CN207968238U - A kind of rotor production line for automatically assembling - Google Patents

A kind of rotor production line for automatically assembling Download PDF

Info

Publication number
CN207968238U
CN207968238U CN201820391960.9U CN201820391960U CN207968238U CN 207968238 U CN207968238 U CN 207968238U CN 201820391960 U CN201820391960 U CN 201820391960U CN 207968238 U CN207968238 U CN 207968238U
Authority
CN
China
Prior art keywords
iron core
pipeline
tumbling
dispensing
sizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820391960.9U
Other languages
Chinese (zh)
Inventor
张敬东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan Maitong Automation Equipment Co Ltd
Original Assignee
Kunshan Maitong Automation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunshan Maitong Automation Equipment Co Ltd filed Critical Kunshan Maitong Automation Equipment Co Ltd
Priority to CN201820391960.9U priority Critical patent/CN207968238U/en
Application granted granted Critical
Publication of CN207968238U publication Critical patent/CN207968238U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The utility model is related to a kind of rotor production line for automatically assembling, including rack, switch board, the pipeline for being arranged in rack and being connect with switch board line, it is sequentially placed along pipeline transporting direction and the iron core group being connect with switch board line fills feed mechanism, iron core endoporus tumbling mechanism, iron core glue applying mechanism, iron core plaster mechanism, magnetic sheet pressurization shaping mechanism, outer circle testing agency, it is arranged in pipeline discharge end and the continuous tunnel furnace curing mechanism placed with the same straight line of pipeline, the rotation testing agency in continuous tunnel furnace curing mechanism discharge end is set;The utility model only needs that rotor component is manually put into upper discharge position, realizes automatic assembling, to save human resources, greatly reduces into production cost, and have many advantages, such as high efficiency, high-precision, rate of good quality rate.

Description

A kind of rotor production line for automatically assembling
Technical field
The utility model is related to automatic fields, refer in particular to a kind of rotor production line for automatically assembling.
Background technology
At present in industry, assembling the degree of automation of rotor is not high, it usually needs a large amount of manpower goes to complete motor Feeding, discharging and assembling of rotor etc., and after assembling also need to that the non-defective unit of finished product is detected and is shunted with defective products, Not only wasting manpower and material resources in this way, production efficiency is not high, and assembly precision is not high, and assembly defect rate is high, causes yields not high.
Utility model content
The utility model aim is for overcome the deficiencies in the prior art and provides a kind of rotor automatic assembling production Line not only has many advantages, such as high efficiency, high-precision, rate of good quality rate, and can save human resources, substantially reduces into production cost.
In order to achieve the above objectives, the technical solution adopted in the utility model is:A kind of rotor production line for automatically assembling, Including rack, switch board, the pipeline for being arranged in rack and being connect with switch board line are sequentially placed along pipeline transporting direction And iron core group dress feed mechanism, iron core endoporus tumbling mechanism, iron core glue applying mechanism, the iron core chip mounter being connect with switch board line Structure, magnetic sheet pressurization shaping mechanism, outer circle testing agency are arranged in pipeline discharge end and the tunnel placed with the same straight line of pipeline The rotation testing agency in continuous tunnel furnace curing mechanism discharge end is arranged in road stove curing mechanism.
Preferably, the iron core group dress feed mechanism includes loading working table, is arranged and consolidates end cap on loading working table The feeding machinery that the iron core that will have been riveted is placed into automatically on pipeline is arranged on riveting machine in the riveting machine that is scheduled on iron core Hand;
The iron core endoporus tumbling mechanism includes tumbling workbench, the tumbling branch placed vertically on tumbling workbench is arranged Support, the double-station tumbling manipulator for being arranged on tumbling workbench and being placed between tumbling supporting rack and pipeline, setting exist On tumbling supporting rack and be placed in right over the one of station of double-station tumbling manipulator abutment sleeve, setting tumbling support The roller burnishing knife of abutment sleeve is driven and stretched on frame by tumbling motor;
The iron core glue applying mechanism includes dispensing supporting rack, be horizontally set on the dispensing fixed plate of dispensing supporting rack upper end, The dispensing movable plate that is arranged below dispensing fixed plate is each passed through four angles of dispensing fixed plate and is connect with dispensing movable plate Dispensing guide post, be arranged in dispensing fixed plate driving dispensing movable plate move up and down dispensing lifting cylinder, be arranged in dispensing The movable plate bottom and glue-dropping tool that is placed in right over pipeline, multiple be arranged are justified in dispensing movable plate bottom and with glue-dropping tool The dispensing machinery hand that week uniformly places;
The iron core plaster mechanism includes patch workbench, is arranged on patch workbench through stepper motor driven patch Piece jig, is set the double-station chip machinery hand for being arranged on patch workbench and being placed between patch jig and pipeline respectively Set patch jig both sides magnetic sheet feeding track, be separately positioned on two magnetic sheet feeding track pushed upwards magnetic sheets and controlled towards patch The pusher manipulator of tool direction movement, the belt conveyor for being separately positioned on two magnetic sheet feeding track feed ends;The belt Magnetic sheet on conveyer is in a row placed, and entire row magnetic sheet can be pushed into magnetic sheet feeding track by pusher manipulator from belt conveyor It is interior;
Magnetic sheet pressurization shaping mechanism includes that shape supporting rack, the sizing that is horizontally set on sizing supporting rack upper end is fixed Plate, be arranged sizing fixed plate below sizing movable plate, be each passed through sizing four angles of fixed plate and with sizing movable plate The sizing guide post of connection, be arranged sizing fixed plate on driving sizing movable plate move up and down sizing lifting cylinder, setting exist Sizing movable plate bottom and be placed in right over pipeline localization tool, it is multiple setting sizing movable plate bottom and with positioning control Has the sizing cylinder that even circumferential is placed;
The outer circle testing agency includes outer circle testing stand, is arranged on outer loop truss frame and is placed in right over pipeline The outer loop truss lifting cylinder that driving outer circle detector slides up and down is arranged on outer loop truss frame in outer circle detector;
