
Publication of CN208073460U publication Critical patent/CN208073460U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Fluid Pressure (AREA)

Abstract

The utility model is related to a kind of drilling gas to gush out initial velocity analyzer calibrating installation.It includes gas circuit that drilling gas, which gushes out initial velocity analyzer calibrating installation, the gas circuit is equipped with air inlet for being connect with air source and for gushing out the gas outlet that initial velocity analyzer is connect with drilling gas, and pressure reducing valve and flowmeter are connected in turn in the gas circuit between air inlet and gas outlet.The drilling gas of the utility model, which gushes out initial velocity analyzer calibrating installation and can detect drilling gas, gushes out initial velocity analyzer with the presence or absence of error and having the characteristics that easy to use, easy to operate.

Description

A kind of drilling gas gushes out initial velocity analyzer calibrating installation
Technical field
The utility model is related to a kind of drilling gas to gush out initial velocity analyzer calibrating installation.
Background technology
It is one of the important indicator for predicting Coal Seam Outburst Hazard that drilling gas, which gushes out initial velocity, it refers in end of drilling Afterwards, sealing of hole is carried out at once, measures the maximum gas amount that closed section is gushed out, and principle is based on prominent coal and non-protruding coal in gas solution Difference in pipette and desorption rate, prominent coal desorption of mash gas amount is big, and initial desorption of mash gas speed is fast, parsing amount declining at any time Deceleration is also fast.
Drilling gas gush out initial velocity size depend on coal seam gas-bearing capacity, coal-bed gas pressure, coal extent of the destruction, The factors such as physico-mechanical properties, i.e., it almost reflect the whole factors for determining Coal Outburst danger, be for underground coal mine work An important indicator for making the danger of face prediction coal and gas prominent or outburst prevention measures validity check is by domestic and international vast coal Scientific and technical personnel obtain by studying for a long period of time and testing.
Currently, scene gushes out initial velocity analyzer measurement drilling gas frequently with WY-30 drilling gas gushes out initial velocity, first Electricity consumption coal borer or wind coal borer drive auger stem, drill in coal seam, often creep into one meter or drilling arrives predetermined depth, exit brill Bar is then fed into hole packer, inflates sealing of hole with inflator, the stream in initial velocity analyzer is finally gushed out with WY-30 drilling gas Gauge measure drill contact after specific length gas flow.Since subsurface environment is severe, WY-30 drilling gas gushes out initial velocity Instrument is influenced analyzer by vibrations and environment in use, the larger phenomenon of flow watchcase error often occurs.Coal mine one As there is no associated check device, cannot find in time there are problem instrument, problem can only be sent to genuine or related calibration authority Could be found when being verified, cause usually measurement data be possible to be distorted.
Utility model content
The purpose of this utility model is to provide a kind of drilling gas to gush out initial velocity analyzer calibrating installation, solves nothing Method finds the problem of drilling gas of problems gushes out initial velocity analyzer in time.
To achieve the above object, the drilling gas of the utility model gushes out the technical solution of initial velocity analyzer calibrating installation It is:
Drilling gas gushes out initial velocity analyzer calibrating installation includes gas circuit, and the gas circuit is equipped with for being connect with air source Air inlet and for gushing out the gas outlet that initial velocity analyzer is connect with drilling gas, the gas circuit between air inlet and gas outlet On be connected with pressure reducing valve and flowmeter in turn.
Advantageous effect:Gush out initial velocity analyzer calibrating installation using the drilling gas of the utility model and examines and determine drilling gas When gushing out initial velocity analyzer, the air inlet of gas circuit is connect with air source, gas outlet in drilling gas gush out initial velocity analyzer Connection, and pressure reducing valve is connected in the gas circuit of air inlet rear end, pressure reducing valve is depressured the gas in air source, the gas after decompression Body enters drilling gas through flowmeter and gushes out initial velocity analyzer, and flowmeter will produce corresponding readings when gas flows through flowmeter, Gas enters after drilling gas gushes out initial velocity analyzer, and the flowmeter that drilling gas is gushed out in initial velocity analyzer also generates phase It should read, compare the reading of two flowmeters, if reading is identical, it is accurate to illustrate that drilling gas gushes out initial velocity analyzer, if Two meter readings differences, then illustrate to gush out initial velocity analyzer by drilling gas that there are errors.The drilling watt of the utility model This, which is gushed out initial velocity analyzer calibrating installation and can detect drilling gas, gushes out initial velocity analyzer with the presence or absence of error and having Have the characteristics that easy to use, easy to operate.
Further, the flowmeter is equipped with the regulating valve for going out throughput for adjusting flowmeter.It is arranged on flowmeter Flow control valve, flow control valve can adjust the gas flow for gushing out speed determinator into drilling gas, when this practicality is new The drilling gas of type gushes out the calibrating of initial velocity analyzer calibrating installation and finds that drilling gas gushes out initial velocity analyzer there are errors When, it can be changed by regulating valve and enter drilling gas and gush out the gas flow of initial velocity analyzer, it can be with by repeatedly reconciling The calculating drilling gas that goes wrong gushes out initial velocity analyzer error amount, improves the accuracy of underground survey data.
Further, it is connected in the gas circuit between the pressure reducing valve and flowmeter for showing gas pressure in gas circuit Pressure gauge.Pressure gauge helps to accurately control admission pressure.
Further, it is connected in the gas circuit between the pressure reducing valve and pressure gauge contained in gas for filtering in gas circuit The filter device of impurity.It is pure that the gas that filter device contributes to enhancing to gush out initial velocity analyzer into drilling gas is set Degree, to contribute to reduction air inlet to gush out the damage of initial velocity analyzer to drilling gas.
Further, the pressure reducing valve, pressure gauge and filter device are wholely set.Pressure reducing valve, pressure gauge and filter device Being wholely set helps to reduce volume, to enhance the applicability of the utility model.
Further, it includes fixed substrate that the drilling gas, which gushes out initial velocity analyzer calibrating installation, the flowmeter, Pressure reducing valve, pressure gauge and filter device are installed in fixed substrate.Flowmeter, pressure reducing valve, pressure gauge and filter device are installed Contribute to the stability of enhancing the utility model in fixed substrate.
Further, the flow is calculated as glass rotameter.
Description of the drawings
Fig. 1 is the structural representation that the drilling gas of the utility model gushes out the embodiment one of initial velocity analyzer calibrating installation Figure;
Fig. 2 is the structural representation that the drilling gas of the utility model gushes out the embodiment two of initial velocity analyzer calibrating installation Figure;
Fig. 3 is the structural representation that the drilling gas of the utility model gushes out the embodiment three of initial velocity analyzer calibrating installation Figure;
In attached drawing:1, air inlet pipe;2, pressure reducing valve;3, pressure gauge;4, filter device;5, connecting tube;6, glass rotors flow Meter;7, regulating valve;8, dial;9, escape pipe;10, pressure reducing valve;11, pressure gauge;12, filter device.
Specific implementation mode
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
The drilling gas of the utility model gushes out the specific embodiment one of initial velocity analyzer calibrating installation, as shown in Figure 1, Including shell, shell is rectangular transparent shell, and shell includes fixed substrate, and the surrounding head and the tail of substrate are connected with four pieces of risers. Gas circuit is installed on substrate, gas circuit includes gas outlet and air inlet, in use, air inlet is connect with air source, gas outlet and brill Hole gas inrush initial velocity analyzer connection.Flowmeter is serially connected in gas circuit, the flow in the present embodiment is calculated as glass rotors stream Gauge 6, certainly, glass rotameter 6 can also be replaced by other kinds of flowmeter in other embodiments, glass rotors Flowmeter 6 includes being vertically arranged tapered glass tube, is provided with dial 8 on the outside of glass tube, tapered glass tube is provided with air admission hole And venthole, air admission hole are located at the lower end of glass tube, venthole is located at the upper end of glass tube, have in glass tube can be in pipe on The float of lower movement also has the regulating valve 7 for adjusting air inflow, the adjusting in the present embodiment on glass rotameter 6 Valve 7 adjusts air inflow by way of screwing, and regulating valve 7 is located at one end of glass tube setting air admission hole, and regulating valve 7 adjusts During air inflow, the float in glass rotameter 6 moves up and down and corresponds to different scale values.Glass rotameter 6 air admission hole is connected with connecting tube 5, and venthole is connected with the escape pipe 9 for being connect with drilling gas initial velocity analyzer, goes out It is gas outlet that tracheae 9, which deviates from the one end being connect with glass rotameter 6,.Connecting tube 5 and escape pipe 9 are rubber tube, are used On the one hand rubber tube helps to connect with the venthole of glass rotameter 6 and air admission hole, another aspect rubber tube is bent Help to enhance the convenience of the utility model in use.The connecting tube 5 being connect with glass rotameter 6 it is another End is connected with pressure reducing valve 2, and pressure reducing valve 2 can reduce admission pressure to play protective glass spinner flowmeter 6 and drilling watt This gushes out the effect of initial velocity analyzer.In order to intuitive, quantitative adjusting admission pressure, the rear end of pressure reducing valve 2 is connected with Pressure gauge 3, pressure gauge 3 can intuitively show the admission pressure occurrence after the adjusting of pressure reducing valve 2.Because in some air sources containing Particulate inclusions, particulate contamination are probably gushed out initial velocity analyzer calibrating installation to the drilling gas of the utility model and are caused Damage, therefore filter device 4 is connected with after pressure reducing valve 2, which can filter out the impurity in air source, in other realities It applies in example, filter device 4 can also be connected to the front end of pressure reducing valve 2 or the rear end of pressure gauge 3 and pressure reducing valve 2 and pressure gauge 3 Between position, the front end exit of pressure reducing valve 2 is connected with the air inlet pipe 1 for being connect with air source, and air inlet pipe 1 deviates from and pressure reducing valve One end of 2 connections is air inlet.Pressure reducing valve, pressure gauge and filter device in the present embodiment are wholely set.
The drilling gas of the utility model gushes out initial velocity analyzer calibrating installation in use, by the air inlet of air inlet pipe 1 It is connect with air source, gas outlet and the drilling gas of escape pipe 9 are gushed out initial velocity analyzer and connect, and adjusting pressure reducing valve 2 reduces air inlet Pressure is to setting value, and gas flows through glass rotameter 6 and generates corresponding discharge reading, and then gas flows through drilling gas and gushes The flowmeter gone out in initial velocity analyzer generates corresponding readings.If the accredited drilling of the identical explanation of the reading of two flowmeters Gas inrush initial velocity analyzer does not have error;Illustrate that accredited drilling gas gushes if the reading of two flowmeters is different Going out initial velocity analyzer, there are errors.When accredited drilling gas gushes out initial velocity analyzer there are when error, glass is adjusted Regulating valve 7 on spinner flowmeter 6 adjusts air inflow to other values, and drilling gas gushes out the production of the flowmeter in initial velocity analyzer Raw corresponding numerical value goes out drilling gas of problems according to the mathematic interpolation between corresponding numerical value and gushes out initial velocity analyzer Error amount, to can still be bored with Accurate Determining in the case that initial velocity analyzer is calibrated not gushing out to problem drilling gas Hole gas inrush initial velocity.
The drilling gas of the utility model gushes out the specific embodiment two of initial velocity analyzer calibrating installation, as shown in Fig. 2, Including shell, shell is rectangular transparent shell, and shell includes fixed substrate, and the surrounding head and the tail of substrate are connected with four pieces of risers. Gas circuit is installed on substrate, gas circuit includes gas outlet and air inlet, in use, air inlet is connect with air source, gas outlet and brill Hole gas inrush initial velocity analyzer connection.Flowmeter is serially connected in gas circuit, the flow in the present embodiment is calculated as glass rotors stream Gauge 6, certainly, glass rotameter 6 can also be replaced by other kinds of flowmeter in other embodiments, glass rotors Flowmeter 6 includes being vertically arranged tapered glass tube, is provided with dial 8 on the outside of glass tube, tapered glass tube is provided with air admission hole And venthole, air admission hole are located at the lower end of glass tube, venthole is located at the upper end of glass tube, have in glass tube can be in pipe on The float of lower movement also has the regulating valve 7 for adjusting air inflow, the adjusting in the present embodiment on glass rotameter 6 Valve 7 adjusts air inflow by way of screwing, and regulating valve 7 is located at one end of glass tube setting air admission hole, and regulating valve 7 adjusts During air inflow, the float in glass rotameter 6 moves up and down and corresponds to different scale values.Glass rotameter 6 air admission hole is connected with connecting tube 5, and venthole is connected with the escape pipe 9 for being connect with drilling gas initial velocity analyzer, goes out It is gas outlet that tracheae 9, which deviates from the one end being connect with glass rotameter 6,.Connecting tube 5 and escape pipe 9 are rubber tube, are used On the one hand rubber tube helps to connect with the venthole of glass rotameter 6 and air admission hole, another aspect rubber tube is bent Help to enhance the convenience of the utility model in use.The connecting tube 5 being connect with glass rotameter 6 it is another End is connected with pressure reducing valve 2, and pressure reducing valve 2 can reduce admission pressure to play protective glass spinner flowmeter 6 and drilling watt This gushes out the effect of initial velocity analyzer.In order to intuitive, quantitative adjusting admission pressure, the rear end of pressure reducing valve 2 is connected with Pressure gauge 3, pressure gauge 3 can intuitively show the admission pressure occurrence after the adjusting of pressure reducing valve 2.
The drilling gas of the utility model gushes out initial velocity analyzer calibrating installation in use, by the air inlet of air inlet pipe 1 It is connect with air source, gas outlet and the drilling gas of escape pipe 9 are gushed out initial velocity analyzer and connect, and adjusting pressure reducing valve 2 reduces air inlet Pressure is to setting value, and gas flows through glass rotameter 6 and generates corresponding discharge reading, and then gas flows through drilling gas and gushes The flowmeter gone out in initial velocity analyzer generates corresponding readings.If the accredited drilling of the identical explanation of the reading of two flowmeters Gas inrush initial velocity analyzer does not have error;Illustrate that accredited drilling gas gushes if the reading of two flowmeters is different Going out initial velocity analyzer, there are errors.When accredited drilling gas gushes out initial velocity analyzer there are when error, glass is adjusted Regulating valve 7 on spinner flowmeter 6 adjusts air inflow to other values, and drilling gas gushes out the production of the flowmeter in initial velocity analyzer Raw corresponding numerical value goes out drilling gas of problems according to the mathematic interpolation between corresponding numerical value and gushes out initial velocity analyzer Error amount, to can still be bored with Accurate Determining in the case that initial velocity analyzer is calibrated not gushing out to problem drilling gas Hole gas inrush initial velocity.
The drilling gas of the utility model gushes out the specific embodiment three of initial velocity analyzer calibrating installation, as shown in figure 3, It is in place of the difference of embodiment one, the pressure reducing valve 10, pressure gauge 11 in the present embodiment and 12 split settings of filter device.Gas Pressure reducing valve 10, pressure gauge 11 and filter device 12 have been sequentially connected in series between the air inlet and gas outlet on road.Certainly, in other implementations In example, filter device 12 can also be connected between pressure reducing valve 10 and pressure gauge 11.Other are identical as embodiment one, no longer superfluous It states.

Claims (7)

1. a kind of drilling gas gushes out initial velocity analyzer calibrating installation, it is characterised in that:Including gas circuit, the gas circuit, which is equipped with, to be used In the air inlet being connect with air source and for gushing out the gas outlet that initial velocity analyzer is connect with drilling gas, air inlet with go out It is connected with pressure reducing valve and flowmeter in turn in gas circuit between gas port.
2. drilling gas according to claim 1 gushes out initial velocity analyzer calibrating installation, it is characterised in that:The flow Meter is equipped with the regulating valve for going out throughput for adjusting flowmeter.
3. drilling gas according to claim 1 or 2 gushes out initial velocity analyzer calibrating installation, it is characterised in that:It is described The pressure gauge for showing gas pressure in gas circuit is connected in gas circuit between pressure reducing valve and flowmeter.
4. drilling gas according to claim 3 gushes out initial velocity analyzer calibrating installation, it is characterised in that:The decompression The filter device for filtering impurities in gas in gas circuit is connected in gas circuit between valve and pressure gauge.
5. drilling gas according to claim 4 gushes out initial velocity analyzer calibrating installation, it is characterised in that:The decompression Valve, pressure gauge and filter device are wholely set.
6. drilling gas according to claim 5 gushes out initial velocity analyzer calibrating installation, it is characterised in that:The drilling Gas inrush initial velocity analyzer calibrating installation includes fixed substrate, and the flowmeter, pressure reducing valve, pressure gauge and filter device are equal In fixed substrate.
7. drilling gas according to claim 1 or 2 gushes out initial velocity analyzer calibrating installation, it is characterised in that:It is described Flow is calculated as glass rotameter.
CN201820371117.4U 2018-03-19 2018-03-19 A kind of drilling gas gushes out initial velocity analyzer calibrating installation Expired - Fee Related CN208073460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820371117.4U CN208073460U (en) 2018-03-19 2018-03-19 A kind of drilling gas gushes out initial velocity analyzer calibrating installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820371117.4U CN208073460U (en) 2018-03-19 2018-03-19 A kind of drilling gas gushes out initial velocity analyzer calibrating installation

Publications (1)

Publication Number Publication Date
CN208073460U true CN208073460U (en) 2018-11-09

Family

ID=64046497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820371117.4U Expired - Fee Related CN208073460U (en) 2018-03-19 2018-03-19 A kind of drilling gas gushes out initial velocity analyzer calibrating installation

Country Status (1)

Country Link
CN (1) CN208073460U (en)

Similar Documents

Publication Publication Date Title
EP3289319B1 (en) Multiphase flow meters and related methods
CN201476821U (en) Double-channel pore plate gas flow rate measuring device with bypass bridge path
CN101825514A (en) Flow-type leakage detection method and device thereof
CN105735967B (en) Method for measuring initial velocity of gas emission in drill hole
CN203941133U (en) Ammonia content on-line monitoring system in a kind of boiler water of electric power plant
CN202002684U (en) Metering device with wide measuring range
CN204575145U (en) Improved vane formula precession spiral flowmeter
CN104234691B (en) On-line multiphase flowmeter during a kind of high-precision real for oil field
CN208073460U (en) A kind of drilling gas gushes out initial velocity analyzer calibrating installation
CN203224283U (en) Liquid flow field calibration device
CN201007666Y (en) Mine slurry continuously autoweighing device
CN102749111A (en) Wet gas flow measuring method and device
CN202748069U (en) Moisture flow measuring device
CN108240948A (en) The double pressure vibration tubular type drilling fluid density on-line measurement instrument of thermostatic type and measuring method
CN206470284U (en) The measurement apparatus of gas in pipelines flow velocity
CN205680008U (en) A kind of strongly corrosion liquid flow control system
CN201420546Y (en) Full-automatic differential pressure weighing type oil-gas metering device
CN209027599U (en) A kind of redundant flow measuring device
KR101370524B1 (en) Fpso
CN110130877A (en) A kind of soft projecting coal bed extraction borehole collapse hole position measurement method
US11815524B2 (en) Volume fraction meter for multiphase fluid flow
CN219715441U (en) Coal drill bits gas desorption sensitive index critical value tester
CN210071076U (en) Novel small-flow liquid calibration system
CN109577923A (en) It is a kind of for measure coal-bed gas exploitation test when reverse irrigation amount device
CN214836211U (en) Drilling fluid overflow early warning monitoring system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109

Termination date: 20200319

CF01 Termination of patent right due to non-payment of annual fee