CN207816268U - It is a kind of to measure high pylom - Google Patents

It is a kind of to measure high pylom Download PDF

Info

Publication number
CN207816268U
CN207816268U CN201820024752.5U CN201820024752U CN207816268U CN 207816268 U CN207816268 U CN 207816268U CN 201820024752 U CN201820024752 U CN 201820024752U CN 207816268 U CN207816268 U CN 207816268U
Authority
CN
China
Prior art keywords
truss
pylom
bottom plate
pedestal
holder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820024752.5U
Other languages
Chinese (zh)
Inventor
侯进峰
段先军
雷素素
李�杰
董伟东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN201820024752.5U priority Critical patent/CN207816268U/en
Application granted granted Critical
Publication of CN207816268U publication Critical patent/CN207816268U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a kind of high pylom of measurement.The high pylom of the measurement includes:Frame body, cat ladder, safety barrier and erecting bed;The frame body is English truss;The bottom area of the English truss is more than topside area;Top bottom plate is provided at the top of the English truss;Be provided on the top bottom plate for personnel by upper manhole;The cat ladder is fixedly connected on a side of the English truss;The top of the cat ladder is stretched out from the upper manhole;The bottom of the cat ladder is abutted with ground;The safety barrier is arranged at the top of the top bottom plate;The safety barrier is around enclosed construction;The bottom of the erecting bed is fixed on the top bottom plate of the English truss, and the holder for installing instruments is provided at the top of the erecting bed;The height of the holder is more than the height of the safety barrier.It can effectively ensure point intervisibility using the utility model, significantly improve precision, efficiency and the stability of the work of construction project to be built construction operation planar survey.

Description

It is a kind of to measure high pylom
Technical field
This application involves engineering measuring technology field more particularly to a kind of high pyloms of measurement.
Background technology
In the construction period of construction project to be built, peak period of especially constructing, a large amount of placing of material and live general layout cloth It sets, the intervisibility at the control point laid at the beginning of engineering is caused to receive serious influence, some control points have been unable to intervisibility, profit It is substantially reduced with rate, causes point periodic test repetition measurement correction difficulty to increase, precision is not easy to ensure, has seriously affected proposed work The efficiency and precision of the measurement work of journey operation side.
Utility model content
In view of this, the utility model provides a kind of high pylom of measurement, it is aobvious so as to effectively ensure point intervisibility Write precision, efficiency and the stability for improving the work of construction project to be built construction operation planar survey.
What the technical solution of the utility model was specifically realized in:
A kind of to measure high pylom, the high pylom of the measurement includes:Frame body, cat ladder, safety barrier and erecting bed;
The frame body is English truss;The bottom area of the English truss is more than topside area;The English truss Top is provided with top bottom plate;Be provided on the top bottom plate for personnel by upper manhole;
The cat ladder is fixedly connected on a side of the English truss;The top of the cat ladder is from the upper manhole Middle stretching;The bottom of the cat ladder is abutted with ground;
The safety barrier is arranged at the top of the top bottom plate;The safety barrier is around enclosed construction;
The bottom of the erecting bed is fixed on the top bottom plate of the English truss, is provided at the top of the erecting bed Holder for installing instruments;The height of the holder is more than the height of the safety barrier.
Preferably, the English truss includes:Pedestal, the first truss, the second truss and top bottom plate;
The bottom of first truss is connect with the pedestal;The top of first truss connects with second truss It connects;The top of second truss is connect with the top bottom plate;
The bottom and top of first truss and the second truss are equilateral triangle;The bottom faces of first truss Bottom area of the product more than second truss;The bottom area of second truss is more than the top surface of second truss Product.
Preferably, first truss and the second truss include:Three main risers and Duo Gen truss frame for connecting pipes;
The more truss frame for connecting pipes are arranged between three main risers, and the both ends of every truss frame for connecting pipe are respectively It is connect with two main risers.
Preferably, the both ends of the truss frame for connecting pipe are respectively welded on two main risers.
Preferably, passing through flanged joint between the pedestal, the first truss, the second truss and top bottom plate.
Preferably, the erecting bed includes:Pedestal, more supporting rods, connecting plate and holder;
The bottom of the pedestal is connect with the top of the top bottom plate of the English truss;
One end of the supporting rod is connect with the pedestal, and the other end is connect with the holder;
The connecting plate is arranged at the top of the holder.
Preferably, being provided with level(l)ing bubble on the connecting plate;
The connecting plate is connect by three fine motion adjustable bolts with the holder.
Preferably, being provided with the mounting hole for installing instruments on the connecting plate.
Preferably, the pedestal is circular steel plate;The pedestal is welded on the top of the top bottom plate.
Preferably, passing through bolted-on between the supporting rod and the pedestal and the holder.
As above as it can be seen that since the high pylom of measurement in the utility model has frame body, cat ladder, safety barrier and erecting bed, Therefore overhead processing can be carried out to control point, the instrument at control point is mounted on to the holder for the erecting bed being arranged at the top of frame body On so that the instrument at control point is located on relatively high position, the height of projecting placing of material height and structures, to It can effectively ensure point intervisibility.Moreover, it is additionally provided with the cat ladder climbed for operating personnel on the above-mentioned high pylom of measurement, Therefore the high pylom of measurement in the utility model conveniently upper people can set up instrumentation and make for a long time as backsight station mark With, can easily apply GNSS technologies to point carry out repetition measurement correction, make traditional total powerstation and global satellite measurement and positioning skill Art is combined and is applied well.
Description of the drawings
Fig. 1 is the structural schematic diagram one of the high pylom of measurement in the utility model embodiment.
Fig. 2 is the structural schematic diagram two of the high pylom of measurement in the utility model embodiment.
Fig. 3 is the schematic top plan view of the first truss in the utility model embodiment.
Fig. 4 is the schematic side view of the first truss in the utility model embodiment.
Fig. 5 is the schematic top plan view of the second truss in the utility model embodiment.
Fig. 6 is the schematic side view of the second truss in the utility model embodiment.
Fig. 7 is the schematic top plan view of the top bottom plate in the utility model embodiment.
Fig. 8 is the structural schematic diagram of the erecting bed in the utility model embodiment.
Fig. 9 is the schematic top plan view of the holder in the utility model embodiment.
Figure 10 is the schematic side view of the holder in the utility model embodiment.
Figure 11 is the schematic side view of the connecting plate in the utility model embodiment.
Figure 12 is the vertical view of the connecting plate in the utility model embodiment.
Figure 13 is the schematic diagram one of the supporting rod in the utility model embodiment.
Figure 14 is the schematic diagram two of the supporting rod in the utility model embodiment.
Figure 15 is the schematic side view of the safety barrier in the utility model embodiment.
Figure 16 is the schematic diagram of the cat ladder in the utility model embodiment.
Specific implementation mode
To make the technical solution of the utility model and advantage be more clearly understood, below in conjunction with drawings and the specific embodiments, The utility model is described in further detail.
Fig. 1 is the structural schematic diagram one of the high pylom of measurement in the utility model embodiment, and Fig. 2 is implemented for the utility model The structural schematic diagram two of the high pylom of measurement in example, Fig. 7 are the schematic top plan view of the top bottom plate in the utility model embodiment. As shown in Fig. 1,2,7,15 and 16, the high pylom of measurement in the utility model embodiment includes:Frame body 11, cat ladder 12, safety protective Column 13 and erecting bed 14;
The frame body 11 is English truss;The bottom area of the English truss is more than topside area;The English truss Top be provided with top bottom plate 21;Be provided on the top bottom plate 21 for personnel by upper manhole 20;
The cat ladder 12 is fixedly connected on a side of the English truss;The top of the cat ladder 12 is from described It is stretched out in manhole 20;The bottom of the cat ladder 12 is abutted with ground;
The safety barrier 13 is arranged at the top of the top bottom plate 21;The safety barrier 13 is to be tied around closing Structure;
The bottom of the erecting bed 14 is fixed on the top bottom plate 21 of the English truss, the top of the erecting bed 14 It is provided with the holder 51 for installing instruments;The height of the holder 51 is more than the height of the safety barrier 14.
According to the structure of the high pylom of above-mentioned measurement it is found that the high pylom of measurement in the utility model has frame body, therefore can To carry out overhead processing to control point, the instrument at control point is mounted on the holder for the erecting bed being arranged at the top of frame body, is made The instrument for obtaining control point is located on relatively high position, the height of projecting placing of material height and structures, so as to Effectively ensure point intervisibility.Moreover, being additionally provided with the cat ladder climbed for operating personnel on the above-mentioned high pylom of measurement, therefore The high pylom of measurement in the utility model conveniently upper people can set up instrumentation and backsight station mark is used as to use for a long time, can Repetition measurement correction easily is carried out to point using GNSS technologies, traditional total powerstation and global satellite measurement and positioning technology is made to obtain It combines and applies well.
In addition, in the technical solution of the utility model, can according to practical situations need to pre-set it is above-mentioned Measure the frame body of high pylom, the height of safety barrier and/or erecting bed.
For example, preferably, in specific embodiment of the utility model, the height of the frame body can be 9~10 meters (m).Certainly, the height of the frame body can also be other preset numerical value or numberical range, will not enumerate herein.
In addition, in the technical solution of the utility model, above-mentioned triangle purlin can be realized using a variety of realization methods Frame.The technical solution of the utility model will be described in detail by taking one such specific implementation as an example below.
For example, as depicted in figs. 1 and 2, preferably, in specific embodiment of the utility model, the English truss can To include:Pedestal 22, the first truss 23, the second truss 24 and top bottom plate 21;
The bottom of first truss 23 is connect with the pedestal 22;The top of first truss 23 and second purlin Frame 24 connects;The top of second truss 24 is connect with the top bottom plate 21;
The bottom and top of first truss, 23 and second truss 24 are equilateral triangle;First truss 23 Bottom area is more than the bottom area of second truss 24;The bottom area of second truss 24 is more than second truss 24 topside area.
In addition, preferably, as shown in Fig. 3~Fig. 6, in specific embodiment of the utility model, first truss and Second truss includes:Three main risers 211 and Duo Gen truss frame for connecting pipe 212;
The more truss frame for connecting pipes 212 are arranged between three main risers 211, every truss frame for connecting pipe 212 Both ends are respectively connect with two main risers 211.
In addition, preferably, in specific embodiment of the utility model, the both ends of the truss frame for connecting pipe are respectively welded at On two main risers.
In addition, preferably, in specific embodiment of the utility model, the pedestal, the first truss, the second truss and top Pass through flanged joint between portion's bottom plate.
In addition, preferably, in specific embodiment of the utility model, the top bottom plate is steel plate.
In addition, in the technical solution of the utility model, can according to practical situations need to pre-set it is above-mentioned Size, the specification of each building block of English truss.
For example, preferably, in specific embodiment of the utility model, the thickness of the top bottom plate is 20 millimeters (mm), thereby may be ensured that operating personnel stand will not deform when on the top bottom plate.Certainly, the top bottom plate Thickness can also be other suitable numerical value, will not enumerate herein.
For example, preferably, in specific embodiment of the utility model, the top bottom plate is circle, and diameter can be with For 1500 millimeters (mm).Certainly, the diameter of the top bottom plate can also be other suitable numerical value, no longer arrange one by one herein It lifts.
For example, preferably, in specific embodiment of the utility model, the diameter of the upper manhole can be 600 millimeters (mm).Certainly, on this diameter of manhole can also be other suitable personnel by numerical value, will not enumerate herein.
For example, preferably, in specific embodiment of the utility model, the equilateral triangle of first truss bottom The length of side can be 1732 millimeters;The length of side of equilateral triangle at the top of second truss can be 932 millimeters.Certainly, above-mentioned The length of side of each equilateral triangle can also be other suitable numerical value, will not enumerate herein.
In addition, in the technical solution of the utility model, above-mentioned erecting bed can be realized using a variety of realization methods. The technical solution of the utility model will be described in detail by taking one such specific implementation as an example below.
For example, preferably, as shown in Fig. 8~Figure 14, in specific embodiment of the utility model, the erecting bed 14 can To include:Pedestal 52, more supporting rods 53, connecting plate 54 and holder 51;
The bottom of the pedestal is connect with the top of the top bottom plate of the English truss;
One end of the supporting rod is connect with the pedestal, and the other end is connect with the holder;
The connecting plate 54 is arranged at the top of the holder 51.
In addition, preferably, in specific embodiment of the utility model, level(l)ing bubble is provided on the connecting plate;Institute Connecting plate is stated to connect with the holder by three fine motion adjustable bolts 543.By adjusting three above-mentioned fine motion adjustable bolts, And coordinate level(l)ing bubble, leveling can be carried out to the connecting plate.
In addition, preferably, in specific embodiment of the utility model, it is provided on the connecting plate for installing instruments Mounting hole.By above-mentioned mounting hole, instruments or the equipment such as all purpose instrument, backsight station mark can be installed on the connecting plate.
In addition, preferably, in specific embodiment of the utility model, the pedestal is circular steel plate;The pedestal It is welded on the top of the top bottom plate.
In addition, preferably, in specific embodiment of the utility model, the supporting rod and the pedestal and the holder Between pass through bolted-on.
In addition, in the technical solution of the utility model, it is contemplated that instrument sight is not blocked and ensures the safety of personnel, it can To pre-set the size and specification of above-mentioned cat ladder.
For example, preferably, in specific embodiment of the utility model, the width of the cat ladder can be 500 millimeters.When So, the width of above-mentioned cat ladder can also be other suitable numerical value (but being less than the diameter of the upper manhole), herein no longer It enumerates.
Furthermore, it is contemplated that not blocking instrument sight and ensureing the safety of personnel, above-mentioned safety barrier can be pre-set Highly.
For example, preferably, in specific embodiment of the utility model, the height of the safety barrier can be 1100 millis Rice.Certainly, the height of above-mentioned safety barrier can also be other suitable numerical value, will not enumerate herein.
In conclusion in the technical solution of the utility model, due to the above-mentioned high pylom of measurement have frame body, cat ladder, Safety barrier and erecting bed, therefore overhead processing can be carried out to control point, the instrument at control point is mounted on and is arranged in frame body On the holder of the erecting bed at top so that the instrument at control point is located on relatively high position, projecting placing of material height With the height of structures, so as to effectively ensure point intervisibility.Moreover, it is also provided with cat ladder on the above-mentioned high pylom of measurement, So that conveniently upper people can set up instrumentation and backsight station mark is used as to use for a long time, GNSS technologies pair can be easily applied Point carries out repetition measurement correction, and traditional total powerstation and GNSS dynamics, static satellite positioning surveys technology is made to be combined well And application, there is good inter-visibility, satellite reception elevation angle can be made to keep best, make to survey between ground, high-altitude, space Fusion that amount means, method are seamless so that control point, which checks, self repaiies that survey ability is rapid, and precision is easily-controllable, construction project to be built construction operation Precision, efficiency, the stability of planar survey work are obtained for and significantly improve, and form the measurement advantage of Incorporate, but also It can make up for each other's deficiencies and learn from each other, enrich the application of measurement method and means.By using the above-mentioned high pylom of measurement, tradition can be made Total powerstation application preferably played and expanded, inter-visibility is good, can be used for resection random setting station, also can be direct Station is set on high pylom.Even when not setting station, can also set up rearscope for a long time, convenient working face to point and after Depending on setting-out efficiency has also obtained promotion at double.In addition, the structure of the above-mentioned high pylom of measurement is simple, easy to disassemble, installation and fortune It is defeated, it can repeatedly utilize, environment protecting and power-saving, it can be directly as concrete structure construction, Construction of Steel Structure installation, finishing and machine The measuring basis of the staged constructions such as electric installation, deformation observation may be implemented net more and unify, increases operation rate.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent substitution, improvement and etc. done should be included in the utility model Within the scope of protection.

Claims (10)

1. a kind of measuring high pylom, which is characterized in that the high pylom of the measurement includes:Frame body, cat ladder, safety barrier and erecting bed;
The frame body is English truss;The bottom area of the English truss is more than topside area;The top of the English truss It is provided with top bottom plate;Be provided on the top bottom plate for personnel by upper manhole;
The cat ladder is fixedly connected on a side of the English truss;It is stretched from the upper manhole at the top of the cat ladder Go out;The bottom of the cat ladder is abutted with ground;
The safety barrier is arranged at the top of the top bottom plate;The safety barrier is around enclosed construction;
The bottom of the erecting bed is fixed on the top bottom plate of the English truss, is provided with and is used at the top of the erecting bed The holder to install instruments;The height of the holder is more than the height of the safety barrier.
2. according to claim 1 measure high pylom, which is characterized in that the English truss includes:Pedestal, the first purlin Frame, the second truss and top bottom plate;
The bottom of first truss is connect with the pedestal;The top of first truss is connect with second truss;Institute The top for stating the second truss is connect with the top bottom plate;
The bottom and top of first truss and the second truss are equilateral triangle;The bottom area of first truss is big In the bottom area of second truss;The bottom area of second truss is more than the topside area of second truss.
3. according to claim 2 measure high pylom, which is characterized in that first truss and the second truss include: Three main risers and Duo Gen truss frame for connecting pipes;
The more truss frame for connecting pipes are arranged between three main risers, and the both ends of every truss frame for connecting pipe are respectively with two Root main riser connects.
4. according to claim 3 measure high pylom, it is characterised in that:
The both ends of the truss frame for connecting pipe are respectively welded on two main risers.
5. according to claim 2 measure high pylom, it is characterised in that:
Pass through flanged joint between the pedestal, the first truss, the second truss and top bottom plate.
6. according to claim 1 measure high pylom, which is characterized in that the erecting bed includes:Pedestal, more supports Bar, connecting plate and holder;
The bottom of the pedestal is connect with the top of the top bottom plate of the English truss;
One end of the supporting rod is connect with the pedestal, and the other end is connect with the holder;
The connecting plate is arranged at the top of the holder.
7. according to claim 6 measure high pylom, it is characterised in that:
It is provided with level(l)ing bubble on the connecting plate;
The connecting plate is connect by three fine motion adjustable bolts with the holder.
8. according to claim 6 measure high pylom, it is characterised in that:
The mounting hole for installing instruments is provided on the connecting plate.
9. according to claim 6 measure high pylom, it is characterised in that:
The pedestal is circular steel plate;The pedestal is welded on the top of the top bottom plate.
10. according to claim 6 measure high pylom, it is characterised in that:
Pass through bolted-on between the supporting rod and the pedestal and the holder.
CN201820024752.5U 2018-01-08 2018-01-08 It is a kind of to measure high pylom Active CN207816268U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820024752.5U CN207816268U (en) 2018-01-08 2018-01-08 It is a kind of to measure high pylom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820024752.5U CN207816268U (en) 2018-01-08 2018-01-08 It is a kind of to measure high pylom

Publications (1)

Publication Number Publication Date
CN207816268U true CN207816268U (en) 2018-09-04

Family

ID=63326407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820024752.5U Active CN207816268U (en) 2018-01-08 2018-01-08 It is a kind of to measure high pylom

Country Status (1)

Country Link
CN (1) CN207816268U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108088428A (en) * 2018-01-08 2018-05-29 北京城建集团有限责任公司 A kind of high pylom of measurement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108088428A (en) * 2018-01-08 2018-05-29 北京城建集团有限责任公司 A kind of high pylom of measurement

Similar Documents

Publication Publication Date Title
Li et al. Structural health monitoring of innovative civil engineering structures in Mainland China
CN102561712B (en) Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
CN205718762U (en) A kind of stake holes measuring instrument
CN107090775A (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN106223623B (en) Steel construction box arched roof truss installation method
CN207816268U (en) It is a kind of to measure high pylom
CN210441865U (en) Urban road bridge road bed engineering measuring equipment
CN115387221A (en) High pier line type control method for high altitude area
CN102966254B (en) Arrangement method for measuring tower used for construction of stub matching method
CN103344214B (en) 1.6-degree parabolic extralarge pier measuring and pier body linear control method
CN108088428A (en) A kind of high pylom of measurement
CN110241735B (en) Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge
CN208918305U (en) A kind of height controller for floorslab concrete
CN108488483B (en) Pipeline non-excavation construction method
CN207036586U (en) A kind of reisilometer detects auxiliary stand with multiple spot
CN109137963A (en) Fixing bracket body and its construction method for foundation bolt group positioning
CN205619903U (en) Deformation monitoring system
CN205593530U (en) Attaches wall type survey control point
CN210288506U (en) Super thick bottom plate measurement unwrapping wire platform
CN109253705A (en) Bridge pier scour survey instrument in a kind of model test
CN113048961A (en) Measuring tool for independent foundation positioning and using method
CN203023751U (en) Multifunctional forced centering foot stool
CN208486136U (en) Stake device for railway track track lining operation
CN207019704U (en) movable three-dimensional intelligent garage measuring platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant