CN207794299U - A kind of complete assembled steel reinforced concrete frame structure system - Google Patents

A kind of complete assembled steel reinforced concrete frame structure system Download PDF

Info

Publication number
CN207794299U
CN207794299U CN201820177808.0U CN201820177808U CN207794299U CN 207794299 U CN207794299 U CN 207794299U CN 201820177808 U CN201820177808 U CN 201820177808U CN 207794299 U CN207794299 U CN 207794299U
Authority
CN
China
Prior art keywords
steel
prefabricated
reinforcement
fastener
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820177808.0U
Other languages
Chinese (zh)
Inventor
胡习兵
曾裕林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820177808.0U priority Critical patent/CN207794299U/en
Application granted granted Critical
Publication of CN207794299U publication Critical patent/CN207794299U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of complete assembled steel reinforced concrete frame structure system, it includes base connection and top fabricated construction system, top fabricated construction system includes Prefabricated composite node, prefabricated post, prefabricated overlapping girder, the prefabricated post is set to Prefabricated composite node upper and lower ends, and the prefabricated overlapping girder is set to Prefabricated composite node side.The purpose of this utility model is to provide a kind of complete assembled steel reinforced concrete frame structure system, the anti-seismic performance of full assembled steel tendon concrete frame structure can be improved, the full assembled for more rapid and better solving reinforced concrete frame structure, is convenient for construction and installation, improves working efficiency.

Description

A kind of complete assembled steel reinforced concrete frame structure system
Technical field
The utility model is related to technical field of civil engineering, specially a kind of full assembled steel tendon concrete frame structure body System.
Background technology
Assembly concrete building refers to passing through site-assembled side based on the concrete prefabricated element with factorial praluction The concrete structure class of formula design-build is built, and is one of the important directions of China's building structure development.With it is traditional cast-in-place mixed Xtah Crude Clay structure is compared, assembly concrete building can reduce building waste, more meet green construction it is energy saving, section material, it is water-saving, The requirements such as environmental protection and sustainable development;Its component can be factory produced, and reduce production cost, improve work efficiency.
The stress performance of assembly concrete building is mainly influenced by prefabricated components connecting node power transmission reliability.Column column Connection, beam-to-column joint and beam beam connecting node domain position stress are extremely complex, especially prominent under seismic loading.Meanwhile The connection type of prefabricated member also influences structural load and transmits and project installation construction.
Currently, the prefabricated components of prefabricated concrete structure connect generally use reinforced bar sleeve grouting process in Practical Project Or beam stress reinforcing bar adds anchor slab and directly cast-in-place etc. modes of concrete column, assembly efficiency is relatively low, and is easy in geological process The weak part for becoming structure down, weakens structure entirety anti-seismic performance.
Utility model content
The purpose of this utility model is in view of the above problems, providing a kind of full assembled steel tendon concrete frame structure body System, can more rapid and better solve the full assembled of reinforced concrete frame structure, and component connecting node stress performance is more Good, power transmission is more reliable, is easily installed construction, improves working efficiency, improves the shock resistance of assembled steel tendon concrete frame structure Energy.
In order to achieve the above object, the technical solution adopted in the utility model is:It includes base connection and top assembly Formula structural system;The top fabricated construction system includes Prefabricated composite node, prefabricated post, prefabricated overlapping girder, described pre- Combined joint processed includes that node box section steel construction, pin, the first steel fastener being connect with prefabricated post and prefabricated overlapping are led Second steel fastener of beam connection, the node of connection the second steel fastener of opposite sides is provided in node box section steel construction Perforated rebar, the node box section steel construction integrally wrap up casting concrete;The prefabricated post includes prefabricated post reinforcing bar Frame and prefabricated styletable steel fastener, the prefabricated post framework of steel reinforcement include column Reinforcement, column tie-bar, the column it is longitudinal by Power reinforcing bar end is welded with prefabricated styletable steel fastener, and the prefabricated styletable steel fastener is connect with the first steel fastener, described Prefabricated post framework of steel reinforcement integrally wraps up casting concrete;The prefabricated overlapping girder includes precast main beam framework of steel reinforcement, beam-ends steel Connector, the precast main beam framework of steel reinforcement include girder lower part Reinforcement, girder top Reinforcement, girder Stirrup, beam-ends steel fastener one end is stretched into precast main beam framework of steel reinforcement and lower flange is welded in precast main beam framework of steel reinforcement On, the beam-ends steel fastener is connect with the second steel fastener, girder top Reinforcement and the second steel fastener Top flange is welded, and the precast main beam framework of steel reinforcement integrally wraps up casting concrete;The base connection includes basic box-shaped Section steel construction, the 5th steel fastener, anchor bar and the pin being connect with prefabricated post, the anchor bar are cut with basic box-shaped Face welding for steel structure, the pin are welded in basic box section steel construction and node box section steel construction outer surface, pass through Pin on basic box section steel construction and node box section steel construction increases the globality of steel construction and concrete, avoids When shaking, concrete is subjected to displacement with steelwork component.
Further, second steel fastener is I-shaped.
Further, the beam-ends steel fastener Wei Shang fonts.
Further, girder top Reinforcement and girder lower part Reinforcement are respectively separated and are set to Upper and lower ends on the inside of girder stirrup, beam-ends steel fastener lower flange is welded on the Reinforcement of girder lower part.
Further, the node box section steel construction is provided with third steel fastener;The precast main beam reinforcing bar Antitorque reinforcing bar is provided at left and right sides of frame, the antitorque reinforcing bar is welded with third steel fastener.
Further, it further includes prefabricated overlapping secondary beam, and the prefabricated overlapping secondary beam includes time of time beam framework, Shang fonts Joist steel connector has poured concrete on the secondary beam framework, and the secondary beam steel fastener is set to time beam framework both ends, described Secondary beam steel fastener is connect with the 4th steel fastener on prefabricated overlapping girder;4th steel fastener is set to prefabricated overlapping On girder.
Further, the secondary beam framework include secondary beam top Reinforcement, it is secondary beam lower part Reinforcement, secondary Beam stirrup, secondary beam top Reinforcement are respectively arranged at secondary beam lower part Reinforcement on the inside of time beam stirrup Lower both ends;Secondary beam lower part Reinforcement is welded with secondary beam steel fastener lower flange.
The beneficial effects of the utility model:1, this system prefabricated components connecting portion uses SRC member and does Method, compared with traditional concrete assembled structure connection way, power transmission is more reliable.
2, beam-column connection adds the way of perforated rebar using combined joint, improves the anti-seismic performance of node.
3, means of structural connection is similar to assembling type steel structure means of structural connection, and construction and installation are more quick, can be effective The lifting machine hold facility time is reduced, working efficiency is greatly improved.
4, Prefabricated composite node passes through the modes such as bolt, weld seam, component connecting portion with prefabricated overlapping girder and prefabricated post Using steel-concrete combined member and node, the ductility and bearing capacity of connecting portion and node are more preferable;Have one between prefabricated components The Steel-Concrete Composite Sections transition of measured length, it can be ensured that the plastic hinge during geological process prevents node from occurring broken It is bad.
Description of the drawings
Fig. 1 is top fabricated construction architectural schematic.
Fig. 2 is Prefabricated composite node and prefabricated overlapping girder connection diagram(Concrete is not shown).
Fig. 3 is Prefabricated composite node and prefabricated post connection diagram(Concrete is not shown).
Fig. 4 is prefabricated overlapping girder and prefabricated overlapping secondary beam connection diagram(Concrete is not shown).
Fig. 5 is prefabricated post structural schematic diagram(Concrete is not shown).
Fig. 6 is prefabricated overlapping main beam structure schematic diagram(Concrete is not shown).
Fig. 7 is prefabricated overlapping secondary beam structural schematic diagram(Concrete is not shown).
Fig. 8 is Prefabricated composite node structure schematic diagram(Concrete is not shown).
Fig. 9 is basic connecting-piece structure schematic diagram(Concrete is not shown).
Label character described in figure is expressed as:1, Prefabricated composite node;2, prefabricated post;3, prefabricated overlapping girder;4, prefabricated Overlap secondary beam;101, node box section steel construction;102, pin;103, the first steel fastener;104, the second steel fastener; 105, node perforated rebar;106, vertical connecting plate;107, cross connecting plate;108, third steel fastener;201, prefabricated post steel Tendons skeleton;202, prefabricated styletable steel fastener;203, Reinforcement;204, column tie-bar;301, girder framework of steel reinforcement;302、 Beam-ends steel fastener;303, antitorque reinforcing bar;304, girder lower part Reinforcement;305, girder top Reinforcement; 306, girder stirrup;307, the 4th steel fastener;401, secondary beam framework;402, secondary beam steel fastener;403, secondary beam stirrup;404、 Secondary beam top Reinforcement;405, secondary beam lower part Reinforcement;501, basic box section steel construction;502, the 5th Steel fastener;503, anchor bar;504, basic beam steel.
Specific implementation mode
In order to enable those skilled in the art to better understand the technical solutions of the present invention, below in conjunction with the accompanying drawings to this reality Be described in detail with novel, the description of this part be only it is exemplary and explanatory, should not be to the scope of protection of the utility model There is any restriction effect.
As shown in figs. 1 to 9, the concrete structure of the utility model is:It includes base connection and top fabricated construction System;The top fabricated construction system includes Prefabricated composite node 1, prefabricated post 2, prefabricated overlapping girder 3, described prefabricated group Close node 1 include node box section steel construction 101, pin 102, the first steel fastener 103 being connect with prefabricated post, with it is prefabricated The second steel fastener 104 that girder 3 connects is overlapped, first steel fastener 103 is set to node box section according to demand 101 upper and lower ends of steel construction or one end, first steel fastener 103 and node box section steel construction 101 it is solderable or Person is integrally formed, and for convenience of being connect with prefabricated post 2, first steel fastener 103 is the quadrangle knot that four blocks of steel plates enclose Vertical connecting plate 106 has been bolted in structure, 103 inner end of the first steel fastener, by vertical connecting plate 106 and in advance Column 2 processed is tentatively connected;Second steel fastener 104 is carried out tentatively by cross connecting plate 107 and prefabricated overlapping girder 3 Connection is provided with connection opposite sides second to ensure power transmission and improve joint behavior in node box section steel construction 101 The node perforated rebar 105 of steel fastener 104 carries out power transmission, the node box section steel knot by node perforated rebar 105 The whole package casting concrete of structure 101;The prefabricated post 2 includes prefabricated post framework of steel reinforcement 201 and prefabricated styletable steel fastener 202,203 end of Reinforcement and the prefabricated styletable steel fastener 202 of the prefabricated post 2 weld, prefabricated styletable steel connection Part 202 is bolted on vertical connecting plate 106, so that 202 and first steel fastener of prefabricated styletable steel fastener 103 tentatively connect, and then weld prefabricated styletable steel fastener 202 and the first steel fastener 103, to ensure to connect Fastness, the prefabricated post framework of steel reinforcement 201 passes through formwork casting concrete again;The prefabricated overlapping girder 3 includes prefabricated Girder framework of steel reinforcement 301, beam-ends steel fastener 302, the precast main beam framework of steel reinforcement 301 include girder lower part longitudinal stress steel Muscle 304, girder top Reinforcement 305, girder stirrup 306, middle girder top Reinforcement 305 are tied up at the scene It pricks on girder stirrup 306, described 302 one end of beam-ends steel fastener is stretched into precast main beam framework of steel reinforcement 301 and lower flange is welded It being connected on girder lower part Reinforcement 304, beam-ends steel fastener 302 is bolted on cross connecting plate 107, from And so that beam-ends steel fastener 302 is connect with the second steel fastener 104, so that prefabricated overlapping girder 3 and Prefabricated composite section Point 1 constitutes an entirety, and girder top Reinforcement 305 and 104 top flange of the second steel fastener are welded, to ensure The continuity of beam-ends negative reinforcement, the precast main beam framework of steel reinforcement 301 integrally wrap up casting concrete in factory;The base The 5th steel fastener 502, the anchor bar 503 that plinth connector includes basic box section steel construction 501, is connect with prefabricated post 2 With pin 102, the anchor bar 503 is welded with basic box section steel construction 501 and is fixed on sole plate reinforcing bar, and Basic beam steel 504 passes through basic box section steel construction 501, and the pin 102 is welded in basic box section steel construction 501 Outer surface, the prefabricated styletable steel fastener 202 of the 5th steel fastener 502 and 2 lower end of prefabricated post by steel plate connector into The preliminary connection of row, then welds together with prefabricated styletable steel fastener 202 after the verticality of correction prefabricated post 2 again, to protect Demonstrate,prove the stress performance of column.
Preferably, second steel fastener 104 is I-shaped.
Preferably, 302 Wei Shang fonts of the beam-ends steel fastener.
Preferably, according to member stress needs, in the second steel fastener 104 on the node box section steel construction 101 The left and right sides is provided with third steel fastener 108;301 left and right sides of the precast main beam framework of steel reinforcement is provided with antitorque reinforcing bar 303, the antitorque reinforcing bar 303 is welded with third steel fastener 108, to improve the torsional property of component.
Preferably, according to floor structure stress needs, it further includes prefabricated overlapping secondary beam 4, and the prefabricated overlapping secondary beam 4 wraps Include the secondary beam steel fastener 402 of time beam framework 401, Shang fonts, the secondary beam framework 401 is in factory's casting concrete, described time Joist steel connector 402 is set to time 401 both ends of beam framework, the secondary beam steel fastener 402 and the 4th on prefabricated overlapping girder 3 Steel fastener 307 connects, and when connection, secondary beam steel fastener 402 and the 4th steel fastener 307 are bolted respectively first It in junction steel plate one end, is then welding, to ensure the stress performance of component connecting portion;4th steel fastener 307 is set It is placed in prefabricated overlapping girder 3.
Preferably, the secondary beam framework 401 includes secondary beam top Reinforcement 404, secondary beam lower part longitudinal stress steel Muscle 405, secondary beam stirrup 403, secondary beam top Reinforcement 404 are set respectively with secondary beam lower part Reinforcement 405 It is placed in time 403 inside upper and lower ends of beam stirrup;Secondary beam lower part Reinforcement 405 and 402 bottom wing of secondary beam steel fastener Edge welds, and wherein secondary beam top Reinforcement 404 is bound at the construction field (site).
Specific process of deployment:According to structure and member stress requirement, factory process Prefabricated composite node 1, prefabricated post 2, Prefabricated overlapping girder 3, prefabricated overlapping secondary beam 4 and base connection, wherein prefabricated overlapping girder 3 overlaps the mixed of secondary beam 4 with prefabricated Solidifying soil is first poured to board bottom absolute altitude.All concrete members are conserved to design strength, that is, complete Prefabricated composite node 1, prefabricated The making of column 2, prefabricated overlapping girder 3, prefabricated overlapping secondary beam 4.
When installation, first base connection is set in basis, the 5th steel fastener 502 wherein in base connection stretches out Bottom prefabricated post 2 in the fabricated construction system of top connect with basic built-in fitting and column temporary support is arranged, then pours by basis Build connecting portion concrete;Prefabricated composite node 1 is installed on the top of prefabricated post 2, then by prefabricated overlapping girder 3 and Prefabricated composite Node 1 carries out installation connection, and beam bottom temporary support is arranged, and distinguishes formwork simultaneously in the connecting portion of node and column, node and beam It is conserved to design strength after disturbing concrete;Prefabricated overlapping secondary beam is carried out installation with prefabricated overlapping girder to connect, and is arranged and faces When support, then the stirrup of primary-secondary beam top Reinforcement and connecting portion is installed again, finally connecting portion formwork simultaneously It is conserved to design strength after disturbing concrete;Prefabricated superimposed sheet is installed to beam, after-pouring floor concrete;In the above sequence The prefabricated components of remaining floor are installed until completing the installation of main frame structure.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment including a series of elements includes not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.
Specific case used herein is expounded the principles of the present invention and embodiment, above example Illustrate the method and its core concept for being merely used to help understand the utility model.The above is only the preferred of the utility model Embodiment, it is noted that due to the finiteness of literal expression, objectively there is unlimited concrete structure, led for this technology For the those of ordinary skill in domain, without departing from the principle of this utility model, can also make it is several improve, retouching or Above-mentioned technical characteristic, can also in the right way be combined by variation;These improve retouching, variation or combine, or without It improves and the design of utility model and technical solution is directly applied into other occasions, be regarded as the protection model of the utility model It encloses.

Claims (8)

1. a kind of complete assembled steel reinforced concrete frame structure system, which is characterized in that it includes base connection and top dress With formula structural system;The top fabricated construction system includes Prefabricated composite node(1), prefabricated post(2), prefabricated overlapping girder (3), the Prefabricated composite node(1)Including node box section steel construction(101), pin(102), connect with prefabricated post One steel fastener(103), with prefabricated the second steel fastener for connecting of overlapping girder(104), node box section steel construction(101) Inside it is provided with connection the second steel fastener of opposite sides(104)Node perforated rebar(105), the node box section steel knot Structure(101)Whole package casting concrete;The prefabricated post(2)Including prefabricated post framework of steel reinforcement(201)Connect with prefabricated styletable steel Fitting(202), the prefabricated styletable steel fastener(202)It is set to prefabricated post framework of steel reinforcement(201)Both ends, the prefabricated styletable Steel fastener(202)With the first steel fastener(103)Connection, the prefabricated post framework of steel reinforcement(201)Whole package pours coagulation Soil;The prefabricated overlapping girder(3)Including precast main beam framework of steel reinforcement(301), beam-ends steel fastener(302), the prefabricated master Beam reinforcement cages(301)Including girder lower part Reinforcement(304), girder top Reinforcement(305), girder hoop Muscle(306), the beam-ends steel fastener(302)Precast main beam framework of steel reinforcement is stretched into one end(301)Interior and lower flange is welded in pre- Girder framework of steel reinforcement processed(301)On, the beam-ends steel fastener(302)With the second steel fastener(104)It connects, on the girder Portion's Reinforcement(305)With the second steel fastener(104)Top flange is welded, the precast main beam framework of steel reinforcement(301)It is whole Body wraps up casting concrete;The base connection includes basic box section steel construction(501)With prefabricated post(2)Connection 5th steel fastener(502), anchor bar(503)And pin(102), the anchor bar(503)With basic box section steel Structure(501)Welding, the pin(102)It is welded in basic box section steel construction(501)Outer surface.
2. a kind of complete assembled steel reinforced concrete frame structure system according to claim 1, which is characterized in that described the Two steel fasteners(104)It is I-shaped.
3. a kind of complete assembled steel reinforced concrete frame structure system according to claim 1, which is characterized in that the beam Hold steel fastener(302)Wei Shang fonts.
4. a kind of complete assembled steel reinforced concrete frame structure system according to claim 1, which is characterized in that the master Beam top Reinforcement(305)With girder lower part Reinforcement(304)It is respectively separated and is set to girder stirrup(306) Inside upper and lower ends, the beam-ends steel fastener(302)Lower flange is welded in girder lower part Reinforcement(304)On.
5. a kind of complete assembled steel reinforced concrete frame structure system according to claim 1, which is characterized in that the section Point box section steel construction(101)It is provided with third steel fastener(108);The precast main beam framework of steel reinforcement(301)Left and right two Side is provided with antitorque reinforcing bar(303), the antitorque reinforcing bar(303)With third steel fastener(108)Welding.
6. a kind of complete assembled steel reinforced concrete frame structure system according to claim 1, which is characterized in that it is also wrapped Include prefabricated overlapping secondary beam(4), the prefabricated overlapping secondary beam(4)Including secondary beam framework(401)The secondary beam steel fastener of, Shang fonts (402), the secondary beam framework(401)On poured concrete, the secondary beam steel fastener(402)It is set to time beam framework (401)Both ends, the secondary beam steel fastener(402)With prefabricated overlapping girder(3)On the 4th steel fastener(307)Connection;Institute State the 4th steel fastener(307)It is set to prefabricated overlapping girder(3)On.
7. a kind of complete assembled steel reinforced concrete frame structure system according to claim 6, which is characterized in that described time Beam framework(401)Including secondary beam top Reinforcement(404), secondary beam lower part Reinforcement(405), secondary beam stirrup (403), secondary beam top Reinforcement(404)With secondary beam lower part Reinforcement(405)It is respectively arranged at secondary beam Stirrup(403)Inside upper and lower ends;Secondary beam lower part Reinforcement(405)With secondary beam steel fastener(402)Lower flange Welding.
8. a kind of complete assembled steel reinforced concrete frame structure system according to claim 1, which is characterized in that described pre- Column framework of steel reinforcement processed(201)Including column Reinforcement(203), column tie-bar(204), the column Reinforcement(203) End and prefabricated styletable steel fastener(202)Welding.
CN201820177808.0U 2018-02-01 2018-02-01 A kind of complete assembled steel reinforced concrete frame structure system Active CN207794299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820177808.0U CN207794299U (en) 2018-02-01 2018-02-01 A kind of complete assembled steel reinforced concrete frame structure system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820177808.0U CN207794299U (en) 2018-02-01 2018-02-01 A kind of complete assembled steel reinforced concrete frame structure system

Publications (1)

Publication Number Publication Date
CN207794299U true CN207794299U (en) 2018-08-31

Family

ID=63267815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820177808.0U Active CN207794299U (en) 2018-02-01 2018-02-01 A kind of complete assembled steel reinforced concrete frame structure system

Country Status (1)

Country Link
CN (1) CN207794299U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518021A (en) * 2018-04-27 2018-09-11 上海泰大建筑科技有限公司 Assembled steel concrete composite beam and its construction method
CN109138152A (en) * 2018-09-30 2019-01-04 华南理工大学 A kind of assembly concrete frame structure
CN110805144A (en) * 2019-11-15 2020-02-18 胡习兵 Full-assembly type high-rise/super high-rise concrete frame support structure system and construction method thereof
CN112282047A (en) * 2020-10-21 2021-01-29 吉林建筑大学 Connecting structure and connecting method for assembled composite floor slab and composite wallboard

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518021A (en) * 2018-04-27 2018-09-11 上海泰大建筑科技有限公司 Assembled steel concrete composite beam and its construction method
CN109138152A (en) * 2018-09-30 2019-01-04 华南理工大学 A kind of assembly concrete frame structure
CN109138152B (en) * 2018-09-30 2023-11-17 华南理工大学 Assembled concrete frame structure
CN110805144A (en) * 2019-11-15 2020-02-18 胡习兵 Full-assembly type high-rise/super high-rise concrete frame support structure system and construction method thereof
CN110805144B (en) * 2019-11-15 2021-04-06 胡习兵 Full-assembly type high-rise/super high-rise concrete frame support structure system and construction method thereof
CN112282047A (en) * 2020-10-21 2021-01-29 吉林建筑大学 Connecting structure and connecting method for assembled composite floor slab and composite wallboard
CN112282047B (en) * 2020-10-21 2022-04-01 吉林建筑大学 Connecting structure and connecting method for assembled composite floor slab and composite wallboard

Similar Documents

Publication Publication Date Title
CN207794299U (en) A kind of complete assembled steel reinforced concrete frame structure system
KR101055672B1 (en) Prefabricated internal hollow hollow pier pier using corrugated steel pipe and construction method
CN104631659B (en) Prefabricated assembled band steel plate concealed bracings overlaid plate type concrete coupled shear wall
CN103104039B (en) Assembled framework beam-column joint adopting cover plate connection and construction method thereof
CN108179806A (en) A kind of complete assembled steel reinforced concrete frame structure system
CN107460954A (en) A kind of post-tensioned prestressing assembling concrete frame energy dissipation component system and construction method
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN109707037A (en) A kind of assembling frame structure Self-resetting dissipative devices and its construction method
CN206737116U (en) Node dry and wet Hybrid connections assembled integral concrete frame structure
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN108060746A (en) A kind of prefabricated PC concrete large-span frame system and its construction method
CN106869315A (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN102995756B (en) Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method
CN109057004A (en) A kind of assembled steel-Combined concrete frame and its connection installation method
CN109372130A (en) The novel full assembly concrete shaped section steel frame node of one kind and its construction method
CN207538322U (en) A kind of prefabricated PC concrete frame frame system
CN108005304A (en) A kind of prefabricated PC concrete frame frame system and its construction method
CN110056092A (en) Bolt plug-in type precast shear wall and superimposed sheet connecting structure and construction method up and down
CN110173076A (en) A kind of no-welding steel core concrete column of high anti-seismic, structural system and its construction method
CN105369892B (en) A kind of steel tube concrete superposed frame structure system
CN103628571B (en) Beam-column joint for reverse construction method and construction method
CN106436895A (en) Steel column-shear wall combined assembled residential building system and construction method thereof
CN109183983A (en) A kind of assembly method of upper and lower interior wall and floor
CN108166619A (en) A kind of novel fabricated concrete structure bean column node
CN111287373A (en) Connecting structure and connecting method for prefabricated composite slab and steel beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant