CN207959429U - Sponge urban road receives drainage structure - Google Patents

Sponge urban road receives drainage structure Download PDF

Info

Publication number
CN207959429U
CN207959429U CN201820348918.9U CN201820348918U CN207959429U CN 207959429 U CN207959429 U CN 207959429U CN 201820348918 U CN201820348918 U CN 201820348918U CN 207959429 U CN207959429 U CN 207959429U
Authority
CN
China
Prior art keywords
water
sink
permeable
harvesting
aquifer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820348918.9U
Other languages
Chinese (zh)
Inventor
光军伟
吴纪东
王超慧
李晓冬
葛晓亮
马庆华
常兴无
张立文
王小娜
赵艳辉
葛峰鑫
高猛
王巍
张静
多志远
王哲良
任远
韩正好
赵永亮
李明
任宗五
赵向阳
梁宪荣
马勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Municipal Engineering General Corp
Original Assignee
Zhengzhou Municipal Engineering General Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Municipal Engineering General Corp filed Critical Zhengzhou Municipal Engineering General Corp
Priority to CN201820348918.9U priority Critical patent/CN207959429U/en
Application granted granted Critical
Publication of CN207959429U publication Critical patent/CN207959429U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Sewage (AREA)

Abstract

The utility model discloses a kind of sponge urban roads to receive drainage structure, is equipped with pavement and driveway along road width direction, the inside on pavement is equipped with greenbelt, and driveway upper edge link length direction is equipped at intervals with rainwater inspection well;Greenbelt includes aquifer, composite geo-membrane, planting soil layer, permeable geotextiles, middle layer of sand and grass planting brick layer from the bottom to top;Driveway is embedded with harvesting sink along link length direction, and harvesting sink includes groove body, and groove body top is flush with running surface;It is equipped with the elongated slot for receiving and keeping water in groove body, gap is equipped between groove body top surface at the top of elongated slot;Several receipts wells are equipped at intervals on driveway at greenbelt, it is multistage to receive well and will receive and keep sink separator, and every section of harvesting sink is spaced and is connected with several water-permeable pipes, and the water-permeable pipe other end stretches into aquifer;The utility model improves road using harvesting sink and stores outlet capacity, and can be sustained after the rain into greenbelt, reduces watering frequency, mitigates discharge pressure when raining heavyly.

Description

Sponge urban road receives drainage structure
Technical field
The utility model is related to urban construction technical fields more particularly to road to receive drainage structure.
Background technology
Sponge city is new generation of city storm water man- agement concept, refers to that city is brought in adaptation environmental change and reply rainwater Natural calamity etc. there is good " elasticity ", also referred to as " water elasticity city ".International term is " low influence Develop storm-water system structure ".Water suction, water storage, infiltration, water purification when raining, by the water stored " release " and are used when needing.
Build sponge city, it is necessary to develop corresponding water storage structure, water transfer structure and water distribution structure.Urban road is general Including pavement and driveway, certain roads Che Deng can be divided into car lane and non-motorized lane again.The design of current main-stream is Pavement is arranged together with greenbelt.Kind is implanted with green plant in greenbelt, waters.Currently, greenbelt water storage function It is limited, separated by tree pond between each region of greenbelt, cannot effectively be connected to, causes some region moisture sufficient, some regions It needs to water, improves the frequency of watering, increase labor intensity.
Utility model content
The purpose of this utility model is to provide a kind of sponge urban roads to receive drainage structure, is improved using harvesting sink Road stores outlet capacity, and can be sustained after the rain into greenbelt, greatly reduces watering frequency, mitigates municipal rainwater when raining heavyly The discharge pressure of pipe network.
To achieve the above object, the utility model sponge urban road receive drainage structure, along road width direction by It is equipped with pavement and driveway successively outside to inside, driveway is non-motorized lane and/or car lane;The inside on pavement is equipped with Greenbelt, greenbelt are equipped at intervals with several tree ponds along link length direction, set in pond and kind to be implanted with green plants;Driveway upper edge road Road length direction is equipped at intervals with several rainwater inspection wells;Running surface is less than pavement surface;On carriageway width direction, Rainwater inspection well upper end is less than its both sides running surface, and rainwater inspection well is connected with municipal Storm Sewer Network;
Greenbelt includes aquifer, planting soil layer and middle layer of sand from the bottom to top, and middle layer of sand upper berth is equipped with grass planting brick layer;Plantation Outer kerbstone is equipped on the outside of soil layer, outer kerbstone is identical as planting soil layer height and is flush;Interior kerbstone is equipped on the inside of planting soil layer, it is interior Kerbstone upper surface is higher than grass planting brick layer upper surface;
It is equipped between aquifer top surface and planting soil layer for permeable and to prevent planting soil from falling to compound in aquifer Geomembrane;Permeable geotextiles are equipped between planting soil layer and middle layer of sand;
Driveway is embedded with harvesting sink along link length direction, and harvesting sink includes groove body, groove body top and driveway Surface is flush, and middle part and the groove body top of planting soil layer are located at same level;Groove body connects with pavement;It is equipped in groove body Elongated slot for receiving and keeping water is equipped with the gap that elongated slot is flowed into for the surface water, the gap edge between elongated slot top and groove body top surface The length direction of groove body is arranged and positioned at the lowest point of groove body top surface width direction;
Several receipts wells are equipped at intervals on driveway at greenbelt, it is multistage, harvesting to receive well and will receive and keep sink separator The sink end-enclosed adjacent with well is received is arranged;Well bottom is received by connecting line to be connected with rainwater inspection well;
Every section of harvesting sink is respectively connected with several water-permeable pipes, and water-permeable pipe one end is connected with groove body and is connected with elongated slot, The water-permeable pipe other end stretches into aquifer;Permeable length of tube is more than or equal to 1 meter;There is water-permeable pipe the gradient and its to stretch into the one of water pipe End is less than one end that it is connected with harvesting sink;Slot bottom of the one end that water-permeable pipe is connected with harvesting sink higher than harvesting sink 5-8 centimetres;
It is covered with permeable geotextiles outside water-permeable pipe;The both ends of water-permeable pipe are equipped with the filtering for stopping sundries in water Net;
The aquifer is metalling or water storage brick layer;It is evenly equipped on the tube wall of water-permeable pipe for permeable hole.
The grain size of 50-100 centimetres of the water storage thickness, rubble is 30-50 millimeters;The planting soil thickness 70-100 Centimetre, the middle layer of sand is 20 centimetres thick.
Along road width direction, bottom setting in the outer height of grass planting brick layer.
Each tree Chi Chu is equipped with the communicating pipe of the aquifer for being connected to the both sides Shu Chi, communicating pipe is located at the bottom of aquifer Portion, communicating pipe arrange that the both ends of communicating pipe are respectively positioned on the medium position of aquifer width direction at the edge of tree Chi Neiyanshuchi.
Pavement other than the greenbelt is equipped with the gradient along its width direction and lowest point connects with greenbelt;Pavement On be provided along its length the blind way brick that several rows are used to indicate blind person;Upper edge its width direction in pavement is equipped at intervals with several Arrange water-permeable brick.
Stretch into 100 centimetres of the threshold value tree pond of aquifer the communicating pipe, the caliber of communicating pipe is 100 millimeters.
The harvesting sink is provided along its length the gradient.
The water-permeable pipe curved arrangement.
It is respectively equipped with movable shutter grate at the top of the both ends of every section of harvesting sink length direction.
It is equipped with mudhole between the least significant end receipts well adjacent thereto of every section of harvesting sink, the diameter of mudhole is more than etc. In 15 centimetres;Mudhole opening is equipped with drain plug in one end of harvesting sink.
The utility model has the following advantages:
Aquifer and harvesting sink can be made full use of to carry out water storage using the structure of the utility model, when rainy, and prevented Only surface gathered water.The groove body of harvesting sink connects with pavement, and pavement is higher than driveway, therefore the rainwater meeting that pavement flows down Accumulate first into harvesting sink, achievees the purpose that when rainfall is smaller first by rainwater-collecting.Rainfall is larger, receives and keeps water After slot stores completely, the rainwater at sink is received and kept under the action of the gradient can smoothly flow into receipts well and import municipal rain pipe Net prevents surface gathered water.
Under dry weather, the water in aquifer can provide moisture content for planting soil layer, prevent planting soil layer excessively dry, protect Card root system of plant obtains sufficient water supply.The middle part of planting soil layer is located at same level with groove body top so that harvesting sink Groove body store full water after, can provide higher hydraulic pressure to aquifer by water-permeable pipe, make water in aquifer more easily by Composite geo-membrane enters planting soil layer.
It is evenly equipped on the tube wall of water-permeable pipe for permeable hole, therefore the water in it can by even tube wall enter Aquifer.The setting of filter screen can prevent the sundries entered in harvesting sink with rainwater from entering aquifer, reducing aquifer Water storage effect, while preventing the permeable hole on permeable tube wall from blocking.
Communicating pipe position it is excessively high when, water level be less than communicating pipe after communicating pipe with regard to disequilibrium water effect.Therefore, it is connected to Pipe can preferably play the role of connection, equilibrium water amount positioned at the bottom of aquifer.Communicating pipe is on the side of tree Chi Neiyanshuchi Along arrangement, to have substantially no effect on the green natural growth for being of taking root, the both ends of communicating pipe are respectively positioned in aquifer width direction Portion position prevents the edge for communicating pipe being located at aquifer width direction from leading to ore layer to play the role of preferably receiving water Shipwreck at opposite side is to pass through communicating pipe.
Set pond has buffer action to the aquifer of its both sides, it is possible to occur the aquifer moisture storage capacitys of the sides Shu Chi compared with It is more, and the phenomenon that the water shortage of the other side.The setting of communicating pipe can avoid this phenomenon, make greenbelt in the longitudinal direction everywhere Water-holding quantity it is more uniform, avoid the phenomenon of drought and waterlogging unevenness.If greenbelt is everywhere, some region waters are enriched and other areas Domain needs to water, then on the one hand water, on the other hand also to distinguish often place region drought and waterlogging situation, workload compared with Greatly, watering is frequent, needs to expend more manpower.After communicating pipe is arranged, each region water-holding quantity of greenbelt is uniform, not with previous water Homogeneous phase ratio can more fully utilize the water-holding capacity in each region of greenbelt so that each region needs the time watered to become Together, no longer need to distinguish which region which region that needs to water does not need when greatly reducing the frequency of watering, and watering Watering, reduces labor intensity.After communicating pipe is arranged, the watering demand in each region of greenbelt is convergent, significantly improves on the whole Working efficiency, reduces watering cost.
Description of the drawings
Fig. 1 is the overlooking structure diagram of the utility model;
Fig. 2 is the vertical cross-section schematic diagram of the utility model at water-permeable pipe;
Fig. 3 is the vertical cross-section schematic diagram for receiving the utility model at well;
Fig. 4 is the schematic cross-section received and kept at sink;
Fig. 5 is the enlarged drawing at A in Fig. 2.
Specific implementation mode
Arrow direction in Fig. 1 to Fig. 3 show gradient direction namely water (flow) direction.
As shown in Figures 1 to 5, the sponge urban road of the utility model receives drainage structure along road width direction by outer It is inwardly equipped with pavement 1 and driveway 2 successively, driveway 2 is non-motorized lane and/or car lane;The inside on pavement 1 is set There are greenbelt 3, greenbelt 3 to be equipped at intervals with several tree ponds 4 along link length direction, interior kind of tree pond 4 is implanted with green plants 5;With people The adjacent 2 upper edge link length direction of driveway in trade 1 is equipped at intervals with several rainwater inspection wells 6;2 surface of driveway is less than people's row 1 surface of road;In 2 width direction of driveway, 6 upper end of rainwater inspection well is less than its 2 surface of both sides driveway, rainwater inspection well 6 It is connected with municipal Storm Sewer Network;Municipal Storm Sewer Network is existing apparatus, not shown.
Greenbelt 3 includes aquifer 7, planting soil layer 8 and middle layer of sand 9 from the bottom to top, and 9 upper berth of middle layer of sand is equipped with grass planting brick layer 10;8 outside of planting soil layer is equipped with outer kerbstone 11, and outer kerbstone 11 is identical as 8 height of planting soil layer and is flush;In planting soil layer 8 Side is equipped with interior kerbstone 14, and 14 upper surface of interior kerbstone is higher than 10 upper surface of grass planting brick layer, can be deposited in sub-fraction rainwater green Change at band, the rainwater of greening belt surface is made all not flow down quickly, the sufficient time is provided to being oozed under moisture.
It is equipped between 7 top surface of aquifer and planting soil layer 8 and is used for permeable and prevents planting soil from falling to answering in aquifer 7 Close geomembrane 12;Permeable geotextiles 13 are equipped between planting soil layer 8 and middle layer of sand 9;
Driveway 2 is embedded with harvesting sink 15 along link length direction, and harvesting sink 15 includes groove body 16,16 top of groove body It is flush with 2 surface of driveway, middle part and 16 top of groove body of planting soil layer 8 are located at same level;Groove body 16 and pavement 1 Connect;It is equipped with the elongated slot 17 for receiving and keeping water in groove body 16, is equipped between 17 top of elongated slot and 16 top surface of groove body and is used for the surface water The gap 18 of elongated slot 17 is flowed into, which is arranged along the length direction of groove body 16 and positioned at 16 top surface width direction of groove body Lowest point;
Be equipped at intervals with several receipts wells 19 on driveway 2 at greenbelt, receive well 19 will receive and keep sink 15 be divided into it is more Section, harvesting sink 15 end-enclosed adjacent with well 19 is received are arranged(It is not attached to lead to receipts well 19 so that rainwater can stay In the presence of in harvesting sink 15, will not flow away along well 19 is received);Well bottom is received by connecting line 20 to be connected with rainwater inspection well It connects;
Every section of harvesting sink 15 is connected with several water-permeable pipes 21, water-permeable pipe 21 along the length direction interval of harvesting sink 15 One end is connected with groove body 16 and is connected with elongated slot 17, and 21 other end of water-permeable pipe stretches into aquifer 7;Permeable length of tube be more than etc. In 1 meter;Water-permeable pipe 21 the have gradient and its stretch into one end of water pipe less than one end that it is connected with harvesting sink;Water-permeable pipe Slot bottom 5-8 centimetre of the one end being connected with harvesting sink higher than harvesting sink(Including endpoints thereof);To prevent mud from blocking Pipeline opening.
It is covered with permeable geotextiles 13 outside water-permeable pipe 21(It is routine techniques in pipe outer cladding cloth, it is not shown permeable herein Geotextiles 13);The both ends of water-permeable pipe 21 are equipped with the filter screen 23 for stopping sundries in water;
The aquifer 7 is metalling or water storage brick layer;It is evenly equipped on the tube wall of water-permeable pipe 21 for permeable hole.
The aquifer 7 is 50-100 centimetres thick, and the grain size of rubble is 30-50 millimeters;8 thickness 70- of the planting soil layer 100 centimetres, the middle layer of sand 9 is 20 centimetres thick.Each numberical range includes endpoints thereof.
Along road width direction, bottom setting in the outer height of grass planting brick layer 10.
Each tree Chi4Chu is equipped with the communicating pipe 22 of the aquifer 7 for being connected to tree 4 both sides of pond, communicating pipe 22 is located at water storage The bottom of layer 7.Communicating pipe 22 position it is excessively high when, water level be less than communicating pipe 22 after communicating pipe 22 with regard to disequilibrium water effect. Therefore, communicating pipe 22 is located at the bottom of aquifer 7, can preferably play the role of connection, equilibrium water amount.Communicating pipe 22 is setting Along the edge arrangement in tree pond 4 in pond 4, to have substantially no effect on the green natural growth for being of taking root, the both ends of communicating pipe 22 are respectively positioned on The medium position of 7 width direction of aquifer prevents communicating pipe 22 to be located at 7 width of aquifer to play the role of preferably receiving water The edge in direction causes the shipwreck at the opposite side of ore layer with by communicating pipe 22.
Set pond 4 has buffer action to the aquifer 7 of its both sides, it is possible to 7 moisture storage capacity of aquifer of tree 4 side of pond occurs It is more, and the phenomenon that the water shortage of the other side.The setting of communicating pipe 22 can avoid this phenomenon, make greenbelt 3 in the longitudinal direction Water-holding quantity everywhere is more uniform, avoids the phenomenon of drought and waterlogging unevenness.If greenbelt 3 is everywhere, some region waters are abundant and another Some regions need to water, then on the one hand water, and on the other hand also to distinguish the drought and waterlogging situation for often locating region, work Measure larger, watering is frequent, needs to expend more manpower.Be arranged communicating pipe 22 after, 3 each region water-holding quantity of greenbelt is uniform, with It is compared toward water is uneven, can more fully utilize the water-holding capacity in 3 each region of greenbelt so that each region needs to water Time it is convergent, no longer need to distinguish which region needs which area of watering when greatly reducing the frequency of watering, and watering Domain need not water, and reduce labor intensity.After communicating pipe 22 is arranged, watering every time waters everywhere to greenbelt 3, from entirety On significantly improve working efficiency, reduce watering cost.
Pavement 1 other than the greenbelt 3 is equipped with the gradient along its width direction and lowest point connects with greenbelt 3;People The blind way brick 24 that several rows are used to indicate blind person is provided along its length on trade 1;Its width direction interval of 1 upper edge of pavement Equipped with several row's water-permeable bricks 25.
Stretch into 100 centimetres of the threshold value tree pond of aquifer 7 communicating pipe 22, the caliber of communicating pipe 22 is 100 millimeters.
The harvesting sink 15 is provided along its length the gradient.
Since harvesting sink 15 is provided along its length the gradient, after receiving and keeping storage full water in sink 15, then flow to Receiving and keeping the rainwater of sink 15 can swimmingly flow to downwards at receipts well 19 along gradient direction, Storm Sewer Network be finally flowed into, to have Effect avoids the water in harvesting sink 15 from storing full rear surface gathered water phenomenon.
21 curved arrangement of the water-permeable pipe, to increase the length and efficiency of water storage permeable.Every section of 15 length side of harvesting sink To both ends at the top of be respectively equipped with movable shutter grate, easy cleaning.
It is equipped with mudhole between every section of least significant end for receiving and keeping sink 15 receipts well 15 adjacent thereto, the diameter of mudhole is big In equal to 15 centimetres.Mudhole opening is equipped with drain plug in one end of harvesting sink.When after using for a longer period, harvesting sink in When putting aside the dirts such as more sludge, drain plug can be extracted, dirt is poured by mudhole with water and receives well 15, Jin Ertong Municipal Storm Sewer Network discharge is crossed, after avoiding long-time use, receives and keeps that the dirt in sink is cumulative, influences normally to make With.Mudhole and drain plug are conventional structure, not shown.
It when raining, falls and is pooled to naturally at greenbelt 3 under the action of the rainwater on pavement 1 is in the gradient, water is by planting Careless brick layer 10, middle layer of sand 9, permeable geotextiles 13, planting soil layer 8, composite geo-membrane 12 reach aquifer 7, savings rubble it Between gap in or water storage brick in.When raining heavyly, the speed oozed under water is slower than speed of raining, therefore rainwater can flow to driveway 2 On.Rainwater on driveway 2 is divided into three parts, and a part flows into harvesting sink 15, is stored in elongated slot 17;It is another on driveway 2 A part of rainwater, which flows into, receives well 19 side by side to municipal Storm Sewer Network;Part III rainwater on driveway 2 flows into rainwater inspection Well 6 enters municipal Storm Sewer Network side by side.After receiving and keeping storage full water in sink 15, the rainwater continued to flow at this branches to receipts water naturally Well 19 or rainwater inspection well 6.Since harvesting sink 15 is provided along its length the gradient, when storage full water in harvesting sink 15 Afterwards, then flow to harvesting sink 15 rainwater can along gradient direction downwards swimmingly flow to receive well 19 at, finally flow into rain pipe Net, to effectively avoid the water in harvesting sink 15 from storing full rear surface gathered water phenomenon.
Aquifer 7 and harvesting sink 15 can be made full use of to carry out water storage using the structure of the utility model, when rainy, and Prevent surface gathered water.When fine, the water in aquifer 7 can be that planting soil layer 8 provides moisture content, prevent 8 mistake of planting soil layer In drying, ensure that root system of plant obtains sufficient water supply.The middle part of planting soil layer 8 is located at same level with 16 top of groove body, So that after the groove body 16 of harvesting sink 15 stores full water, higher hydraulic pressure can be provided to aquifer 7 by water-permeable pipe 21, make water storage Water in layer 7 enters planting soil layer 8 more easily by composite geo-membrane 12.After even if the water in harvesting sink 15 is finished, store 7 middle and lower part institute water storage part of water layer remains able to enter in planting soil layer 8, this is because following two physical phenomenons:1, capillary is existing As causing the water of lower section to be moved upward.2, when the moisture content in aquifer 7 is more than planting soil layer 8, the phase of the gas in aquifer 7 It is more than the relative humidity of gas in planting soil layer 8 to humidity, therefore the vapor in aquifer 7 will enter planting soil layer naturally In 8.
Be evenly equipped on the tube wall of water-permeable pipe 21 for permeable hole, thus the water in it can by even tube wall into Enter aquifer 7.The setting of filter screen 23 can prevent the sundries entered in harvesting sink 15 with rainwater from entering aquifer 7, reducing The water storage effect of aquifer 7, while preventing the permeable hole on 21 tube wall of water-permeable pipe from blocking.
Above example is only to illustrate and unrestricted the technical solution of the utility model, although with reference to above-described embodiment pair The utility model is described in detail, it will be understood by those of ordinary skill in the art that:Still can to the utility model into Row modification or equivalent replacement should all without departing from any modification or partial replacement of the spirit and scope of the utility model Cover in the right of the utility model.

Claims (10)

1. sponge urban road receives drainage structure, it is equipped with pavement and driveway successively along road width direction ecto-entad, Driveway is non-motorized lane and/or car lane;It is characterized in that:The inside on pavement is equipped with greenbelt, and greenbelt is along road Road length direction is equipped at intervals with several tree ponds, sets in pond and kind to be implanted with green plants;Driveway upper edge link length direction interval is set There are several rainwater inspection wells;Running surface is less than pavement surface;On carriageway width direction, rainwater inspection well upper end is low In its both sides running surface, rainwater inspection well is connected with municipal Storm Sewer Network;
Greenbelt includes aquifer, planting soil layer and middle layer of sand from the bottom to top, and middle layer of sand upper berth is equipped with grass planting brick layer;Planting soil layer Outside is equipped with outer kerbstone, and outer kerbstone is identical as planting soil layer height and is flush;Interior kerbstone, interior kerbstone are equipped on the inside of planting soil layer Upper surface is higher than grass planting brick layer upper surface;
It is equipped between aquifer top surface and planting soil layer and is used for permeable and prevents planting soil from falling to the composite earthwork in aquifer Film;Permeable geotextiles are equipped between planting soil layer and middle layer of sand;
Driveway is embedded with harvesting sink along link length direction, and harvesting sink includes groove body, groove body top and running surface It is flush, middle part and the groove body top of planting soil layer are located at same level;Groove body connects with pavement;It is equipped with and is used in groove body The elongated slot of water is received and kept, is equipped with the gap for flowing into elongated slot for the surface water at the top of elongated slot between groove body top surface, the gap is along groove body Length direction be arranged and positioned at groove body top surface width direction lowest point;
Several receipts wells are equipped at intervals on driveway at greenbelt, it is multistage to receive well and will receive and keep sink separator, receives and keeps sink The end-enclosed adjacent with well is received is arranged;Well bottom is received by connecting line to be connected with rainwater inspection well;
Every section of harvesting sink is respectively connected with several water-permeable pipes, and water-permeable pipe one end is connected with groove body and is connected with elongated slot, permeable The pipe other end stretches into aquifer;Permeable length of tube is more than or equal to 1 meter;It is low that there is water-permeable pipe the gradient and its to stretch into one end of water pipe One end that Yu Qiyu harvesting sinks are connected;Slot bottom 5-8 of the one end that water-permeable pipe is connected with harvesting sink higher than harvesting sink Centimetre;
It is covered with permeable geotextiles outside water-permeable pipe;The both ends of water-permeable pipe are equipped with the filter screen for stopping sundries in water;
The aquifer is metalling or water storage brick layer;It is evenly equipped on the tube wall of water-permeable pipe for permeable hole.
2. sponge urban road according to claim 1 receives drainage structure, it is characterised in that:The water storage thickness 50- 100 centimetres, the grain size of rubble is 30-50 millimeters;70-100 centimetres of the planting soil thickness, the middle layer of sand are 20 centimetres thick.
3. sponge urban road according to claim 1 receives drainage structure, it is characterised in that:Along road width direction, Bottom setting in the outer height of grass planting brick layer.
4. sponge urban road according to claim 1 receives drainage structure, it is characterised in that:Each tree Chi Chu is all provided with useful In the communicating pipe of the aquifer of the both sides connection Shu Chi, it is located at the bottom of aquifer communicating pipe, communicating pipe is tree Chi Neiyanshuchi's Edge arranges that the both ends of communicating pipe are respectively positioned on the medium position of aquifer width direction.
5. sponge urban road according to claim 1 receives drainage structure, it is characterised in that:Other than the greenbelt Pavement is equipped with the gradient along its width direction and lowest point connects with greenbelt;Several rows are provided along its length on pavement It is used to indicate the blind way brick of blind person;Upper edge its width direction in pavement is equipped at intervals with several row's water-permeable bricks.
6. sponge urban road according to claim 4 receives drainage structure, it is characterised in that:The communicating pipe stretches into storage The caliber in 100 centimetres of the threshold value tree pond of water layer, communicating pipe is 100 millimeters.
7. sponge urban road according to claim 1 receives drainage structure, it is characterised in that:The harvesting sink is along it Length direction is equipped with the gradient.
8. sponge urban road according to claim 1 receives drainage structure, it is characterised in that:The water-permeable pipe is bent cloth It sets.
9. sponge urban road according to claim 1 receives drainage structure, it is characterised in that:Every section of harvesting sink length It is respectively equipped with movable shutter grate at the top of the both ends in direction.
10. sponge urban road according to claim 1 receives drainage structure, it is characterised in that:
Mudhole is equipped between every section of least significant end for receiving and keeping sink receipts well adjacent thereto, the diameter of mudhole is more than or equal to 15 Centimetre;Mudhole opening is equipped with drain plug in one end of harvesting sink.
CN201820348918.9U 2018-03-15 2018-03-15 Sponge urban road receives drainage structure Active CN207959429U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820348918.9U CN207959429U (en) 2018-03-15 2018-03-15 Sponge urban road receives drainage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820348918.9U CN207959429U (en) 2018-03-15 2018-03-15 Sponge urban road receives drainage structure

Publications (1)

Publication Number Publication Date
CN207959429U true CN207959429U (en) 2018-10-12

Family

ID=63742786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820348918.9U Active CN207959429U (en) 2018-03-15 2018-03-15 Sponge urban road receives drainage structure

Country Status (1)

Country Link
CN (1) CN207959429U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193758A (en) * 2018-03-15 2018-06-22 郑州市市政工程总公司 Sponge urban road receives drainage structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193758A (en) * 2018-03-15 2018-06-22 郑州市市政工程总公司 Sponge urban road receives drainage structure
CN108193758B (en) * 2018-03-15 2024-01-09 郑州市市政工程总公司 Sponge urban road storing and draining structure

Similar Documents

Publication Publication Date Title
CN108193758A (en) Sponge urban road receives drainage structure
CN102720267B (en) Ecological building and working method thereof
CN207362631U (en) A kind of road rain water recovery system of sponge urban construction
CN206090587U (en) School dropout's attitude system of watering is gathered to side slope
KR101163615B1 (en) A tree rain/nutrient liquid supplying apparatus
CN107926625A (en) A kind of water-collecting irrigation device suitable for gardens
CN211368282U (en) Municipal road pavement structure based on sponge city
CN211185126U (en) Roof greening system of building
CN110952640B (en) Sponge city seepage and drainage structure and sponge city water circulation system
CN206635863U (en) A kind of rainwater purification is regulated and stored system
CN206575904U (en) A kind of domatic saline and alkaline improvement vegetation water-saving structure
CN106499033B (en) Road green belt system for drainage and water retention
CN205894164U (en) Street greening takes energy -conserving environment -friendly device
CN214116694U (en) Ecological case of planting and applied this water conservancy ecological stereoplasm revetment of planting case
CN109763538A (en) Rainwater penetration system
CN207244782U (en) A kind of rainwater cyclic utilization system for mountain area sponge urban construction
CN207959429U (en) Sponge urban road receives drainage structure
CN109183532A (en) A kind of north city rainwater purification depending on road is regulated and stored ecological utilization system
CN205934646U (en) Water conservancy system
CN205357488U (en) A irrigation equipment for roof greening lawn
CN211353410U (en) Sloping field tea garden infiltration pipe water intaking drip irrigation system that catchments
CN210421325U (en) Prevent soil erosion and water loss's greenbelt
CN209194665U (en) Cell storm sewer exhaust system
CN209636585U (en) A kind of pavement grass planting ditch
CN207828737U (en) A kind of greenbelt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant