CN207987927U - Multistage echelon foundation pit supporting system - Google Patents

Multistage echelon foundation pit supporting system Download PDF

Info

Publication number
CN207987927U
CN207987927U CN201820069855.3U CN201820069855U CN207987927U CN 207987927 U CN207987927 U CN 207987927U CN 201820069855 U CN201820069855 U CN 201820069855U CN 207987927 U CN207987927 U CN 207987927U
Authority
CN
China
Prior art keywords
level
support pile
order
guan liang
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820069855.3U
Other languages
Chinese (zh)
Inventor
任晓光
杨志银
王召磊
姜晓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Metallurgical Construction Research Institute (shenzhen) Co Ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
Original Assignee
Metallurgical Construction Research Institute (shenzhen) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Metallurgical Construction Research Institute (shenzhen) Co Ltd filed Critical Metallurgical Construction Research Institute (shenzhen) Co Ltd
Priority to CN201820069855.3U priority Critical patent/CN207987927U/en
Application granted granted Critical
Publication of CN207987927U publication Critical patent/CN207987927U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a kind of multistage echelon foundation pit supporting system, support system includes three-level supporting construction, water-seal pile in first order supporting construction is arranged between first order support pile stake, first order Guan Liang is arranged at the top of first order support pile, second level Guan Liang in the supporting construction of the second level is arranged at the top of the support pile of the second level, third level Guan Liang in third level supporting construction is arranged at the top of third level support pile, first order support pile side, which corresponds at the Guan Liang position of the second level, is fixedly installed first order purlin, it is connected with each other by first order coupling beam between first order purlin and second level Guan Liang, it is connected with each other by first order cant beam between first order Guan Liang and second level Guan Liang;Second level support pile side, which corresponds at third level Guan Liang position, is fixedly installed second level purlin, is connected with each other by second level coupling beam between second level purlin and third level Guan Liang, is connected with each other by second level cant beam between second level Guan Liang and third level Guan Liang.

Description

Multistage echelon foundation pit supporting system
Technical field
The utility model discloses a kind of support system, and especially a kind of multistage echelon foundation pit supporting system belongs to foundation pit work Journey technical field.
Background technology
With the quickening of urbanization paces, to meet the functions such as growing orbit traffic transfer, business, parking, The more nervous dense urban centers of land used, underground space development degree is higher and higher, and scale is increasing.It is more and more deep Base pit engineering shows the features such as area is big, depth is deep, surrounding enviroment are complicated, Deformation control requirement is stringent, the duration is tight, conventional to prop up Watch box system has been difficult to meet numerous requirements simultaneously.Stake(Wall)There are problems for anchor system:The limitation of more ground government uses anchor cable, needs Occupy the red line external space, long in time limit, formation condition bad adaptability etc..Stake(Wall)There are problems for support body system:Inner support system with build It builds underground structure to intersect, cubic metre of earth and stone outward transport is limited, and Underground Construction is limited, and it is complicated that support pours dismounting construction long in time limit. There are problems for double-row pile, cantilever pile:Supporting depth is limited, Deformation control is poor.
Invention content
It cannot meet the shortcomings that technology requires, this practicality for system of deep foundation pit support in the prior art mentioned above A kind of multistage echelon foundation pit supporting system of novel offer, uses rigid joint to connect multiline pile classification echelon to form rigid frame body System, can solve the above problems.
The utility model solve its technical problem the technical solution adopted is that:A kind of multistage echelon foundation pit supporting system, branch Watch box system includes three-level supporting construction, and first order supporting construction includes first order support pile, water-seal pile and first order Guan Liang, sealing Stake is arranged between first order support pile stake, and first order Guan Liang is arranged at the top of first order support pile, and second level supporting construction includes Second level support pile and second level Guan Liang, second level Guan Liang are arranged at the top of the support pile of the second level, and third level supporting construction includes Third level support pile and third level Guan Liang, third level Guan Liang are arranged at the top of third level support pile, first order support pile side pair It should be fixedly installed first order purlin at the Guan Liang position of the second level, pass through the first order between first order purlin and second level Guan Liang Coupling beam is connected with each other, and is connected with each other by first order cant beam between first order Guan Liang and second level Guan Liang;Second level support pile side Face, which corresponds at third level Guan Liang position, is fixedly installed second level purlin, by the between second level purlin and third level Guan Liang Two level coupling beam is connected with each other, and is connected with each other by second level cant beam between second level Guan Liang and third level Guan Liang.
The technical solution that the utility model solves the use of its technical problem further comprises:
The anchorage length of the first order support pile is greater than or equal to 1.2 times of foundation depth.
The second level support pile anchorage length is greater than or equal to first order podium level.
The third level support pile anchorage length is greater than or equal to 2.5 times of second level podium level.
Areas outside is fixedly installed first order jet face layer, third between the second level Guan Liang and second level purlin Areas outside is fixedly installed second level jet face layer between grade Guan Liang and Foundation Pit baseplane.
The stake of the first order support pile is long and stake diameter is all higher than second level support pile and third level support pile;The third level The stake of support pile is long and stake diameter is more than second level support pile.
Described each classification height determines according to Different Strata and foundation depth, but third level support pile height be less than or Equal to 0.25 times foundation depth.
The distance between described first order support pile and second level support pile are greater than or equal to 3 times of support pile stake diameter; The distance between second level support pile and third level support pile are greater than or equal to 3 times of support pile stake diameter.
The first order support pile to the width between third level support pile is greater than or equal to 0.5H.
The utility model has the beneficial effects that:The utility model is simple in structure, easy for construction, the deep, excavation area to depth Big foundation pit can provide the support system of safe and reliable, effective control deformation.
The utility model is described further below in conjunction with the drawings and specific embodiments.
Description of the drawings
Fig. 1 is the utility model section structural schematic diagram.
In figure, 1- first order support piles, 2- water-seal piles, 3- first order Guan Liangs, the second level 4- support pile, 5- third level supportings Stake, 6- first order cant beams, 7- first order purlins, 8- first order coupling beams, 9- first order jet face layers, the second level 10- Guan Liang, 11- Third level Guan Liang, the second level 12- purlin, the second level 13- cant beam, the second level 14- coupling beam, the second level 15- jet face layer.
Specific implementation mode
The present embodiment is the preferred embodiments of the present invention, other its all principles and basic structure are identical as the present embodiment Or it is approximate, within scope of protection of the utility model.
Attached drawing 1 is please referred to, the utility model is a kind of multistage echelon foundation pit supporting system comprising three-level supporting construction, First order supporting construction includes first order support pile 1, water-seal pile 2 and first order Guan Liang 3, and water-seal pile 2 and first order support pile 1 are simultaneously Row's setting, water-seal pile 2 are arranged between adjacent first order support pile 1, and the setting of first order Guan Liang 3 is pushed up in first order support pile 1 Portion, in the present embodiment, the anchorage length of first order support pile 1(I.e. first order support pile 1 enters Foundation Pit bottom length)According to not It is determined with stratum and foundation depth, the anchorage length of usual first order support pile 1 is greater than or equal to 1.2H(H is foundation depth, I.e. ground level to Foundation Pit bottom height);Second level supporting construction includes second level support pile 4 and second level Guan Liang 10, and second The setting of grade Guan Liang 10 is in 4 top of second level support pile, the present embodiment, 4 anchorage length of second level support pile(That is second level supporting Stake 4 enters Foundation Pit bottom length)It is determined according to Different Strata and foundation depth, the anchorage length of usual second level support pile 4 More than or equal to 1.0H1(H1 is first order podium level, the i.e. height from 3 top surface of first order Guan Liang to Foundation Pit bottom);Third Grade supporting construction includes third level support pile 5 and third level Guan Liang 11, and the setting of third level Guan Liang 11 is pushed up in third level support pile 5 Portion, in the present embodiment, 5 anchorage length of third level support pile(I.e. third level support pile 5 enters Foundation Pit bottom length)According to difference Stratum and foundation depth determine that the anchorage length of usual third level support pile 5 is greater than or equal to 2.5H2(H2 is flat for the second level Platform height, the i.e. height from 10 top surface of second level Guan Liang to Foundation Pit bottom).In the present embodiment, water-seal pile 2 should enter relatively impermeable Water layer and enter to cheat bottom(Hole bottom refers to Foundation Pit bottom)Depth should be greater than 2m.In the present embodiment, first order support pile is as main sealing When structure, clear distance is less than or equal to 500mm between the stake of first order support pile 1;Between second level support pile and third level support pile stake Clear distance matches between stake away from first order support pile 1.
In the present embodiment, 1 side of first order support pile, which corresponds at 10 position of second level Guan Liang, is fixedly installed the first order Purlin 7 is connected with each other between first order purlin 7 and second level Guan Liang 10 by first order coupling beam 8, first order Guan Liang 3 and second It is connected with each other by first order cant beam 6 between grade Guan Liang 10;Support pile 4 side in the second level corresponds at 11 position of third level Guan Liang It is fixedly installed second level purlin 12, is interconnected by 14 phase of second level coupling beam between second level purlin 12 and third level Guan Liang 11 It connects, is connected with each other by second level cant beam 13 between second level Guan Liang 10 and third level Guan Liang 11;Second level Guan Liang 10 and second Areas outside is fixedly installed first order jet face layer 9 between grade purlin 12, and in the present embodiment, first order jet face layer 9 uses Cement mortar structure, areas outside is fixedly installed second level jet face layer between third level Guan Liang 11 and Foundation Pit baseplane 15, second level jet face layer 15 uses cement mortar structure.
In the present embodiment, main bearing member of the first order support pile 1 as the utility model, first order support pile 1 The long and stake diameter of stake is all higher than second level support pile 4 and third level support pile 5;The stake of third level support pile 5 is long and stake diameter is more than the Two level support pile 4.In the present embodiment, each height for being classified support pile(To the distance of bottom of foundation ditch plane i.e. at the top of support pile)Root It is determined according to Different Strata and foundation depth, 5 height of third level support pile is less than or equal to 0.25H(H is foundation depth).
In the present embodiment, support pile array pitch at different levels are preferably equidistant, and the array pitch of support piles at different levels is greater than or equal to 3 times of stake The overall width of the support pile stake diameter of diameter minimum, support system is greater than or equal to 0.5H(H is foundation depth), in the utility model The overall width of the support system refers to that first order support pile to the width between third level support pile, further includes simultaneously First order support pile and the third level support pile width of itself, with first order support pile to the width institute between third level support pile The meaning of statement is identical.
In the present embodiment, coupling beams at different levels and corresponding support pile are by reserved steel bar in support pile and rear bar planting and tie It surrounds purlin and forms rigid joint.Cant beams at different levels are connect with the reserved steel bar of top Guan Liang, are bound simultaneously with lower part Guan Liang reinforcing bar, together It pours to be formed.
In the utility model, support piles at different levels include more than one, between level-one support pile use corresponding Guan Liang Connection, multistage support stake are distributed in a ring each along foundation pit internal structure.
The utility model mainly includes the following steps when implementing:
Step S1, construction site carries out finishing operations, unwrapping wire positioning is carried out to supporting construction, to ensure that it is vertically arranged.
Step S2, it constructs on ground to first order support pile 1 and water-seal pile 2, then carries out corresponding first order Guan Liang 3 Construction is built.
Step S3, layer and section earth excavation is high to 4 stake top top mark of second level support pile.
Step S4, it constructs to second level support pile 4.
Step S5, corresponding second level Guan Liang 11, first order cant beam 6, first order purlin 7 and the first cascade are built in construction Beam 8.
Step S6, layer and section earth excavation is high to 5 stake top top mark of third level support pile.
Step S7, it constructs to third level support pile 5.
Step S8, corresponding third level Guan Liang 11, second level cant beam 13, second level purlin 12 and the second cascade are built in construction Beam 14.
Step S9, layer and section earth excavation is to Foundation Pit bottom.
In the utility model, due to supporting construction at different levels all be using reinforced concrete structure constitute, so, construct to it Main binding including means for supporting reinforcement steel bar is laid with and concrete pours.
The utility model is simple in structure, easy for construction, foundation pit deep to depth, that excavation area is big can provide it is safe and reliable, The effectively support system of control deformation.

Claims (9)

1. a kind of multistage echelon foundation pit supporting system, it is characterized in that:The support system includes three-level supporting construction, the first order Supporting construction includes first order support pile, water-seal pile and first order Guan Liang, and water-seal pile is arranged between first order support pile stake, and first Grade Guan Liang is arranged at the top of first order support pile, and second level supporting construction includes second level support pile and second level Guan Liang, and second Grade Guan Liang is arranged at the top of the support pile of the second level, and third level supporting construction includes third level support pile and third level Guan Liang, third Grade Guan Liang is arranged at the top of third level support pile, and first order support pile side, which corresponds at the Guan Liang position of the second level, to be fixedly installed First order purlin is connected with each other between first order purlin and second level Guan Liang by first order coupling beam, first order Guan Liang and second It is connected with each other by first order cant beam between grade Guan Liang;Second level support pile side, which corresponds at third level Guan Liang position to fix, to be set Be equipped with second level purlin, be connected with each other by second level coupling beam between second level purlin and third level Guan Liang, second level Guan Liang with It is connected with each other by second level cant beam between third level Guan Liang.
2. multistage echelon foundation pit supporting system according to claim 1, it is characterized in that:The first order support pile it is embedding Gu length is greater than or equal to 1.2 times of foundation depth.
3. multistage echelon foundation pit supporting system according to claim 1, it is characterized in that:The second level support pile build-in Length is greater than or equal to first order podium level.
4. multistage echelon foundation pit supporting system according to claim 1, it is characterized in that:The third level support pile build-in Length is greater than or equal to 2.5 times of second level podium level.
5. multistage echelon foundation pit supporting system according to claim 1, it is characterized in that:The second level Guan Liang and second Areas outside is fixedly installed first order jet face layer between grade purlin, between third level Guan Liang and Foundation Pit baseplane outside region Side is fixedly installed second level jet face layer.
6. multistage echelon foundation pit supporting system according to claim 1, it is characterized in that:The stake of the first order support pile Long and stake diameter is all higher than second level support pile and third level support pile;The stake diameter of third level support pile is more than second level support pile.
7. multistage echelon foundation pit supporting system according to claim 1, it is characterized in that:The third level support pile height Less than or equal to 0.25 times foundation depth.
8. multistage echelon foundation pit supporting system according to claim 1, it is characterized in that:The first order support pile and The distance between two level support pile is greater than or equal to 3 times of support pile stake diameter;Between second level support pile and third level support pile Distance be greater than or equal to 3 times of support pile stake diameter.
9. multistage echelon foundation pit supporting system according to claim 1, it is characterized in that:The first order support pile is to Width between three-level support pile is greater than or equal to 0.5H.
CN201820069855.3U 2018-01-16 2018-01-16 Multistage echelon foundation pit supporting system Active CN207987927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820069855.3U CN207987927U (en) 2018-01-16 2018-01-16 Multistage echelon foundation pit supporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820069855.3U CN207987927U (en) 2018-01-16 2018-01-16 Multistage echelon foundation pit supporting system

Publications (1)

Publication Number Publication Date
CN207987927U true CN207987927U (en) 2018-10-19

Family

ID=63819504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820069855.3U Active CN207987927U (en) 2018-01-16 2018-01-16 Multistage echelon foundation pit supporting system

Country Status (1)

Country Link
CN (1) CN207987927U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577346A (en) * 2019-01-02 2019-04-05 深圳市前海世茂投资管理有限公司 A kind of foundation pit supporting system and its method of construction
CN111021369A (en) * 2019-12-31 2020-04-17 深圳宏业基岩土科技股份有限公司 Chair type double-row pile anchor construction method
CN111395354A (en) * 2020-03-20 2020-07-10 中国建筑西南勘察设计研究院有限公司 Multi-stage large-row-spacing pile combined supporting structure and foundation pit excavation method thereof
CN111472362A (en) * 2020-05-23 2020-07-31 江苏地基工程有限公司 Inclined support foundation pit supporting system and construction method
CN113513032A (en) * 2021-03-23 2021-10-19 深圳市工勘岩土集团有限公司 Three-row pile gravity dam combined retaining structure for filled high slope
CN114108645A (en) * 2021-11-02 2022-03-01 广州地铁设计研究院股份有限公司 Foundation pit supporting structure adjacent to underground engineering and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577346A (en) * 2019-01-02 2019-04-05 深圳市前海世茂投资管理有限公司 A kind of foundation pit supporting system and its method of construction
CN111021369A (en) * 2019-12-31 2020-04-17 深圳宏业基岩土科技股份有限公司 Chair type double-row pile anchor construction method
CN111395354A (en) * 2020-03-20 2020-07-10 中国建筑西南勘察设计研究院有限公司 Multi-stage large-row-spacing pile combined supporting structure and foundation pit excavation method thereof
CN111472362A (en) * 2020-05-23 2020-07-31 江苏地基工程有限公司 Inclined support foundation pit supporting system and construction method
CN113513032A (en) * 2021-03-23 2021-10-19 深圳市工勘岩土集团有限公司 Three-row pile gravity dam combined retaining structure for filled high slope
CN114108645A (en) * 2021-11-02 2022-03-01 广州地铁设计研究院股份有限公司 Foundation pit supporting structure adjacent to underground engineering and construction method thereof

Similar Documents

Publication Publication Date Title
CN207987927U (en) Multistage echelon foundation pit supporting system
CN100543241C (en) Using the half contrary method of doing in a kind of underground construction one more
CN101914925A (en) Basement by using optimized composite prefabricated arch wall as external wall
CN102758632A (en) Rock stratum double initial support layering method for establishing large-scale underground structure
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN206512723U (en) A kind of multiple-layer horizontal coupling beam double-row pile and underground pipe gallery monolithic construction
CN101117800A (en) Method for one-pile-three-use in underground engineering
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN210598987U (en) Subway station based on single-layer four-guide-hole and middle-guide-hole inner pile foundation
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN102425171A (en) Forward-backward constructing method for central island of deep and large foundation pit
CN206928305U (en) A kind of rigid passive area buttress type supporting construction
CN109518699A (en) Miniature steel pipe pile adds grid spray anchor deep foundation ditch combination supporting scheme system and its construction method
CN112095626A (en) Foundation pit supporting structure serving as corridor underpinning pile foundation and construction method thereof
CN101353896A (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN207419519U (en) A kind of campshed supporting is with helping the structural system that arm-type barricade is combined
CN206752667U (en) A kind of basement barrier wall structure
CN211500658U (en) Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN104005414B (en) Large-size rebar cast in place concrete pile supports the constructional method of column
CN107326932B (en) Quasi-semi-reverse construction method for underground garage
CN113235613A (en) Newly-built foundation pit excavation supporting method using adjacent existing fender post
CN208917850U (en) A kind of miniature steel pipe pile adds grid to spray anchor deep foundation ditch combination supporting scheme system
CN205804383U (en) A kind of Whirlwind tank water-stop curtain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant