CN207997055U - Nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device - Google Patents

Nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device Download PDF

Info

Publication number
CN207997055U
CN207997055U CN201721801860.0U CN201721801860U CN207997055U CN 207997055 U CN207997055 U CN 207997055U CN 201721801860 U CN201721801860 U CN 201721801860U CN 207997055 U CN207997055 U CN 207997055U
Authority
CN
China
Prior art keywords
air bag
stainless steel
gas
argon gas
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721801860.0U
Other languages
Chinese (zh)
Inventor
赵永明
施靖峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNNC Nuclear Power Operation Management Co Ltd
Qinshan Nuclear Power Co Ltd
Original Assignee
CNNC Nuclear Power Operation Management Co Ltd
Qinshan Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNNC Nuclear Power Operation Management Co Ltd, Qinshan Nuclear Power Co Ltd filed Critical CNNC Nuclear Power Operation Management Co Ltd
Priority to CN201721801860.0U priority Critical patent/CN207997055U/en
Application granted granted Critical
Publication of CN207997055U publication Critical patent/CN207997055U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arc Welding In General (AREA)

Abstract

The purpose of this utility model is that nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device, the equipment to protect the molding effect of weld seam and the function of quality with argon arc welding backside oxide is prevented.The device is mainly made of heat resistant rubber air bag, tunger tube, steel pipe, nylon sheet, pressure gauge, clip etc., air bag 1 is temperature resistant rubber air bag, is opened there are one hole, 3 one end of tunger tube is inserted into hole, 1 hole diameter of air bag and the outer diameter of tunger tube 3 match, and are tightly fastened connected;The other end connection tracheal pressure table 6 of tunger tube 3;Air bag 1, tunger tube 3 are put into pipeline, and the air bag 1 after expansion is fitted closely with 8 inner wall of stainless steel pipes.Using the airbag apparatus, under high radiation environment, facilitate installation and taking-up, reduces personal radiation dose, low manufacture cost, and can secondary use;After onsite application, argon gas protecting effect is good, and weldquality reaches core level-one acceptance criteria.

Description

Nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas chamber Device
Technical field
The utility model is related to nuclear power plant's nuclear grade stainless steel valve pipe welding internal protection fields, and in particular to a seed nucleus Power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device.
Background technology
The primary Ioops pressure boundary critical valves of the in-service power plant of presurized water reactor, due to being repaiied for many years to the repeatedly grinding of valve Multiple, the built-up welding layer thickness of valve sealing face has had reached minimum thickness as defined in producer.It is such as continuing with, valve may be influenced Service life, need under high dose rate environment to valve carry out integral replacing.Valve pipe material is stainless steel pipes, slope Degree of lip-rounding formula is docking, using argon arc welding method, to prevent argon arc welding backside oxide, needs to establish argon gas room inside pipeline, Protect the molding effect and quality of weld seam.
Currently, the stainless steel pipes welding internal protection in China is generally built by the way of nylon baffle or the water soluble paper Argon gas room, but Shortcomings to be found, nylon baffle is such as used, installation is inconvenient, time-consuming longer, under the high radiation environment of primary Ioops, Personal radiation dose significantly improves, and after the completion of welding job, is not easily taken out, and is easy to form foreign matter.Such as use the water soluble paper, a side Face easily forms foreign matter, is on the other hand easy to influence primary Ioops water quality.To solve the above problems, devising primary Ioops valve pipe It welds argon gas and protects room relevant apparatus.
Invention content
The technology of the utility model solves the problems, such as:
The purpose of the present invention is be directed to presurized water reactor primary Ioops critical valves pipeline stainless steel argon arc welding to need to establish argon gas guarantor Room is protected, under high radioactivity environment and the requirement of anti-foreign matter, the modes such as existing nylon baffle and the water soluble paper are not suitable for work and want It asks, it is proposed that a kind of protective device of air bag argon gas room devises relevant experimental rig.
The technical solution of the utility model is:
The argon gas room is mainly surveyed by heat resistant rubber air bag, gas tube, steel pipe, nylon sheet, pressure gauge, argon bottle, contact The compositions such as Wen Yi, clip, and need to set up analogue body, consider the heat resisting temperature of the heat-resisting air bag of rubber and caused by temperature increases The protecting effect of deflection and argon gas room.By test measurement, reasonable installation distance and air bag of the air bag apart from weld bond is selected to fill Argon pressure size.
A kind of nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protection gas cell device, including:Rubber Air bag, changeover portion stainless steel tube, gas tube, external screw thread steel pipe, valve deck mouth nylon cover board, pressure gauge, valve body, stainless steel pipes, Air bag is temperature resistant rubber air bag, is opened there are one hole, gas tube one end is inserted into hole, the hole diameter and gas tube of air bag Outer diameter match, be tightly fastened connected;The other end of gas tube connects tracheal pressure table;Air bag, gas tube are put into pipeline, Air bag after expansion is fitted closely with stainless steel pipes inner wall.
There are three internal thread holes for processing on valve deck mouth nylon cover board, and internal thread hole size is consistent with external screw thread steel pipe, stainless Steel external screw thread steel pipe and valve deck mouth nylon cover board are screwed connection, and inflated rubber pipe passes through stainless steel external screw thread steel from inside Pipe, wherein two tracheaes are respectively pipeline both sides air bag applying argon gas, a tracheae is applying argon gas in argon gas room.Valve deck mouth nylon lid It is T fonts to have annular projection, end face on plate, and the outer diameter of annular projection is matched with the internal diameter of valve body port, valve deck mouth nylon lid Plate is fixedly connected with body cap mouth, and valve deck mouth nylon cover board, pipeline both sides air bag and stainless steel pipes establish closed argon gas jointly Room.Changeover portion stainless steel tube both ends are connected by clip with inflated rubber pipe.
The utility model has the beneficial effect that compared with prior art:
(1) valve deck mouth nylon cover board is processed into circle, section at T fonts, can the effective and tight-lipped close fit of valve deck, with pipe Road both sides air bag establishes closed argon gas room jointly;
(2) three internal thread holes are processed on nylon cover board, three threading steel pipes pass through three interior spiral shells of nylon cover board Line mouth, wherein two steel pipes are to pass through pipeline both sides airbag inflation pipe, a steel pipe is passing through argon gas room tracheae;Pass through Rotation threaded steel pipe can adjust the center that airbag inflation pipe is located at pipeline;
(3) air bag is inflated after being put into pipeline, keeps air bag close to insides of pipes.In the welding process, in conjunction with test data, Certain pressure value is kept by pressure gauge;
(4) stainless steel changeover portion is located at weld bond position, determines that the length of stainless steel changeover portion, both sides are used by test data Clip is connected with air bag air inlet pipe.Go deep into length by adjusting external screw thread steel pipe, it is ensured that air bag air inlet pipe is located at pipeline center Position.
(5) airbag apparatus is used, under high radiation environment, facilitates installation and taking-up, reduces personal radiation dose, together When, it is easy decontamination, it can secondary use;
(6) the device low manufacture cost, and can secondary use, have certain economic value;After onsite application, argon gas is protected Shield works well, and weldquality reaches core level-one acceptance criteria.
Description of the drawings
Fig. 1 is that the utility model nuclear power plant primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device Structure drawing of device.
Fig. 2 is that the utility model nuclear power plant primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device Nylon covering plate structure figure.
Fig. 3 is that the utility model nuclear power plant primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device Stainless steel transition section structure figure.
In figure:1. rubber pneumatic bag, 2. changeover portion stainless steel tubes, 3. gas tubes, 4. external screw thread steel pipes, 5. valve deck mouth nylon lids Plate, 6. pressure gauges, 7. valve bodies, 8. stainless steel pipes.
Specific implementation mode
In the following with reference to the drawings and specific embodiments to the utility model nuclear power plant primary Ioops nuclear grade valve stainless steel pipes argon Arc welding argon gas protection gas cell device is described in detail:
The basic thought of the present invention is by designing air bag and nylon cover board, a closed argon gas being established in insides of pipes Room passes through 1:1 analogue body test data determines the blowing pressure of air bag and places distance, determines the gas stream of argon gas room gas Amount.By simulating welded seam quality results, the implementation parameter at scene is determined.
The hot arc injection-tube check-valves two of one factory 320MW unit shutdown cooling systems of center nuclear power operational management Co., Ltd Platform swing check valve is the critical valves of primary Ioops pressure boundary.Due to being repaiied for many years to the repeatedly grinding of this two deck valves door Multiple, the built-up welding layer thickness of valve sealing face has had reached minimum thickness as defined in producer.It is such as continuing with, valve may be influenced Service life.Therefore company has replaced two deck valve doors in planned outage, and valve and main pipe pipe material are stainless steel material, Welding method is welded capping using argon arc bottoming.
The present invention is mainly made of following 3 parts:
(1) airbag apparatus
As shown in Figure 1, the air bag is temperature resistant rubber air bag, open that there are one holes on air bag 1,3 one end of gas tube is inserted into In hole, the hole diameter and the outer diameter of gas tube 3 of air bag 1 match, and are tightly fastened connected.The other end of gas tube 3 connects Tracheal pressure table 6.Air bag 1, gas tube 3 are put into pipeline, and by gas tube 3 into pipeline applying argon gas, the air bag 1 after expansion It need to be fitted closely with 8 inner wall of stainless steel pipes, and pressure size is recorded by reading tracheal pressure table 6.1:On 1 analogue body Pipeline butt is carried out, after having welded one layer, between contact type thermometric indicator, measures and becomes from weld bond to the temperature of two side ducts of weld bond Change, while recording the pressure change of air bag 1, the blowing pressure of final choice suitable mounting distance and air bag 1.In view of existing There may be gas leakage using 1 interface of air bag, therefore, are filled with the gas selection argon gas of air bag 1, i.e., with internal protection gas one It causes.
(2) valve deck mouth nylon cover board
As shown in Fig. 2, there are three internal thread hole, internal thread hole size and external screw threads for processing on the valve deck mouth nylon cover board 5 Steel pipe 4 is consistent, and stainless steel external screw thread steel pipe 4 and valve deck mouth nylon cover board 5 are screwed connection, and inflated rubber pipe 3 is worn from inside Stainless steel external screw thread steel pipe 4 is crossed, wherein two tracheaes are respectively pipeline both sides air bag applying argon gas, a tracheae is to be filled in argon gas room Argon gas.It is T fonts to have annular projection, end face on valve deck mouth nylon cover board 5, and the outer diameter of annular projection is interior with 7 port of valve body Diameter matches, and valve deck mouth nylon cover board 5 is fixedly connected with 7 lid mouth of valve body, valve deck mouth nylon cover board 5, pipeline both sides air bag 1 and not Rust steel conduit 8 establishes closed argon gas room jointly.
(3) changeover portion stainless steel tube
As shown in figure 3,2 both ends of changeover portion stainless steel tube are connected by clip and inflated rubber pipe 3.In view of installation Period airbag inflation pipe is susceptible to eccentric or even is welded close to weld bond if used tracheae due to its own gravity or installation deviation There may be the scenes for blowing tracheae in termination process, therefore, after calculating practical air bag mounting distance, are used in weld bond region One section stainless steel changeover portion.
Device process is as follows:Valve 7 is pumped into spool first, in advance by air bag 1, air bag air inlet pipe 3 and transition stainless steel The connection of pipe 2 is completed;External screw thread steel pipe 4 is screwed in into valve deck mouth nylon cover board 5, and valve deck mouth nylon cover board 5 is buckled into the lid of valve body 7 At mouthful.Air bag 1 is put into, distance is determined according to the result of simulation test, and air bag air inlet pipe 3 is passed through into threaded steel pipe, and even Pressure gauge 6 and argon bottle are connect, adjusts balloon positions in real time;To 1 applying argon gas of air bag, makes it close to insides of pipes, position is fixedly mounted It sets;Valve 7 and pipeline point solid welding are determined, by adjusting the height of threaded steel pipe, determine that air bag air inlet pipe is in pipeline center position It sets;Argon gas room tracheae 3 is passed to threaded steel pipe 4, and to applying argon gas in argon gas room, is started after argon content in gas chamber is up to standard Argon arc backing weld connects, in welding process, according to experimental data and argon pressure table, it is ensured that air bag keeps certain pressure value;It waits for After the completion of backing welding, airbag gas is bled off, removes nylon cover board 5, and air bag and accessory are taken out together, timely decontamination;It beats Quality inspection is carried out to weld seam after the completion of bottom, starts follow-up electric welding field after qualified.
Hot arc injection-tube of the present apparatus in one factory 320MW unit shutdown cooling systems of center nuclear power operational management Co., Ltd Two swing check valve valve pipes of check-valves are applied successfully in replacing.

Claims (4)

1. a kind of nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device, including:Rubber gas Capsule (1), changeover portion stainless steel tube (2), gas tube (3), external screw thread steel pipe (4), valve deck mouth nylon cover board (5), pressure gauge (6), Valve body (7), stainless steel pipes (8), it is characterised in that:Air bag (1) is temperature resistant rubber air bag, is opened there are one hole, gas tube (3) One end is inserted into hole, and air bag (1) hole diameter and the outer diameter of gas tube (3) match, and are tightly fastened connected;Gas tube (3) other end connection tracheal pressure table (6);Air bag (1), gas tube (3) are put into pipeline, the air bag (1) after expansion with not Rust steel conduit (8) inner wall fits closely.
2. a kind of nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas as described in claim 1 protects gas chamber Device, it is characterised in that:Processing is there are three internal thread hole on the valve deck mouth nylon cover board (5), internal thread hole size with it is outer Unanimously, stainless steel external screw thread steel pipe (4) and valve deck mouth nylon cover board (5) are screwed connection threaded steel pipe (4), inflated rubber pipe (3) stainless steel external screw thread steel pipe (4) is passed through from inside, wherein two tracheaes are respectively pipeline both sides air bag applying argon gas, a gas Pipe is applying argon gas in argon gas room.
3. a kind of nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas as described in claim 1 protects gas chamber Device, it is characterised in that:There is annular projection on the valve deck mouth nylon cover board (5), end face is T fonts, annular projection it is outer Diameter is matched with the internal diameter of valve body (7) port, and valve deck mouth nylon cover board (5) is fixedly connected with valve body (7) lid mouth, valve deck mouth nylon lid Plate (5), pipeline both sides air bag (1) and stainless steel pipes (8) establish closed argon gas room jointly.
4. a kind of nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas as described in claim 1 protects gas chamber Device, it is characterised in that:Changeover portion stainless steel tube (2) both ends are connected by clip and inflated rubber pipe (3).
CN201721801860.0U 2017-12-21 2017-12-21 Nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device Active CN207997055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721801860.0U CN207997055U (en) 2017-12-21 2017-12-21 Nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721801860.0U CN207997055U (en) 2017-12-21 2017-12-21 Nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device

Publications (1)

Publication Number Publication Date
CN207997055U true CN207997055U (en) 2018-10-23

Family

ID=63836553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721801860.0U Active CN207997055U (en) 2017-12-21 2017-12-21 Nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device

Country Status (1)

Country Link
CN (1) CN207997055U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112496602A (en) * 2020-11-12 2021-03-16 福建福清核电有限公司 Air bag type welding argon filling protection method for nuclear power plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112496602A (en) * 2020-11-12 2021-03-16 福建福清核电有限公司 Air bag type welding argon filling protection method for nuclear power plant
CN112496602B (en) * 2020-11-12 2022-09-16 福建福清核电有限公司 Air bag type welding argon filling protection method for nuclear power plant

Similar Documents

Publication Publication Date Title
CN105209812B (en) For sealing chamber, pipeline or tank and the pipe closing device of pipeline group
CN106051240A (en) Safety valve as well as online detecting device and online detecting method of safety valve
CN103915124B (en) Nuclear power station conventional island demineralized water distribution system full cut-off repair method
US9297487B2 (en) Installation of a valve in a pipeline
CN207997055U (en) Nuclear power plant's primary Ioops nuclear grade valve stainless steel pipes argon arc welding argon gas protects gas cell device
CN104455722B (en) Installing construction method for semiconductor manufacture procedure gas conveying pipelines
CN110345330A (en) A kind of online leakage monitor of double-level-metal expansion joint and method
CN113414476A (en) Pipeline butt-joint circumferential weld protective gas sealing device and method
CN206627259U (en) A kind of continuous annealing furnace pipe heat exchanger leak detecting device
CN205909851U (en) Transformer stores up blocking detector of oil tank respirator
CN201437852U (en) Top entry type pneumatic ball valve
CN207718838U (en) Heavy water reactor fuel handling white-out station potentiometer protective device
CN103432702B (en) Visit fire tube powder automatic gasoloid extinguisher
CN106704759A (en) Internal-pressure self-regulated sealed three-dimensional compensator with online alarm device
CN110682236B (en) Ice plug jacket device for metal surface sealing joint maintenance operation
CN209909230U (en) PE ball valve grease injection device
CN203131189U (en) Mechanical type full-automatic water-control air exhaust valve
CN204758148U (en) Hot jacket formula thermocouple
KR200493296Y1 (en) Digital manometer and recorder
CN209525933U (en) A kind of nuclear power plant's liquid nitrogen ice berg device
CN208565890U (en) A kind of side flanges sealing clamp
CN112802618A (en) Ice plug isolation process for nuclear power explosion valve
CN207636260U (en) A kind of airtight test instrument of generator outlet casing
CN106077911A (en) A kind of welding argon-filling device relying on the transformation of waste and old cutting torch to make and using method thereof
CN207687662U (en) Steel welding gas cylinder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant