CN207829909U - A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction - Google Patents
A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction Download PDFInfo
- Publication number
- CN207829909U CN207829909U CN201721717615.1U CN201721717615U CN207829909U CN 207829909 U CN207829909 U CN 207829909U CN 201721717615 U CN201721717615 U CN 201721717615U CN 207829909 U CN207829909 U CN 207829909U
- Authority
- CN
- China
- Prior art keywords
- rod iron
- steel
- locking plug
- steel form
- telescoping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a kind of power tunnel telescoping steel form locking plug template installation ruggedized constructions to be arranged circumferentially more piece channel steel along the radian of telescoping steel form on the outside of locking plug template, often saves channel steel and is fixed on telescoping steel form panel by rod iron;Long timber wedge is equipped between the channel steel and the locking plug template;The rod iron includes at least the first rod iron and the second rod iron, and first rod iron encircles the channel steel and telescoping steel form panel welding from side, and second rod iron is welded in the channel steel back side across the telescoping steel form panel.By the utility model, two lined steel mould trolley plug formwork erections are quick, simple, firm, operate, accelerate construction progress convenient for operating personnel, reduce operating personnel, reduce risk, shorten the construction period, and installation and strengthening quality are significantly improved.
Description
Technical field
The utility model is related to power tunnel telescoping steel form technical field of construction, specifically a kind of power tunnel telescoping steel form plug
Template installs ruggedized construction.
Background technology
Power tunnel barrel engineering in two lining concrete placements, with shaped mix by the side at telescoping steel form both ends
Solidifying soil contact, need not block, in addition face empty side, then needs that locking plug template is arranged.Due to the thickness of Tunnel Second Lining
It changes with Grades of Surrounding Rock, and country rock basal plane caused by drilling and blasting method excavation is uneven, locking plug template can not make sizing
Punching block.
In the prior art, generally use plank and steel pipe combination are deposited as trolley end plug since reinforcement technique is not in place
In following problem.
1. the construction time is long:Since tunnel cross-section changes, supporting steel pipe cannot follow skewed horizontal load scaffolding steel pipe with template
Ring utilizes, and concrete vibrating is affected to locking plug template and support tube, causes spillage at form joint, and race mould occur, lead
The position offsets such as waterstop, built-in fitting are caused, need repeatedly to be handled, the construction time is long.
2. circulation material waste is big:Tunnel excavation section is influenced by various factors, often recycles two thickness of the liner degree of each section
It is uneven, need the plank of various different lengths;The locking plug template damage of dismounting is more, needs a large amount of planks to be had enough to meet the need, week
It is low to turn stock utilization, construction cost increases.
3. security risk is big:Locking plug template is reinforced, and mould is seen in concreting process, and often cycle needs several templates
Work, average each form fixer expend 3-6h, need personnel more, stream time is long, and security risk is big.
Utility model content
In view of the above-mentioned problems, the utility model provides a kind of power tunnel telescoping steel form locking plug template installation ruggedized construction.
A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction, on the outside of locking plug template, along the arc of telescoping steel form
Degree is arranged circumferentially more piece channel steel, often saves channel steel and is fixed on telescoping steel form panel by rod iron.
Preferably, the long 1-2m of channel steel is often saved.
Preferably, long timber wedge is equipped between the channel steel and the locking plug template.
Preferably, the rod iron includes at least the first rod iron and the second rod iron, and first rod iron is encircled described from side
Channel steel and telescoping steel form panel welding, second rod iron are welded in the channel steel back of the body across the telescoping steel form panel
Face;The rod iron further includes third rod iron, and the third rod iron welds side by side with second rod iron, and the steel is fixed in one end
On mould trolley panel.
Preferably, first rod iron uses 25 screw-thread steels of φ, second rod iron and the third rod iron to use φ 12
Round steel.
The beneficial effects of the utility model:1. two lined steel mould trolley plug formwork erections are quick, simple, firm, it is convenient for operation people
Member's operation, accelerates construction progress, and reduces operating personnel, reduces risk, shortens the construction period;2. compared with reinforcement means before, improve
Circulation material utilization rate reduces project cost;3. two lined steel mould trolley locking plug templates are installed and strengthening quality is significantly improved.
Description of the drawings
Fig. 1 is the structural schematic diagram of embodiment 1.
Reference sign
10- telescoping steel form panels, 20- locking plug templates, 30- channel steels, the first rod irons of 401-, the second rod irons of 402-, 403-
Three rod irons, 50- long timber wedges, 60- rubber fastening bands.
Specific implementation mode
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.The utility model
Embodiment provides for the sake of example and description, and be not be limited to exhaustively or by the utility model it is disclosed
Form.Many modifications and variations are obvious for the ordinary skill in the art.Selection and description are implemented
Example be in order to more preferably illustrate the principles of the present invention and practical application, and make those skilled in the art it will be appreciated that
Various embodiments with various modifications of the utility model to design suitable for special-purpose.
Embodiment 1
A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction, as shown in Figure 1, in the thick wooden locking plug templates of 5cm
20 outsides, more piece channel steel 30 is arranged circumferentially along the radian of telescoping steel form, is often saved channel steel and is fixed on telescoping steel form panel by rod iron
On 10, the long 1-2m of channel steel is often saved.
Long timber wedge 50, by long timber wedge wedging, the long long 15- of timber wedge are equipped between the channel steel 30 and the locking plug template 20
25cm。
The rod iron includes at least the first rod iron 401 and the second rod iron 402, and first rod iron 401 encircles institute from side
Channel steel 30 and the telescoping steel form panel 10 welding are stated, second rod iron 402 is welded in across the telescoping steel form panel 10
30 back side of the channel steel;The rod iron further includes third rod iron 403, and the third rod iron 403 and second rod iron 402 are side by side
Welding, one end is fixed on the telescoping steel form panel 10;First rod iron use 25 screw-thread steels of φ, second rod iron and
The third rod iron uses 12 round steel of φ.Fixed structure in this way, channel steel are relatively fixed to telescoping steel form panel securely
On.
Obviously, described embodiment is only a part of the embodiment of the utility model, instead of all the embodiments.
Based on the embodiments of the present invention, this field and those of ordinary skill in the related art are not making creative work
Under the premise of the every other embodiment that is obtained, should all belong to the range of the utility model protection.
Claims (5)
1. a kind of power tunnel telescoping steel form locking plug template installs ruggedized construction, which is characterized in that on the outside of locking plug template, along punching block
The radian of trolley is arranged circumferentially more piece channel steel, often saves channel steel and is fixed on telescoping steel form panel by rod iron;
The rod iron includes at least the first rod iron and the second rod iron, and first rod iron encircles the channel steel and the steel from side
Mould trolley panel welds, and second rod iron is welded in the channel steel back side across the telescoping steel form panel.
2. power tunnel telescoping steel form locking plug template according to claim 1 installs ruggedized construction, which is characterized in that often save slot
The long 1-2m of steel.
3. power tunnel telescoping steel form locking plug template according to claim 2 installs ruggedized construction, which is characterized in that the slot
Long timber wedge is equipped between steel and the locking plug template.
4. power tunnel telescoping steel form locking plug template according to claim 1 installs ruggedized construction, which is characterized in that the steel
Stick further includes third rod iron, and the third rod iron welds side by side with second rod iron, and the telescoping steel form face is fixed in one end
On plate.
5. power tunnel telescoping steel form locking plug template according to claim 4 installs ruggedized construction, which is characterized in that described the
One rod iron usesScrew-thread steel, second rod iron and the third rod iron use 12 round steel of φ.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721717615.1U CN207829909U (en) | 2017-12-12 | 2017-12-12 | A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721717615.1U CN207829909U (en) | 2017-12-12 | 2017-12-12 | A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207829909U true CN207829909U (en) | 2018-09-07 |
Family
ID=63387322
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721717615.1U Active CN207829909U (en) | 2017-12-12 | 2017-12-12 | A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207829909U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107842376A (en) * | 2017-12-12 | 2018-03-27 | 中国水利水电第四工程局有限公司 | A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction |
-
2017
- 2017-12-12 CN CN201721717615.1U patent/CN207829909U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107842376A (en) * | 2017-12-12 | 2018-03-27 | 中国水利水电第四工程局有限公司 | A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204984441U (en) | It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction | |
CN101864959A (en) | Method for tunneling construction of main structure of underground station | |
CN102797481B (en) | Large-span tunnel arch secondary lining steel bar binding construction method based on skeleton beams | |
CN107989034A (en) | A kind of manually digging hole filling pile and its construction method | |
CN103982188A (en) | Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system | |
JP6480815B2 (en) | Tunnel junction structure and tunnel construction method | |
CN103628885A (en) | Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel | |
CN108999212A (en) | The template construction method of underground concrete pool wall antiseep | |
CN106192898B (en) | The joint construction method of Face Slab of Concrete-faced Rockfill anti-settling deformation | |
CN103882813A (en) | Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform | |
CN107268634A (en) | Deep basal pit waist rail construction typified form system | |
CN102518300B (en) | Embedded conical bearing joint type steel structure support and construction method thereof | |
CN105781593A (en) | Steel grating assisted diversion tunnel preliminary bracing structure and method | |
CN207829909U (en) | A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction | |
CN208201880U (en) | A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit | |
CN109869153B (en) | Integral lifting cantilever formwork device for rapidly constructing shaft lining and construction method | |
CN103603494B (en) | A kind of ultra-thin steel truss sloping core construction method and formwork structure | |
CN105040726A (en) | Method for applying circular prestress on fan foundation connection | |
CN106149744A (en) | Pile foundation steel bar cage skeletal support device and construction method | |
CN107842376A (en) | A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction | |
CN108179754A (en) | The construction method of long and narrow Extra-Deep Foundation Pit system | |
CN206539007U (en) | A kind of arch steel concrete wall formwork erecting structure | |
CN102562098B (en) | Tunnel steel temporary inverted arch with rapid assembly and disassembly | |
CN102444408A (en) | Secondary lining split mounting type blocking head device for metro underground excavation tunnel | |
CN207160418U (en) | A kind of reinforced column constructing device of free removal template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |