CN207919724U - A kind of prefabricated assembled rainwater storage tank - Google Patents

A kind of prefabricated assembled rainwater storage tank Download PDF

Info

Publication number
CN207919724U
CN207919724U CN201820036723.0U CN201820036723U CN207919724U CN 207919724 U CN207919724 U CN 207919724U CN 201820036723 U CN201820036723 U CN 201820036723U CN 207919724 U CN207919724 U CN 207919724U
Authority
CN
China
Prior art keywords
end wall
upper cover
fixedly connected
bottom plate
upstream end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820036723.0U
Other languages
Chinese (zh)
Inventor
陆胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhengyi Water Co Ltd
Original Assignee
Anhui Zhengyi Water Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhengyi Water Co Ltd filed Critical Anhui Zhengyi Water Co Ltd
Priority to CN201820036723.0U priority Critical patent/CN207919724U/en
Application granted granted Critical
Publication of CN207919724U publication Critical patent/CN207919724U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of prefabricated assembled rainwater storage tanks,Including upper cover and bottom plate,The upper cover top surface is equipped with inlet port,The upper cover turning pours mouth equipped with perforation upper cover,The base plate interior concrete is fixedly connected with reinforcing bar,Bottom plate turning concrete is fixedly connected with pouring area,The plate upper surface is equipped with installation groove,The installation groove slidably connects downstream end wall,Upstream end wall and side wall,The downstream end wall and the upstream end wall side are opposite equipped with water inlet pore and water outlet pore,The downstream end wall,Upstream end wall and the adjacent side of side wall have been bolted to connection fixed plate,The downstream end wall,Upstream end wall side adjacent with side wall has fixed link to be fixedly connected by fixed plate surface soldered,The inside sidewalls bolt is fixedly connected with mounting bracket,The utility model,It can on-site consolidation,Reduce the amount of labour used,Effectively shorten the duration,Save construction cost,It is safe and efficient,It is convenient and efficient,It is worthy to be popularized.

Description

A kind of prefabricated assembled rainwater storage tank
Technical field
The utility model is related to rainwater storage equipment technology field, specially a kind of prefabricated assembled rainwater storage tank.
Background technology
Rainwater storage tank is a kind of rainwater-collecting facility, is taken up a large area, and can generally be built in city square, greenery patches, stop The lower section of the public domains such as parking lot, main function are that the peak flow of rainfall runoff is kept in it, after maximum stream flow decline Rainwater is discharged at leisure from storage pond again.Rainwater flood peak can be evaded, realize that rainwater recycles, and be avoided that initial stage rain Pollution of the water to receiving waters, moreover it is possible to which positive effect is played in the draining scheduling between drainage.
Currently, the method that the concrete steel building built both at home and abroad in building field generally uses is:In target Building position scene wiretie, Site Template build configuration and cast in situs commerical ready-mixed concrete.It is limited to target building Contraction in Site area, water power auxiliary facility, the concrete curing time, seasonal climate environment and government are in haze weather To the limitation of the conditions such as building trade coercion policy, the structure time of building, cost budgeting, building knot when pm2.5 is exceeded Structure intensity, human cost etc. often exceed and are expected.Excess budget causes immeasurable loss to building enterprise and society, becomes Mutually improve cost.And on-site construction processes are various, and every inter process mutually restricts, and the duration is longer.And in winter When construction, the measures such as brooder need to be used, but concrete quality is not easy to ensure, heating, steel bar meter may cause live fire, give Site operation brings inconvenience, for this purpose, proposing a kind of prefabricated assembled rainwater storage tank.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated assembled rainwater storage tanks, can be reduced and used with on-site consolidation Work amount, effectively shortens the duration, saves construction cost, safe and efficient, convenient and efficient, to solve mentioned above in the background art ask Topic.
To achieve the above object, the utility model provides the following technical solutions:A kind of prefabricated assembled rainwater storage tank, packet Upper cover and bottom plate are included, the upper cover top surface is equipped with inlet port, and the upper cover turning is equipped with the mouth that pours of perforation upper cover, described Base plate interior concrete is fixedly connected with reinforcing bar, and bottom plate turning concrete is fixedly connected with pouring area, the bottom plate upper table Face is equipped with installation groove, and the installation groove slidably connects downstream end wall, upstream end wall and side wall, the downstream end wall and institute It is opposite equipped with pore and water outlet pore, the downstream end wall, upstream end wall and the adjacent side of side wall of intaking to state upstream end wall side Fixed plate, the downstream end wall, upstream end wall and the adjacent side of side wall has been bolted to connection to weld by fixed plate surface It is connected to fixed link to be fixedly connected, the inside sidewalls bolt is fixedly connected with mounting bracket.
Preferably, the inlet port is integral with upper cover pours.
Preferably, the mouth that pours is corresponding with pouring area, and each turning is equipped with 4, remembers 12 altogether.
Preferably, the pouring area is reinforcing bar rolling groove, and lower end enters bottom plate, and upper end is beyond the certain height of upstream end wall.
Preferably, the installation groove be mold pour, be integral with bottom plate, section be it is trapezoidal, groove bottom Width is identical as sidewall thickness.
Preferably, the installation groove can inject mortar into slot.
Compared with prior art, the utility model has the beneficial effects that:
1, the utility model, it is simple in structure, reliable, convenient and efficient, it is of low cost and efficient;
2, all accessories are mill work, can be directly assembled integral at the construction field (site), reduce the amount of labour used, contract significantly Casual labourer's phase;
3, side wall, upstream end wall and downstream end wall realize that seam slip casting pours connection by pouring area, secure, rapidly It is convenient;
4, concrete is injected into installation groove, and side wall and end wall is made to be fixed in slot, it is easy to accomplish and action is efficient, peace Entirely.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model upper cover;
Fig. 3 is the structural schematic diagram of the utility model pouring area;
Fig. 4 is the installation groove structural schematic diagram of the utility model;
Fig. 5 is the side wall and endwall structure schematic diagram of the utility model;
Fig. 6 is the structural schematic diagram of the utility model fixed plate.
In figure:1 upper cover, 2 inlet ports, 3 pour mouth, 4 bottom plates, 5 downstream end walls, 6 side walls, 7 upstream end walls, 8 water inlet pores, 9 mounting brackets, 10 pouring areas, 11 installation grooves, 12 reinforcing bars, 13 fixed links, 14 bolts, 15 fixed plates.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 6 are please referred to Fig.1, the utility model provides a kind of technical solution:The prefabricated assembled rainwater storage tank, including it is upper Lid 1 and bottom plate 4, it is characterised in that:1 top surface of the upper cover has poured inlet port 2, and 1 turning of the upper cover is equipped in perforation Lid 1 pours mouth 3, and 4 inner concrete of the bottom plate is fixedly connected with reinforcing bar 12, and 4 turning concrete of the bottom plate is fixedly connected There are pouring area 10,4 upper surface of the bottom plate to be equipped with installation groove 11, the installation groove 11 slidably connects downstream end wall 5, on End wall 7 and side wall 6 are swum, the downstream end wall 5 and 7 side of the upstream end wall are opposite equipped with water inlet pore 8 and water outlet pore 16, the downstream end wall 5, upstream end wall 7 and 6 adjacent side of side wall are fixedly connected with fixed plate 15 by bolt 14, under described End wall 5 is swum, upstream end wall 7 has fixed link 13 to be fixedly connected with 6 adjacent side of side wall by 15 surface soldered of fixed plate, described 6 inside bolt of side wall is fixedly connected with mounting bracket 9.
Specifically:The inlet port 2 is integral with upper cover 1 and pours.
Specifically:The mouth 3 that pours is corresponding with pouring area 10, and each turning is equipped with 4, remembers 12 altogether.
Specifically:The pouring area 10 is reinforcing bar rolling groove, and lower end enters bottom plate 4, and upper end is beyond the certain height of upstream end wall 7 Degree.
Specifically:The installation groove 11 is that mold pours, and is integral with bottom plate 4, and section is trapezoidal, groove bottom Width it is identical as sidewall thickness.
Specifically:The installation groove 11 can inject mortar into slot.
Operation principle:It is in construction area that the excavation of foundation pit for putting rainwater storage tank is good first, according to designed elevation, reserve The position of water inlet pore 8 and water outlet pore 16 well is easily installed pipeline, and in hole rising pouring slurry, after solidification, assembled accessory is transported To construction site, bottom plate 4 is placed in foundation pit bottom first, then by side wall 6 and 5 fixed plate 15 of upstream end wall 7 and downstream end wall It is fixed by bolt 14, is then welded and fixed fixed link 13, be then placed in assembled good side wall with end wall with loop wheel machine It fills in groove 11, and injects ready-mixed concrete into slot, after solidification, the mouth 3 that pours in upper cover 1 is precisely placed on pouring area 10 On, then the slip casting into the reinforcing bar rolling groove of pouring area 10, turning is poured and is integral, the whole assembled completion of storage pond, subsequently Situation in pond being checked by inlet port 2, being cleared up, the necessary machine such as draining pump can be also installed by mounting bracket 9.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of prefabricated assembled rainwater storage tank, including upper cover (1) and bottom plate (4), it is characterised in that:Upper cover (1) top Portion surface has poured inlet port (2), and upper cover (1) turning pours mouth (3) equipped with perforation upper cover (1), and the bottom plate (4) is interior Portion's concrete is fixedly connected with reinforcing bar (12), and bottom plate (4) turning concrete is fixedly connected with pouring area (10), the bottom plate (4) upper surface is equipped with installation groove (11), and the installation groove (11) slidably connects downstream end wall (5), upstream end wall (7) and Side wall (6), the downstream end wall (5) and the upstream end wall (7) side are opposite to be equipped with water inlet pore (8) and water outlet pore (16), the downstream end wall (5), upstream end wall (7) and the adjacent side of side wall (6) are fixedly connected with fixed plate by bolt (14) (15), there are fixation in the downstream end wall (5), upstream end wall (7) and the adjacent side of side wall (6) by fixed plate (15) surface soldered Bar (13) is fixedly connected, and bolt is fixedly connected with mounting bracket (9) on the inside of the side wall (6).
2. a kind of prefabricated assembled rainwater storage tank according to claim 1, it is characterised in that:The inlet port (2) with Upper cover (1), which is integral, to be poured.
3. a kind of prefabricated assembled rainwater storage tank according to claim 1, it is characterised in that:It is described pour mouth (3) with Pouring area (10) is corresponding, and each turning is equipped with 4, remembers 12 altogether.
4. a kind of prefabricated assembled rainwater storage tank according to claim 1, it is characterised in that:The pouring area (10) is Reinforcing bar rolling groove, lower end enter bottom plate (4), and upper end is beyond the certain height of upstream end wall (7).
5. a kind of prefabricated assembled rainwater storage tank according to claim 1, it is characterised in that:The installation groove (11) It pours for mold, is integral with bottom plate (4), section is trapezoidal, and the width of groove bottom is identical as sidewall thickness.
6. a kind of prefabricated assembled rainwater storage tank according to claim 1, it is characterised in that:The installation groove (11), mortar can be injected into slot.
CN201820036723.0U 2018-01-04 2018-01-04 A kind of prefabricated assembled rainwater storage tank Expired - Fee Related CN207919724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820036723.0U CN207919724U (en) 2018-01-04 2018-01-04 A kind of prefabricated assembled rainwater storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820036723.0U CN207919724U (en) 2018-01-04 2018-01-04 A kind of prefabricated assembled rainwater storage tank

Publications (1)

Publication Number Publication Date
CN207919724U true CN207919724U (en) 2018-09-28

Family

ID=63616328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820036723.0U Expired - Fee Related CN207919724U (en) 2018-01-04 2018-01-04 A kind of prefabricated assembled rainwater storage tank

Country Status (1)

Country Link
CN (1) CN207919724U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351843A (en) * 2020-07-02 2022-04-15 武汉圣禹排水***有限公司 Method for constructing sewage buffer tank and sewage buffer tank constructed by method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351843A (en) * 2020-07-02 2022-04-15 武汉圣禹排水***有限公司 Method for constructing sewage buffer tank and sewage buffer tank constructed by method

Similar Documents

Publication Publication Date Title
CN110241806A (en) A kind of method and crust layer forming crust layer on dredging silt slurry stockyard surface
CN207919724U (en) A kind of prefabricated assembled rainwater storage tank
CN105822068B (en) Ultralong thin walled concrete walls under hot environment pour and maintenance process
CN109441110A (en) A kind of basement shear wall post-cast strip precast outer die construction method
CN207633546U (en) Toilet concrete sealing prefabricated components
CN110056074A (en) Pin-connected panel sewage pumping station and its construction method
CN110847113A (en) Cast-in-place deep arc type wave wall construction method based on sliding formwork
CN218061486U (en) Device for water spraying maintenance of bricks on construction site
CN204418691U (en) A kind of for cast-in-place vertical member and horizontal member junction concrete blocking apparatus
CN218535068U (en) Precast box girder curing means
AU2021101264A4 (en) A foundation pit drainage system for flood control
CN206503069U (en) trestle drainage system
CN201686965U (en) Cast-in-situ reinforced concrete strobe for diversion tunnel
CN111364466B (en) Construction method of dry dock bottom plate
CN211499772U (en) A template structure for roofing parapet
CN202440761U (en) Combined type template used for high pier construction
CN205975677U (en) Precast concrete slot
CN208328869U (en) A kind of prefabricated fish pass slot of bottom plate
CN206053113U (en) It is applied to the attachment structure of the structural slab and fabricated construction plate of fabricated construction
CN220352900U (en) Waterproof structure of intermittent expansion reinforcing belt for underground engineering
CN117868387A (en) BIM-based positioning basement roof post-cast strip concrete support column and method
CN214363641U (en) Post-cast strip folding type block net
CN219864033U (en) Post-pouring belt rainwater diversion mold
CN211257067U (en) Cast-in-place utility tunnel formwork system in many cabins of big section
CN103938867A (en) Method and device for constructing combining position of floor and toilet or balcony

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20210104