CN207965627U - A kind of special HIL testboard bay test adaptor harness speeded of meaning - Google Patents
A kind of special HIL testboard bay test adaptor harness speeded of meaning Download PDFInfo
- Publication number
- CN207965627U CN207965627U CN201820145557.8U CN201820145557U CN207965627U CN 207965627 U CN207965627 U CN 207965627U CN 201820145557 U CN201820145557 U CN 201820145557U CN 207965627 U CN207965627 U CN 207965627U
- Authority
- CN
- China
- Prior art keywords
- harness
- meaning
- hil
- adaptor
- uut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The utility model discloses a kind of special HIL testboard bay test adaptor harness speeded of meaning, including meaning spy speed switching harness and UuT transfer harness, the special switching harness of speeding of the meaning includes adaptor connector socket and meaning spy connect with adaptor connector socket speeds ECU1 plugs and Yi Te speed ECU2 plugs, and UuT harness of transferring includes UuT connectors and the adaptor connector plug being connect with UuT connectors;A kind of special HIL testboard bay test adaptor harness speeded of the meaning spy's HIL testboard bays of speeding that will anticipate are connected with tested electronic control unit, complete the transmission of energy and the transmission of signal between HIL boards and UuT, the efficiency for being tested exemplar is replaced when improving different test event switchings, harness cost when different test platforms or rack switching is reduced, the risk that handoff procedure causes harness to be lost is reduced.
Description
Technical field
The utility model designs technical field of new energy more particularly to a kind of special HIL testboard bays test speeded of meaning
Switching harness.
Background technology
The development prospect of new-energy automobile is wide, will necessarily become the main traffic trip tool of future world;New energy
Automobile is widely regarded as one of the main path for the problems such as solving automobile exhaust pollution and short petroleum-based energy, with new energy
The technology of automobile improves, and market is universal and fast-developing, is also carried to the properties of product, reliability, safety of its key components and parts
Go out increasingly higher demands;Entire car controller and battery management system and power battery are as New-energy electric vehicle core
Part:Wherein, the arbiter that entire car controller is exported as automobile kinetic energy, performance directly affect the safety of vehicle traveling;Power
Battery is responsible for the energy supply of automobile and is stored, and performance directly affects service life and the safety of electric vehicle;With power battery
Mating battery management system(Generally use distributed structure, by a master control borad and it is multiple from control plate constitute)It controls dynamic
The complicated charge and discharge process of power battery, for ensureing that the safe efficient operation of power battery plays decisive role.Therefore, exist
Comprehensive performance test is carried out to entire power battery pack before entrucking and battery management system and entire car controller are carried out comprehensive
Functional test be necessary.
It is mainly at present independent to the laboratory test of New-energy electric vehicle entire car controller and battery and management system
It carries out, test battery management system is to simulate all batteries monomer with hardware in loop equipment and power battery pack analog machine
The signals such as electric current, voltage, temperature, and by they be respectively connected to battery management system master control borad and all from control plate;This method
The performance of practical power battery pack cannot be simulated completely, and can not be to power battery pack into performance tests such as trip temperature, charge and discharge.
The performance for testing power battery pack is to carry out charge and discharge electrician to the power battery being in temperature simulation equipment with charging/discharging apparatus
The test of condition, and it is combined with entire car controller, this method can carry out comprehensive work(to battery management system and entire car controller
It can test.
Utility model content
The technical problems to be solved in the utility model is to overcome existing technological deficiency, provides a kind of meaning the special HIL surveys speeded
Test stand frame test adaptor harness, can effectively solve the problems in background technology.
In order to solve the above technical problems, the technical solution that the utility model uses is;
Provide a kind of special HIL testboard bay test adaptor harness speeded of meaning, including meaning spy speeds switching harness and UuT switchings
Harness, the special switching harness of speeding of the meaning includes adaptor connector socket and the meaning spy being connect with adaptor connector socket speeds ECU1
Plug and Yi Te speed ECU2 plugs, and the UuT switchings harness includes UuT connectors and switching connect with UuT connectors company
Connect device plug.
Further, the meaning spy speeds ECU1 plugs and Yi Te ECU2 plugs of speeding are led with adaptor connector socket by AWG8
Line and/or AWG20 conducting wires are attached.
Further, the adaptor connector plug is carried out with UuT connectors by AWG8 conducting wires and/or AWG20 conducting wires
Connection.
Further, the adaptor connector socket jacket uses AMP sheaths.
Further, the adaptor connector female terminal using AMP wide Pin accordingly tin plating terminal.
The beneficial effects of the utility model:A kind of special HIL testboard bay test adaptor harness speeded of meaning of the utility model will
Meaning spy HIL testboard bays of speeding connects with tested electronic control unit, the transmission of energy and the biography of signal between completion HIL boards and UuT
It passs;, the efficiency for being tested exemplar is replaced when improving the switching of different test events, reduces different test platforms or when rack switches
Harness cost reduces the risk that handoff procedure causes harness to be lost.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model
Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other attached drawings.
Fig. 1 is a kind of special HIL testboard bay test adaptor wiring harness structure block diagrams speeded of meaning of the utility model.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, the every other embodiment that those of ordinary skill in the art are obtained all belongs to
In the range of the utility model protection.
As shown in Figure 1, according to a kind of special HIL testboard bay test adaptor harness speeded of meaning described in the utility model, packet
Include meaning spy speed switching harness 1 and UuT switching harness 2, the meaning spy speed switching harness 1 including adaptor connector socket 8 and with
The meaning spy that adaptor connector socket 8 connects speeds ECU1 plugs 3 and Yi Te speeds ECU2 plugs 4, the UuT switchings harness 2 includes UuT
Connector 11 and the adaptor connector plug 10 being connect with UuT connectors 11.
In the present embodiment, the meaning spy speeds ECU1 plugs 3 and Yi Te speeds, and ECU2 plugs 4 pass through with adaptor connector socket 8
AWG8 conducting wires and/or AWG20 conducting wires are attached;The adaptor connector plug 10 passes through AWG8 conducting wires with UuT connectors 11
And/or AWG20 conducting wires are attached;Wherein related power supply, ground connection, large current load circuit crimp AWG8 conducting wires, meet related
The current-carrying demand of return wire;Remaining signal communication and small load circuit crimp AWG20 conducting wires, the special switching harness circuit of speeding of meaning
The other end is installed successively according to corresponding aperture position elder generation alphabet ascending order, then the order of Arabic numerals ascending order into adaptor connector socket
In.
In the present embodiment, 8 sheath of adaptor connector socket uses AMP sheaths.
In the present embodiment, 8 terminal of adaptor connector socket using AMP wide Pin accordingly tin plating terminal.
When specifically used, first, meaning spy is speeded into ECU1 plugs 3 and meaning spy speeds ECU2 plugs 4 and HIL test cabinets BOB
ECU1 sockets on panel and the connection of ECU2 sockets;Then UuT connectors 11 are connect with UuT;Finally, adaptor connector is inserted
First 10 connect with adaptor connector socket 8.
In conclusion by means of the above-mentioned technical proposal of the utility model, a kind of special HIL tests speeded of meaning of the utility model
The engine bench test switching harness spy's HIL testboard bays of speeding that will anticipate connects with tested electronic control unit, energy between completion HIL boards and UuT
Transmission and signal transmission;, the efficiency for being tested exemplar is replaced when improving different test event switchings, it is flat to reduce different tests
Harness cost when platform or rack switch reduces the risk that handoff procedure causes harness to be lost.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection domain within.
Claims (5)
1. a kind of special HIL testboard bay test adaptor harness speeded of meaning, which is characterized in that speed switching harness including meaning spy(1)With
UuT switching harness(2), the meaning spy speed switching harness(1)Including adaptor connector socket(8)And with adaptor connector socket
(8)The meaning spy of connection speeds ECU1 plugs(3)It speeds ECU2 plugs with meaning spy(4), the UuT switchings harness(2)Including UuT connectors
(11)And with UuT connectors(11)The adaptor connector plug of connection(10).
2. the special HIL testboard bay test adaptor harness speeded of a kind of meaning according to claim 1, which is characterized in that described
Meaning spy speeds ECU1 plugs(3)It speeds ECU2 plugs with meaning spy(4)With adaptor connector socket(8)Pass through AWG8 conducting wires and/or AWG20
Conducting wire is attached.
3. the special HIL testboard bay test adaptor harness speeded of a kind of meaning according to claim 2, which is characterized in that described
Adaptor connector plug(10)With UuT connectors(11)It is attached by AWG8 conducting wires and/or AWG20 conducting wires.
4. the special HIL testboard bay test adaptor harness speeded of a kind of meaning according to claim 1, which is characterized in that described
Adaptor connector socket(8)Sheath uses AMP sheaths.
5. the special HIL testboard bay test adaptor harness speeded of a kind of meaning according to claim 4, which is characterized in that described
Adaptor connector socket(8)Terminal using AMP wide Pin accordingly tin plating terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820145557.8U CN207965627U (en) | 2018-01-29 | 2018-01-29 | A kind of special HIL testboard bay test adaptor harness speeded of meaning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820145557.8U CN207965627U (en) | 2018-01-29 | 2018-01-29 | A kind of special HIL testboard bay test adaptor harness speeded of meaning |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207965627U true CN207965627U (en) | 2018-10-12 |
Family
ID=63735690
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820145557.8U Expired - Fee Related CN207965627U (en) | 2018-01-29 | 2018-01-29 | A kind of special HIL testboard bay test adaptor harness speeded of meaning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207965627U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109901073A (en) * | 2019-02-22 | 2019-06-18 | 重庆金康动力新能源有限公司 | To plug device, battery modules charge and discharge electricity detecting system and automatically to insert method |
CN113960475A (en) * | 2021-10-26 | 2022-01-21 | 广州巨湾技研有限公司 | Method for rapidly switching test models of different items |
CN114578784A (en) * | 2022-01-24 | 2022-06-03 | 中汽研汽车检验中心(天津)有限公司 | Signal switching box for automobile virtual rack test |
-
2018
- 2018-01-29 CN CN201820145557.8U patent/CN207965627U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109901073A (en) * | 2019-02-22 | 2019-06-18 | 重庆金康动力新能源有限公司 | To plug device, battery modules charge and discharge electricity detecting system and automatically to insert method |
CN113960475A (en) * | 2021-10-26 | 2022-01-21 | 广州巨湾技研有限公司 | Method for rapidly switching test models of different items |
CN114578784A (en) * | 2022-01-24 | 2022-06-03 | 中汽研汽车检验中心(天津)有限公司 | Signal switching box for automobile virtual rack test |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9784780B2 (en) | Battery simulator with variable current capacity | |
CN207965627U (en) | A kind of special HIL testboard bay test adaptor harness speeded of meaning | |
CN110134115B (en) | Hardware-in-loop test platform and test method for new energy vehicle power battery management system | |
CN105486949A (en) | Charging pile test system | |
CN103207334B (en) | A kind of test macro of electric automobile combined charging equipment and method of testing thereof | |
CN213183232U (en) | Intelligent power battery module training platform for small vehicle | |
CN207832980U (en) | A kind of new energy vehicle power battery pack and battery management engine bench test system | |
CN111398863A (en) | Direct current transformer control and protection device test platform and method based on RTDS | |
CN207232755U (en) | A kind of new energy vehicle BMS charging CAN communication test systems with real load | |
CN102456914B (en) | A kind ofly be applicable to the automobile-used lithium ion battery pack system of power electric | |
CN210668925U (en) | Communication harness, simulation test equipment and system | |
WO2021206211A1 (en) | Charging adaptor that is compatible with can-plc data communication | |
CN107843848A (en) | A kind of electrokinetic cell and battery management test stand system | |
CN111324106A (en) | Vehicle control unit and battery management system combined hardware-in-the-loop test bench | |
CN202084602U (en) | Lithium-ion battery pack system suitable for power electric car | |
CN213092561U (en) | Aircraft maintenance standard line construction practical training platform | |
CN113570953A (en) | Battery system teaching platform based on analog battery and implementation method | |
CN108365659B (en) | Battery module parallel tool and battery module parallel system | |
CN109144032B (en) | Communication test device for bus network control component | |
CN208255331U (en) | A kind of charging pile CC/CP device for testing functions | |
CN218470879U (en) | Testing device and testing system of battery management system | |
CN207965529U (en) | A kind of Hardware-in-the-loop simu- lation system of the master and slave control plate of test battery management system | |
CN218099402U (en) | Direct current charging pile simulation device for function test | |
CN108536115A (en) | A kind of detection device of electrokinetic cell system Main Control Tank | |
KR20210024539A (en) | DC voltage charging post for charging electric vehicles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181012 Termination date: 20210129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |