CN207863443U - One kind being used for the fixed device of temporary component - Google Patents
One kind being used for the fixed device of temporary component Download PDFInfo
- Publication number
- CN207863443U CN207863443U CN201820156086.0U CN201820156086U CN207863443U CN 207863443 U CN207863443 U CN 207863443U CN 201820156086 U CN201820156086 U CN 201820156086U CN 207863443 U CN207863443 U CN 207863443U
- Authority
- CN
- China
- Prior art keywords
- nut
- component
- steel plate
- fixed
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model proposes one kind being used for the fixed device of temporary component, including cast-in-situ floor, steel plate, reserving hole, the first nut, third nut, sleeve, screw rod, the second nut, fixed plate, gasket and overhanging component.The utility model is a kind of device for being suitable for being fixed temporarily construction member on floor made using the principle of seal plate, it is convenient, fast for construction, it can effectively solve the problem that a series of security risks generated because component is removed and hidden danger of quality, reduce the risk of floor seepage after component is removed, security protection cost and maintenance cost are reduced, construction efficiency is improved.Meanwhile the repeatable utilization of some materials of the device, some materials cost can be saved, really realizes cost efficiency.
Description
Technical field
The utility model is related to architectural furnitures, particularly relate to a kind of for the fixed device of temporary component.
Background technology
In Building Construction, according to the selection of arrangement and method for construction, it usually needs install interim overhanging component, such as overhang
Installation and fixation, the fixation of overhanging unloading platform end of component I-steel etc..At present, it is common practice to utilize " several " font
Bar built-in fitting is fixed installation or installation is fixed using threading bolt.Utilize " several " font bar built-in fitting to outstanding
Choose component and installation be fixed, after overhanging component is removed, need using the plants such as cutting machine to " several " font reinforcing bar into
Row cutting, needs the resources such as laying electric line again before cutting, cause the waste of manpower, and often left protrusion after cutting
The steel bar end of flooring is unfavorable for construction in later period, while foring some potential safety problems to pedestrian;And utilize threading bolt pair
Installation is fixed in overhanging component, after overhanging component is removed, needs the bolt hole to being reserved on floor to block, often
Because hole is smaller and hole surface is more smooth, the perforated after blocking is caused to be also easy to produce hidden danger of quality or the device to hole such as leakage
Hole blocked after picking chisel processing, and economic, purpose of efficiently constructing is not achieved.
Utility model content
The utility model proposes one kind being used for the fixed device of temporary component, and it is pre-buried to solve " several " font in the prior art
Part is inconvenient, influences the problem of later stage floor plates quality.
What the technical solution of the utility model was realized in:One kind being used for the fixed device of temporary component, including cast-in-place
Floor, the cast-in-situ floor is interior to be equipped with steel plate, and steel plate is equipped with reserving hole, and the side of steel plate is equipped with corresponding reserving hole
First nut, the other side of steel plate is equipped with the third nut of corresponding reserving hole, between the end face of cast-in-situ floor and the first nut
One end of sleeve equipped with corresponding reserving hole, screw rod passes through reserving hole, sleeve to be connect with the first nut, third nut, spiral shell
The other end of bar is connect with the second nut, and the fixed plate being adjacent to the second nut, the second nut and fixed plate are arranged on screw rod
Between be equipped with gasket, overhanging component is accompanied between fixed plate and cast-in-situ floor.
The third nut is acorn nut, and steel plate is connect with the first nut, third nut respectively by weld all around weld seam.
It is set on the steel plate there are two the reserving hole of bar shaped arrangement, overhanging component is located between two screw rods.
The utility model is the one kind for being suitable for being fixed temporarily construction member on floor made using the principle of seal plate
Device, it is convenient, fast for construction, it can effectively solve the problem that a series of security risks generated because component is removed and hidden danger of quality, drop
The risk of floor seepage after low component is removed, reduces security protection cost and maintenance cost, improves construction efficiency.Meanwhile the dress
The repeatable utilization of some materials set, can save some materials cost, really realize cost efficiency.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, other drawings may also be obtained based on these drawings.
FIG. 1 is a schematic structural view of the utility model.
In figure:1- steel plates, 2- reserving holes, the first nuts of 3-, 4- third nuts, 5- weld all around weld seams, 6- screw rods, 7- sets
Cylinder, 8- cast-in-situ floors, 9- overhanging components, 10- gaskets, 11- fixed plates, the second nuts of 12-.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not under the premise of making the creative labor
The every other embodiment obtained, shall fall within the protection scope of the present invention.
It is used for the fixed device of temporary component, including cast-in-situ floor 8 as shown in Figure 1, a kind of, in the cast-in-situ floor 8
Equipped with steel plate 1, steel plate 1 is equipped with reserving hole 2, and the side of steel plate 1 is equipped with the first nut 3 of corresponding reserving hole 2, steel plate 1
The other side be equipped with the third nut 4 of corresponding reserving hole 2, be equipped between the end face of cast-in-situ floor 8 and the first nut 3 it is corresponding in advance
It boxes out the sleeve 7 in hole 2, one end of screw rod 6 passes through reserving hole 2, sleeve 7 to be connect with the first nut 3, third nut 4, screw rod 6
The other end connect with the second nut 12, be arranged with the fixed plate 11 being adjacent to the second nut 12 on screw rod 6, the second nut 12 with
It is equipped with gasket 10 between fixed plate 11, overhanging component 9 is accompanied between fixed plate 11 and cast-in-situ floor 8.
The third nut 4 be acorn nut, steel plate 1 by weld all around weld seam 5 respectively with the first nut 3, third nut 4
Connection.First nut, third nut have the connecting sewing of a circle when being connect with steel plate, enclosed these connecting sewings completely by weld seam
It blocks up, and combines the lid shape structure of third nut, realize water stopping function.
It is set on the steel plate 1 there are two the reserving hole 2 of bar shaped arrangement, overhanging component 9 is located between two screw rods 6.
The utility model is first to cut steel plate as required, and drill on the steel plate(Hole size according to screw rod specification
Model), then the first nut and third nut-welding in hole both sides(In order to ensure welding quality, screw rod can be used before welding
Attaching nut positions, and tightens screw rod and nut), nut and being connected and fixed for steel plate are welded using weld all around, pre-buried after completing
When will to screw rod add casing, cast-in-situ floor pours completion, after intensity reaches overhanging component installation requirement, can be installed,
Second nut and fixed plate are put on into screw rod, then overhanging component is stuck between fixed plate and cast-in-situ floor, the second nut is twisted
Tightly, fixed plate compresses overhanging component, realizes the fixed installation of overhanging component.After overhanging component is removed, screw rod, fixed plate, gasket
And second nut it is recyclable after recycling.
The utility model can need adjustment member size according to construction, may be configured as single screw rod, twin-screw and multiscrew
Fixing device, easy to operate, positional accuracy is high, small by concrete construction disturbing influence, can guarantee Embedment Construction quality;Together
When, convenient disassembly is reusable, can save operating time and material resources, energy conservation and environmental protection;Steel plate cooperation third nut encloses
Weldering welding after there is water stopping function, later stage to remove screw rod, has good effect to the antiseepage in screw hole region, can save
The resources such as manpower, financial resources and the material resources of the processing of screw rod hole.The utility model is conducive to site safety civilized construction, has fine
Quality and benifit and economic benefit.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection domain within.
Claims (3)
1. one kind being used for the fixed device of temporary component, including cast-in-situ floor(8), it is characterised in that:The cast-in-situ floor(8)
It is interior to be equipped with steel plate(1), steel plate(1)It is equipped with reserving hole(2), steel plate(1)Side be equipped with corresponding reserving hole(2)First
Nut(3), steel plate(1)The other side be equipped with corresponding reserving hole(2)Third nut(4), cast-in-situ floor(8)End face and the
One nut(3)Between be equipped with corresponding reserving hole(2)Sleeve(7), screw rod(6)One end pass through reserving hole(2), sleeve
(7)With the first nut(3), third nut(4)Connection, screw rod(6)The other end and the second nut(12)Connection, screw rod(6)On
It is arranged with and the second nut(12)The fixed plate being adjacent to(11), the second nut(12)With fixed plate(11)Between be equipped with gasket
(10), fixed plate(11)With cast-in-situ floor(8)Between accompany overhanging component(9).
2. according to claim 1 be used for the fixed device of temporary component, it is characterised in that:The third nut(4)
For acorn nut, steel plate(1)Pass through weld all around weld seam(5)Respectively with the first nut(3), third nut(4)Connection.
3. according to claim 1 be used for the fixed device of temporary component, it is characterised in that:The steel plate(1)On set
There are two the reserving holes of bar shaped arrangement(2), overhanging component(9)Positioned at two screw rods(6)Between.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820156086.0U CN207863443U (en) | 2018-01-30 | 2018-01-30 | One kind being used for the fixed device of temporary component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820156086.0U CN207863443U (en) | 2018-01-30 | 2018-01-30 | One kind being used for the fixed device of temporary component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207863443U true CN207863443U (en) | 2018-09-14 |
Family
ID=63460233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820156086.0U Expired - Fee Related CN207863443U (en) | 2018-01-30 | 2018-01-30 | One kind being used for the fixed device of temporary component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207863443U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409626A (en) * | 2019-07-24 | 2019-11-05 | 中国十七冶集团有限公司 | A kind of pre-buried hanging ring and installation process method |
-
2018
- 2018-01-30 CN CN201820156086.0U patent/CN207863443U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409626A (en) * | 2019-07-24 | 2019-11-05 | 中国十七冶集团有限公司 | A kind of pre-buried hanging ring and installation process method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102619152A (en) | Split mounting type prefabricated reinforced concrete construction temporary road | |
CN206748695U (en) | The prefabricated edges of boards mould of zigzag | |
CN208950303U (en) | A kind of assembled beam-column node template | |
CN103696359A (en) | Prefabricated and cast-in-place bridge pier structure and construction method | |
CN105952154B (en) | A kind of concrete-pouring template stent | |
CN107191006B (en) | Dismantling and repairing method for refractory concrete layer of diversion trench | |
CN206189454U (en) | Piping lane | |
CN104405165B (en) | The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof | |
CN207863443U (en) | One kind being used for the fixed device of temporary component | |
CN109797971B (en) | Disassembling and assembling method for cast-in-place reinforced concrete frame structure building component | |
CN208685933U (en) | A kind of post-cast strip template free of demolition | |
CN109763571A (en) | It is a kind of semicircle bolt snap ring assemblies and with its fix overhanging I-steel construction method | |
CN108457148A (en) | A kind of multi-functional temporary road structure of assembled and its construction method | |
CN206554511U (en) | A kind of improved water-stop opposite-pulling screw rod device | |
CN206769379U (en) | Shear wall formwork exempts from drilling construction structure | |
CN204041078U (en) | A kind of tunnel lining trolley plugging device | |
CN208152107U (en) | Steel-edged rubber water stop mounting device | |
CN206189458U (en) | Multi -deck formula piping lane | |
CN206001126U (en) | A kind of floor sealing hole sizing gasifying device | |
CN212130497U (en) | Prefabricated pipe joint structure for pipe jacking method tunnel opening | |
CN210217761U (en) | Device is used in movement joint construction | |
CN209602904U (en) | A kind of steel plate turnover road surface | |
CN207619988U (en) | The cast-in-place concrete of bar shaped foundation pit is to supportting the connection structure with prefabricated linking beam | |
CN202466352U (en) | Spliced prefabricated reinforced concrete construction temporary road | |
CN207863442U (en) | A kind of easy device for positioning and installing convenient for building facade temporary component bearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180914 Termination date: 20210130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |