CN208037876U - A kind of architectural engineering hanging device - Google Patents

A kind of architectural engineering hanging device Download PDF

Info

Publication number
CN208037876U
CN208037876U CN201820466213.7U CN201820466213U CN208037876U CN 208037876 U CN208037876 U CN 208037876U CN 201820466213 U CN201820466213 U CN 201820466213U CN 208037876 U CN208037876 U CN 208037876U
Authority
CN
China
Prior art keywords
pedestal
architectural engineering
safety rope
hanging device
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820466213.7U
Other languages
Chinese (zh)
Inventor
苏少民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820466213.7U priority Critical patent/CN208037876U/en
Application granted granted Critical
Publication of CN208037876U publication Critical patent/CN208037876U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is related to construction engineering technical fields, and disclose a kind of architectural engineering hanging device, including pedestal, open up fluted at the top of the pedestal, and the inner wall bottom of the groove is installed with support column.The architectural engineering hanging device, pass through pedestal, groove, support column, first idler wheel, motor, rotor plate, pedestal, the first sliding groove, second sliding slot, column, cross bar, compression bar, second idler wheel, supporting beam, hanging beam, first supporting block, servo motor, coiling block, safety rope, safe becket bridle, connector, hook is used cooperatively with pulley, the positive and negative operating of servo motor, drive coiling block positive and negative rotation, the safety rope being wrapped on coiling block is set to realize folding and unfolding process, to which the weight being suspended on hook is maneuvered into eminence, motor rotation band movable plate rotates, to make pedestal rotate, make whole device that there is rotation hoisting function, this architectural engineering hoisting equipment structure is simple, repair easy to disassemble.

Description

A kind of architectural engineering hanging device
Technical field
The utility model is related to construction engineering technical field, specially a kind of architectural engineering hanging device.
Background technology
Architectural engineering refers to through construction to all kinds of building constructions and its affiliated facility and the circuit mating with it, pipeline Be formed by engineering entity with the installation activity of equipment, wherein " building construction " refer to have head cover, beam column, wall, can be formed in Portion space meets people's production, lives, the engineering of study and public activity needs, in word engineering construction, often applies to lifting and set Standby, hanging device can transfer weight toward eminence, be a kind of being widely used in the place such as harbour, workshop, electric power and building site Crane conveyor tool, this title of crane are the unified titles of hoisting machinery, are usually main or truck crane, the crawler crane of crane And tyre crane, crane be useful in that hanging device, speedily carry out rescue work, lifting, machinery and rescue.
Hanging device utilizes rotating mechanism, drives safety rope and the hook of its connection that weight is maneuvered into eminence, saves labor Power and reduction manual labor amount realize lifting operation, at present tradition hanging device by the folding and unfolding of safety rope, substantially can be completely Sufficient lifting operation, but structure is more complex, it has not been convenient to the detachable maintaining of equipment, so propose that a kind of technical solution is above-mentioned to solve The problem of proposition.
Utility model content
(One)The technical issues of solution
In view of the deficiencies of the prior art, the utility model provides a kind of architectural engineering hanging device, has structure letter The advantages that single repair easy to disassemble, solves the problems, such as the complicated inconvenient detachable maintaining of traditional hoisting equipment structure.
(Two)Technical solution
To realize that the purpose of above structure repair simply easy to disassemble, the utility model provide the following technical solutions:It is a kind of Architectural engineering hanging device, including pedestal, open up at the top of the pedestal fluted, and peace is fixed in the inner wall bottom of the groove Equipped with support column, the top movable of the support column is connected with the first idler wheel, and the inner wall bottom of the groove is installed with electricity The output shaft of machine, the motor is installed with rotor plate, and pedestal is installed at the top of the rotor plate, the pedestal Bottom offers the first sliding groove, opens up second sliding slot at the top of the pedestal, column is installed at the top of the pedestal, described Cross bar is installed on the right side of column, the bottom of the cross bar is plugged with compression bar, and the bottom of the compression bar is connected with Second wheel is installed with supporting beam at the top of the pedestal, hanging beam, the hanging beam is installed on the right side of the supporting beam Top be installed with pulley, the first supporting block, the top of first supporting block are installed on the left of the supporting beam Portion is installed with servo motor, and the output shaft of the servo motor is installed with coiling block, the surface of the coiling block around It is connected to safety rope, the one end of the safety rope far from coiling block is provided with safe becket bridle, and the inner wall of the safe becket bridle fixes peace Equipped with connector, the bottom of the connector is installed with hook, and the surface of the safe becket bridle is socketed with casing, the set The left and right sides of pipe is plugged with clamping screw, and the inside of the clamping screw is installed with check plate, the hanging beam Right side is installed with connecting rod, and outer catheter is plugged at the top of the connecting rod, and the inner wall of the outer catheter is connected with Inner catheter.
Preferably, the quantity of the support column is eight, and the rounded inner wall bottom for being distributed in groove.
Preferably, the first sliding groove and second sliding slot are annular groove, the surface of first idler wheel and the first sliding groove Inner wall contact, the surface of second idler wheel is contacted with the inner wall of second sliding slot.
Preferably, the safety rope is the steel wire rope of one centimetre of diameter, and the length of the safety rope is not less than five meters.
Preferably, the quantity of the clamping screw is four, and symmetrical as line of symmetry using the vertical centerline of casing.
Preferably, the first strengthening rib strip, the branch are installed between the top of the pedestal and the left side of supporting beam It is installed with the second supporting block on the right side of support beam, second is installed between the top and hanging beam of second supporting block and is added Strengthening tendons item.
Preferably, the inside of the hook and the inside of check plate are installed with stop rib, the connector Top is installed with push plate, and the push plate is L-shaped, and cable-through hole is offered at the top of the push plate.
(Three)Advantageous effect
Compared with prior art, the utility model provides a kind of architectural engineering hanging device, has following beneficial to effect Fruit:
1, the architectural engineering hanging device passes through pedestal, groove, support column, the first idler wheel, motor, rotor plate, base Seat, the first sliding groove, second sliding slot, column, cross bar, compression bar, the second idler wheel, supporting beam, hanging beam, the first supporting block, servo motor, Coiling block, safety rope, safe becket bridle, connector, hook and pulley are used cooperatively, and the positive and negative operating of servo motor drives coiling Block positive and negative rotation makes the safety rope being wrapped on coiling block realize folding and unfolding process, to be suspended on the weight allocation and transportation on hook To eminence, motor rotation band movable plate rotates, and to make pedestal rotate, whole device is made to have rotation hoisting function, this building work Journey hoisting equipment structure is simple, repair easy to disassemble, and disclosure satisfy that lifting operation in most cases.
2, the architectural engineering hanging device, by safe becket bridle, connector, hook, casing, clamping screw, check plate, Connecting rod, outer catheter, inner catheter, pulley, the second supporting block and push plate are used cooperatively, and safety rope passes through outer catheter and interior leads Pipe, during lifting, outer catheter and inner catheter can limit the shaking range of safety rope, and limitation safety rope is smaller It is shaken in range, improves whole equipment safety, the safe becket bridle in junction of safety rope and connector uses clamping screw The mode further reinforced to it with check plate, prevents safety rope from falling off, and causes unexpected safety accident.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model stop plate structure schematic diagram;
Fig. 3 is the utility model coiling block structure schematic diagram.
In figure:1 pedestal, 2 grooves, 3 support columns, 4 first idler wheels, 5 motors, 6 rotor plates, 7 pedestals, 8 the first sliding grooves, 9 Two sliding slots, 10 columns, 11 cross bars, 12 compression bars, 13 second idler wheels, 14 supporting beams, 15 hanging beams, 16 first supporting blocks, 17 servos electricity Machine, 18 coiling blocks, 19 safety ropes, 20 safe becket bridles, 21 connectors, 22 hooks, 23 casings, 24 clamping screws, 25 check plates, 26 Connecting rod, 27 outer catheters, 28 inner catheters, 29 pulleys, 30 second supporting blocks, 31 push plates.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, a kind of architectural engineering hanging device, including pedestal 1, the top of pedestal 1 open up fluted 2, The inner wall bottom of groove 2 is installed with support column 3, and the top movable of support column 3 is connected with the first idler wheel 4, the inner wall of groove 2 Bottom is installed with motor 5, and the output shaft of motor 5 is installed with rotor plate 6, and the top of rotor plate 6 is installed with base Seat 7, the bottom of pedestal 7 offer the first sliding groove 8, and 7 top of pedestal opens up second sliding slot 9, and the top of pedestal 7 is installed with vertical The right side of column 10, column 10 is installed with cross bar 11, and the bottom of cross bar 11 is plugged with compression bar 12, and the bottom activity of compression bar 12 connects It is connected to the second idler wheel 13, the top of pedestal 7 is installed with supporting beam 14, and the right side of supporting beam 14 is installed with hanging beam 15, The top of hanging beam 15 is installed with pulley 29, and the left side of supporting beam 14 is installed with the first supporting block 16, the first supporting block 16 top is installed with servo motor 17, and the output shaft of servo motor 17 is installed with coiling block 18, coiling block 18 Surface is wrapped with safety rope 19, and the quantity of support column 3 is eight, and the rounded inner wall bottom for being distributed in groove 2, the first sliding groove 8 and second sliding slot 9 be annular groove, the surface of the first idler wheel 4 is contacted with the inner wall of the first sliding groove 8, the surface of the second idler wheel 13 It being contacted with the inner wall of second sliding slot 9, safety rope 19 is the steel wire rope of one centimetre of diameter, and the length of safety rope 19 is not less than five meters, The surface of safety rope 19 is contacted with the top of pulley 29, and is installed between the top and the left side of supporting beam 14 of pedestal 7 One strengthening rib strip, the right side of supporting beam 14 are installed with the second supporting block 30, the top and hanging beam 15 of the second supporting block 30 it Between be installed with the second strengthening rib strip, pass through pedestal 1, groove 2, support column 3, the first idler wheel 4, motor 5, rotor plate 6, pedestal 7, the first sliding groove 8, second sliding slot 9, column 10, cross bar 11, compression bar 12, the second idler wheel 13, supporting beam 14, hanging beam 15, first The cooperation of bracer 16, servo motor 17, coiling block 18, safety rope 19, safe becket bridle 20, connector 21, hook 22 and pulley 29 It uses, 17 positive and negative operating of servo motor, drives 18 positive and negative rotation of coiling block, the safety rope being wrapped on coiling block 18 19 is made to realize Folding and unfolding process, to which the weight being suspended on hook 22 is maneuvered into eminence, the rotation band movable plate turn 6 of motor 5 is dynamic, to make pedestal 7 rotations make whole device have rotation hoisting function, this architectural engineering hoisting equipment structure is simple, repair easy to disassemble, and It disclosure satisfy that lifting operation in most cases, the brand and model of motor 5 is XD ZYC-110/11, the product of servo motor 17 Board model LCMT38M02130M15025, the first strengthening rib strip and the second strengthening rib strip keep whole equipment more stable, the first rolling While wheel 4 and the second idler wheel 13 are played a supporting role, also makes the rotation of pedestal 7 more smooth, be convenient for lifting operation, safety rope 19 one end far from coiling block 18 are provided with safe becket bridle 20, and the inner wall of safe becket bridle 20 is installed with connector 21, connection First 21 bottom is installed with hook 22, and the surface of safe becket bridle 20 is socketed with casing 23, and the left and right sides of casing 23 is inserted It is connected to clamping screw 24, the inside of clamping screw 24 is installed with check plate 25, and the right side of hanging beam 15 is installed with company The top of extension bar 26, connecting rod 26 is plugged with outer catheter 27, and the inner wall of outer catheter 27 is connected with inner catheter 28, clamping screw 24 quantity is four, and symmetrical as line of symmetry using the vertical centerline of casing 23, links up with 22 inside and check plate 25 Inside be installed with stop rib, the top of connector 21 is installed with push plate 31, and push plate 31 is L-shaped, push plate 31 Top offer cable-through hole, by safe becket bridle 20, connector 21, hook 22, casing 23, clamping screw 24, check plate 25, Connecting rod 26, outer catheter 27, inner catheter 28, pulley 29, the second supporting block 30 and push plate 31 are used cooperatively, and safety rope 19 passes through Outer catheter 27 and inner catheter 28, during lifting, the shaking that outer catheter 27 and inner catheter 28 can limit safety rope 19 is maximum Stroke, limitation safety rope 19 shake in the range of smaller, improve whole equipment safety, safety rope 19 and connector 21 The safe becket bridle in junction 20 uses the mode that clamping screw 24 and check plate 25 further reinforce it, prevents safety rope 19 de- It falls, causes unexpected safety accident, push plate 31 is pushed up upwards in 19 uplink of safety rope, by inner catheter 28, prevents from influencing safety rope 19 uplinks are locked safe becket bridle 20 by clamping screw 24 and check plate 25, and the stop rib of 25 inside of check plate makes fixation Effect is more preferable, which has very high safety and stability with hanging device.
In conclusion the architectural engineering hanging device, passes through pedestal 1, groove 2, support column 3, the first idler wheel 4, motor 5, rotor plate 6, pedestal 7, the first sliding groove 8, second sliding slot 9, column 10, cross bar 11, compression bar 12, the second idler wheel 13, supporting beam 14, Hanging beam 15, the first supporting block 16, servo motor 17, coiling block 18, safety rope 19, safe becket bridle 20, connector 21,22 and of hook Pulley 29 is used cooperatively, 17 positive and negative operating of servo motor, is driven 18 positive and negative rotation of coiling block, is made to be wrapped on coiling block 18 Safety rope 19 realizes folding and unfolding process, and to which the weight being suspended on hook 22 is maneuvered into eminence, the rotation band movable plate of motor 5 turns 6 It is dynamic, to make pedestal 7 rotate, make whole device that there is rotation hoisting function, this architectural engineering hoisting equipment structure is simple, just It in detachable maintaining, and disclosure satisfy that lifting operation in most cases, pass through safe becket bridle 20, connector 21, hook 22, set Pipe 23, clamping screw 24, check plate 25, connecting rod 26, outer catheter 27, inner catheter 28, pulley 29, the second supporting block 30 and push plate 31 are used cooperatively, and safety rope 19 passes through outer catheter 27 and inner catheter 28, and during lifting, outer catheter 27 and inner catheter 28 can To limit the shaking range of safety rope 19, limitation safety rope 19 shakes in the range of smaller, improves whole equipment peace Quan Xing, the safe becket bridle in the junction of safety rope 19 and connector 21 20 uses clamping screw 24 and check plate 25 is further to its The mode of reinforcing prevents safety rope 19 from falling off, and causes unexpected safety accident.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of architectural engineering hanging device, including pedestal(1), it is characterised in that:The pedestal(1)Top offer it is recessed Slot(2), the groove(2)Inner wall bottom be installed with support column(3), the support column(3)Top movable be connected with First idler wheel(4), the groove(2)Inner wall bottom be installed with motor(5), the motor(5)Output shaft fix peace Equipped with rotor plate(6), the rotor plate(6)Top be installed with pedestal(7), the pedestal(7)Bottom offer One sliding slot(8), the pedestal(7)Top opens up second sliding slot(9), the pedestal(7)Top be installed with column(10), The column(10)Right side be installed with cross bar(11), the cross bar(11)Bottom be plugged with compression bar(12), the pressure Bar(12)Bottom be connected with the second idler wheel(13), the pedestal(7)Top be installed with supporting beam(14), described Supporting beam(14)Right side be installed with hanging beam(15), the hanging beam(15)Top be installed with pulley(29), described Supporting beam(14)Left side be installed with the first supporting block(16), first supporting block(16)Top be installed with and watch Take motor(17), the servo motor(17)Output shaft be installed with coiling block(18), the coiling block(18)Surface It is wrapped with safety rope(19), the safety rope(19)Far from coiling block(18)One end be provided with safe becket bridle(20), the peace Full becket bridle(20)Inner wall be installed with connector(21), the connector(21)Bottom be installed with hook(22), The safe becket bridle(20)Surface be socketed with casing(23), described sleeve pipe(23)The left and right sides be plugged with clamping screw (24), the clamping screw(24)Inside be installed with check plate(25), the hanging beam(15)Right side be fixedly mounted There is connecting rod(26), the connecting rod(26)Top be plugged with outer catheter(27), the outer catheter(27)Inner wall activity connect It is connected to inner catheter(28).
2. a kind of architectural engineering hanging device according to claim 1, it is characterised in that:The support column(3)Number Amount is eight, and rounded is distributed in groove(2)Inner wall bottom.
3. a kind of architectural engineering hanging device according to claim 1, it is characterised in that:The first sliding groove(8)With Second sliding slot(9)It is annular groove, first idler wheel(4)Surface and the first sliding groove(8)Inner wall contact, it is described second rolling Wheel(13)Surface and second sliding slot(9)Inner wall contact.
4. a kind of architectural engineering hanging device according to claim 1, it is characterised in that:The safety rope(19)It is straight The steel wire rope that one centimetre of diameter, the safety rope(19)Length be not less than five meters, the safety rope(19)Surface and pulley (29)Top contact.
5. a kind of architectural engineering hanging device according to claim 1, it is characterised in that:The clamping screw(24)'s Quantity is four, and with casing(23)Vertical centerline be line of symmetry it is symmetrical.
6. a kind of architectural engineering hanging device according to claim 1, it is characterised in that:The pedestal(7)Top With supporting beam(14)Left side between be installed with the first strengthening rib strip, the supporting beam(14)Right side be installed with Two supporting blocks(30), second supporting block(30)Top and hanging beam(15)Between be installed with the second strengthening rib strip.
7. a kind of architectural engineering hanging device according to claim 1, it is characterised in that:The hook(22)Inside And check plate(25)Inside be installed with stop rib, the connector(21)Top be installed with push plate (31), the push plate(31)It is L-shaped, the push plate(31)Top offer cable-through hole.
CN201820466213.7U 2018-03-30 2018-03-30 A kind of architectural engineering hanging device Expired - Fee Related CN208037876U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820466213.7U CN208037876U (en) 2018-03-30 2018-03-30 A kind of architectural engineering hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820466213.7U CN208037876U (en) 2018-03-30 2018-03-30 A kind of architectural engineering hanging device

Publications (1)

Publication Number Publication Date
CN208037876U true CN208037876U (en) 2018-11-02

Family

ID=63947124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820466213.7U Expired - Fee Related CN208037876U (en) 2018-03-30 2018-03-30 A kind of architectural engineering hanging device

Country Status (1)

Country Link
CN (1) CN208037876U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109160438A (en) * 2018-11-06 2019-01-08 王晓龙 A kind of engineering construction erecting by overhang
CN111606224A (en) * 2020-05-26 2020-09-01 傅波 Capital construction lifting device
CN113582017A (en) * 2021-08-02 2021-11-02 安徽耕驰智能设备制造有限公司 Mounting structure for steel in assembling process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109160438A (en) * 2018-11-06 2019-01-08 王晓龙 A kind of engineering construction erecting by overhang
CN111606224A (en) * 2020-05-26 2020-09-01 傅波 Capital construction lifting device
CN113582017A (en) * 2021-08-02 2021-11-02 安徽耕驰智能设备制造有限公司 Mounting structure for steel in assembling process
CN113582017B (en) * 2021-08-02 2023-12-15 安徽耕驰智能设备制造有限公司 Mounting structure that steel used in assembly process

Similar Documents

Publication Publication Date Title
CN208037876U (en) A kind of architectural engineering hanging device
CN201217617Y (en) Mechanized charging apparatus for drilling crew
CN202226549U (en) Novel low building height steel wire rope electric block
CN207030799U (en) A kind of anti-single-beam crane waved
CN205802845U (en) A kind of civil engineering is with hanging a liter machine
CN206395761U (en) A kind of jack lift for small building
CN210480714U (en) Pipeline lifting device for construction
CN205114770U (en) Heavily loaded companion ladder of multistage automation
CN204802839U (en) Jacking equipment for building
CN201647881U (en) Rope reeling mechanism for hanging basket
CN204224093U (en) A kind of hanging basket with automatic rope rolling apparatus
CN208485534U (en) A kind of construction lifting appliance
CN213011642U (en) Novel gantry crane
CN209651776U (en) A kind of construction overhung construction
CN207700795U (en) A kind of jacking system neutral body Garage lifting platform power drive unit
CN211945979U (en) Electric single-beam crane stable in operation
CN208037897U (en) A kind of Novel hoisting driving device
CN215798318U (en) Hang whole elevating gear of basket template
CN211196426U (en) Simple trolley for hoisting
CN220845304U (en) Lifting support with double holding materials
CN204222924U (en) Bearing transport trolley
CN220412593U (en) High security steel stand hoist device
CN207002152U (en) A kind of chemical industry equipment removes and installs special framed bent
CN219821504U (en) Reinforcing bar handling device that residential building construction was used
CN208919565U (en) A kind of support leg device of engineering machinery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102