CN207987962U - A kind of city piping lane mounting device - Google Patents

A kind of city piping lane mounting device Download PDF

Info

Publication number
CN207987962U
CN207987962U CN201820251007.4U CN201820251007U CN207987962U CN 207987962 U CN207987962 U CN 207987962U CN 201820251007 U CN201820251007 U CN 201820251007U CN 207987962 U CN207987962 U CN 207987962U
Authority
CN
China
Prior art keywords
pushing tow
tube coupling
prefabricated tube
briquetting
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820251007.4U
Other languages
Chinese (zh)
Inventor
曾凡贵
何宏伟
王清江
刘成龙
王悦
周瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Chongqing Technology and Business Institute
Original Assignee
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd, Chongqing Technology and Business Institute filed Critical Chongqing Construction Engineering Group Co Ltd
Priority to CN201820251007.4U priority Critical patent/CN207987962U/en
Application granted granted Critical
Publication of CN207987962U publication Critical patent/CN207987962U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

A kind of city piping lane mounting device provided by the utility model, including multiple sequentially connected prefabricated tube couplings, each prefabricated tube coupling is in the cavity structure of both ends open, and the open end of adjacent two prefabricated tube coupling is opposite to be clamped, wherein each prefabricated tube coupling is moved by boom hoisting;The boom hoisting includes two walking rails parallel with prefabricated pipe nodal axisn line, and lifting gantry for moving prefabricated tube coupling is provided between two walking rails;It further include movable top pushing device, the movable top pushing device includes parallel with prefabricated pipe pitch diameter two to pushing tow briquetting, pushing tow briquetting can be by lifting by crane gantry-travelling, a wherein pushing tow briquetting is fixedly mounted on the distal opening end of multiple prefabricated tube couplings of connection, another pushing tow briquetting moves installation with the quantity of prefabricated tube coupling between two pushing tow briquettings, compression assemblies are equipped between the pushing tow briquetting prefabricated tube coupling adjacent with pushing tow briquetting, compression assemblies are for squeezing adjacent two prefabricated tube coupling docking.

Description

A kind of city piping lane mounting device
Technical field
The utility model is related to tube coupling mounting technique fields, and in particular to a kind of city piping lane mounting device.
Background technology
The development of big and medium-sized cities, city piping lane, which has become, solves all kinds of cross pipe-line interference, construction and dimension in urban development The major measure of the inconvenient problem of shield.Existing city piping lane construction method takes cast-in-place wet construction form, wet construction mode to apply more The work duration is longer, and quality is difficult to control, and the problem of percolating water easily occurs;When city piping lane is constructed, also have using prefabricated peace Dress form, but mostly during the prefabricated tube coupling connection of more piece is mounted to piping lane is lifting installation exercise, is hung in prefabricated tube coupling It pretends to position between prefabricated tube coupling and prefabricated tube coupling when industry and be not allowed, there are prefabricated tube coupling seam crossing because imprecision leads to percolating water Problem.
Utility model content
For the deficiency in the presence of the prior art, the utility model provides a kind of city piping lane mounting device, solves Piping lane installation has that gap leads to infiltration in the prior art.
To achieve the above object, the utility model uses the following technical solution:A kind of city piping lane mounting device, packet Multiple sequentially connected prefabricated tube couplings are included, each prefabricated tube coupling is in the cavity structure of both ends open, and adjacent two prefabricated tube coupling is opened Mouth end is opposite to be clamped, wherein each prefabricated tube coupling is moved by boom hoisting;The boom hoisting includes and prefabricated pipe nodal axisn Two parallel walking rails of line, are provided with lifting gantry for moving prefabricated tube coupling between two walking rails;Further include moving Dynamic formula thrustor, the movable top pushing device include the two pushing tow briquettings for installing contiguous prefabricated tube coupling, two pushing tow pressures Block can be by lifting by crane gantry-travelling, wherein a pushing tow briquetting fixes the end of the prefabricated tube coupling of first segment of starting installation, Ling Yiding Pushing block moves installation, another pushing tow briquetting equal position in each installation process with the quantity of prefabricated tube coupling between two pushing tow briquettings In the end for the prefabricated tube coupling being connected with upper one prefabricated tube coupling;Compression assemblies are each equipped between pushing tow briquetting and prefabricated tube coupling, Compression assemblies coordinate with pushing tow briquetting docks for squeezing adjacent two prefabricated tube coupling;The compression assemblies include multigroup jack and The cyclic annular pushing tow holder to match with prefabricated tube coupling open end, the both ends of each jack by installation part and pushing tow holder and Pushing tow briquetting connects.
The use principle of the utility model:Before the installation of prefabricated tube coupling, walking rails and lifting gantry are first installed, are risen Hanging gantry can arbitrarily move on walking rails, when installing prefabricated tube coupling, by the prefabricated tube coupling of first segment and the second prefabricated tube coupling of section By lifting by crane gantry-travelling to corresponding installation site, one open end of the prefabricated tube coupling of first segment is opened with the one of the second prefabricated tube coupling of section Mouthful end is staggered relatively, and another open end of the prefabricated tube coupling of first segment is then moved to by lifting by crane gantry by a pushing tow briquetting, will Another pushing tow briquetting is moved to another open end of the prefabricated tube coupling of the second section, by more between prefabricated tube coupling and pushing tow briquetting Group jack works at the same time, and jack one end provides support force, two prefabricated pipes of jack other end pushing tow by pushing tow briquetting Section tightly docks the prefabricated tube coupling of the first segment open end opposite with the second prefabricated tube coupling of section, complete the prefabricated tube coupling of first segment and After the docking of the second prefabricated tube coupling of section, the pushing tow briquetting being used cooperatively with the second prefabricated tube coupling of section is moved by lifting by crane gantry It opens, the mobile prefabricated tube coupling of third section makes the open end pair of an open end and the second prefabricated tube coupling of section for the prefabricated tube coupling of third section It connects, then pushing tow briquetting is moved to the free open end of the prefabricated tube coupling of third section, compression assemblies are installed, multigroup jack work is passed through Make with the second prefabricated tube coupling of section tightly to dock the prefabricated tube coupling of third section, and so on, it will be multiple by movable top pushing device The effectively tight abutting joint of prefabricated tube coupling forms piping lane.
Compared with the prior art, the utility model has the advantages that:The utility model will be pre- using boom hoisting The positioning of tubulation section is placed, then prefabricated tube coupling and contiguous prefabricated tube coupling are accurately positioned combination by the realization of movable top pushing device, Ensure that the seam crossing of two prefabricated tube couplings tightly contacts, avoids the problem of prefabricated tube coupling joint seal imprecision leads to infiltration.
Description of the drawings
Fig. 1 is that movable top pushing device is schemed with the cooperation of prefabricated tube coupling in the utility model;
Fig. 2 is the line A-A sectional view in Fig. 1;
Fig. 3 is the utility model upper mounting seat front view;
Fig. 4 is that middle boom hoisting is schemed with the cooperation of prefabricated tube coupling on the utility model.
In attached drawing:Fixed station 1, plays lifting lug 3, jack counter-force seat 4, mounting base 5, jack 6, pushing tow branch at pushing tow briquetting 2 Frame 7, prefabricated tube coupling 9, cyclic annular clamping groove 10, cyclic annular clamping bump 11, installation cavity 12, fixed pin 13, connects ring-shaped rubber item 8 Connect block 14, through-hole 15, locating piece 16, elastic element 17, fixing groove 18, connecting rod 19, sliding groove 20, walking rails 21, traveling Wheel 22, support column 23, load-bearing pillar 24, hoisting apparatus 25, locating slot 26.
Specific implementation mode
The utility model is described further below in conjunction with the accompanying drawings.
As shown in Figure 1 to 4, a kind of city piping lane mounting device described in the utility model, including multiple be sequentially connected Prefabricated tube coupling 9, each prefabricated tube coupling 9 is in the cavity structure of both ends open, and the wherein open end of prefabricated tube coupling 9 is equipped with convex The cyclic annular clamping bump 11 gone out is equipped with ring-shaped rubber item 8,9 another open end of prefabricated tube coupling in 11 outer wrapping of cyclic annular clamping bump Equipped with the cyclic annular clamping groove 10 being recessed inwardly.The design of cyclic annular clamping bump 11 and cyclic annular clamping groove 10 can be effectively by two-phase Adjacent prefabricated tube coupling 9 docks, and can play the role of leakproof in the ring-shaped rubber item 8 of 11 outer wrapping of cyclic annular clamping bump, ensure pre- The docking of tubulation section 9 forms the problems such as piping lane is not in later leak, ensures the quality of piping lane construction.Prefabricated tube coupling 9 is in factory Then middle machine-shaping is transported extremely needs construction site to be mounted.The prefabricated tube coupling 9 to construction site is transported by playing lifting It sets and is moved to predetermined installation site.It needs that boom hoisting first is installed according to construction access road between prefabricated tube coupling 9 is installed, first Two walking rails 21 are laid with, prefabricated tube coupling 9 is mounted between two walking rails 21 and the axis of walking rails 21 and prefabricated tube coupling 9 It is parallel, lifting gantry for moving prefabricated tube coupling 9 is provided between two walking rails 21;It includes vertical parallel to lift by crane gantry It is arranged and the load-bearing pillar 24 between 23 and two support column 23 of adjustable two support column, is equipped with and uses in the bottom of support column 23 In the travelling wheel 22 slided on walking rails 21, slideway is equipped on load-bearing pillar 24, sliding is equipped with multiple liftings on slideway Device 25.Adjustable berth away from two support columns 23 be mainly that two support columns, 23 upper end and load-bearing pillar 24 are slidably connected, can root The spacing of two walking rails 21 and the spacing of two support columns are effectively adjusted according to the size of prefabricated tube coupling 9;It is main on load-bearing pillar 24 Multiple hoisting apparatus 25 are fixed with, boom hoisting can be simple crane, need to by rope when installing prefabricated tube coupling 9 The prefabricated tube coupling 9 of the first segment to be lifted by crane is fixed, and the prefabricated tube coupling of first segment 9 is moved up certain altitude by hoisting apparatus 25, The prefabricated tube coupling of first segment 9 is moved to predetermined installation site and placed by the travelling wheel 22 by supporting column bottom, similarly by rising The second prefabricated tube coupling of section 9 is moved to default installation site by device for hoisting, at this time an open end and second for the prefabricated tube coupling of first segment 9 9 a bite end of prefabricated tube coupling is saved with respect to Matching installation, it is then by movable top pushing device that two 9 opposite ends of prefabricated tube coupling are close Docking.
Movable top pushing device includes the two pushing tow briquettings 2 for installing contiguous prefabricated tube coupling 9, and pushing tow briquetting 2 is gravity Wall, convenient for providing support force for pushing tow tube coupling, the section of parallel 9 axis direction of prefabricated tube coupling of pushing tow briquetting 2 for jack 6 The vertical edge side wall of structure in a rectangular trapezoid, two pushing tow briquettings, 2 section is oppositely arranged for convenience of structure is installed on vertical edge side wall It builds;Multiple jack counter-force seats 4 are respectively equipped on the vertical edge side wall of two pushing tow briquettings, 2 section, jack counter-force seat 4 is Steel built-in fitting is equipped with fixed station 1 in the bevel edge side of 2 section of pushing tow briquetting, and fixed station 1 is used for further to stablizing pushing tow briquetting 2;Multiple lifting lugs 3 are equipped in the short horizontal sides side wall of 2 section of pushing tow briquetting, the installation for playing lifting lug 3 is easy for by lifting by crane dragon Door movable top pushing block 2.Two pushing tow briquettings 2 can be by lifting by crane gantry-travelling, wherein a pushing tow briquetting 2 fixes starting installation The end of the prefabricated tube coupling of first segment 9, another pushing tow briquetting 2 move installation with the quantity of prefabricated tube coupling 9 between two pushing tow briquettings 2, Another pushing tow briquetting 2 is respectively positioned on the end for the prefabricated tube coupling 9 being connected with upper one prefabricated tube coupling 9 in each installation process;Each Compression assemblies are equipped between pushing tow briquetting 2 and prefabricated tube coupling, compression assemblies coordinate pre- for squeezing adjacent two with pushing tow briquetting 2 Tubulation section 9 docks;The compression assemblies include multigroup jack 6 and the cyclic annular pushing tow branch that matches with 9 open end of prefabricated tube coupling The both ends of frame 7, each jack 6 are connect by installation part with pushing tow holder 7 and pushing tow briquetting 2.Wherein pushing tow holder 7 is lattice Structure holder, the design of lattice falsework had both facilitated the movement of pushing tow holder 7, at the same the installation of pushing tow holder 7 be also convenient for it is multigroup very heavy Top 6 uniformly applies thrust, ensures the tight docking of adjacent two prefabricated tube coupling 9.
Installation part includes mounting base 5, and mounting base 5 is detachably connected with pushing tow holder 7 and jack counter-force seat 4, installation Seat 5 can be steel member, simply, the mode that mounting base 5 can be bolted with pushing tow directly and jack counter-force seat 4 Detachable installation etc.;It is provided with mounting groove in mounting base 5, the installation cavity for installing 6 end of jack is equipped in mounting groove 12, in 6 end of jack equipped with link block 14, link block 14 is arranged with 12 grafting of installation cavity, is equipped with and connects in installation cavity 12 Connect the fixing piece that block 14 is detachably connected.Fixing piece includes the multiple fixing grooves 18 communicated with installation cavity 12, and the utility model is adopted With two fixing grooves 18 disposed in parallel, it is connected to by sliding groove 20 between two fixing grooves 18, it is also sliding in each fixing groove 18 Dynamic to be equipped with fixed pin 13,13 one end of fixed pin is fixed by elastic element 17 and 18 one end of fixing groove, and elastic element 17 can be adopted With spring etc., 13 other end of fixed pin can slide into installation cavity 12, and connecting rod 19 is connected between two fixed pins 13, Connecting rod 19 is equipped with locating piece 16, and locating piece 16 moves back and forth in locating slot 26;Be provided on link block 14 with it is multiple solid Multiple through-holes 15 that rationed marketing 13 is used cooperatively, each fixed pin 13 reciprocatingly slides in its corresponding fixing groove 18 intermittently to be passed through Corresponding through-hole 15.When jack 6 is installed with mounting base 5, first moves running fix block 16 and connecting rod 19 is driven to move, connecting rod The fixed pin 13 at 19 movement drive both ends sliding compression spring in corresponding fixing groove 18, by the link block 14 on jack 6 It is inserted into installation cavity 12, then unclamps locating piece 16, spring-return deformation pushes fixed pin 13 to be slidably inserted into pair to installation cavity 12 Link block 14 is fixed in the through-hole 15 answered and achievees the purpose that fixed jack 6.The jack easy to use 6 of installation part Installation and dismounting, reduce the set-up time of jack 6, improve the construction efficiency of piping lane.
Finally illustrate, above example is merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those of ordinary skill in the art that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the right of the utility model.

Claims (5)

1. a kind of city piping lane mounting device, including multiple sequentially connected prefabricated tube couplings (9), each prefabricated tube coupling (9) is in two The cavity structure of end opening, the open end of adjacent two prefabricated tube coupling (9) is opposite to be clamped, wherein each prefabricated tube coupling (9) passes through Boom hoisting moves;The boom hoisting includes two walking rails (21) parallel with prefabricated tube coupling (9) axis, in two rails Lifting gantry for moving prefabricated tube coupling (9) is provided between road (21);It is characterized in that:It further include mobile pushing tow dress It sets, the movable top pushing device includes the two pushing tow briquettings (2) for installing contiguous prefabricated tube coupling (9), two pushing tow briquettings (2) It can be by lifting by crane gantry-travelling, wherein a pushing tow briquetting (2) fixes the end of the prefabricated tube coupling of first segment (9) of starting installation, separately One pushing tow briquetting (2) moves installation with the quantity of prefabricated tube coupling (9) between two pushing tow briquettings (2), and another pushing tow briquetting (2) is every The end for the prefabricated tube coupling (9) being connected with upper one prefabricated tube coupling (9) is respectively positioned in secondary installation process;Each pushing tow briquetting (2) with Compression assemblies are equipped between prefabricated tube coupling, it is right for squeezing adjacent two prefabricated tube coupling (9) that compression assemblies coordinate with pushing tow briquetting (2) It connects;The compression assemblies include multigroup jack (6) and the cyclic annular pushing tow holder (7) that matches with prefabricated tube coupling (9) open end, The both ends of each jack (6) are connect by installation part with pushing tow holder (7) and pushing tow briquetting (2).
2. a kind of city piping lane mounting device according to claim 1, feature are being:The installation part includes mounting base (5), mounting base (5) is detachably connected with pushing tow holder (7) and pushing tow briquetting (2), and mounting groove is provided in mounting base (5), It is equipped with the installation cavity (12) for installing jack (6) end in mounting groove, link block is equipped in jack (6) end (14), link block (14) is arranged with installation cavity (12) grafting, is equipped in installation cavity (12) and is detachably connected with link block (14) Fixing piece.
3. a kind of city piping lane mounting device according to claim 2, feature are being:The fixing piece includes and installation Multiple fixing grooves (18) that chamber (12) communicates, the interior sliding of each fixing groove (18) is equipped with fixed pin (13), on link block (14) The multiple through-holes (15) being used cooperatively with multiple fixed pins (13) are provided with, each fixed pin (13) is in its corresponding fixing groove (18) The interval that inside reciprocatingly slides passes through corresponding through-hole (15).
4. a kind of city piping lane mounting device according to claim 3, feature are being:The pushing tow briquetting (2) is attached most importance to Power wall, the section structure in a rectangular trapezoid of parallel prefabricated tube coupling (9) axis direction of pushing tow briquetting (2), two pushing tow briquettings (2) are disconnected The vertical edge side wall in face is oppositely arranged, and it is anti-to be respectively equipped with multiple jack on the vertical edge side wall of two pushing tow briquetting (2) sections Power seat (4), jack counter-force seat (4) are connect with mounting base (5), and fixed station is equipped in the bevel edge side of pushing tow briquetting (2) section (1), multiple lifting lugs (3) are equipped in the short horizontal sides side wall of pushing tow briquetting (2) section.
5. a kind of city piping lane mounting device, feature are being according to any one of claims 1-4:The prefabricated pipe Section (9) wherein open end is equipped with the cyclic annular clamping bump (11) outwardly protruded, and in cyclic annular clamping bump (11), outer wrapping is equipped with Ring-shaped rubber item (8), another open end of prefabricated tube coupling (9) are equipped with the cyclic annular clamping groove (10) being recessed inwardly.
CN201820251007.4U 2018-02-11 2018-02-11 A kind of city piping lane mounting device Expired - Fee Related CN207987962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820251007.4U CN207987962U (en) 2018-02-11 2018-02-11 A kind of city piping lane mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820251007.4U CN207987962U (en) 2018-02-11 2018-02-11 A kind of city piping lane mounting device

Publications (1)

Publication Number Publication Date
CN207987962U true CN207987962U (en) 2018-10-19

Family

ID=63824487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820251007.4U Expired - Fee Related CN207987962U (en) 2018-02-11 2018-02-11 A kind of city piping lane mounting device

Country Status (1)

Country Link
CN (1) CN207987962U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972542A (en) * 2019-03-05 2019-07-05 中交第二航务工程局有限公司 Precast block assembled box culvert side wall mounting and positioning device and method
CN112962666A (en) * 2021-02-07 2021-06-15 北京市政路桥股份有限公司 Prefabricated pipe gallery moving device and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972542A (en) * 2019-03-05 2019-07-05 中交第二航务工程局有限公司 Precast block assembled box culvert side wall mounting and positioning device and method
CN112962666A (en) * 2021-02-07 2021-06-15 北京市政路桥股份有限公司 Prefabricated pipe gallery moving device and construction method

Similar Documents

Publication Publication Date Title
CN207987962U (en) A kind of city piping lane mounting device
CN208364141U (en) A kind of automatic walking trolley device of tunnel lining trolley material distributing machine
CN104723013A (en) Overhead pipeline welding stand
CN205276887U (en) Hot wall concrete pumping auxiliary assembly is prevented to large -scale steel form
CN212599995U (en) Welding installation equipment for hot-melt welded pipe
CN208293613U (en) A kind of city integrated piping lane Quick Release die set device of running type
CN204584639U (en) A kind of aerial pipeline welding stand
CN209601099U (en) Buried pipeline transloading equipment
CN105568869A (en) Walking type triangular hanging basket
CN201614232U (en) Steel cylinder overturning lifting appliance for large-caliber PCCP
CN202428153U (en) Manipulator type pipeline hoisting aligning device
CN215763629U (en) Large-diameter drainage pipeline sliding traction mounting system
CN205151653U (en) Panel automatic lifting device
CN209027926U (en) A kind of centrifugal cast iron pipe semi-automation pressure testing device
CN204075643U (en) Belt feeder slow-speed shaft shaft coupling demounting tool
CN208866739U (en) Quick coupling automatic butt jointing device
CN201632806U (en) Vertical assembly device of steel cylinder spigot for large-caliber PCCP
CN207735316U (en) Tin multipath receiving ball tube device of offshore movable formula
CN206410989U (en) A kind of cement anchoring agent anchor force experiment simulation aperture apparatus
CN205898628U (en) Mortar infiltration appearance
CN207144468U (en) Receiving apparatus in the lower hanger of core tube construction form frame system
CN206011358U (en) A kind of carrying dolly and the filling system using which
CN108266204B (en) Core concrete pouring equipment and process for assembled confined concrete arch truss
CN110202040A (en) Steel pipe socket molding machine
CN206066285U (en) Underground anchor cable cutting holder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

Termination date: 20210211