CN207829909U - A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction - Google Patents

A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction Download PDF

Info

Publication number
CN207829909U
CN207829909U CN201721717615.1U CN201721717615U CN207829909U CN 207829909 U CN207829909 U CN 207829909U CN 201721717615 U CN201721717615 U CN 201721717615U CN 207829909 U CN207829909 U CN 207829909U
Authority
CN
China
Prior art keywords
rod iron
steel
locking plug
steel form
telescoping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721717615.1U
Other languages
Chinese (zh)
Inventor
窦志强
谢延强
刘钊
刘家宁
程进东
冯勤
杨鑫
黄登福
赵亚妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201721717615.1U priority Critical patent/CN207829909U/en
Application granted granted Critical
Publication of CN207829909U publication Critical patent/CN207829909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of power tunnel telescoping steel form locking plug template installation ruggedized constructions to be arranged circumferentially more piece channel steel along the radian of telescoping steel form on the outside of locking plug template, often saves channel steel and is fixed on telescoping steel form panel by rod iron;Long timber wedge is equipped between the channel steel and the locking plug template;The rod iron includes at least the first rod iron and the second rod iron, and first rod iron encircles the channel steel and telescoping steel form panel welding from side, and second rod iron is welded in the channel steel back side across the telescoping steel form panel.By the utility model, two lined steel mould trolley plug formwork erections are quick, simple, firm, operate, accelerate construction progress convenient for operating personnel, reduce operating personnel, reduce risk, shorten the construction period, and installation and strengthening quality are significantly improved.

Description

A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction
Technical field
The utility model is related to power tunnel telescoping steel form technical field of construction, specifically a kind of power tunnel telescoping steel form plug Template installs ruggedized construction.
Background technology
Power tunnel barrel engineering in two lining concrete placements, with shaped mix by the side at telescoping steel form both ends Solidifying soil contact, need not block, in addition face empty side, then needs that locking plug template is arranged.Due to the thickness of Tunnel Second Lining It changes with Grades of Surrounding Rock, and country rock basal plane caused by drilling and blasting method excavation is uneven, locking plug template can not make sizing Punching block.
In the prior art, generally use plank and steel pipe combination are deposited as trolley end plug since reinforcement technique is not in place In following problem.
1. the construction time is long:Since tunnel cross-section changes, supporting steel pipe cannot follow skewed horizontal load scaffolding steel pipe with template Ring utilizes, and concrete vibrating is affected to locking plug template and support tube, causes spillage at form joint, and race mould occur, lead The position offsets such as waterstop, built-in fitting are caused, need repeatedly to be handled, the construction time is long.
2. circulation material waste is big:Tunnel excavation section is influenced by various factors, often recycles two thickness of the liner degree of each section It is uneven, need the plank of various different lengths;The locking plug template damage of dismounting is more, needs a large amount of planks to be had enough to meet the need, week It is low to turn stock utilization, construction cost increases.
3. security risk is big:Locking plug template is reinforced, and mould is seen in concreting process, and often cycle needs several templates Work, average each form fixer expend 3-6h, need personnel more, stream time is long, and security risk is big.
Utility model content
In view of the above-mentioned problems, the utility model provides a kind of power tunnel telescoping steel form locking plug template installation ruggedized construction.
A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction, on the outside of locking plug template, along the arc of telescoping steel form Degree is arranged circumferentially more piece channel steel, often saves channel steel and is fixed on telescoping steel form panel by rod iron.
Preferably, the long 1-2m of channel steel is often saved.
Preferably, long timber wedge is equipped between the channel steel and the locking plug template.
Preferably, the rod iron includes at least the first rod iron and the second rod iron, and first rod iron is encircled described from side Channel steel and telescoping steel form panel welding, second rod iron are welded in the channel steel back of the body across the telescoping steel form panel Face;The rod iron further includes third rod iron, and the third rod iron welds side by side with second rod iron, and the steel is fixed in one end On mould trolley panel.
Preferably, first rod iron uses 25 screw-thread steels of φ, second rod iron and the third rod iron to use φ 12 Round steel.
The beneficial effects of the utility model:1. two lined steel mould trolley plug formwork erections are quick, simple, firm, it is convenient for operation people Member's operation, accelerates construction progress, and reduces operating personnel, reduces risk, shortens the construction period;2. compared with reinforcement means before, improve Circulation material utilization rate reduces project cost;3. two lined steel mould trolley locking plug templates are installed and strengthening quality is significantly improved.
Description of the drawings
Fig. 1 is the structural schematic diagram of embodiment 1.
Reference sign
10- telescoping steel form panels, 20- locking plug templates, 30- channel steels, the first rod irons of 401-, the second rod irons of 402-, 403- Three rod irons, 50- long timber wedges, 60- rubber fastening bands.
Specific implementation mode
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.The utility model Embodiment provides for the sake of example and description, and be not be limited to exhaustively or by the utility model it is disclosed Form.Many modifications and variations are obvious for the ordinary skill in the art.Selection and description are implemented Example be in order to more preferably illustrate the principles of the present invention and practical application, and make those skilled in the art it will be appreciated that Various embodiments with various modifications of the utility model to design suitable for special-purpose.
Embodiment 1
A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction, as shown in Figure 1, in the thick wooden locking plug templates of 5cm 20 outsides, more piece channel steel 30 is arranged circumferentially along the radian of telescoping steel form, is often saved channel steel and is fixed on telescoping steel form panel by rod iron On 10, the long 1-2m of channel steel is often saved.
Long timber wedge 50, by long timber wedge wedging, the long long 15- of timber wedge are equipped between the channel steel 30 and the locking plug template 20 25cm。
The rod iron includes at least the first rod iron 401 and the second rod iron 402, and first rod iron 401 encircles institute from side Channel steel 30 and the telescoping steel form panel 10 welding are stated, second rod iron 402 is welded in across the telescoping steel form panel 10 30 back side of the channel steel;The rod iron further includes third rod iron 403, and the third rod iron 403 and second rod iron 402 are side by side Welding, one end is fixed on the telescoping steel form panel 10;First rod iron use 25 screw-thread steels of φ, second rod iron and The third rod iron uses 12 round steel of φ.Fixed structure in this way, channel steel are relatively fixed to telescoping steel form panel securely On.
Obviously, described embodiment is only a part of the embodiment of the utility model, instead of all the embodiments. Based on the embodiments of the present invention, this field and those of ordinary skill in the related art are not making creative work Under the premise of the every other embodiment that is obtained, should all belong to the range of the utility model protection.

Claims (5)

1. a kind of power tunnel telescoping steel form locking plug template installs ruggedized construction, which is characterized in that on the outside of locking plug template, along punching block The radian of trolley is arranged circumferentially more piece channel steel, often saves channel steel and is fixed on telescoping steel form panel by rod iron;
The rod iron includes at least the first rod iron and the second rod iron, and first rod iron encircles the channel steel and the steel from side Mould trolley panel welds, and second rod iron is welded in the channel steel back side across the telescoping steel form panel.
2. power tunnel telescoping steel form locking plug template according to claim 1 installs ruggedized construction, which is characterized in that often save slot The long 1-2m of steel.
3. power tunnel telescoping steel form locking plug template according to claim 2 installs ruggedized construction, which is characterized in that the slot Long timber wedge is equipped between steel and the locking plug template.
4. power tunnel telescoping steel form locking plug template according to claim 1 installs ruggedized construction, which is characterized in that the steel Stick further includes third rod iron, and the third rod iron welds side by side with second rod iron, and the telescoping steel form face is fixed in one end On plate.
5. power tunnel telescoping steel form locking plug template according to claim 4 installs ruggedized construction, which is characterized in that described the One rod iron usesScrew-thread steel, second rod iron and the third rod iron use 12 round steel of φ.
CN201721717615.1U 2017-12-12 2017-12-12 A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction Active CN207829909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721717615.1U CN207829909U (en) 2017-12-12 2017-12-12 A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721717615.1U CN207829909U (en) 2017-12-12 2017-12-12 A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction

Publications (1)

Publication Number Publication Date
CN207829909U true CN207829909U (en) 2018-09-07

Family

ID=63387322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721717615.1U Active CN207829909U (en) 2017-12-12 2017-12-12 A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction

Country Status (1)

Country Link
CN (1) CN207829909U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107842376A (en) * 2017-12-12 2018-03-27 中国水利水电第四工程局有限公司 A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107842376A (en) * 2017-12-12 2018-03-27 中国水利水电第四工程局有限公司 A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction

Similar Documents

Publication Publication Date Title
CN204984441U (en) It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction
CN101864959A (en) Method for tunneling construction of main structure of underground station
CN102797481B (en) Large-span tunnel arch secondary lining steel bar binding construction method based on skeleton beams
CN107989034A (en) A kind of manually digging hole filling pile and its construction method
CN103982188A (en) Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system
JP6480815B2 (en) Tunnel junction structure and tunnel construction method
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN108999212A (en) The template construction method of underground concrete pool wall antiseep
CN106192898B (en) The joint construction method of Face Slab of Concrete-faced Rockfill anti-settling deformation
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN107268634A (en) Deep basal pit waist rail construction typified form system
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN105781593A (en) Steel grating assisted diversion tunnel preliminary bracing structure and method
CN207829909U (en) A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction
CN208201880U (en) A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit
CN109869153B (en) Integral lifting cantilever formwork device for rapidly constructing shaft lining and construction method
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN105040726A (en) Method for applying circular prestress on fan foundation connection
CN106149744A (en) Pile foundation steel bar cage skeletal support device and construction method
CN107842376A (en) A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction
CN108179754A (en) The construction method of long and narrow Extra-Deep Foundation Pit system
CN206539007U (en) A kind of arch steel concrete wall formwork erecting structure
CN102562098B (en) Tunnel steel temporary inverted arch with rapid assembly and disassembly
CN102444408A (en) Secondary lining split mounting type blocking head device for metro underground excavation tunnel
CN207160418U (en) A kind of reinforced column constructing device of free removal template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant