CN207934028U - The foundation structure of serious Collapsible Loess District basement process - Google Patents

The foundation structure of serious Collapsible Loess District basement process Download PDF

Info

Publication number
CN207934028U
CN207934028U CN201820156799.7U CN201820156799U CN207934028U CN 207934028 U CN207934028 U CN 207934028U CN 201820156799 U CN201820156799 U CN 201820156799U CN 207934028 U CN207934028 U CN 207934028U
Authority
CN
China
Prior art keywords
pile
foundation
serious
collapsible loess
basement process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820156799.7U
Other languages
Chinese (zh)
Inventor
邢沛霖
张艳军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITIC General Institute of Architectural Design and Research Co Ltd
Original Assignee
CITIC General Institute of Architectural Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CITIC General Institute of Architectural Design and Research Co Ltd filed Critical CITIC General Institute of Architectural Design and Research Co Ltd
Priority to CN201820156799.7U priority Critical patent/CN207934028U/en
Application granted granted Critical
Publication of CN207934028U publication Critical patent/CN207934028U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model is related to a kind of foundation structures of serious Collapsible Loess District basement process, including the element earth pile being set in the collapsible loess soil body, the cushion lime being covered on element earth pile, the rigid pile through cushion lime and between element earth pile, the pile foundation support table being connected in rigid pile and with rigid pile and the foundation beam being connected with pile foundation support table on pile foundation support table, back fill course is covered on cushion lime.The utility model using the above structure can be to avoid loess immersion saturated yielding, while increasing substantially bearing capacity of pile foundation, and the safety of pile foundation is substantially increased under the premise of reducing basic cost.

Description

The foundation structure of serious Collapsible Loess District basement process
Technical field
The utility model is related to a kind of foundation structures of serious Collapsible Loess District basement process.
Background technology
In the Base foundation design of the serious Site of Collapsible Loess of big thickness, be faced with conventional foundation treatment mode without The problems such as method eliminates so deep collapsibility of loess, and foundation treatment depth cannot meet code requirement.When using rigid pile foundation It must consider not carry out the negative friction of basement process part collapsible loess, be to ensure bearing capacity of pile foundation, Shi Biyao in this way Stake is lengthened, stake diameter is increased or increases stake number, engineering economy is very poor.
Invention content
For under such special geologic condition, the utility model provides a kind of serious Collapsible Loess District basement process Foundation structure, the structure can increase substantially bearing capacity of pile foundation in the case where identical stake is long, big under the premise of reducing basic cost The big safety for improving pile foundation.
To achieve the above object, the utility model adopts the following technical solution:A kind of serious Collapsible Loess District ground The foundation structure of processing, including the element earth pile being set in the collapsible loess soil body, the ash being covered on element earth pile Soil padding, the rigid pile through cushion lime and between element earth pile, the stake being connected in rigid pile and with rigid pile Base cushion cap and the foundation beam being connected with pile foundation support table on pile foundation support table, are covered with back fill course on cushion lime.
Pipeline box culvert is embedded in the back fill course of the utility model.
In the above-mentioned technical solutions, element earth pile filler material is clay.
In the above-mentioned technical solutions, cushion lime is generally 500mm thickness.It may be used 3:7 dirt, ranging from entire ground Process range.
In the above-mentioned technical solutions, rigid pile is reinforced concrete pile or other types pile foundation.
In the above-mentioned technical solutions, pipeline box culvert is reinforced concrete pipiline box culvert.
The utility model using the above structure can be to avoid loess immersion saturated yielding, while increasing substantially bearing capacity of pile foundation, The safety of pile foundation is substantially increased under the premise of reducing basic cost.
Description of the drawings
Fig. 1 is the structural schematic diagram of this practicality.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific embodiment is described further this Ground Treatment Schemes utility model.
As shown in Figure 1, the utility model includes the element earth pile 1 being set in the collapsible loess soil body, is covered in element Cushion lime 2 on native compaction pile 1, is located at rigid pile 3 at the rigid pile 3 through cushion lime 2 and between element earth pile 1 The upper and pile foundation support table 4 being connected with rigid pile 3 and the foundation beam 5 being connected with pile foundation support table 4 on pile foundation support table 4, dirt pad It is covered with back fill course 6 on layer 3.Structural column 9 is connected on foundation beam 5.
The pipeline box culvert 7 for putting pipeline 8 is embedded in the back fill course 6 of the utility model.
In the above-mentioned technical solutions, element earth pile filler material is clay.
In the above-mentioned technical solutions, cushion lime is generally 500mm thickness.It may be used 3:7 dirt, ranging from entire ground Process range.
In the above-mentioned technical solutions, rigid pile is general reinforced concrete pile or other types pile foundation.
In the above-mentioned technical solutions, pipeline box culvert is general reinforced concrete pipiline box culvert.
Specific implementation step is as follows:
First within the scope of the proposed place of building, expires hall according to certain spacing and arrange element earth pile 1;Wait for that plain soil squeezes After close stake 1 detects qualification, then 500mm thickness 3 is completely spread on it:7 cushion limes 2;Rigid pile of constructing again 3;Wait for that the detection of rigid pile 3 is closed It constructs again after lattice pile foundation support table 4 and foundation beam 5;Then construction backfill 6 and equipment pipe external wrapping concrete box culvert 7, then construct Superstructure(Pipeline 8, structural column 9).
After implementing according to the above technical scheme, when rigid pile Design of Bearing Capacity, element earth pile 1 handles saturated yielding in depth bounds Property loess can be included in positive friction by native parameter value under natural conditions, in element earth pile 1 bottom to rigid pile bottom range Untreated collapsible loess can be included in positive friction by native parameter value under saturation state;It does not account for not only so untreated The negative friction of part collapsible loess is included in its positive friction instead, to which bearing capacity of pile foundation greatly improved.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not It is confined to this, any one skilled in the art within the technical scope disclosed by the utility model, can readily occur in Change or replacement, should be covered within the scope of the utility model.

Claims (6)

1. a kind of foundation structure of serious Collapsible Loess District basement process, it is characterised in that:Including being set to collapsibility Huang It is element earth pile in the soil body, the cushion lime being covered on element earth pile, through cushion lime and compacted positioned at element soil Rigid pile between stake, the pile foundation support table being connected in rigid pile and with rigid pile and on the pile foundation support table it is solid with pile foundation support table Foundation beam even is covered with back fill course on cushion lime.
2. the foundation structure of serious Collapsible Loess District basement process according to claim 1, it is characterised in that:Backfill Pipeline box culvert is embedded in soil layer.
3. the foundation structure of serious Collapsible Loess District basement process according to claim 1, it is characterised in that:Plain soil Compaction pile filler material is clay.
4. the foundation structure of serious Collapsible Loess District basement process according to claim 1, it is characterised in that:Dirt Bed course thickness is 500mm.
5. the foundation structure of serious Collapsible Loess District basement process according to claim 1, it is characterised in that:Rigidity Stake is reinforced concrete pile.
6. the foundation structure of serious Collapsible Loess District basement process according to claim 2, it is characterised in that:Pipeline Box culvert is reinforced concrete pipiline box culvert.
CN201820156799.7U 2018-01-30 2018-01-30 The foundation structure of serious Collapsible Loess District basement process Active CN207934028U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820156799.7U CN207934028U (en) 2018-01-30 2018-01-30 The foundation structure of serious Collapsible Loess District basement process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820156799.7U CN207934028U (en) 2018-01-30 2018-01-30 The foundation structure of serious Collapsible Loess District basement process

Publications (1)

Publication Number Publication Date
CN207934028U true CN207934028U (en) 2018-10-02

Family

ID=63650581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820156799.7U Active CN207934028U (en) 2018-01-30 2018-01-30 The foundation structure of serious Collapsible Loess District basement process

Country Status (1)

Country Link
CN (1) CN207934028U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469086A (en) * 2018-11-10 2019-03-15 中国石油化工股份有限公司临汾煤层气分公司 A kind of Collapsible Loess District pump house ground Simple treatment method
CN109797769A (en) * 2019-03-14 2019-05-24 兰州理工大学 A kind of Collapsible Loess District underground pipe gallery foundation structure and its construction method
CN115748791A (en) * 2022-11-16 2023-03-07 中国能源建设集团广东省电力设计研究院有限公司 Collapsible loess area pile foundation structure and construction method thereof
US11686062B1 (en) 2022-06-14 2023-06-27 Prince Mohammad Bin Fahd University Geofabric-containing foundation system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469086A (en) * 2018-11-10 2019-03-15 中国石油化工股份有限公司临汾煤层气分公司 A kind of Collapsible Loess District pump house ground Simple treatment method
CN109797769A (en) * 2019-03-14 2019-05-24 兰州理工大学 A kind of Collapsible Loess District underground pipe gallery foundation structure and its construction method
CN109797769B (en) * 2019-03-14 2024-04-09 兰州理工大学 Collapsible loess area underground comprehensive pipe gallery foundation structure and construction method thereof
US11686062B1 (en) 2022-06-14 2023-06-27 Prince Mohammad Bin Fahd University Geofabric-containing foundation system
US11702814B1 (en) 2022-06-14 2023-07-18 Prince Mohammad Bin Fahd University Stone column foundation system for collapsible soils
US11846082B1 (en) 2022-06-14 2023-12-19 Prince Mohammad Bin Fahd University Foundation system for collapsible soils
CN115748791A (en) * 2022-11-16 2023-03-07 中国能源建设集团广东省电力设计研究院有限公司 Collapsible loess area pile foundation structure and construction method thereof
CN115748791B (en) * 2022-11-16 2023-09-26 中国能源建设集团广东省电力设计研究院有限公司 Collapsible loess area pile foundation structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN207934028U (en) The foundation structure of serious Collapsible Loess District basement process
CN204023431U (en) A kind of corrugated steel culvert fills structure
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN102888834B (en) A kind of construction method of major diameter broken stone pile
CN105544512A (en) Reinforced sack grouting stone-breaking pile with heat transferring tube buried therein and construction method
CN105298516A (en) Combined supporting structure of steel pipe pile steel-bar-embedded tunnel composite lining used for soft foundation
CN202117068U (en) Micropile plate-type composite foundation
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN207959264U (en) Soft clay foundation adjoins High-filled emkankment pipe gallery
CN205225280U (en) A combined supporting structure that is used for steel -pipe pile bar planting tunnel composite lining of soft base
CN203684204U (en) Plastic flow soft foundation reinforced structure
CN101691760B (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN205152971U (en) Composite pile foundation pile is offended and disobey with rude remarks and is shaken damping adjustment device
CN203238642U (en) Supporting retaining wall of foundation pit
CN110512636A (en) One kind being suitable for double-layer staggered formula long-short pile composite shock insulation basis under the conditions of macroseism
CN102605758A (en) Pile type reinforcement system
CN203855956U (en) Cast-in-place pile structure with sleeve
CN212477620U (en) Structure for building gravity dam on deep and thick covering layer
CN102943480B (en) Loess foundation pit supporting method
CN201212151Y (en) Retaining wall foundation structure
CN103790173A (en) Lime-soil compaction pile and CFG rigid pile combined device and method for disposing collapsible loess
CN209760216U (en) reinforcement system based on soft soil foundation drainage consolidation
CN203755332U (en) Device for treating collapsible loess with lime-soil compaction piles and CFG rigid piles combined
CN208088230U (en) A kind of net dress Ke shell barricades
CN104895095A (en) A method of reinforcing deep water foundation pit steel sheet pile cofferdams

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant