CN207892215U - The portable scaffold of adjustable length and height - Google Patents
The portable scaffold of adjustable length and height Download PDFInfo
- Publication number
- CN207892215U CN207892215U CN201820176657.7U CN201820176657U CN207892215U CN 207892215 U CN207892215 U CN 207892215U CN 201820176657 U CN201820176657 U CN 201820176657U CN 207892215 U CN207892215 U CN 207892215U
- Authority
- CN
- China
- Prior art keywords
- telescoping member
- bar telescoping
- height
- scaffold
- adjustable length
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses the portable scaffolds of adjustable length and height, it includes horizon bar telescoping member and vertical bar telescoping member;The horizon bar telescoping member is connect by locking device with connecting rod by horizontally disposed carriage structure and is formed;The vertical bar telescoping member is connect by locking device with connecting rod by the carriage structure arranged vertically and is formed;Multigroup horizon bar telescoping member is combined with each other with vertical bar telescoping member and connects, and constitute cube scaffold frame structure, the middle and upper part of cube scaffold frame structure is provided with the flexible steel plate for operation, skewed horizontal load is installed between the horizon bar telescoping member and vertical bar telescoping member, the both ends of the skewed horizontal load are machined with and the matched pin hole of carriage structure, bolt is installed, the bottom of the cube scaffold frame structure is equipped with universal wheel on the pin hole.Height, length and the connection system for guide rail that can be moved easily can be adjusted.
Description
Technical field
The utility model belongs to construction engineering technical field, and in particular to one kind can require adjust according to engineering construction
Section height, length and the connection system for guide rail that can be moved easily.
Background technology
During overlength continuous wall construction, it cannot generally meet primary concreting, need to be split wall, point
It constructs for many positions in storehouse, in this operation process, is required for poured position in storehouse before often pouring a bin level successively
Scaffold installation is carried out, waits pouring and finishes, and needs to remove on scaffold, adjacent position in storehouse yet to be built is moved to and is installed.It repeats
Assembling and disassembling process has seriously affected whole construction progress, increases job costs.In Practical Project work progress, pour
Position in storehouse size be not it is stereotyped constant, length or height can change because of a variety of causes of engineering, one
As scaffold be difficult to flexibly solve the above problems, certain adverse effect will be generated to engineering in use.
Utility model content
The problem of for encountered in the above engineering construction, the purpose of this utility model is to provide one kind can be according to work
Journey building requirements can adjust height, length and the connection system for guide rail that can be moved easily.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:Adjustable length and height
Portable scaffold, it includes horizon bar telescoping member and vertical bar telescoping member;The horizon bar telescoping member is by level
The carriage structure of arrangement connect composition with connecting rod by locking device;The vertical bar telescoping member by arranging vertically
Carriage structure connect composition with connecting rod by locking device;Multigroup horizon bar telescoping member and the flexible structure of vertical bar
Part is combined with each other connection, and constitutes cube scaffold frame structure, is arranged in the middle and upper part of cube scaffold frame structure
It is useful for the flexible steel plate of operation, skewed horizontal load is installed between the horizon bar telescoping member and vertical bar telescoping member, institute
State skewed horizontal load both ends be machined with the matched pin hole of carriage structure, bolt is installed on the pin hole, it is described vertical
The bottom of cube scaffold frame structure is equipped with universal wheel.
The carriage structure is made of rotatable idler wheel and stressed member, and the rotatable idler wheel two end axles are fixed on
On stressed member, rotatable idler wheel can be freely rotated, and stressed member is coating steel pipe, and stressed member both ends are equipped with the first card
Slot.
The second card slot is provided in the connecting rod, the locking device is by idler wheel clamp, third rotatable shaft and locking
Clamp forms.
The bolt is made of the 4th rotatable shaft and locking clamp.
It is connected by cross bar between the adjacent carriage structure.
It is connected by the second rotatable shaft between the stressed member.
Supporting rod is hinged with by the first rotatable shaft on the side wall of the carriage structure of scaffold bottom.
The utility model compared with prior art, have the advantage that for:
1, by horizon bar telescoping member and vertical bar telescoping member, height can be adjusted according to the needs of construction
With length, the scaffold of different scale can be assembled into;
2, when sized, the telescoping rod of the present apparatus is mobile on idler wheel to be adjusted, and is stretched compared to others
Contracting regulating device it is more effortless with it is flexible;
3, detaching products are easy to assembly, entirely through fast 6 times of general scaffold lapping of bolt-locking device phase continued proportion or more,
Structure more safety and stability;
4, it takes up space after detaching products small, is conducive to storage and transport;
5, service life is long, can be used 15 years or more.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the utility model overall system structure schematic diagram.
Fig. 2 is the utility model horizon bar telescoping member structural schematic diagram.
Fig. 3 is the utility model vertical bar telescoping member structural schematic diagram.
Fig. 4 is the structural schematic diagram of another embodiment of the utility model horizon bar telescoping member.
Fig. 5 is the structural schematic diagram of another embodiment of the utility model vertical bar telescoping member.
Fig. 6 is the schematic diagram of two kinds of forms of the utility model locking device structure.
Fig. 7 is the utility model carriage structural schematic diagram.
Fig. 8 is the schematic diagram of the utility model adjacent level carriage and two kinds of forms of vertical sliding device.
Fig. 9 is the utility model connecting rod structural schematic diagram.
Figure 10 is the utility model latch structure schematic diagram.
In figure:1 carriage structure, 2 connecting rods, 3 universal wheels, 4 supporting rods, 5 cross bars, 6 skewed horizontal loads, 7 bolts, 8
One rotatable shaft, 9 rotatable idler wheels, 10 stressed members, 11 second rotatable shafts, 12 locking devices, 13 idler wheel clamps, 14 thirds
Rotatable shaft, 15 locking clamps, 16 the 4th rotatable shafts, 17 locking clamps, 18 second card slots, 19 flexible steel plates, 20 first cards
Slot.
Specific implementation mode
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
As Figure 1-10 shows, the portable scaffold of adjustable length and height, it includes horizon bar telescoping member and erects
Straight-bar telescoping member;The horizon bar telescoping member passes through locking device by horizontally disposed carriage structure 1 and connecting rod 2
12 connection compositions;The vertical bar telescoping member passes through locking device 12 by the carriage structure 1 arranged vertically with connecting rod 2
Connection composition;Multigroup horizon bar telescoping member is combined with each other with vertical bar telescoping member and connects, and constitutes cube foot hand
Frame frame structure is provided with the flexible steel plate 19 for operation, the level in the middle and upper part of cube scaffold frame structure
Skewed horizontal load 6 is installed, the both ends of the skewed horizontal load 6 are machined with and slide between bar telescoping member and vertical bar telescoping member
1 matched pin hole of apparatus structure is equipped with bolt 7, the bottom peace of the cube scaffold frame structure on the pin hole
Equipped with universal wheel 3.Wherein the flexible steel plate 19 is scalable steel plate, can be according to the length adjustment phase that scaffold is adjusted
The length for the workbench answered can be adjusted easily by the carriage structure 1 between two groups of carriage structures 1
Spacing, and then achieve the purpose that adjust scaffold height and spacing.
In work progress, the length adjustment of horizontal direction, by the sliding in horizontal carriage, is adjusted by horizontal brace rod
The scaffold length needed for construction operation is saved, is fixed horizontal brace rod and horizontal carriage by locking device.
The adjusting of height, by the sliding in vertical sliding device, is adjusted to the foot needed for construction operation by vertical connecting rod
Hand cradle height is fixed vertical connecting rod and vertical sliding device by locking device.
Further, the carriage structure 1 is made of rotatable idler wheel 9 and stressed member 10, the rotatable rolling
It takes turns 9 two end axles to be fixed on stressed member 10, rotatable idler wheel 9 can be freely rotated, and stressed member 10 is coating steel pipe, stress
10 both ends of rod piece are equipped with the first card slot 20.The both ends of the axis are separately fixed on stressed member, and idler wheel is according to certain spacing
Uniformly it is arranged between two stressed members.
Further, the second card slot 18 is provided in the connecting rod 2, the locking device 12 is by idler wheel clamp 13,
Three rotatable shafts 14 and locking clamp 15 form.
Further, the bolt 7 is made of the 4th rotatable shaft 16 and locking clamp 17.
Further, it is connected by cross bar 5 between the adjacent carriage structure 1.
Further, it is connected by the second rotatable shaft 11 between the stressed member 10.
Further, it is hinged with by the first rotatable shaft 8 on the side wall of the carriage structure 1 of scaffold bottom
Supporting rod 4.
Further, card slot, length direction and high direction, length direction and wide direction are provided with above stressed member in the outer part
It is provided with skewed horizontal load between adjacent stressed member, card slot, stressed member and skewed horizontal load are also equipped with above skewed horizontal load
Its corresponding card slot is inserted by bolt to connect.
The course of work and operation principle of the utility model:
The utility model is installed according to the model of design, the use of time, according to the requirement of engineering construction, to structure system
The length of system is adjusted with height, when the length to structural system is adjusted, locking device 12 is pulled out first, in cunning
1 long mobile connection bar 2 of dynamic apparatus structure, when waiting for that horizon bar telescoping member length is identical as the length of construction requirement, passes through lock
Determine device 12 and catch on rotatable idler wheel across card slot 18, bending locking clamp 15 locks horizon bar telescoping member;To knot
The adjustment of construction system height is identical as the adjustment to structural system length.
After waiting for that height and length are all adjusted, scalable steel plate is adjusted, so that it is adapted with system length, is placed on just
On its corresponding cushion cap.
After system overall dimensions are adjusted so that supporting rod 4 is in retracted state, pushes connection system for guide rail, waits for foot hand
Frame reaches the position of its work so that supporting rod 4 is adjusted to holding state, and entire connection system for guide rail is secured firmly to ground
On.
There are a certain distance with scaffold top for present apparatus workbench, it is therefore an objective to allow top to serve as fence effect, protect
Protect worker safety.
Above-described embodiment is used for illustrating the utility model, rather than limits the utility model, in this practicality
In novel spirit and scope of the claims, to any modifications and changes that the utility model is made, this reality is both fallen within
With novel protection domain.
Claims (7)
1. the portable scaffold of adjustable length and height, it is characterised in that:It includes horizon bar telescoping member and vertical bar
Telescoping member;The horizon bar telescoping member is by horizontally disposed carriage structure(1)With connecting rod(2)Pass through locking device
(12)Connection composition;The vertical bar telescoping member is by the carriage structure arranged vertically(1)With connecting rod(2)Pass through locking
Device(12)Connection composition;Multigroup horizon bar telescoping member is combined with each other with vertical bar telescoping member and connects, and constitutes vertical
Cube scaffold frame structure is provided with the flexible steel plate for operation in the middle and upper part of cube scaffold frame structure
(19), skewed horizontal load is installed between the horizon bar telescoping member and vertical bar telescoping member(6), the skewed horizontal load(6)
Both ends be machined with and carriage structure(1)Matched pin hole is equipped with bolt on the pin hole(7), the cube
The bottom of scaffold frame structure is equipped with universal wheel(3).
2. the portable scaffold of adjustable length according to claim 1 and height, it is characterised in that:The sliding dress
Set structure(1)By rotatable idler wheel(9)And stressed member(10)Composition, the rotatable idler wheel(9)Two end axles are fixed on stress
Rod piece(10)On, rotatable idler wheel(9)It can be freely rotated, stressed member(10)For coating steel pipe, stressed member(10)Both ends
Equipped with the first card slot(20).
3. the portable scaffold of adjustable length according to claim 1 and height, it is characterised in that:The connecting rod
(2)On be provided with the second card slot(18), the locking device(12)By idler wheel clamp(13), third rotatable shaft(14)And locking
Clamp(15)Composition.
4. the portable scaffold of adjustable length according to claim 1 and height, it is characterised in that:The bolt
(7)By the 4th rotatable shaft(16)With locking clamp(17)Composition.
5. the portable scaffold of adjustable length according to claim 1 and height, it is characterised in that:Adjacent is described
Carriage structure(1)Between pass through cross bar(5)It is connected.
6. the portable scaffold of adjustable length according to claim 2 and height, it is characterised in that:The force rod
Part(10)Between pass through the second rotatable shaft(11)It is connected.
7. the portable scaffold of adjustable length according to claim 1 and height, it is characterised in that:Positioned at scaffold
The carriage structure of bottom(1)Side wall on pass through the first rotatable shaft(8)It is hinged with supporting rod(4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820176657.7U CN207892215U (en) | 2018-02-01 | 2018-02-01 | The portable scaffold of adjustable length and height |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820176657.7U CN207892215U (en) | 2018-02-01 | 2018-02-01 | The portable scaffold of adjustable length and height |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207892215U true CN207892215U (en) | 2018-09-21 |
Family
ID=63543477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820176657.7U Expired - Fee Related CN207892215U (en) | 2018-02-01 | 2018-02-01 | The portable scaffold of adjustable length and height |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207892215U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797956A (en) * | 2019-01-29 | 2019-05-24 | 浙江水利水电学院 | A kind of adjustable scaffold and its manufacturing method |
CN112538960A (en) * | 2020-12-09 | 2021-03-23 | 河南省予卓信息科技有限公司 | Make things convenient for dismouting and firm scaffold frame |
CN114439207A (en) * | 2022-02-16 | 2022-05-06 | 中国建筑第八工程局有限公司 | Multifunctional scaffold and construction method thereof |
-
2018
- 2018-02-01 CN CN201820176657.7U patent/CN207892215U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797956A (en) * | 2019-01-29 | 2019-05-24 | 浙江水利水电学院 | A kind of adjustable scaffold and its manufacturing method |
CN109797956B (en) * | 2019-01-29 | 2021-03-02 | 浙江水利水电学院 | Adjustable scaffold and manufacturing method thereof |
CN112538960A (en) * | 2020-12-09 | 2021-03-23 | 河南省予卓信息科技有限公司 | Make things convenient for dismouting and firm scaffold frame |
CN114439207A (en) * | 2022-02-16 | 2022-05-06 | 中国建筑第八工程局有限公司 | Multifunctional scaffold and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207892215U (en) | The portable scaffold of adjustable length and height | |
CN105152032A (en) | Installing method for bridge crane in enclosed environment workshop | |
CN212927049U (en) | Template shock attenuation strutting arrangement for building engineering | |
CN108824938A (en) | A kind of construction Moveable Pipeline bracket and its application method | |
CN217175586U (en) | Operating platform for slope construction | |
CN203223003U (en) | Detachable triangular jig frame for steel truss assembling | |
CN203236194U (en) | Replacing device for hinged pin roll mechanism of stacker cantilever | |
CN214786228U (en) | Beam column reinforcing construction device | |
CN201567160U (en) | Detachable combined high-level crane boom | |
CN206189894U (en) | Stable building engineering strutting arrangement | |
CN203514368U (en) | Side slope detection work platform | |
CN214834581U (en) | Portable construction device is used in building engineering construction | |
CN213418456U (en) | Building scaffold wall connecting piece | |
CN111421086B (en) | Energy-concerving and environment-protective type building material processing equipment | |
CN204983435U (en) | A lift strutting arrangement for various coil of strip die mould | |
CN107401123A (en) | Portable prestressed stretch-draw servicing unit | |
CN204663027U (en) | For the bracing or strutting arrangement that rack is installed | |
CN210482970U (en) | Extension formula elevartor shaft construction operation protection platform | |
US3266211A (en) | Method of erecting an electrical power transmission tower | |
CN113006508A (en) | Movable shallow trench steel constructs protector | |
CN219569500U (en) | Supporting equipment convenient to install and used for steel structure construction | |
CN202755632U (en) | Scaffold | |
CN211500064U (en) | Road and bridge engineering safety barrier device | |
CN206561385U (en) | A kind of gradient coil mounting tool | |
CN220481704U (en) | Discharging frame for house building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180921 Termination date: 20210201 |
|
CF01 | Termination of patent right due to non-payment of annual fee |