CN208044036U - A kind of electric automobile power battery component testing equipment - Google Patents

A kind of electric automobile power battery component testing equipment Download PDF

Info

Publication number
CN208044036U
CN208044036U CN201820480126.7U CN201820480126U CN208044036U CN 208044036 U CN208044036 U CN 208044036U CN 201820480126 U CN201820480126 U CN 201820480126U CN 208044036 U CN208044036 U CN 208044036U
Authority
CN
China
Prior art keywords
test
power battery
motorized pulleys
platform
battery assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820480126.7U
Other languages
Chinese (zh)
Inventor
汪滨
项诚
徐岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yika New Energy Automobile Co Ltd
Original Assignee
Zhejiang Yika New Energy Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yika New Energy Automobile Co Ltd filed Critical Zhejiang Yika New Energy Automobile Co Ltd
Priority to CN201820480126.7U priority Critical patent/CN208044036U/en
Application granted granted Critical
Publication of CN208044036U publication Critical patent/CN208044036U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Secondary Cells (AREA)

Abstract

The utility model is related to a kind of electric automobile power battery component testing equipments, including rack-mounted test platform, test platform is equipped with multiple spaced motorized pulleys and forms test section, two of which motorized pulleys are located at entrance and the exit of test section, entrance is equipped with first position inductor, a second position inductor that test position is reached for detecting power battery assembly is additionally provided in test section, test platform on the right side of test section is equipped with passage cylinder, test connector towards test section is installed in passage cylinder, the test harness being connected on test connector is connected with battery test system.The utility model drives power battery assembly to be measured to move ahead by motorized pulleys, position of the power battery assembly to be measured in test section is detected by position sensor, the plug of test connector is completed by passage cylinder, without manual hand manipulation, both time saving and energy saving, safety is improved again, greatly improves working efficiency.

Description

A kind of electric automobile power battery component testing equipment
Technical field
The utility model is related to a kind of electrokinetic cell equipment more particularly to a kind of electric automobile power battery component to survey Try equipment.
Background technology
Along with worldwide energy shortages and environmental requirement, the electric vehicle of environmental protection and energy saving has become automobile industry Developing direction, the power source of electric vehicle is exactly the power battery assembly formed after being connected by multisection lithium battery connection in series-parallel.It is dynamic After the completion of the assembly of power battery component, need to test its relevant parameter, performance using battery test system, to ensure that it goes out Factory's quality.Currently, when test, the insertion and extraction of the connector of battery test system and power battery assembly docking are all by people Work manual operation is completed, and there are security risks, and power battery assembly volume is larger, heavier-weight, at present complete manually hand Dynamic operation moves test position to or moves away from test position, very time-consuming and laborious, influences working efficiency.
Invention content
The utility model mainly solve original test to power battery assembly need manual hand manipulation realize move and The plug of connector, it is not only time-consuming and laborious, but also there is technical issues that;A kind of electric automobile power battery component is provided Test equipment, by equipment control be automatically performed power battery assembly move and the plug of connector, it is not only time saving and energy saving, but also Safety is improved, working efficiency is greatly improved.
The above-mentioned technical problem of the utility model is mainly to be addressed by following technical proposals:The utility model Electric automobile power battery component testing equipment, including rack, the test platform that is located in rack and cover on test platform Cover body, test platform are equipped with multiple spaced motorized pulleys, form test section, and two of which motorized pulleys are located at The entrance of test platform and exit, there are one the test connectors of activity installation, test connector to be located on test platform The right side of test section, the test platform on the right side of test section are equipped with passage cylinder, and passage cylinder and test connector are connected, connection Test harness on test connector is connected with battery test system, and the entrance of test platform incudes equipped with first position Device is additionally provided with a second position inductor that test position is reached for detecting power battery assembly on test platform.It is electronic Roller is rotated by motor, and power battery assembly to be measured is driven to enter test section from the entrance of test platform, when waiting for When surveying power battery assembly arrival test position, motorized pulleys stop operating, and passage cylinder acts at this time, and test connector is pushed away To power battery assembly to be measured, and test connector is made to be plugged with the connector in power battery assembly to be measured and p-wire The battery test system of Shu Xianglian can start to test power battery assembly to be measured.It is completed, passage cylinder Counteragent, extracts test connector, and motorized pulleys rotation drives the power battery assembly being completed going out from test platform Test section is left at mouthful.Next power battery assembly to be measured enters back into test section and is tested.Motorized pulleys had both played driving The effect of power battery assembly Forward to be measured, and play the role of reducing frictional force, so that battery is moved ahead more smooth.The utility model By equipment control be automatically performed power battery assembly move and the plug of connector, be not necessarily to manual hand manipulation, it is both time saving It is laborsaving, and safety is improved, greatly improve working efficiency.
Preferably, the test platform is equipped with the first stop cylinder and the second stop cylinder, the first stop cylinder Between the motorized pulleys and motorized pulleys adjacent thereto of entrance, the second stop cylinder is located at the motorized pulleys in exit Between motorized pulleys adjacent thereto.For stopping, subsequently power battery assembly to be measured enters test section to first stop cylinder, Second stop cylinder limits the power battery assembly to be measured for entering test section in test position.When first position inductor detects When to power battery assembly to be measured completely into test section, then the first stop cylinder acts, and rises from upwards, and blocking comes subsequent Other power battery assemblys to be measured go successively to test section;When the second position, inductor detects power battery assembly to be measured, Showing that power battery assembly to be measured arrived test position, then motorized pulleys stop operating, while the second stop cylinder acts, to Upper emersion stops power battery assembly to be measured and moves ahead, limited in test position.So that test connector will not shift, Ensure the connector tested in connector and power battery assembly to be measured and can correctly align, reliable grafting.
Preferably, the test platform of the test section is equipped with the guide pad being symmetrical set, guide pad difference Positioned at the left and right side of test platform entrance, the opposite face of two guide pads is a guiding surface, and guide pad is located at described Motorized pulleys top.Guide pad is to be ready playing guiding role into the power battery assembly to be measured of test section, it is ensured that waits for Surveying power battery assembly will not shift, and can enter in test section along the tandem direction of test section.
Preferably, the left side of the test section, right side are respectively provided with row's directive wheel, directive wheel is located at described electronic The top of roller.The setting of directive wheel, both plays position-limiting action, it is ensured that the preceding line direction of power battery assembly to be measured, and play The effect for reducing frictional force makes battery move ahead more smooth.
Preferably, it is connected with tank chain on the test connector, the test harness being connected on test connector It is threaded through in tank chain.With the plug of test connector, test harness needs to stretch or shrink repeatedly, is easily damaged or breaks It splits.Tank chain plays a protective role to p-wire beam, and the stress of plug is undertaken by tank chain, and test harness is made to be hardly damaged or break It splits, improves reliability.
Preferably, the test platform is equipped with code reader, the installation position of code reader and power battery pack to be measured Bar code installation position on part is corresponding.By code reader, the model, parameter and requirement of power battery assembly to be measured can be read The information such as the performance reached.When power battery assembly to be measured reach test position when, code reader just with power battery pack to be measured Bar code installation position on part is corresponding, and the relevant parameter letter that power battery assembly to be measured should reach is obtained after code reader barcode scanning The actual parameter information for the power battery assembly to be measured that breath and battery test system obtain after tested is compared, to judge Whether qualified go out power battery assembly to be measured.
The utility model has the beneficial effects that:It drives power battery assembly to be measured to move ahead by motorized pulleys, is felt by position It answers device to detect position of the power battery assembly to be measured in test section, is realized to power battery to be measured one by one by stop cylinder Component is tested successively, and the power battery assembly to be measured in test section is properly positioned at test position, passes through passage Cylinder completes the plug of test connector.The utility model by it is a series of control be automatically performed power battery assembly move and The plug of connector is tested, it is not only time saving and energy saving, but also safety is improved, greatly improve working efficiency.
Description of the drawings
Fig. 1 is a kind of dimensional structure diagram of the utility model.
Fig. 2 is that the utility model opens a kind of overlooking structure diagram after the cover.
Fig. 3 is a kind of dimensional structure diagram of the utility model test platform part.
1. rack in figure, 2. test platforms, 3. cover bodies, 4. roller mounting plates, 5. motorized pulleys, 6. entrances, 7. outlets Place, 8. guide pads, 9. directive wheels, 10. first position inductors, 11. second position inductors, 12. first stop cylinders, 13. Second stop cylinder, 14. test connectors, 15. passage cylinders, 16. tank chains, 17. code readers.
Specific implementation mode
Below with reference to the embodiments and with reference to the accompanying drawing the technical solutions of the present invention will be further described.
Embodiment:A kind of electric automobile power battery component testing equipment of the present embodiment, as shown in Figure 1, including rack 1, rack-mounted test platform 2 and the cover body 3 on test platform is covered on, bottom of the frame is equipped with multiple adjustable height Lifting support leg.Two roller mounting plates 4 are installed, as shown in Figure 2 and Figure 3, between two roller mounting plates on test platform It is equipped with seven to be arranged in a row and parallel to each other, spaced motorized pulleys 5, forms test section, two of which motorized pulleys It is located at entrance 6 and the exit 7 of test section.Respectively there are one guide pads 8 and one for installation for the upper surface of two roller mounting plates Arrange directive wheel 9.Between the first motorized pulleys and the second motorized pulleys, two guide pads are symmetrical set guide pad, and two The opposite face of a guide pad is a guiding surface.Directive wheel two is one group, removes the first, second motorized pulleys, remaining is adjacent Respectively there is one group of directive wheel between motorized pulleys.The entrance of test section is equipped with first position inductor 10, is gone back on test platform Installation there are one second position inductor 11, second position inductor positioned at the five, the 6th motorized pulleys between and with it is the 6th electric Dynamic roller is adjacent.The first stop cylinder 12 and the second stop cylinder 13 are also equipped on test platform, the first stop cylinder is located at Between first, second motorized pulleys, the second stop cylinder is between the six, the 7th motorized pulleys.Have one on the right side of test section The test connector 14 of a activity installation, there are two passage cylinder 15, two passage for installation on the test platform on the right side of test section The piston of cylinder is connected with left side, the right side of test connector respectively, tests on connector and is connected with tank chain 16, is connected to survey The test harness tried on plug-in unit is threaded through in tank chain, and test harness is connected with battery test system.Test connector is located at The rear portion of test section, in the present embodiment, test connector is between the five, the 6th motorized pulleys.It installs in the left side of test section There are one code reader 17, in the present embodiment, code reader is positioned at the five, the 6th motorized pulleys between, and tests the installation of connector Position is corresponding.
The course of work:Power battery assembly to be measured is transported to this equipment by conveyer belt, and motorized pulleys are under the driving of motor Rotation, drives power battery assembly to be measured to enter test section from the entrance of test section, inductor, which detects, when first position waits for When surveying power battery assembly completely into test section, then the first stop cylinder acts, and rises from upwards, and blocking comes subsequent other Power battery assembly to be measured goes successively to test section, when the second position, inductor detects power battery assembly to be measured, shows Power battery assembly to be measured arrived test position, then motorized pulleys stop operating, while the second stop cylinder acts, and ramps up Go out, stops power battery assembly to be measured and move ahead, limited in test position;At this point, code reader just with power electric to be measured Bar code installation position on the component of pond is corresponding, and the related ginseng that power battery assembly to be measured should reach is obtained after code reader barcode scanning Number information, while passage cylinder act, will test connector push power battery assembly to be measured to, and make test connector with it is to be measured Connector in power battery assembly plugs, and grafting finishes, and battery test system starts to carry out power battery assembly to be measured Test;By the power electric to be measured by testing the actual parameter information of the power battery assembly to be measured obtained and being obtained by barcode scanning The relevant parameter information that pond component should reach is compared, to judge whether power battery assembly to be measured is qualified.Test It finishing, passage cylinder counteragent, extracts test connector, the first, second stop cylinder, which declines, retracts, motorized pulleys rotation, It drives the power battery assembly being completed to leave test section from the exit of test platform, comes the power electric to be measured of entrance Pond component enters test section, completes performance test to power battery assembly to be measured one by one successively.
The utility model is automatically performed the plug for moving and testing connector of power battery assembly by a series of controls, Not only time saving and energy saving, but also safety is improved, greatly improve working efficiency.When equipment normal operation can 24 hours incessantly into action The test job of power battery component.

Claims (6)

1. a kind of electric automobile power battery component testing equipment, it is characterised in that flat including rack, the test being located in rack Platform is equipped with multiple spaced motorized pulleys with the cover body on test platform, test platform is covered on, and forms test section, wherein Two motorized pulleys are located at entrance and the exit of test platform, and the test installed there are one activity on test platform connects Plug-in unit, test connector are located at the right side of test section, and the test platform on the right side of test section is equipped with passage cylinder, passage cylinder with It tests connector to be connected, the test harness being connected on test connector is connected with battery test system, the import of test platform Place is equipped with first position inductor, be additionally provided on test platform one reach test position for detecting power battery assembly the Two position sensors.
2. a kind of electric automobile power battery component testing equipment according to claim 1, it is characterised in that the survey It tries platform and is equipped with the first stop cylinder and the second stop cylinder, the first stop cylinder is located at the motorized pulleys and therewith of entrance Between adjacent motorized pulleys, the second stop cylinder is located between the motorized pulleys and motorized pulleys adjacent thereto in exit.
3. a kind of electric automobile power battery component testing equipment according to claim 1, it is characterised in that the survey The test platform in examination area is equipped with the guide pad that is symmetrical set, guide pad be located at test platform entrance left side and The opposite face on right side, two guide pads is a guiding surface, and guide pad is located at the top of the motorized pulleys.
4. a kind of electric automobile power battery component testing equipment according to claim 3, it is characterised in that the survey Left side, the right side in examination area are respectively provided with row's directive wheel, and directive wheel is located at the top of the motorized pulleys.
5. a kind of electric automobile power battery component testing equipment according to claim 1, it is characterised in that the survey It tries and is connected with tank chain on plug-in unit, the test harness being connected on test connector is threaded through in tank chain.
6. a kind of electric automobile power battery component testing equipment according to claims 1 or 2 or 5, it is characterised in that institute The test platform stated is equipped with code reader, the bar code installation position phase on the installation position of code reader and power battery assembly to be measured It is corresponding.
CN201820480126.7U 2018-03-30 2018-03-30 A kind of electric automobile power battery component testing equipment Expired - Fee Related CN208044036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820480126.7U CN208044036U (en) 2018-03-30 2018-03-30 A kind of electric automobile power battery component testing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820480126.7U CN208044036U (en) 2018-03-30 2018-03-30 A kind of electric automobile power battery component testing equipment

Publications (1)

Publication Number Publication Date
CN208044036U true CN208044036U (en) 2018-11-02

Family

ID=63943433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820480126.7U Expired - Fee Related CN208044036U (en) 2018-03-30 2018-03-30 A kind of electric automobile power battery component testing equipment

Country Status (1)

Country Link
CN (1) CN208044036U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118939A (en) * 2019-02-14 2019-08-13 株洲福德轨道交通研究院有限公司 EOL test equipment
CN110333458A (en) * 2018-03-30 2019-10-15 浙江伊卡新能源汽车有限公司 Electric automobile power battery component testing equipment and its control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110333458A (en) * 2018-03-30 2019-10-15 浙江伊卡新能源汽车有限公司 Electric automobile power battery component testing equipment and its control method
CN110118939A (en) * 2019-02-14 2019-08-13 株洲福德轨道交通研究院有限公司 EOL test equipment

Similar Documents

Publication Publication Date Title
CN208044036U (en) A kind of electric automobile power battery component testing equipment
CN105108740B (en) A kind of portable handling wheel robot
CN207020281U (en) A kind of functional test equipment
CN105196022B (en) A kind of waterproof blind plugging automatic insert equipment
KR970070381A (en) Car parking lot
KR20170030014A (en) An assembly line for testing motor driving
CN114814552B (en) Full-automatic detection device for temperature and humidity sensor double-layer circuit board
CN108972610A (en) Mechanical arm clamping jaw and manipulator
CN205464825U (en) Charger automatic testing and radium carving production line
CN116256240A (en) Precast slab on-line measuring device
CN206193206U (en) Battery package and discharge test system
CN106223683B (en) With aligning structure without anti-collision multi-layer parking device and stop pick-up method
CN209757063U (en) Fixed electricity changing platform structure
CN219978424U (en) Online detection equipment for data line connector
CN211385867U (en) Production system
CN110333458A (en) Electric automobile power battery component testing equipment and its control method
CN117007874A (en) Online detection equipment for data line connector
CN207847191U (en) Three-dimensional bicycle garage
CN110899142A (en) Production system
CN115870617A (en) Laser welding production line and method
CN112643644B (en) Material taking method of engineering robot
CN114799865A (en) Automatic production line and implementation method of LED module
CN214225285U (en) Elevator module test structure
CN210080121U (en) High-efficient chip visual detection equipment
CN212093019U (en) Terminal box plastic equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102