CN207799448U - The centralized monitoring system of one pipe of enterprise is realized applied to industrial park - Google Patents

The centralized monitoring system of one pipe of enterprise is realized applied to industrial park Download PDF

Info

Publication number
CN207799448U
CN207799448U CN201820177828.8U CN201820177828U CN207799448U CN 207799448 U CN207799448 U CN 207799448U CN 201820177828 U CN201820177828 U CN 201820177828U CN 207799448 U CN207799448 U CN 207799448U
Authority
CN
China
Prior art keywords
enterprise
wastewater
monitoring
pipe
water inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820177828.8U
Other languages
Chinese (zh)
Inventor
李文秀
吴迪
张建明
何立兴
李凤达
赵淑萍
辛红香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sound Environmental Engineering Co Ltd
Original Assignee
Beijing Sound Environmental Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sound Environmental Engineering Co Ltd filed Critical Beijing Sound Environmental Engineering Co Ltd
Priority to CN201820177828.8U priority Critical patent/CN207799448U/en
Application granted granted Critical
Publication of CN207799448U publication Critical patent/CN207799448U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of centralized monitoring systems for realizing one pipe of enterprise applied to industrial park, including:Several groups enterprise wastewater pressure collection system, Online Monitoring Control room, several probe tubes, several groups on-line monitoring instrument, PLC control devices, section mixing pit, blender and section waste water total outlet pipe.The system is by being arranged several groups enterprise wastewater pressure collection system, every group of enterprise wastewater pressure collection system is set to be connected with the wastewater drainage pipe of corresponding enterprise, several groups enterprise wastewater pressure collection system is connect with several groups on-line monitoring instrument respectively, realization is individually monitored the draining of each enterprise, coordinate the control of PLC control devices, it can be according to the index of each enterprise's waste discharge, control the open and close of the corresponding each group enterprise wastewater pressure collection system of each enterprise, realize the Centralized Monitoring that a pipe is looked forward to the enterprise one in industrial park, certain enterprises in industrial park are avoided to steal row's overstandard waste water.

Description

Centralized monitoring system applied to industrial park for realizing one enterprise and one pipe
Technical Field
The utility model belongs to environmental engineering field water treatment field, concretely relates to be applied to industrial park and realize a centralized monitoring system of enterprise's pipe.
Background
Because of the various types of industries in the industrial park, each industry is composed of a plurality of sections of processes, the property difference of the produced sewage is large, and the sewage in the industrial park contains COD and BOD5、SS、NH3the industrial wastewater treatment plant has the main characteristics that the sewage of different industrial parks has large water quality difference due to different park industry types, a targeted treatment process is adopted in the centralized treatment process according to the actual water quality condition of the sewage, the sewage collection pipe network laying, sewage receiving standard and execution supervision of the sewage collection pipe network are problems on the other hand, a large part of the sewage discharged by various enterprises in some parks enters a park comprehensive sewage treatment plant without effective pretreatment, the difficulty of standard-reaching treatment of the park comprehensive sewage treatment plant is increased, adverse effects are caused to the normal and stable operation of the park comprehensive sewage treatment plant, the pollution load discharge of the park pollution is aggravated to a certain extent, the composition of the industrial wastewater is complex, different discharge laws and large concentration difference cause large water quality change entering the sewage treatment plant, the water quality of the park comprehensive sewage treatment plant is adversely affected by the normal and stable operation of the park comprehensive sewage treatment plant, and the water quality of the park pollution load discharge is aggravated to a certain extent due to the combination of the coagulation and discharge of the sewage treatment process, the sewage treatment plant has the problem that the water quality of the sewage treatment plant is difficult to reach the standard, the water quality, the sewage treatment plant has the problem that the water quality of the water treatment plant is increased, the water quality of the sewage treatment plant, the sewage treatment plant has the high-water quality of the sewage treatment plant, the sewage treatment plant has the high-water-discharge process-discharge regulation-discharge system has the high-discharge process-discharge regulation-discharge process-The sewage treatment plant can not stably run up to the standard, and even the whole sewage treatment system is broken down. The lack of specialized personnel at the wastewater treatment stations of some enterprises for operational management also exacerbates the severity of the problem.
In actual operation, some enterprises do not strictly carry out sewage disposal and diversion, domestic sewage, ground flushing water and cooling water are mixed and discharged, and even part of industrial wastewater is mixed into the cooling water and discharged; the sewage treatment process of some enterprises is relatively laggard, and the treated sewage is directly discharged when the treated sewage does not meet the takeover standard; and sewage treatment facilities of some enterprises can not normally operate, and most of untreated industrial wastewater is directly discharged into a sewage pipe network. And as the area of a general industrial park is large, most of the sewage of enterprises is mainly discharged into a park public sewage pipeline system, once the problem occurs, responsibility units cannot be confirmed, great difficulty is caused to environmental management of the park and operation units of a sewage treatment system, and the problem is also one of main reasons for causing garden pollution disputes. The problem is a difficult problem to be solved as soon as possible in many industrial parks.
SUMMERY OF THE UTILITY MODEL
Based on the problem that prior art exists, the utility model aims at providing a be applied to industrial park and realize a centralized monitoring system of managing of enterprise, can realize the centralized monitoring of managing of enterprise to each enterprise of industrial park, strengthened the management and control of government to the enterprise, supervise enterprise discharge to reach standard sewage.
The utility model aims at realizing through the following technical scheme:
the embodiment of the utility model provides a be applied to industrial park and realize a centralized monitoring system of enterprise's a pipe, include:
the system comprises a plurality of groups of enterprise wastewater pressure collecting systems, an online monitoring control room, a plurality of sampling pipes, a plurality of groups of online monitoring instruments, a PLC (programmable logic controller) control device, a zone mixing pool, a stirrer and a zone wastewater main water outlet pipe; wherein;
each enterprise wastewater pressure collection system in the plurality of groups of enterprise wastewater pressure collection systems is provided with a water inlet and an enterprise wastewater outlet pipe, the water inlet of each group of enterprise wastewater pressure collection systems is connected with the wastewater outlet pipe of each corresponding enterprise, and the enterprise wastewater outlet pipe of each group of enterprise wastewater pressure collection systems is connected with the district mixing tank;
a stirrer is arranged in the district mixing tank and used for mixing the wastewater of each enterprise, the district mixing tank is provided with a total water outlet, the total water outlet is connected with the district wastewater total water outlet pipe, and the district wastewater total water outlet pipe is connected to a sewage treatment plant;
the plurality of groups of on-line monitoring meters and the PLC control device are all arranged in the on-line monitoring control room, and each group of on-line monitoring meters corresponding to each enterprise are respectively connected with the wastewater pressure collection system of the corresponding enterprise through a sampling pipe; and the PLC control system receives the wastewater quantity and wastewater quality indexes of each enterprise, feeds back information in time and controls the opening and closing of the wastewater collection system valve of each enterprise.
By the foregoing the utility model provides a technical scheme can see out, the utility model provides a be applied to industrial park and realize a centralized monitoring system of enterprise's pipe, its beneficial effect is:
by arranging a plurality of groups of enterprise wastewater pressure collecting systems, abandoning the traditional gravity flow pipeline system, connecting each group of enterprise wastewater pressure collecting systems with the wastewater drainage pipe of the corresponding enterprise, connecting the plurality of groups of enterprise wastewater pressure collecting systems with a plurality of groups of online monitoring instruments respectively, realizing the independent monitoring of the drainage of each enterprise, matching the control of a PLC control device, controlling the opening and closing of each group of enterprise wastewater pressure collecting systems corresponding to each enterprise according to the indexes of the drainage of each enterprise, realizing the centralized monitoring of one enterprise, one enterprise and one enterprise in an industrial park, avoiding the stealing and draining of overproof wastewater of some enterprises in the industrial park, conveniently and accurately determining the pollution source to the industrial park in time, being beneficial to controlling the stealing, draining and draining phenomena of the enterprises, defining the responsibility main body of the superpollution drainage enterprises, and enhancing the environmental awareness of each enterprise, the supervision of the government on enterprises is enhanced, and the difficulty of sewage treatment in sewage treatment plants is greatly reduced.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of a centralized monitoring system for implementing one enterprise and one management system applied to an industrial park according to an embodiment of the present invention;
in the figure: 1-enterprise wastewater collecting tank; 2-a wastewater lift pump; 3-enterprise sewage pipes; 4-water inlet electromagnetic valve; 5-an electromagnetic flow meter; 6-enterprise water inlet monitoring pool; 7-sampling tube; 8-an online monitoring control room; 9-each group of online monitoring instruments; 10-a PLC control device; 11-a water outlet electromagnetic valve; 12-enterprise wastewater outlet pipe; 13-a slice zone mixing tank; 14-a stirrer; 15 total water outlet pipe
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiment of the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Details not described in the embodiments of the present invention belong to the prior art known to those skilled in the art.
As shown in fig. 1, the embodiment of the utility model provides a be applied to industrial park and realize a centralized monitoring system who manages of enterprise, can carry out centralized monitoring to each enterprise's sewage of industry in the management and control of an enterprise, include:
the system comprises a plurality of groups of enterprise wastewater pressure collecting systems, an online monitoring control room 8, a plurality of sampling pipes 7, a plurality of groups of online monitoring instruments, a PLC (programmable logic controller) control device 10, a district mixing pool 13, a stirrer 14 and a district wastewater main water outlet pipe 15; wherein,
each group of enterprise wastewater pressure collection systems in the plurality of groups of enterprise wastewater pressure collection systems is provided with a water inlet and an enterprise wastewater outlet pipe 12, the water inlet of each group of enterprise wastewater pressure collection systems is connected with the wastewater outlet pipe of each corresponding enterprise, and the enterprise wastewater outlet pipe 12 of each group of enterprise wastewater pressure collection systems is connected with the district mixing tank 13;
a stirrer 14 is arranged in the district mixing tank and used for mixing the wastewater of each enterprise, the district mixing tank is provided with a main water outlet, the main water outlet and the district wastewater main water outlet pipe are connected, and the district wastewater main water outlet pipes used for connecting other districts are connected to a sewage treatment plant;
the plurality of groups of on-line monitoring meters and the PLC control device 10 are all arranged in the on-line monitoring control room 8, and each group of on-line monitoring meters 9 corresponding to each enterprise are respectively connected with a wastewater pressure collection system of the corresponding enterprise through a sampling pipe;
the PLC control device 10 is respectively in communication connection with each group of online monitoring instruments 9 and each group of enterprise wastewater pressure collection systems, can monitor the wastewater discharge amount of each enterprise according to corresponding electromagnetic flow meters, receives the wastewater amount and wastewater quality indexes of each enterprise, feeds back information in time, and can correspondingly control the opening and closing of each group of enterprise wastewater pressure collection systems according to wastewater index signals collected by each group of online monitoring instruments 9. If the sewage exceeds the standard, closing the enterprise wastewater pressure collection system of the corresponding enterprise, and if the sewage does not exceed the standard, keeping the enterprise wastewater pressure collection system of the corresponding enterprise open. Specifically, the PLC control device 10 controls the water inlet and outlet solenoid valves of the enterprise wastewater pressure collection system to open and close the enterprise wastewater pressure collection system.
Among the above-mentioned centralized monitoring system, every group enterprise's waste water pressure collecting system's constitution is the same among a plurality of groups enterprise waste water pressure collecting system, and wherein, every group enterprise waste water pressure collecting system includes:
the system comprises an enterprise wastewater collecting tank 1, a wastewater lifting pump 2, an enterprise sewage discharge pipe 3, a water inlet electromagnetic valve 4, an electromagnetic flow meter 5, an enterprise water inlet monitoring tank 6, an enterprise wastewater outlet pipe 12 and a water outlet electromagnetic valve 11; wherein,
the enterprise wastewater collecting tank 1 is provided with the water inlet connected with a wastewater drainage pipe of a corresponding enterprise;
a wastewater lifting pump 2 is arranged in the enterprise wastewater collecting tank 1, the wastewater lifting pump 2 is connected with an enterprise water inlet monitoring tank 6 through an enterprise sewage discharge pipe 3, and the enterprise water inlet monitoring tank 6 is connected with an enterprise wastewater outlet pipe 12 provided with an outlet electromagnetic valve 11;
the enterprise sewage draining pipe 3 is sequentially provided with a water inlet electromagnetic valve 4 and an electromagnetic flowmeter 5;
the wastewater lifting pump 2, the water inlet electromagnetic valve 4, the electromagnetic flowmeter 5 and the water outlet electromagnetic valve 11 are respectively in communication connection with the PLC control device 10.
The centralized monitoring system further comprises: the enterprise water inlet monitoring tanks 6 of each group of enterprise wastewater pressure collection systems are distributed on the upper layer of the confluence mixing tank and form an upper-layer structure and a lower-layer structure with the confluence mixing tank, and the enterprise water inlet monitoring tanks 6 are all high-level water tanks; and the enterprise wastewater discharged after reaching the standard flows to a sewage treatment plant through the lower layer mixing tank by gravity.
In the centralized monitoring system, the position of an enterprise wastewater collecting tank 1 is arranged at the position corresponding to an enterprise;
the location of the enterprise water intake monitoring pool 6 is built above the room of the on-line monitoring control room 8.
Further, the PLC control device 10 is in communication connection with a sewage treatment plant and a PCL control system of a central office, so that feedback can be monitored conveniently and timely, and real-time monitoring can be performed.
Embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
The centralized monitoring system that is applied to industrial park realization enterprise and management that this embodiment provided, this system includes:
the system comprises a plurality of groups of enterprise wastewater pressure collection systems, wherein each group of enterprise wastewater pressure collection systems is formed by connecting an enterprise wastewater collecting tank 1, a wastewater lifting pump 2, an enterprise blow-off pipe 3, a water inlet electromagnetic valve 4, an electromagnetic flowmeter 5 and an enterprise water inlet monitoring tank 6, corresponds to one enterprise and is connected with a wastewater discharge pipe of the enterprise;
further comprising: the online monitoring control room 8, a plurality of sampling pipes 7, the online monitoring control room are internally provided with a PLC control device 10 and a plurality of groups of online monitoring instruments which are respectively arranged aiming at each enterprise, each group of online monitoring instrument 9 corresponds to one enterprise, and each group of online monitoring instrument 9 is connected with each group of enterprise wastewater pressure collecting systems of the corresponding enterprise through one sampling pipe 7 and is particularly connected with an enterprise water inlet monitoring pool 6 of each group of enterprise wastewater pressure collecting systems;
enterprise water inlet monitoring pool 6 of each group of enterprise wastewater pressure collection systems is connected with a district mixing pool 13 through an enterprise wastewater outlet pipe 12 provided with an outlet electromagnetic valve 11, a stirrer 14 is arranged in the district mixing pool 13, and the effluent of the district mixing pool is discharged to a sewage treatment plant through a main drain pipe 15.
The utility model discloses a centralized monitoring system's concrete application as follows:
firstly, carrying out subarea division on an industrial park according to the geographical position and the enterprise type condition; building and perfecting a sewage system in each district, realizing distribution of rain and sewage, building a sewage comprehensive pipe gallery in each district, and meeting the pipe connecting conditions of one enterprise and one pipe;
and each district selects a reasonable position to build a district centralized monitoring center and a high-level collecting tank. The sewage of each enterprise of this parcel discharges into the catch basin 1 of enterprise after the inside water treatment of enterprise, the blow off pipe 3 of enterprise promotes pressure flow to the enterprise that district centralized detection center corresponds through waste water elevator pump 2 and intakes monitoring pond 6, electromagnetic flowmeter 5 monitors each enterprise's discharge, every online monitoring instrument of group 9 only intakes index COD to the enterprise, NH3-N, TN, TP carries out automatic sampling monitoring, implement 24 hours automatic monitoring, the monitoring result in time feeds back to PLC controlling means, when PLC controlling means discerns this quality of water of intaking superscript can in time make the feedback, with the water solenoid valve 4 and the play water solenoid valve 11 of the enterprise's waste water pressure collecting system of this enterprise of self-closing, PCL controlling system is with signal transmission to district sewage treatment plant and environmental protection office, in time arrange personnel's sampling analysis, reserve as the evidence, feedback in the enterprise that exceeds standard. And for the wastewater with the detection index up to the standard, the water outlet electromagnetic valve 11 is opened, the wastewater automatically flows into the district mixing tank 13 through the water outlet pipe 12, and the wastewater automatically flows into the park sewage treatment plant through the district main water outlet pipe 15 after being stirred by the waste water of other enterprises through the mixing tank stirrer 14.
The utility model discloses consider traditional gravity flow drainage pipe's deep basal pit, the cost is great, the construction difficulty just receives ground water level, topography and geological conditions influence is great, for better solution this type of problem, each enterprise adopts "one enterprise one pipe" pressure sewage collecting system, abandon traditional gravity flow pipe-line system, adopt enterprise's waste water pressure collecting system to realize waste water pressure transmission, be connected to the concentrated monitoring center of plot through the plot utility tunnel, the concentrated monitoring center is by monitoring the catch basin, reach PLC control room two parts between the monitoring and constitute, the monitoring catch basin is established to high-order pond, and be two-layer from top to bottom, every little catch basin of upper strata corresponds a blowdown enterprise, the big catch basin of lower floor is the mixed pond of converging, the qualified enterprise's sewage of monitoring passes through pressure flow to sewage treatment plant through the lower floor catch basin. On one hand, the problem of difficult construction can be solved, the pipeline laying can not be limited by the terrain, various complex terrains can be used, and special requirements can be met, and on the other hand, the sewage pipe can conveniently enter the high-level water pool, so that necessary conditions are provided for follow-up.
The electric valves are arranged on the blow-off pipes of the enterprises, dynamic monitoring is carried out on the discharge water volume and each index of sewage of each enterprise for 24 hours through the online instruments, the PLC online control system is arranged in the monitoring room, and once the source of the sewage exceeding the standard is found, the electric valves of the corresponding enterprises are automatically closed to stop receiving the water coming from the enterprises. Can standardize the enterprise's drainage of industrial park through this system, stop to steal the phenomenon that the drainage was discharged not up to standard by the enterprise, strengthen the environmental protection consciousness of each enterprise, the reinforcing government is to the supervision dynamics of enterprise, supervise the enterprise and arrange the table and discharge sewage, more be favorable to steal the monitoring and control of drainage phenomenon by the enterprise, clear and definite super sewage discharge enterprise responsibility main part, the fine waste water of industrial park before having solved all adopts unified underground sewage pipes to carry sewage treatment plant, some enterprises are holding the happy psychology of stream, the drainage is discharged badly up to standard, sewage treatment plant is to the problem of the degree of difficulty of industrial sewage unified treatment.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are all covered by the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (5)

1. A centralized monitoring system applied to an industrial park for realizing one enterprise and one pipe is characterized by comprising:
the system comprises a plurality of groups of enterprise wastewater pressure collecting systems, an online monitoring control room (8), a plurality of sampling pipes (7), a plurality of groups of online monitoring instruments, a PLC (programmable logic controller) control device (10), a district mixing pool (13), a stirrer (14) and a district wastewater main water outlet pipe (15); wherein,
each group of enterprise wastewater pressure collection systems in the plurality of groups of enterprise wastewater pressure collection systems is provided with a water inlet and an enterprise wastewater outlet pipe (12), the water inlet of each group of enterprise wastewater pressure collection systems is connected with the wastewater outlet pipe of each corresponding enterprise, and the enterprise wastewater outlet pipe (12) of each group of enterprise wastewater pressure collection systems is connected with the district mixing tank (13);
a stirrer (14) is arranged in the zonal mixing pool (13), the zonal mixing pool (13) is provided with a main water outlet, and the main water outlet is connected with a zonal wastewater main water outlet pipe (15);
the plurality of groups of on-line monitoring meters and the PLC control device (10) are all arranged in the on-line monitoring control room (8), and each group of on-line monitoring meters (9) corresponding to each enterprise are respectively connected with a wastewater pressure collection system of the corresponding enterprise through a sampling pipe;
the PLC control device (10) is respectively in communication connection with each group of online monitoring instruments (9) and each group of enterprise wastewater pressure collection systems, and can correspondingly control the opening and closing of each group of enterprise wastewater pressure collection systems according to wastewater index signals collected by each group of online monitoring instruments (9).
2. The centralized monitoring system for industrial park to realize one enterprise and one pipe according to claim 1, wherein each of the plurality of sets of enterprise wastewater pressure collecting systems is the same in structure, and wherein each set of enterprise wastewater pressure collecting systems comprises:
the system comprises an enterprise wastewater collecting tank (1), a wastewater lifting pump (2), an enterprise sewage discharge pipe (3), a water inlet electromagnetic valve (4), an electromagnetic flow meter (5), an enterprise water inlet monitoring tank (6), an enterprise wastewater outlet pipe (12) and an outlet electromagnetic valve (11); wherein,
the enterprise wastewater collecting tank (1) is provided with the water inlet connected with a wastewater drainage pipe of a corresponding enterprise;
a wastewater lifting pump (2) is arranged in the enterprise wastewater collecting tank (1), the wastewater lifting pump (2) is connected with an enterprise water inlet monitoring tank (6) through an enterprise sewage discharge pipe (3), and the enterprise water inlet monitoring tank (6) is connected with an enterprise wastewater outlet pipe (12) provided with a water outlet electromagnetic valve (11);
a water inlet electromagnetic valve (4) and an electromagnetic flowmeter (5) are sequentially arranged on the enterprise sewage discharge pipe (3);
the waste water lifting pump (2), the water inlet electromagnetic valve (4), the electromagnetic flowmeter (5) and the water outlet electromagnetic valve (11) are respectively in communication connection with the PLC control device (10).
3. The centralized monitoring system for realizing one enterprise and one pipe applied to the industrial park as claimed in claim 2 is characterized in that the position of the enterprise wastewater collecting tank (1) is arranged at the position corresponding to the enterprise;
the position of the enterprise water inlet monitoring pool (6) is arranged adjacent to the online monitoring control room (8).
4. A centralized monitoring system for an enterprise, a management system, as defined in any one of claims 1 to 3, further comprising: the enterprise water inlet monitoring pools (6) of each group of enterprise wastewater pressure collection systems are uniformly distributed on the upper layer of the confluence mixing pool and form an upper-layer structure and a lower-layer structure with the confluence mixing pool, and each enterprise water inlet monitoring pool (6) is a high-level water pool;
and the water inlet monitoring pool (6) of each enterprise is connected with the confluence mixing pool and is connected with the plate area mixing pool (13) through the confluence mixing pool.
5. A centralized monitoring system for an enterprise, a management system, as defined in any one of claims 1 to 3, wherein the PLC control device (10) is also communicatively connected to a master control system.
CN201820177828.8U 2018-02-01 2018-02-01 The centralized monitoring system of one pipe of enterprise is realized applied to industrial park Active CN207799448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820177828.8U CN207799448U (en) 2018-02-01 2018-02-01 The centralized monitoring system of one pipe of enterprise is realized applied to industrial park

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820177828.8U CN207799448U (en) 2018-02-01 2018-02-01 The centralized monitoring system of one pipe of enterprise is realized applied to industrial park

Publications (1)

Publication Number Publication Date
CN207799448U true CN207799448U (en) 2018-08-31

Family

ID=63267829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820177828.8U Active CN207799448U (en) 2018-02-01 2018-02-01 The centralized monitoring system of one pipe of enterprise is realized applied to industrial park

Country Status (1)

Country Link
CN (1) CN207799448U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108996575A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of aerial guard system of industrial wastewater
CN108996572A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of explosion-proof guard system of sewage network
CN108996573A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 One machine of one kind surveys sewage and adopts distributing pipe line system
CN108996576A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of sewage treatment intelligent control method
CN108996571A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of sewage conduct intelligent online management system
CN108996574A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of independent control method of enterprise's sewage
CN111610303A (en) * 2020-06-30 2020-09-01 重庆地质矿产研究院 Underground water environment detection method for shale gas development area

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108996575A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of aerial guard system of industrial wastewater
CN108996572A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of explosion-proof guard system of sewage network
CN108996573A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 One machine of one kind surveys sewage and adopts distributing pipe line system
CN108996576A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of sewage treatment intelligent control method
CN108996571A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of sewage conduct intelligent online management system
CN108996574A (en) * 2018-09-06 2018-12-14 湖州德环环保科技有限公司 A kind of independent control method of enterprise's sewage
CN108996573B (en) * 2018-09-06 2024-03-26 湖州德环环保科技有限公司 Sewage collecting and distributing pipeline system for one machine measurement
CN111610303A (en) * 2020-06-30 2020-09-01 重庆地质矿产研究院 Underground water environment detection method for shale gas development area

Similar Documents

Publication Publication Date Title
CN207799448U (en) The centralized monitoring system of one pipe of enterprise is realized applied to industrial park
CN101387119B (en) Rainwater gathering, processing and re-using system for large-sized workshop roof and method thereof
CN105974829B (en) A kind of intelligence adapter sewage control method
CN115653065B (en) Rainwater collecting and recycling system, control method and integrated control box
CN211621803U (en) Full-quantity filtering system for secondary water supply
CN211735657U (en) Sewage discharge system and sewage monitoring system
CN111472430A (en) Building site sewage and rainwater treatment method and circulating system
CN207633471U (en) A kind of region fragment based on mixed flow tubulation net cuts dirt and regulates and stores drainage system
CN211774196U (en) A by-pass flow filtration system for secondary water supply
CN207760988U (en) A kind of combined drainage system of sewage and rainwater
CN212452982U (en) Dirty rainwater circulation system of building site
CN215367710U (en) Multi-effect hierarchical formula is rain regulation pond just
CN212772580U (en) Rainwater collecting and recycling system convenient for remote control
CN211690686U (en) Intercepting well device for rainwater drainage port
CN107285521A (en) Full-automatic pressure type water purification station
CN209837186U (en) Diverging device of domestic waste water reutilization
CN208650180U (en) A kind of sanitary sewage centralized collection device of hydroelectric project underground power house
CN209721896U (en) The buried sewage-treatment plant of intelligence equipmentization
CN221261565U (en) Chemical industry garden waste water monitoring and collecting system
CN113136935A (en) Multi-effect grading type primary rain storage tank
CN207436176U (en) A kind of drainage system with online treatment facility
CN207436188U (en) A kind of drainage system with rain processing system
CN206844236U (en) A kind of slight sewage system for recycling of building
CN110963622A (en) Secondary water supply deep purification system with coupling quality-dividing function
CN205502190U (en) Well equipment that dams is flowed to automatic accent of integration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant