CN207793889U - Gantry crane system matched with movable formwork for use - Google Patents

Gantry crane system matched with movable formwork for use Download PDF

Info

Publication number
CN207793889U
CN207793889U CN201721790884.0U CN201721790884U CN207793889U CN 207793889 U CN207793889 U CN 207793889U CN 201721790884 U CN201721790884 U CN 201721790884U CN 207793889 U CN207793889 U CN 207793889U
Authority
CN
China
Prior art keywords
guide rail
running part
gantry crane
crane system
walking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721790884.0U
Other languages
Chinese (zh)
Inventor
李传习
柯璐
曹水东
陈卓异
罗南海
曹先慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201721790884.0U priority Critical patent/CN207793889U/en
Application granted granted Critical
Publication of CN207793889U publication Critical patent/CN207793889U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a portal crane system that collocation moving die carrier used. The gantry crane system comprises a bridge, two support legs fixed on two sides of the bridge, a traveling mechanism arranged at the lower ends of the support legs, a first guide rail and a second guide rail; the walking mechanism comprises a driving device, an inner side walking part and an outer side walking part, wherein the inner side walking part and the outer side walking part are arranged at the lower ends of the supporting legs; the driving device is used for driving the inner side walking part to walk along the first guide rail and driving the outer side walking part to walk along the second guide rail. The utility model discloses can conveniently transport the steel reinforcement cage, greatly shorten construction cycle, improve the efficiency of construction.

Description

A kind of gantry crane system that collocation mobile formwork uses
Technical field
The utility model is related to a kind of gantry crane systems that collocation mobile formwork uses, and belong to bridge construction equipment and technology neck Domain.
Background technology
In traditional Construction Through Form on Traveler, due to the limitation of hanging device, the scene in reinforcing bar to template that need to manually have bad luck is tied up It pricks, the assembling reinforcement period is 3-5 days, this in-process can not carry out process, causes part worker idle, influences bridge construction Duration.Also, the assembling reinforcement in template, low construction efficiency, labor intensity are big.
Utility model content
The utility model is intended to provide a kind of gantry crane system that collocation mobile formwork uses, the supporting leg of gantry crane system Both it can walk, can also be walked along mobile formwork along girder, convenient transfer steel reinforcement cage can greatly shorten construction period, Improve construction efficiency.
To achieve the goals above, technical solution used by the utility model is:
A kind of gantry crane system that collocation mobile formwork uses, including crane span structure, two supporting legs for being fixed on crane span structure both sides;Its It is structurally characterized in that, further includes the walking mechanism for being installed on supporting leg lower end, the first guide rail and the second guide rail;
The walking mechanism includes driving device, inside running part and outside running part mounted on supporting leg lower end;It is described Inside running part is mounted on the supporting leg lower end inside, and the outside running part is mounted on the supporting leg lower end outside, and inside Running part is located at the inside of outside running part;
The driving device is described outer for driving the inside running part to walk along the first guide rail, and for driving Side running part is walked along the second guide rail;First guide rail is used to that the two side ends in concrete girder to be arranged, and described second leads Rail is used to that the two side ends in mobile formwork exterior sheathing to be arranged, and first guide rail is located at the inside of the second guide rail.
Inside running part and outside running part are arranged creatively under single supporting leg simultaneously for the utility model as a result, can To realize supporting leg(Portal frame)On girder walking and/or in the purpose that exterior sheathing uplink is walked so that convenient transfer reinforcing bar Cage shortens construction period, and improving construction efficiency becomes possibility.
Inside described in the utility model is for girder center line, is interior close to the side of girder center line Side, the side far from girder center line are outside.
Embodiment according to the present utility model can also make the utility model further optimization, below for optimization after The technical solution of formation:
Preferably, the driving device includes the motor mounted in supporting leg bottom end, and the output end of the motor is connected with speed reducer, The speed reducer is connected by transmission mechanism with the inside running part and outside running part being mounted on transmission shaft.Further, described Transmission mechanism includes the first gear being connected with output end of reducer, the second gear on transmission shaft;The first gear With second gear engaged transmission.
In order to reduce the frictional resistance of walking, the inside running part is the first roller, which walks first On guide rail;The outside running part is the second roller, which walks on the second guide rail.It walks in order to facilitate roller, First guide rail of track of walking is housed in the two side ends of the girder as the first roller, is equipped in the two side ends of the exterior sheathing The second guide rail as the second roller walking track.Gauge between first guide rail is less than the rail between second guide rail Away from.
In order to adjust the position of the second guide rail, adjusting block is housed between second guide rail and exterior sheathing.Further, In order to avoid the second guide rail generates interference effect, the bottom of the outboard end of the adjusting block and the second guide rail when transverse prestress tensioning End is hinged and connected between outside portion by axis pin, which can laterally rotate around the adjusting block.As such, it is desirable to tensioning When, the second guide rail can be flipped to the outside around the adjusting block, operating space is provided to transverse prestress tensioning is carried out, improve The convenience used.
It is lifted for convenience, trolley is slidably fitted on the crane span structure, elevator is installed on the trolley Machine.
Gantry crane system used using above-mentioned collocation mobile formwork carry out bridge construction method it include walking as follows Suddenly:
1)Advance banding steel cage when bridge construction;
2)After exterior sheathing molding, driving device drives the inside running part and the walking of outside running part, realizes that supporting leg exists Change rail movement on girder and exterior sheathing, the steel reinforcement cage segmental hoisting that will have been bound in advance by the hoist engine on crane span structure Into exterior sheathing;
3)It can carry out carrying out while concreting, concreting and maintenance after installation internal model next across steel reinforcement cage Binding work.
It is noted that the girder of the utility model refers to the girder of construction bridges, it is main when using this gantry crane Beam is the bridge to have completed, and exterior sheathing does not play a supportive role to the girder, and it is solidifying to be only used as wet mixing when next bridge beam pours The supporter of soil.
Compared with prior art, the utility model has the beneficial effects that:When bridge construction can advance banding steel cage, molding Four rail gantry crane systems of the utility model are used in place, to be after installation internal model by the steel reinforcement cage segmental hoisting that bind in advance afterwards It can carry out that while concreting, concreting and maintenance next binding work across steel reinforcement cage can be carried out again, avoid making It is idle at worker, make each process compact neat, the construction period of bridge by 12-15 days of traditional mobile formwork technology/across shortening To 7-10 days/across the notable total construction period for shortening bridge brings considerable economic benefit for project.
In addition, gantry crane system of the utility model can also be used as and pour equipment between bridge and mobile formwork, goods and materials And the transfer tool of other building materials.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model one embodiment;
Fig. 2 is the partial enlargement structural representation of walking mechanism in Fig. 1;
Fig. 3 is the structural schematic diagram of the utility model transverse prestress tensile state.
In figure
1. supporting leg;2. crane span structure;3. trolley;4. hoist engine;5. walking mechanism;6. girder;7. exterior sheathing;8. the first roller Wheel;9. the second roller;10. the first guide rail;11. the second guide rail;12. adjusting block;13. axis pin;14. motor;15. speed reducer;16. First gear;17. second gear;18. transmission shaft.
Specific implementation mode
The utility model is described in detail below with reference to attached drawing and in conjunction with the embodiments.It should be noted that not conflicting In the case of, the feature in the embodiments of the present invention and embodiment can be combined with each other.For sake of convenience, hereinafter such as There are "upper", "lower", "left", "right" printed words, only indicates consistent with the upper and lower, left and right direction of attached drawing itself, not to structure Play restriction effect.
A kind of four rail gantry crane systems for using of collocation mobile formwork as illustrated in fig. 1 and 2, including crane span structure 2, are fixed respectively In 2 both ends of crane span structure supporting leg 1, rotational installation in 1 lower end inside of supporting leg the first roller 8, rotational installation in 1 lower end outside of supporting leg The second roller 9, be fixed on two the first guide rails 10 of 6 two side ends of girder and be fixed on 7 two side ends of exterior sheathing two Two guide rails 11, the first roller 8 are seated 10 top of the first guide rail, and the second roller 9 is seated 11 top of the second guide rail, walking mechanism 5 are installed on supporting leg 1, and the first roller 8 and the rotation of the second roller 9, several trolleys 3 is driven to be slidably mounted under crane span structure 2 Side, hoist engine 4 are installed on trolley 3.Due to two the first guide rails 10 and mobile formwork exterior sheathing on concrete girder 6 Spacing between two the second guide rails 11 on 7 is different, therefore four row's rollers are arranged in 1 bottom of supporting leg(That is the first roller 8 and second Roller 9), 1 lower two kind of roller of every supporting leg along longitudinal direction respectively be arranged two, may be implemented gantry crane concrete girder 6 and move Change rail movement on dynamic model frame exterior sheathing 7, gantry crane can be from concrete girders 6 on smooth movement to exterior sheathing 7, can also From on exterior sheathing 7 on smooth movement to concrete girder 6.
Carrying out construction method using above-mentioned gantry crane system is:When bridge construction can advance banding steel cage, exterior sheathing close After mould, by the hoist engine 4 on gantry crane system of the utility model by the steel reinforcement cage segmental hoisting that has bound in advance to external mold In plate, it can carry out carrying out again while concreting, concreting and maintenance after installation internal model next across steel reinforcement cage Binding work, avoid causing worker idle, make each process compact neat, significantly shorten the construction period of bridge, be project band Carry out considerable economic benefit.
As shown in Fig. 2, the walking mechanism 5 can be following structure comprising be installed on speed reducer 15 on supporting leg 1, The motor 14 that is connected with 15 input shaft of speed reducer, is connected to the second roller at the first gear 16 being installed on 15 output shaft of speed reducer The second gear 17 and the transmission shaft 18 that is connected respectively with the first roller 8 and the second roller 9 of both ends of wheel 9, first gear 16 and Second gear 17 is meshed.The rotation of motor 14 is rotated by driving first gear 16 after 15 control mode of speed reducer, to therewith The second gear 17 of engagement drives the rotation of the second roller 9 to walk along the second guide rail 11.And transmission shaft 18 drives the first roller 8 along the One guide rail 10 rotates, and realizes the walking of gantry crane.
As shown in figure 3, second guide rail 11 is rotatablely installed by axis pin 13 on adjusting block 12, adjusting block 12 passes through spiral shell Bolt is installed on 7 both sides of exterior sheathing.When carrying out transverse prestress tensioning, the second guide rail 11 can be turned outward by axis pin 13 It is dynamic, so that it is conceded tensioning space, therefore further improve the convenience used.
The content that above-described embodiment illustrates should be understood as that these embodiments are only used for being illustrated more clearly that the utility model, Rather than limitation the scope of the utility model, after having read the utility model, those skilled in the art are new to this practicality The modification of the various equivalent forms of type each falls within the application range as defined in the appended claims.

Claims (8)

1. a kind of gantry crane system that collocation mobile formwork uses, including crane span structure(2), be fixed on crane span structure(2)Two branch of both sides Leg(1);It is characterized in that, further including being installed on supporting leg(1)The walking mechanism of lower end(5), the first guide rail(10)With the second guide rail (11);
The walking mechanism(5)Including driving device, it is mounted on supporting leg(1)The inside running part and outside running part of lower end;Institute It states inside running part and is mounted on the supporting leg(1)Lower end inside, the outside running part are mounted on the supporting leg(1)Outside lower end Side, and inside walking portion is located at the inside of outside running part;
The driving device is for driving the inside running part along the first guide rail(10)Walking, and it is described outer for driving Side running part is along the second guide rail(11)Walking;First guide rail(10)For being arranged in concrete girder(6)Two side ends, Second guide rail(11)For being arranged in mobile formwork exterior sheathing(7)Two side ends, and first guide rail(10)Positioned at Two guide rails(11)Inside.
2. gantry crane system that collocation mobile formwork according to claim 1 uses, which is characterized in that the driving device Including being mounted in supporting leg(1)The motor of bottom end(14), the motor(14)Output end and speed reducer(15)It is connected, the speed reducer(15) By transmission mechanism and it is mounted in transmission shaft(18)On inside running part and outside running part be connected.
3. gantry crane system that collocation mobile formwork according to claim 2 uses, which is characterized in that the transmission mechanism Including with speed reducer(15)The first gear that output end is connected(16), it is mounted in transmission shaft(18)On second gear(17);It is described First gear(16)With second gear(17)Engaged transmission.
4. gantry crane system that collocation mobile formwork according to claim 1 uses, which is characterized in that the inside walking Portion is the first roller(8), first roller(8)Walking is in the first guide rail(10)On;The outside running part is the second roller (9), second roller(9)Walking is in the second guide rail(11)On.
5. gantry crane system that collocation mobile formwork according to claim 4 uses, which is characterized in that first guide rail (10)Between gauge be less than the second guide rail(11)Between gauge.
6. gantry crane system that collocation mobile formwork according to any one of claims 1-5 uses, which is characterized in that institute State the second guide rail(11)With exterior sheathing(7)Between be equipped with adjusting block(12).
7. gantry crane system that collocation mobile formwork according to claim 6 uses, which is characterized in that the adjusting block (12)Outboard end and the second guide rail(11)Basolateral portion between pass through axis pin(13)It is hinged and connected, second guide rail(11) It can be around the adjusting block(12)It laterally rotates.
8. gantry crane system that collocation mobile formwork according to any one of claims 1-5 uses, which is characterized in that institute State crane span structure(2)On be slidably fitted with trolley(3), the trolley(3)On hoist engine is installed(4).
CN201721790884.0U 2017-12-20 2017-12-20 Gantry crane system matched with movable formwork for use Expired - Fee Related CN207793889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721790884.0U CN207793889U (en) 2017-12-20 2017-12-20 Gantry crane system matched with movable formwork for use

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721790884.0U CN207793889U (en) 2017-12-20 2017-12-20 Gantry crane system matched with movable formwork for use

Publications (1)

Publication Number Publication Date
CN207793889U true CN207793889U (en) 2018-08-31

Family

ID=63281650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721790884.0U Expired - Fee Related CN207793889U (en) 2017-12-20 2017-12-20 Gantry crane system matched with movable formwork for use

Country Status (1)

Country Link
CN (1) CN207793889U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107881925A (en) * 2017-12-20 2018-04-06 长沙理工大学 Gantry crane system matched with movable formwork and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107881925A (en) * 2017-12-20 2018-04-06 长沙理工大学 Gantry crane system matched with movable formwork and construction method thereof

Similar Documents

Publication Publication Date Title
CN107059640B (en) Bridge girder erection machine for prefabricated segmental beam span-by-span construction and construction method thereof
CN107640706B (en) Hoisting equipment and construction method thereof
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN101476287B (en) Construction method for carrying large box girder by tire type portal jib crane
CN201474704U (en) Needle beam type hydraulic steel mould carrier
CN104594141B (en) A kind of track paving fortune engineering truck
CN207643377U (en) A kind of self-propelled hydraulic box girder template
CN109267491B (en) Movable formwork and construction method thereof
CN207904782U (en) Large span crosses tunnel box beam bridge formation machine
CN109869164A (en) Combination hydraulic formwork jumbo pours the construction method of porous separate tunnel
CN108098982A (en) Large-span Precast box beam hydraulic deploying and retracting internal mold
CN104695335A (en) Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding
CN207793889U (en) Gantry crane system matched with movable formwork for use
CN106223983A (en) A kind of diversion tunnel inclined shaft, flat section tunneling boring primary steel mould trolley
CN209144661U (en) Mould bases for bridge construction
CN108002229A (en) A kind of low clearance box culvert part loop wheel machine with turn over function
CN205638491U (en) Multi -functional platform truck
CN109208533A (en) Harbour integrated construction system and method based on stake top top pushing platform
CN204023336U (en) A kind of subway track-laying machine
CN108149589A (en) Large span crosses tunnel box beam bridge formation machine
CN104831638B (en) A kind of mobile formwork straddle truck and construction method thereof
CN107881925A (en) Gantry crane system matched with movable formwork and construction method thereof
CN207825160U (en) Large-span Precast box beam hydraulic deploying and retracting internal mold
CN209114417U (en) Harbour integrated construction system based on stake top top pushing platform
CN207552933U (en) Reinforced mesh entirety mould-entering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831

Termination date: 20181220

CF01 Termination of patent right due to non-payment of annual fee