The continuous tunnel furnace curing mechanism includes being arranged in pipeline discharge end and the tunnel placed with the same straight line of pipeline Pipeline upper rotor part is put in continuous tunnel furnace curing oven in continuous tunnel furnace curing oven feed end and is put in array by stove curing oven, setting That sets enters stove manipulator;
The rotation testing agency includes rotation detection workbench, setting on rotation detection workbench and stretches into rotation inspection Survey the rotating jig below workbench, the high-speed rotating V belt translation of driving rotating jig is set below rotation detection workbench, Two are vertically arranged in rotating jig both sides and detect the lifting guide pillar of workbench across rotation, are arranged and detect workbench in rotation Top is used to connect the upper connecting rod of two lifting guide pillar upper ends, setting rises below rotation detection workbench for connecting two The lower connecting rod of drop guide post lower end, the protective cover for being arranged on upper connecting rod and being placed in right over rotating jig, setting are rotating The rotation that its output end is connect with lower connecting rod for driving protective cover to move up and down below detection workbench detects lifting cylinder.
Preferably, the continuous tunnel furnace curing oven be divided into from feed end to discharge end warming-up section, constant temperature zone, temperature descending section every From section, force cooling section.
Preferably, the double-station tumbling manipulator and double-station chip machinery hand include the shaft placed vertically, drive The material grasping motor of turn axis rotation, the double end cylinder for being horizontally set on shaft upper end, to be vertically arranged in double end cylinder two respectively defeated The material grasping lifting cylinder of outlet, the clamping jaw cylinder for being separately positioned on two material grasping lifting cylinder output ends.
Preferably, the glue-dropping tool and localization tool include magnechuck, are vertically arranged in magnechuck middle part use In the positioning pin being inserted into iron core endoporus.
Due to the application of the above technical scheme, the utility model has following advantages compared with prior art:
Rotor production line for automatically assembling described in the utility model only needs that rotor component is manually put into upper discharge position, It realizes automatic assembling, to save human resources, greatly reduces into production cost, and with high efficiency, high-precision, Gao Liang The advantages that product rate.
Description of the drawings
Technical solutions of the utility model are described further below in conjunction with the accompanying drawings:
Attached drawing 1 is the structural schematic diagram of rotor production line for automatically assembling described in the utility model;
Attached drawing 2 is that the structure of continuous tunnel furnace curing mechanism in rotor production line for automatically assembling described in the utility model is shown It is intended to;
Attached drawing 3 is the structure that iron core group fills feed mechanism in rotor production line for automatically assembling described in the utility model Schematic diagram;
Attached drawing 4 is the structure of iron core endoporus tumbling mechanism in rotor production line for automatically assembling described in the utility model Schematic diagram;
Attached drawing 5 is the structural representation of iron core glue applying mechanism in rotor production line for automatically assembling described in the utility model Figure;
Attached drawing 6 is the structural representation of iron core plaster mechanism in rotor production line for automatically assembling described in the utility model Figure;
Attached drawing 7 is partial enlarged view at A in Fig. 6;
Attached drawing 8 is the structure of magnetic sheet pressurization shaping mechanism in rotor production line for automatically assembling described in the utility model Schematic diagram;
Attached drawing 9 is that the magnetic sheet shaping mechanism that pressurizes is looked up in rotor production line for automatically assembling described in the utility model Figure;
Attached drawing 10 is that the structure of loop truss mechanism of rotor production line for automatically assembling described in the utility model China and foreign countries is shown It is intended to;
Attached drawing 11 is the front view that testing agency is rotated in rotor production line for automatically assembling described in the utility model;
Attached drawing 12 is the left view that testing agency is rotated in rotor production line for automatically assembling described in the utility model.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific embodiment the utility model is described in further detail.
Attached drawing 1-12 is rotor production line for automatically assembling described in the utility model, including rack, switch board, setting The pipeline 3 being connect in rack and with switch board line is sequentially placed along 3 transporting direction of pipeline and is connect with switch board line Iron core group dress feed mechanism 1, iron core endoporus tumbling mechanism 2, iron core glue applying mechanism 4, iron core plaster mechanism 5, magnetic sheet pressurization it is fixed Type mechanism 6, outer circle testing agency 7 are arranged and cure in 3 discharge end of pipeline and the continuous tunnel furnace placed with 3 same straight line of pipeline The rotation testing agency 9 in 8 discharge end of continuous tunnel furnace curing mechanism is arranged in mechanism 8;When work:Iron core group fills feed mechanism 1 one by one Iron core is put on pipeline 3, when iron core is transported to iron core endoporus tumbling mechanism 2, iron core endoporus tumbling mechanism 2 is to iron core Endoporus carries out tumbling, and then iron core is transported to iron core glue applying mechanism 4, and iron core glue applying mechanism 4 understands the position to waiting for patch on iron core Dispensing is carried out, then iron core is transported to iron core plaster mechanism 5, and iron core plaster mechanism 5 can be in the surface automatic chip mounting of iron core, then Iron core is transported to magnetic sheet pressurization shaping mechanism 6, and magnetic sheet pressurization shaping mechanism 6 squeezes magnetic sheet, so that magnetic sheet is fixed on iron core surface, connect It iron core and is transported to outer circle testing agency 7, whether the outer circle that multiple magnetic sheets detect in outer circle testing agency 7 reaches requirement, then complete Enter continuous tunnel furnace curing mechanism 8 from pipeline 3 at the rotor of patch, continuous tunnel furnace curing mechanism 8 makes magnetic sheet by heated baking It is secured firmly to iron core surface, it is last to be put by hand to rotation testing agency 9 from the discharge end of continuous tunnel furnace curing mechanism 8 by rotor Upper high speed rotation detects the bonding strength of magnetic sheet on rotor;
The iron core group dress feed mechanism 1 includes loading working table 11, is arranged and fixes end cap on loading working table 11 Riveting machine 12 on iron core is arranged the iron core riveted is placed into the feeder on pipeline 3 automatically on riveting machine 12 Tool hand 13;When work:By hand by together with end cap and iron core assembly, it is subsequently placed in riveting machine 12 and is riveted, last feeder The iron core riveted is placed on pipeline 3 by tool hand 13 automatically;
The iron core endoporus tumbling mechanism 2 includes tumbling workbench 21, is arranged and is placed vertically on tumbling workbench 21 Tumbling supporting rack 22, the double-station tumbling for being arranged on tumbling workbench 21 and being placed between tumbling supporting rack 22 and pipeline 3 Manipulator 23, the positioning for being arranged on tumbling supporting rack 22 and being placed in right over 23 one of station of double-station tumbling manipulator The roller burnishing knife 25 that abutment sleeve 24 is driven and stretched by tumbling motor 26 is arranged on tumbling supporting rack 22 in sleeve 24;Work When:Double-station tumbling manipulator 23 will wait for that the iron core of tumbling is placed in abutment sleeve 24 on pipeline 3, while by abutment sleeve 24 The interior iron core for completing tumbling is placed on pipeline 3, and then motor driving roller burnishing knife 25 is to waiting for the iron core of tumbling in abutment sleeve 24 Carry out tumbling;
The dispensing that the iron core glue applying mechanism 4 includes dispensing supporting rack 41, is horizontally set on 41 upper end of dispensing supporting rack is solid Fixed board 42, the dispensing movable plate 45 being arranged below dispensing fixed plate 42, be each passed through 42 4 angles of dispensing fixed plate and with The point that driving dispensing movable plate 45 moves up and down is arranged in dispensing fixed plate 42 in the dispensing guide post 44 of the connection of dispensing movable plate 45 Glue lifting cylinder 43, the glue-dropping tool 47 for being arranged in 45 bottom of dispensing movable plate and being placed in 3 surface of pipeline, multiple settings exist 45 bottom of dispensing movable plate and the dispensing machinery hand 46 placed with 47 even circumferential of glue-dropping tool;When work:Dispensing lifting cylinder 43 driving dispensing movable plates 45 move down, and then fix iron core by glue-dropping tool 47, last multiple dispensing machinery hands 46 Carry out dispensing;
The iron core plaster mechanism 5 includes patch workbench 51, is arranged and is driven by stepper motor on patch workbench 51 Dynamic patch jig 53 is arranged in patch workbench 51 and the double-station chip mounter that is placed between patch jig 53 and pipeline 3 Tool hand 55, is separately positioned on two magnetic sheet feeding tracks 54 at the magnetic sheet feeding track 54 for being separately positioned on 53 both sides of patch jig Pusher manipulator 52 that pushed upwards magnetic sheet is moved towards 53 direction of patch jig, be separately positioned on two magnetic sheet feeding tracks 54 into Expect the belt conveyor 53 at end;Magnetic sheet on the belt conveyor 53 is in a row placed, and pusher manipulator 52 can be from Belt Conveying It will be in entire row magnetic sheet push-in magnetic sheet feeding track 54 on machine 53;When work:Magnetic sheet is first in a row manually placed to two Belt Conveyings On machine 53, then stepper motor driving patch jig 53, which rotates by a certain angle, (when pasting four magnetic sheets, is rotated by 90 °;When patch six When piece magnetic sheet, 60 degree are rotated;When pasting eight magnetic sheets, 45 degree are rotated, and so on), most latter two pusher manipulator 52 difference Magnetic sheet in corresponding magnetic sheet feeding track 54 is pushed towards 53 direction of patch jig and completes patch, is not had when in magnetic sheet feeding track 54 After having magnetic sheet, entire row magnetic sheet can be pushed into magnetic sheet feeding rail by two pusher manipulators 52 from corresponding belt conveyor 53 respectively In road 54, automatic feeding;
The magnetic sheet pressurization shaping mechanism 6 includes sizing supporting rack 61, is horizontally set on determining for sizing 61 upper end of supporting rack Type fixed plate 62, be arranged sizing fixed plate 62 below sizing movable plate 65, be each passed through sizing 62 4 angles of fixed plate and Sizing guide post 64, the setting driving sizing movable plate 65 in sizing fixed plate 62 being connect with sizing movable plate 65 move up and down Sizing lifting cylinder 63, be arranged in sizing 65 bottom of movable plate and the localization tool 67, the Duo Geshe that are placed in right over pipeline 3 It sets in sizing 65 bottom of movable plate and the sizing cylinder 66 placed with 67 even circumferential of localization tool;Working method and iron core dispensing As mechanism 4, therefore no longer describe;
The outer circle testing agency 7 includes outer circle testing stand 71, is arranged on outer loop truss frame 71 and is placed in pipeline 3 just The outer loop truss lifting that driving outer circle detector 73 slides up and down is arranged on outer loop truss frame 71 in the outer circle detector 73 of top Cylinder 72;When work:Outer loop truss lifting cylinder 72 first drives outer circle detector 73 to move downward, and the iron core of completion patch is made to set In in outer circle detector 73, outer loop truss is then carried out;
The continuous tunnel furnace curing mechanism 8 includes being arranged in 3 discharge end of pipeline and the tunnel placed with 3 same straight line of pipeline Road stove curing oven 81, setting put 3 upper rotor part of pipeline in continuous tunnel furnace curing oven 81 in 81 feed end of continuous tunnel furnace curing oven And enter stove manipulator 82 in what array was placed;When work:Enter stove manipulator 82 and the rotor on pipeline 3 is first put into continuous tunnel furnace It in curing oven 81, and is placed in array, then iron core process of passing through tunnel stove curing oven 81, which carries out heated baking, makes magnetic sheet securely fix On iron core surface;
The rotation testing agency 9 includes rotation detection workbench 91, setting on rotation detection workbench 91 and stretches into The rotating jig 92 of 91 lower section of rotation detection workbench, setting 92 high speed of driving rotating jig below rotation detection workbench 91 The V belt translation 98, two of rotation is vertically arranged in 92 both sides of rotating jig and across the lifting guide pillar of rotation detection workbench 91 93, it is arranged above rotation detection workbench 91 for connecting the upper connecting rod 95 of two 93 upper ends of lifting guide pillar, setting is being revolved Turn the lower section of detection workbench 91 for connect the lower connecting rods 96 of two 93 lower ends of lifting guide pillar, setting on upper connecting rod 95 and It is placed in the protective cover 94 right over rotating jig 92, setting its output end and lower connecting rod 96 below rotation detection workbench 91 It connects the rotation for driving protective cover 94 to move up and down and detects lifting cylinder 97;When work:First the rotor after solidification is placed in On rotating jig 92, then rotation detection lifting cylinder 97 drives protective cover 94 to move down, and rotor is made to be placed in protective cover 94, Last V belt translation 98 drives 92 high speed rotation of rotating jig, detects the bonding strength of magnetic sheet on rotor.
Further, the continuous tunnel furnace curing oven 81 be divided into from feed end to discharge end warming-up section 811, constant temperature zone 812, Temperature descending section distance piece 813 forces cooling section 814.
Further, the double-station tumbling manipulator 23 and double-station chip machinery hand 55 include the shaft placed vertically 232, the material grasping motor 231 of the rotation of drive shaft 232, the double end cylinder 235 for being horizontally set on 232 upper end of shaft, difference are vertical Be arranged 235 liang of output ends of double end cylinder material grasping lifting cylinder 234, be separately positioned on two material grasping lifting cylinders 234 and export The clamping jaw cylinder 233 at end.
Further, the glue-dropping tool 47 and localization tool 67 include magnechuck, are vertically arranged in magnechuck The positioning pin that portion is used to be inserted into iron core endoporus.
Due to the application of the above technical scheme, the utility model has following advantages compared with prior art:
Rotor production line for automatically assembling described in the utility model only needs that rotor component is manually put into upper discharge position, It realizes automatic assembling, to save human resources, greatly reduces into production cost, and with high efficiency, high-precision, Gao Liang The advantages that product rate.
The specific application example that the above is only the utility model does not constitute the scope of protection of the utility model any limit System.Any technical scheme formed by adopting equivalent transformation or equivalent replacement, all fall within the utility model rights protection scope it It is interior.

Claims (5)

1. a kind of rotor production line for automatically assembling, it is characterised in that:Including rack, switch board, be arranged in rack and with The pipeline of switch board line connection, is sequentially placed along pipeline transporting direction and the iron core group being connect with switch board line loads onto material Mechanism, iron core endoporus tumbling mechanism, iron core glue applying mechanism, iron core plaster mechanism, magnetic sheet pressurization shaping mechanism, outer circle detection machine Structure is arranged in pipeline discharge end and the continuous tunnel furnace curing mechanism placed with the same straight line of pipeline, and setting cures in continuous tunnel furnace The rotation testing agency of mechanism discharge end.
2. rotor production line for automatically assembling according to claim 1, it is characterised in that:The iron core group fills feeder Structure includes loading working table, the riveting machine being fixed on end cap on iron core is arranged on loading working table, is arranged on riveting machine The feeding manipulator iron core riveted being placed into automatically on pipeline;
The iron core endoporus tumbling mechanism includes tumbling workbench, the tumbling support placed vertically on tumbling workbench is arranged Frame, the double-station tumbling manipulator for being arranged on tumbling workbench and being placed between tumbling supporting rack and pipeline, setting are being rolled On light supporting rack and be placed in right over the one of station of double-station tumbling manipulator abutment sleeve, be arranged in tumbling supporting rack The upper roller burnishing knife that abutment sleeve is driven and stretched by tumbling motor;
The iron core glue applying mechanism includes dispensing supporting rack, is horizontally set on the dispensing fixed plate of dispensing supporting rack upper end, setting Dispensing movable plate below dispensing fixed plate, the point for being each passed through four angles of dispensing fixed plate and being connect with dispensing movable plate Glue guide post is arranged in dispensing fixed plate the dispensing lifting cylinder for driving dispensing movable plate to move up and down, is arranged in dispensing activity Board bottom portion and be placed in the glue-dropping tool right over pipeline, it is multiple setting dispensing movable plate bottom and with glue-dropping tool circumference it is equal The dispensing machinery hand of even placement;
The iron core plaster mechanism includes patch workbench, is arranged and is controlled by stepper motor driven patch on patch workbench The double-station chip machinery hand that has, be arranged on patch workbench and be placed between patch jig and pipeline is separately positioned on The magnetic sheet feeding track of patch jig both sides is separately positioned on two magnetic sheet feeding track pushed upwards magnetic sheets towards patch jig side To mobile pusher manipulator, it is separately positioned on the belt conveyors of two magnetic sheet feeding track feed ends;The Belt Conveying Magnetic sheet on machine is in a row placed, and entire row magnetic sheet can be pushed into magnetic sheet feeding track by pusher manipulator from belt conveyor;
Magnetic sheet pressurization shaping mechanism include shape supporting rack, be horizontally set on sizing supporting rack upper end sizing fixed plate, Sizing movable plate below sizing fixed plate is set, is each passed through sizing four angles of fixed plate and is connect with sizing movable plate Sizing guide post, be arranged sizing fixed plate on driving sizing movable plate move up and down sizing lifting cylinder, setting shaping The movable plate bottom and localization tool that is placed in right over pipeline, multiple settings movable plate bottom and are justified in sizing with localization tool The sizing cylinder that week uniformly places;
The outer circle that the outer circle testing agency includes outer circle testing stand, is arranged on outer loop truss frame and is placed in right over pipeline The outer loop truss lifting cylinder that driving outer circle detector slides up and down is arranged on outer loop truss frame in detector;
The continuous tunnel furnace curing mechanism includes being arranged in pipeline discharge end and consolidating with the continuous tunnel furnace of the same straight line placement of pipeline Change stove, be arranged and put pipeline upper rotor part in continuous tunnel furnace curing oven and in array placement in continuous tunnel furnace curing oven feed end Enter stove manipulator;
The rotation testing agency includes rotation detection workbench, setting on rotation detection workbench and stretches into rotation detection work Make the rotating jig below platform, setting drives the high-speed rotating V belt translation of rotating jig below rotation detection workbench, two It is vertically arranged in rotating jig both sides and the lifting guide pillar across rotation detection workbench, setting is rotating above detection workbench For connecting the upper connecting rod of two lifting guide pillar upper ends, setting is led below rotation detection workbench for connecting two liftings The lower connecting rod of column lower end, the protective cover for being arranged on upper connecting rod and being placed in right over rotating jig, setting are detected in rotation The rotation that its output end is connect with lower connecting rod for driving protective cover to move up and down below workbench detects lifting cylinder.
3. rotor production line for automatically assembling according to claim 1, it is characterised in that:The continuous tunnel furnace curing oven from Feed end is divided into warming-up section to discharge end, constant temperature zone, temperature descending section distance piece, forces cooling section.
4. rotor production line for automatically assembling according to claim 2, it is characterised in that:The double-station tumbling machinery Hand and double-station chip machinery hand include the shaft placed vertically, the material grasping motor of drive shaft rotation, is horizontally set on and turns The double end cylinder of axis upper end, is separately positioned on two at the material grasping lifting cylinder for being vertically arranged in two output end of double end cylinder respectively The clamping jaw cylinder of material grasping lifting cylinder output end.
5. rotor production line for automatically assembling according to claim 2, it is characterised in that:The glue-dropping tool and positioning Jig includes magnechuck, is vertically arranged in positioning pin of the magnechuck middle part for being inserted into iron core endoporus.
CN201820391960.9U 2018-03-22 2018-03-22 A kind of rotor production line for automatically assembling Active CN207968238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820391960.9U CN207968238U (en) 2018-03-22 2018-03-22 A kind of rotor production line for automatically assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820391960.9U CN207968238U (en) 2018-03-22 2018-03-22 A kind of rotor production line for automatically assembling

Publications (1)

Publication Number Publication Date
CN207968238U true CN207968238U (en) 2018-10-12

Family

ID=63725923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820391960.9U Active CN207968238U (en) 2018-03-22 2018-03-22 A kind of rotor production line for automatically assembling

Country Status (1)

Country Link
CN (1) CN207968238U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108233646A (en) * 2018-03-22 2018-06-29 昆山迈通自动化设备有限公司 A kind of rotor production line for automatically assembling
CN109412361A (en) * 2018-12-05 2019-03-01 巨力自动化设备(浙江)有限公司 ABS electric machine iron core is accurately positioned feeding device
CN110523857A (en) * 2019-08-15 2019-12-03 佛山市顺德区亿盛达精密机械制造有限公司 It is a kind of apply motor production in pressing assembly line
CN111478525A (en) * 2020-04-15 2020-07-31 重庆市美庆科技有限公司 Motor core wiring card mounting machine
CN111682709A (en) * 2020-06-08 2020-09-18 日立电梯电机(广州)有限公司 Stator core assembling method
CN112737236A (en) * 2020-12-25 2021-04-30 广东松庆智能科技股份有限公司 Automatic die-casting production method of aluminum motor rotor

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108233646A (en) * 2018-03-22 2018-06-29 昆山迈通自动化设备有限公司 A kind of rotor production line for automatically assembling
CN109412361A (en) * 2018-12-05 2019-03-01 巨力自动化设备(浙江)有限公司 ABS electric machine iron core is accurately positioned feeding device
CN109412361B (en) * 2018-12-05 2023-09-05 巨力自动化设备(浙江)有限公司 ABS motor core accurate positioning loading attachment
CN110523857A (en) * 2019-08-15 2019-12-03 佛山市顺德区亿盛达精密机械制造有限公司 It is a kind of apply motor production in pressing assembly line
CN111478525A (en) * 2020-04-15 2020-07-31 重庆市美庆科技有限公司 Motor core wiring card mounting machine
CN111478525B (en) * 2020-04-15 2022-12-06 重庆市美庆科技有限公司 Motor core wiring card mounting machine
CN111682709A (en) * 2020-06-08 2020-09-18 日立电梯电机(广州)有限公司 Stator core assembling method
CN111682709B (en) * 2020-06-08 2021-08-31 日立电梯电机(广州)有限公司 Stator core assembling method
CN112737236A (en) * 2020-12-25 2021-04-30 广东松庆智能科技股份有限公司 Automatic die-casting production method of aluminum motor rotor

Similar Documents

Publication Publication Date Title
CN207968238U (en) A kind of rotor production line for automatically assembling
CN108233646A (en) A kind of rotor production line for automatically assembling
CN107756049B (en) Multi-station processing system and method for shock absorber
CN107791011B (en) A kind of full line stud automatic assembly system and method
CN109724521B (en) Full-automatic marking, grading, dispensing and curing device and detection, marking and boxing production system thereof
CN107159835A (en) A kind of automatic nut riveting device
CN109361297A (en) Embedded PMSM rotor magnet steel automatic assembly equipment
CN108637664A (en) The full-automatic package system of the high-accuracy heat dissipation bearing fan of one kind and assembly method
CN203659809U (en) Ball-shaped bulb production facility
CN105904841A (en) Full-automatic transfer printing machine device and transfer printing method thereof
CN109702404B (en) Aluminum template welding rib equipment
CN203817752U (en) Automatic assembling device of connector
CN102284884B (en) Workpiece conveying mechanism
CN109453961B (en) Special-shaped bolt production equipment
CN105014223A (en) Full-automatic high-frequency welding machine and welding method thereof
CN202162615U (en) Workpiece conveying mechanism
CN208214744U (en) A kind of semi-automatic assembling hot riveting machine of automobile instrument index
CN109801768B (en) Motor and method for magnetizing magnetic frame and magnetic strip of motor
CN107984192A (en) Machine shaft top gear press-in device and its pressing method
CN108381165B (en) Start shaft press-fitting equipment and operation method thereof
CN206474896U (en) A kind of intelligent production line of elevator signal system-specific
CN210489756U (en) Portable power source kludge
CN113188414A (en) Automatic detection line for motor rotor iron core
CN109317358B (en) Full-automatic electromagnetic element production line with dispensing system
CN107138347B (en) Magnetic sheet gluing machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant