CN207944566U - A kind of connection structure being built in construction material - Google Patents
A kind of connection structure being built in construction material Download PDFInfo
- Publication number
- CN207944566U CN207944566U CN201721643640.XU CN201721643640U CN207944566U CN 207944566 U CN207944566 U CN 207944566U CN 201721643640 U CN201721643640 U CN 201721643640U CN 207944566 U CN207944566 U CN 207944566U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- spliceosome
- positioning column
- connecting rod
- positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of connection structure being built in construction material, the first cylinder, the second cylinder are equipped in the first spliceosome, first automatic telescopic link and the first positioning column are equipped with third cylinder in the second spliceosome, 4th cylinder, the second automatic telescopic link and the second positioning column;First cylinder is located at the lower section of the first positioning column, and the second cylinder is located at the top of the first positioning column, and the first positioning hole being adapted to the first positioning column is equipped between the first cylinder and the second cylinder;Third cylinder is located at the lower section of the second positioning column, and the 4th cylinder is located at the top of the second positioning column, and the second location hole being adapted to the second positioning column is equipped between third cylinder and the 4th cylinder.The device of fixed connecting rod is arranged in the first spliceosome and the second spliceosome, so that the first spliceosome and the second spliceosome is passed through connecting rod and securely fixed, simple in structure, cost is relatively low by the first spliceosome, the second spliceosome and connecting rod for the utility model.
Description
Technical field
The utility model is related to the connection structure fields of building board more particularly to one kind to be built in construction material
Connection structure.
Background technology
In the prior art, the connection of glass fibre reinforced gypsum board material generally uses plate to be completed with plate connecting method, this
Form of construction work, which not only needs to expend a large amount of working hour in seaming position, carries out splicing polishing, at the same the structural strength of seam crossing and
Stability can not be guaranteed, and most of settling modes are by with bolt fixed plate material, causing bolt leakage in plank, having
The assembling of plank may be influenced, and unsightly.
Therefore, the prior art is defective, needs to improve.
Utility model content
Technical problem to be solved in the utility model is:It is simple in structure to provide one kind, is easy production, is conducive to plank and assembles
The connection structure being built in construction material.
The technical solution of the utility model is as follows:A kind of connection structure being built in construction material, including the first splicing
Body, the second spliceosome, and the connecting rod for connecting the first spliceosome and the second spliceosome;Wherein, first spliceosome
In be equipped with the first cylinder, the second cylinder, the first automatic telescopic link and the first positioning column, the is equipped in second spliceosome
Three cylinders, the 4th cylinder, the second automatic telescopic link and the second positioning column;First cylinder is located under the first positioning column
Side, second cylinder are located at the top of the first positioning column, are equipped between first cylinder and the second cylinder and the first positioning
The first positioning hole of column adaptation, first positioning column are located in first positioning hole, and first automatic telescopic link is located at first
The middle part of location hole;The third cylinder is located at the lower section of the second positioning column, and the 4th cylinder is located at the upper of the second positioning column
Side is equipped with the second location hole being adapted to the second positioning column, second positioning column between the third cylinder and the 4th cylinder
In second location hole, second automatic telescopic link is located at the middle part of second location hole.
Using above-mentioned technical proposal, in the connection structure being built in construction material, first spliceosome and
Fool proof neck is equipped in second spliceosome, the connecting rod is equipped with the fool proof snap-gauge being adapted to fool proof neck.
Using above-mentioned each technical solution, in the connection structure being built in construction material, the connecting rod two
Concave structure setting is held, handle is provided on the concave architecture.
Using above-mentioned each technical solution, the utility model by the first spliceosome, the second spliceosome and connecting rod,
The device of fixed connecting rod is set in the first spliceosome and the second spliceosome, the first spliceosome and the second spliceosome is made to pass through connection
Bar securely fixes, simple in structure, and cost is relatively low.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Specific implementation mode
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail.
Present embodiments provide a kind of connection structure being built in construction material, including the first spliceosome 1, the second splicing
Body 15, and the connecting rod 8 for connecting the first spliceosome 1 and the second spliceosome 15;Wherein, it is set in first spliceosome 1
There are the first cylinder 2, the second cylinder 7, the first automatic telescopic link 4 and the first positioning column 3, is equipped in second spliceosome 15
Third cylinder 14, the 4th cylinder 9, the second automatic telescopic link 12 and the second positioning column 13;First cylinder 2 is located at first
The lower section of positioning column 3, second cylinder 7 are located at the top of the first positioning column 3, between first cylinder, 2 and second cylinder 7
Equipped with the first positioning hole being adapted to the first positioning column 3, first positioning column 3 is located in first positioning hole, and described first certainly
Dynamic telescopic rod 4 is located at the middle part of first positioning hole;The third cylinder 14 is located at the lower section of the second positioning column 13, the 4th gas
Cylinder 9 is located at the top of the second positioning column 13, is equipped between the third cylinder 14 and the 4th cylinder 9 and is adapted to the second positioning column 13
Second location hole, second positioning column 13 is located in second location hole, and it is fixed that second automatic telescopic link 12 is located at second
The middle part in position hole.
Such as Fig. 1, in the present embodiment, the first spliceosome 1 and the second spliceosome 15 are all glass fibre reinforced gypsum board, the
It is filled out between one spliceosome 1 and the second spliceosome 15 and sets layer slot 16, then spliced the first spliceosome 1 and second with connecting rod 8
Body 15 connects, and realizes and is seamlessly connected.First cylinder 2 is set in the first spliceosome 1, the second cylinder 7, the first automatic telescopic link 4,
And first positioning column 3.First cylinder 2 is located at 3 lower section of the first positioning column, and the second cylinder 7 is located at 3 top of the first positioning column.The
First positioning hole is provided between one cylinder 2 and the second cylinder 7, the first positioning column 3 is located among first positioning hole, the first positioning
Column 3 can slide in first positioning hole.First, the first positioning column 3 is close to the first cylinder 2, at this point, the first automatic telescopic link 4
It is compressed by the first positioning column 3.Start the first cylinder 2, the first positioning column 3 is washed away by the first cylinder 2, along first positioning hole toward second
7 direction of cylinder moves.When the first positioning column 3 passes through connecting rod 8 and is contacted with the second cylinder 7, the first automatic telescopic link 4 is released
It puts, in the elongation to first positioning hole of the first automatic telescopic link 4, the first positioning column 3 is fastened on the first automatic telescopic link 4 and second
Between cylinder 7.When needing to exit connecting rod 8, the first automatic telescopic link 4 is retracted, and the first positioning column 3 can freely exist at this time
It is slided in first positioning hole.Second cylinder 7 starts, and the first positioning column 3 is launched toward 2 direction of the first cylinder, makes the first positioning column 3
Return back to initial position.Second spliceosome 15 is similar with 1 structure of the first spliceosome, third cylinder 14 in the second spliceosome 15,
The operation logic and the first spliceosome 1 of 4th cylinder 9, the second automatic telescopic link 12, the second positioning column 13 and second location hole
Equally, excessive description is not done herein.In this way, setting structure by the way that card is arranged in the first spliceosome 1 and the second spliceosome 15, make
Connecting rod 8 securely fixes the first spliceosome 1 and the second spliceosome 15, and for the structure after assembly without leakage position, overall appearance is beautiful
It sees.
Further, it is equipped with fool proof neck 5 in first spliceosome, 1 and second spliceosome 15, is set in the connecting rod 8
There is the fool proof snap-gauge 10 being adapted to fool proof neck 5.
Such as Fig. 1, in order to ensure that the first positioning column 3 and the second positioning column 13 can pass through connecting rod 8, in the first spliceosome
1 and second fool proof neck 5 is arranged on spliceosome 15, and the fool proof snap-gauge 10 being adapted to fool proof neck 5 is arranged in connecting rod 8.When
After fool proof snap-gauge 10 is pushed into fool proof neck 5, the first positioning column 3 and the second positioning column 13 can pass freely through connecting rod 8.
Further, the concave structure 6 in 8 both ends of the connecting rod is arranged, and handle is provided on the concave architecture 6
11。
For the ease of being put into connecting rod 8 into the first spliceosome 1 and the second spliceosome 15, or by connecting rod 8 from first
Spliceosome 1 and the second spliceosome 15 are taken out, and the both ends of connecting rod 8 are arranged to concave architecture 6, one is set up on concave architecture 6
Handle 11 can conveniently pick and place connecting rod 8 using handle 11 as impetus.
Using above-mentioned each technical solution, the utility model by the first spliceosome, the second spliceosome and connecting rod,
The device of fixed connecting rod is set in the first spliceosome and the second spliceosome, the first spliceosome and the second spliceosome is made to pass through connection
Bar securely fixes, simple in structure, and cost is relatively low.
The above is only the preferred embodiments of the present utility model only, is not intended to limit the utility model, all in this practicality
All any modification, equivalent and improvement etc., should be included in the guarantor of the utility model made by within novel spirit and principle
Within the scope of shield.
Claims (3)
1. a kind of connection structure being built in construction material, it is characterised in that:Including the first spliceosome, the second spliceosome, with
And the connecting rod for connecting the first spliceosome and the second spliceosome;Wherein, the first cylinder is equipped in first spliceosome, the
Two cylinders, the first automatic telescopic link and the first positioning column, are equipped with third cylinder in second spliceosome, the 4th cylinder, the
Two automatic telescopic links and the second positioning column;First cylinder is located at the lower section of the first positioning column, and second cylinder is located at
The top of first positioning column is equipped with the first positioning hole being adapted to the first positioning column between first cylinder and the second cylinder,
First positioning column is located in first positioning hole, and first automatic telescopic link is located at the middle part of first positioning hole;Described
Three cylinders are located at the lower section of the second positioning column, and the 4th cylinder is located at the top of the second positioning column, the third cylinder and
The second location hole being adapted to the second positioning column is equipped between four cylinders, second positioning column is located in second location hole, institute
State the middle part that the second automatic telescopic link is located at second location hole.
2. the connection structure according to claim 1 being built in construction material, it is characterised in that:First spliceosome
With in the second spliceosome the fool proof snap-gauge being adapted to fool proof neck is equipped with equipped with fool proof neck, the connecting rod.
3. the connection structure according to claim 1 being built in construction material, it is characterised in that:The connecting rod both ends
Concave structure setting is provided with handle on the concave architecture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721643640.XU CN207944566U (en) | 2017-11-30 | 2017-11-30 | A kind of connection structure being built in construction material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721643640.XU CN207944566U (en) | 2017-11-30 | 2017-11-30 | A kind of connection structure being built in construction material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207944566U true CN207944566U (en) | 2018-10-09 |
Family
ID=63703991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721643640.XU Active CN207944566U (en) | 2017-11-30 | 2017-11-30 | A kind of connection structure being built in construction material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207944566U (en) |
-
2017
- 2017-11-30 CN CN201721643640.XU patent/CN207944566U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207944566U (en) | A kind of connection structure being built in construction material | |
CN205976596U (en) | Assembly type building supporting frame | |
CN207110530U (en) | A kind of civil engineering support meanss | |
CN204169293U (en) | Legerity type desk | |
CN205395366U (en) | High strength glass steel honeycomb panel | |
CN202706269U (en) | Connection structure of acrylic-plate curtain wall | |
CN202559814U (en) | Iron tower | |
CN206267312U (en) | A kind of adjustable steel construction security booth steel structure frame | |
CN208885027U (en) | A kind of steel structure net rack preassembling positioning device based on BIM | |
CN205655092U (en) | High strength steel board | |
CN204344598U (en) | A kind of piecing devices for rod member spatial joins | |
CN209090223U (en) | A kind of combined folding table tennis table | |
CN203514948U (en) | Large-span portable arched tent | |
CN207314524U (en) | A kind of high performance concrete chain type combining structure | |
CN208534089U (en) | A kind of ancient building pin pier connects reinforcing and repairs structure | |
CN203034916U (en) | Assembled construction barrier | |
CN201943224U (en) | Imperforate connecting fixture of point-supported glass curtain wall | |
CN203700968U (en) | Box girder internal formwork and box girder manufacturing formwork system | |
CN206260406U (en) | A kind of canopy film auxiliary installation device | |
CN206256365U (en) | Arch bridge | |
CN205805013U (en) | A kind of device of pre-stress fibre sheet material reinforced column | |
CN206781129U (en) | A kind of new waterproof elastic composite structure | |
CN205063321U (en) | Building cross fastener | |
CN207176949U (en) | A kind of anti-deformation environment-friendly type of waterproof integrates sheet material | |
CN205712647U (en) | A kind of S type roof system batter post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Room 901, building D1, TCL Science Park, 1001 Zhongshan Garden Road, Shuguang community, Xili street, Nanshan District, Shenzhen, Guangdong 518000 Patentee after: Shenzhen Jianhe Construction Group Co.,Ltd. Address before: 8 / F, building D3, TCL International e city, Zhongshan Garden Road, Nanshan District, Shenzhen, Guangdong 518000 Patentee before: SHENZHEN JIANHE DECORATION ENGINEERING Co.,Ltd. |
|
CP03 | Change of name, title or address |