CN207865605U - A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit - Google Patents
A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit Download PDFInfo
- Publication number
- CN207865605U CN207865605U CN201820043707.4U CN201820043707U CN207865605U CN 207865605 U CN207865605 U CN 207865605U CN 201820043707 U CN201820043707 U CN 201820043707U CN 207865605 U CN207865605 U CN 207865605U
- Authority
- CN
- China
- Prior art keywords
- air conditioning
- conditioning chamber
- air
- spinning
- screen window
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Spinning Or Twisting Of Yarns (AREA)
Abstract
The utility model belongs to textile technology field, and in particular to a kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit.The utility model makes full use of the internal low grade residual heats such as textile mills' spinning frame waste heat, sizing machine heat dissipation, with the waste heat of spinning workshop, sizing machine heat dissipation recovery technology, to improve the temperature of card room, the energy-saving and emission-reduction in process of textile production are furthermore achieved, card room's temperature when improving low temperature season, the energy-saving and emission-reduction for reducing the energy consumption of textile air-conditioner in production process, improving workshop moisture temperature environment, realizing textile industry.The utility model is combined using the blowing of wind turbine counterblast, mobile belt screen window, deduster, promote sticky cotton-wool, the sedimentation landing of fiber ash, through the spraying of floor groove tail-end blower fan, collect discharge, effectively realize the return air dust removal by filtration of air conditioning chamber, textile industry energy use efficiency is improved, enterprise's production cost is reduced.
Description
Technical field
The utility model belongs to textile technology field, and in particular to a kind of with waste heat recovery, counterblast dust-extraction unit
Spinning air-conditioning system.
Background technology
It is had the following problems in present spinnery:(1)Since spinning workshop equipment compares concentration, heat exhaust compares
Greatly, these heats improve first the operating temperature in spinning workshop be unfavorable for work production, furthermore since these heats do not have
It recycles unreasonable, continues on for reproduction using less, cause the waste of energy.(2)Card room's region humiture situation and
Air-conditioning adjusting is undesirable, and air quantity, wind pressure, temperature are unbalanced, and air-conditioning temperature and humidity adjustment energy consumption is also larger;(3)Spinning workshop return air
Dedusting is not thorough sticky cotton-wool, the sedimentation of fiber ash.
The return air dedusting technology that cotton mill's spinning workshop uses at present is to act on grit in the process using flow rotation
On centrifugal force so that dust is separated from dust-contained airflow.But this return air dedusting technology is easy because of its dust removal process Whirlwind cyclone
It blocks, and larger, dedusting is not thorough for return air the drainage tough cotton-wool, the fiber ash dedusting resistance that come, it is often sticky
Screen window mesh influences dust removing effects.
Utility model content
In the presence of solving the problems, such as background technology, the utility model proposes one kind with waste heat recovery, anti-gas
Flow the spinning air-conditioning system of dust-extraction unit.
What the technical solution of the utility model was realized in:It is a kind of to carry waste heat recovery, the spinning of counterblast dust-extraction unit
Yarn air-conditioning system, structure are that installation of ceiling has air supply duct, spinning workshop both sides to be equipped with the first sky inside spinning workshop
Room, the second air conditioning chamber, third air conditioning chamber are adjusted, pipeline is connected between the first air conditioning chamber, the second air conditioning chamber and the 5th air conditioning chamber, the
It is connected with pipeline between three air conditioning chambers and the 4th air conditioning chamber.First air conditioning chamber, the second air conditioning chamber, third air conditioning chamber are close to spun yarn vehicle
Between side wall it is embedded return air inlet is installed, the first air conditioning chamber, the second air conditioning chamber, third air conditioning chamber wall around peace
Equipped with belt screen window is rolled, rolls belt screen window and be on the outside of return air inlet;The air conditioning chamber's wall for being equipped with return air inlet side fixes peace
Equipped with deduster, deduster, which is located at, to be rolled on the outside of belt screen window;Yarn is installed at the overhead surface of the rolling belt screen window of bottom
Window driving apparatus, wind turbine are equipped with drainage pipeline below the rolling belt screen window of bottom, the drainage pipeline below wind turbine
There is opening;Installation of ceiling has return air duct, preceding spinning workshop both sides to be equipped with the 4th air conditioning chamber, the 5th sky inside preceding spinning workshop
Room, the 4th air conditioning chamber, the 5th air conditioning chamber is adjusted to be mounted on air outlet, the 5th air conditioning chamber in the nearby wall of spinning workshop side
It is connected with heat pipe between sizing room.
The deduster includes dedusting box, dust removal brush, and dust removal brush is movably arranged on by knurly screw in dedusting box, dedusting
Box passes through on setscrew fixed wall.
The box top of the dedusting box is open-close type, detachable between dust removal brush and dedusting box.
The rolling belt screen window coordinates with slideway or pulley blocks.
The utility model makes full use of the internal low grade residual heats such as textile mills' spinning frame waste heat, sizing machine heat dissipation, realizes thin
Between charka, the heat of sizing room and card room swaps and balance forms afterheat recycling system.With the waste heat of spinning workshop,
The energy-saving and emission-reduction in process of textile production are furthermore achieved to improve the temperature of card room in sizing machine heat dissipation recovery technology,
Card room's temperature when improving low temperature season reduces the energy consumption of textile air-conditioner in production process, improves workshop moisture temperature
Environment, the energy-saving and emission-reduction for realizing textile industry.The utility model is using the blowing of wind turbine counterblast, mobile belt screen window, dedusting
Device is combined, and is promoted sticky cotton-wool, the sedimentation landing of fiber ash, through the spraying of floor groove tail-end blower fan, is collected discharge, effectively realize
The return air dust removal by filtration of air conditioning chamber, improves textile industry energy use efficiency, reduces enterprise's production cost.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, other drawings may also be obtained based on these drawings.
Fig. 1 is the spinning workshop planar structure schematic diagram of the utility model.
Fig. 2 is the dust removal by ventilation front view of the utility model.
Fig. 3 is the dust removal by ventilation sectional view of the utility model.
Fig. 4 is the dust removal by ventilation dimensional structure diagram of the utility model.
Fig. 5 is the deduster structure sectional view of the utility model.
1 spinning workshop, 2 return air inlets, spinning workshop before 3,4 sizing rooms, 5 heat pipes, 6 first air conditioning chambers, 7 second air conditioning chambers, 8
Third air conditioning chamber, 9 the 4th air conditioning chambers, 10 the 5th air conditioning chambers, 11 air outlets, 12 rolling belt screen windows, 13 screen window driving devices, 14
Wind turbine, 15 dedusters, 16 drainage pipelines, 17 dedusting boxes, 18 dust removal brush, 19 knurly screws, 20 setscrews.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not under the premise of making the creative labor
The every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment 1:As shown in Fig. 1 ~ 5, a kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit,
Structure is to have air supply duct in 1 inside installation of ceiling of spinning workshop, and it is empty that 1 both sides of spinning workshop are equipped with the first air conditioning chamber 6, second
Room 7, third air conditioning chamber 8 are adjusted, pipeline is connected between the first air conditioning chamber 6, the second air conditioning chamber 7 and the 5th air conditioning chamber 10, third is empty
It adjusts and is connected with pipeline between room 8 and the 4th air conditioning chamber 9;First air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 are close to spun yarn
The wall of 1 side of workshop is embedded to be equipped with return air inlet 2, the first air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 wall
Embedded be fitted around rolls belt screen window 12, rolls belt screen window 12 in 2 outside of return air inlet;2 side of return air inlet is installed
Air conditioning chamber's wall be installed with deduster 15, deduster 15, which is located at, rolls 12 outside of belt screen window;The rolling belt of bottom
Screen window driving device 13, wind turbine 14, the lower section installation of the rolling belt screen window 12 of bottom are installed at the overhead surface of screen window 12
There is drainage pipeline 16, the drainage pipeline 16 in 14 lower section of wind turbine has opening;3 inside installation of ceiling of preceding spinning workshop has backwind tube
Road, 3 both sides of preceding spinning workshop are equipped with the 4th air conditioning chamber 9, the 5th air conditioning chamber 10, and the 4th air conditioning chamber 9, the 5th air conditioning chamber 10 are close
It is mounted on air outlet 11 in the wall of 3 side of preceding spinning workshop, heat pipe 5 is connected between the 5th air conditioning chamber 10 and sizing room 4.
When work, air supply duct is equably sent into fresh air to spinning workshop 1, and return air gas of the fresh air after heat exchange is by returning
Air port 2 enters the first air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8, the driving movement belt of spun yarn driving device 13 screen window 12
Movement, deduster 15 are close to mobile belt screen window 12 and rub away attachment, and 14 air blast of wind turbine is blown off on mobile belt screen window 12
Attachment drop into lower section drainage pipeline 16, send out workshop through drainage pipeline, then return air gas passes through pipeline to be sent into the 4th empty
Room 9, the 5th air conditioning chamber 10, sizing room 4 is adjusted, heat transmission to the 5th air conditioning chamber 10, it is empty further to promote the 5th by heat pipe 5
The high temperature return air heat in room 10 is adjusted, then the 4th air conditioning chamber 9, the high temperature return air in the 5th air conditioning chamber 10 are equal by air outlet 11
Even feeding card room 3, the installation of ceiling return air duct above card room 3, gas after heat exchange by return air duct send to
Outside card room Room 3.
Embodiment 2:A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit, structure are in spun yarn
1 inside installation of ceiling of workshop has air supply duct, 1 both sides of spinning workshop to be equipped with the first air conditioning chamber 6, the second air conditioning chamber 7, third sky
Room 8 is adjusted, pipeline, third air conditioning chamber 8 and the 4th sky are connected between the first air conditioning chamber 6, the second air conditioning chamber 7 and the 5th air conditioning chamber 10
Tune is connected with pipeline between room 9;First air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 close to 1 side of spinning workshop wall
Wall is embedded to be equipped with return air inlet 2, the first air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 wall embedded be fitted around
Have and roll belt screen window 12, rolls belt screen window 12 and coordinate with slideway.It is other structures, same as Example 1.
Embodiment 3:A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit, structure are in spun yarn
1 inside installation of ceiling of workshop has air supply duct, 1 both sides of spinning workshop to be equipped with the first air conditioning chamber 6, the second air conditioning chamber 7, third sky
Room 8 is adjusted, pipeline, third air conditioning chamber 8 and the 4th sky are connected between the first air conditioning chamber 6, the second air conditioning chamber 7 and the 5th air conditioning chamber 10
Tune is connected with pipeline between room 9;First air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 close to 1 side of spinning workshop wall
Wall is embedded to be equipped with return air inlet 2, the first air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 wall embedded be fitted around
Have and roll belt screen window 12, rolls belt screen window 12 and coordinate with pulley blocks.It is other structures, same as Example 1.
Embodiment 4:A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit, structure are in spun yarn
1 inside installation of ceiling of workshop has air supply duct, 1 both sides of spinning workshop to be equipped with the first air conditioning chamber 6, the second air conditioning chamber 7, third sky
Room 8 is adjusted, pipeline, third air conditioning chamber 8 and the 4th sky are connected between the first air conditioning chamber 6, the second air conditioning chamber 7 and the 5th air conditioning chamber 10
Tune is connected with pipeline between room 9;First air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 close to 1 side of spinning workshop wall
Wall is embedded to be equipped with return air inlet 2, the first air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 wall embedded be fitted around
Have and roll belt screen window 12, rolls belt screen window 12 in 2 outside of return air inlet;The air conditioning chamber's wall for being equipped with 2 side of return air inlet is solid
Dingan County is equipped with deduster 15, and deduster 15 includes dedusting box 17, dust removal brush 18, and dust removal brush 18 is installed by 19 activity of knurly screw
In dedusting box 17, dedusting box 17 passes through on 20 fixed wall of setscrew.It is other structures, same as Example 1.
Embodiment 5:A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit, structure are in spun yarn
1 inside installation of ceiling of workshop has air supply duct, 1 both sides of spinning workshop to be equipped with the first air conditioning chamber 6, the second air conditioning chamber 7, third sky
Room 8 is adjusted, pipeline, third air conditioning chamber 8 and the 4th sky are connected between the first air conditioning chamber 6, the second air conditioning chamber 7 and the 5th air conditioning chamber 10
Tune is connected with pipeline between room 9;First air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 close to 1 side of spinning workshop wall
Wall is embedded to be equipped with return air inlet 2, the first air conditioning chamber 6, the second air conditioning chamber 7, third air conditioning chamber 8 wall embedded be fitted around
Have and roll belt screen window 12, rolls belt screen window 12 in 2 outside of return air inlet;The air conditioning chamber's wall for being equipped with 2 side of return air inlet is solid
Dingan County is equipped with deduster 15, and deduster 15 includes dedusting box 17, dust removal brush 18, and dust removal brush 18 is installed by 19 activity of knurly screw
In dedusting box 17, dedusting box 17 is by the way that on 20 fixed wall of setscrew, the box top of dedusting box 17 is open-close type, dust removal brush 18
It is detachable between dedusting box 17.It is other structures, same as Example 4.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection domain within.
Claims (4)
1. a kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit, it is characterised in that:Spinning workshop(1)It is interior
Portion's installation of ceiling has air supply duct, spinning workshop(1)Both sides are equipped with the first air conditioning chamber(6), the second air conditioning chamber(7), third it is empty
Adjust room(8), the first air conditioning chamber(6), the second air conditioning chamber(7)With the 5th air conditioning chamber(10)Between be connected with pipeline, third air conditioning chamber
(8)With the 4th air conditioning chamber(9)Between be connected with pipeline;First air conditioning chamber(6), the second air conditioning chamber(7), third air conditioning chamber(8)It leans on
Nearly spinning workshop(1)The wall of side is embedded to be equipped with return air inlet(2), the first air conditioning chamber(6), the second air conditioning chamber(7), third
Air conditioning chamber(8)Wall embedded be fitted around roll belt screen window(12), roll belt screen window(12)In return air inlet(2)
Outside;Return air inlet is installed(2)Air conditioning chamber's wall of side is installed with deduster(15), deduster(15)Positioned at rolling belt
Screen window(12)Outside;The rolling belt screen window of bottom(12)Overhead surface at screen window driving device is installed(13), wind turbine
(14), the rolling belt screen window of bottom(12)Lower section drainage pipeline is installed(16), it is in wind turbine(14)The drainpipe of lower section
Road(16)There is opening;Preceding spinning workshop(3)Internal installation of ceiling has return air duct, preceding spinning workshop(3)Both sides are equipped with the 4th
Air conditioning chamber(9), the 5th air conditioning chamber(10), the 4th air conditioning chamber(9), the 5th air conditioning chamber(10)By nearby spinning workshop(3)Side
Air outlet is mounted in wall(11), the 5th air conditioning chamber(10)With sizing room(4)Between be connected with heat pipe(5).
2. a kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit as described in claim 1, feature exist
In:Deduster(15)Including dedusting box(17), dust removal brush(18), dust removal brush(18)Pass through knurly screw(19)It is movably arranged on and removes
Dirt box(17)It is interior, dedusting box(17)Pass through setscrew(20)On fixed wall.
3. a kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit as claimed in claim 2, feature exist
In:Dedusting box(17)Box top be open-close type, dust removal brush(18)With dedusting box(17)Between it is detachable.
4. a kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit described in claim 1, feature exist
In:Roll belt screen window(12)Coordinate with slideway or pulley blocks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820043707.4U CN207865605U (en) | 2018-01-11 | 2018-01-11 | A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820043707.4U CN207865605U (en) | 2018-01-11 | 2018-01-11 | A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207865605U true CN207865605U (en) | 2018-09-14 |
Family
ID=63461173
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820043707.4U Expired - Fee Related CN207865605U (en) | 2018-01-11 | 2018-01-11 | A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207865605U (en) |
-
2018
- 2018-01-11 CN CN201820043707.4U patent/CN207865605U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101482303B (en) | Energy-saving consumption-reducing air conditioning method and unit air conditioner of spinning factory | |
CN108253540B (en) | Multifunctional air conditioner | |
CN102705912B (en) | Personalized environment control system for expressway toll booth | |
CN207865605U (en) | A kind of spinning air-conditioning system with waste heat recovery, counterblast dust-extraction unit | |
CN102162662B (en) | Dual-slideway automatic dedusting intelligent ventilation system | |
CN202853045U (en) | Intelligentized heat removing and dehumidifying system for communication base station | |
CN110131828A (en) | It is a kind of suitable for south building inner region multi-line system and its for cooling method | |
CN102764545A (en) | Novel primary prefilter | |
CN206803367U (en) | bidirectional flow heat recovery fresh air dehumidifier | |
CN206755396U (en) | A kind of fresh air purifier | |
CN208952323U (en) | A kind of temperature and humidity control device of energy-saving and water-saving type spinning and weaving workshop | |
CN207299387U (en) | A kind of ventilating system | |
CN212746713U (en) | Return air recycling system of dust filter unit | |
CN206121416U (en) | Putty workshop of polishing | |
CN205897358U (en) | Dust removal air conditioning equipment | |
CN201628319U (en) | Combined fresh air integrated processing machine | |
CN107185342A (en) | A kind of mining detachable wet type air curtain deduster | |
CN210463470U (en) | Closed-loop constant-temperature constant-pressure adjusting system for fiber production | |
CN209619162U (en) | Low temperature dehumidification sludge drying machine | |
CN208859778U (en) | A kind of model work shop inner ventilation equipment | |
CN206274198U (en) | Purification air-conditioning and ventilated linked energy conserving system | |
CN205191824U (en) | A ventilation unit for among air conditioning system | |
CN205128517U (en) | Online ion electrostatic precipitator machine | |
CN219387950U (en) | Cooling, dehumidifying and dedusting device for subway tunnel construction | |
CN221146728U (en) | High-efficiency energy-saving industrial air conditioner air purification and humidification structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 451191 No. 1 Huaihe Road, Shuang Hu Economic and Technological Development Zone, Xinzheng, Zhengzhou, Henan Patentee after: Zhongyuan University of Technology Address before: 451191 No. 1 Huaihe Road, Shuanghu Town Economic and Technological Development Zone, Zhengzhou City, Henan Province Patentee before: Zhongyuan University of Technology |
|
CP02 | Change in the address of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180914 Termination date: 20190111 |
|