CN207780209U - A kind of wind electricity change paddle charger comprehensive test device - Google Patents

A kind of wind electricity change paddle charger comprehensive test device Download PDF

Info

Publication number
CN207780209U
CN207780209U CN201820071795.9U CN201820071795U CN207780209U CN 207780209 U CN207780209 U CN 207780209U CN 201820071795 U CN201820071795 U CN 201820071795U CN 207780209 U CN207780209 U CN 207780209U
Authority
CN
China
Prior art keywords
charger
plc
test device
output end
comprehensive test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820071795.9U
Other languages
Chinese (zh)
Inventor
丁宛超
卢乐
张春勇
李小庆
绕木金
胡岳
张建强
刘佳伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng information technology (Hebei) Co.,Ltd.
Original Assignee
Gu'an Huadian Tianren Control Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gu'an Huadian Tianren Control Equipment Co Ltd filed Critical Gu'an Huadian Tianren Control Equipment Co Ltd
Priority to CN201820071795.9U priority Critical patent/CN207780209U/en
Application granted granted Critical
Publication of CN207780209U publication Critical patent/CN207780209U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

A kind of wind electricity change paddle charger comprehensive test device, three-phase alternating-current supply enter digital power by fuse type disconnector and breaker, are powered to charger by digital power, load needed for the test of electronic load analog charge device;Host computer connect the entire test process of control with PLC controller;Oscillograph detects charger input and output voltage and electric current;Indicator light shows test mode;Fan gives test system radiating.The utility model measures a charger every time, it can be achieved that charger precisely, efficiently measures, and realizes automatic measurement, and test data is intuitive;It can ensure that charger detects reliability, ensure that wind electricity change paddle safe operation.

Description

A kind of wind electricity change paddle charger comprehensive test device
Technical field
The utility model belongs to the test dress of the variable pitch charger of technical field of wind power generation more particularly to wind-power electricity generation It sets.
Background technology
Wind-powered electricity generation industry was quickly grown in recent years, and requirements at the higher level are proposed to the quality and efficiency of the detection of wind-powered electricity generation auxiliary products. As the electric power conversion apparatus of variable blade control system, the reliability direct relation complete blower safety of charger.To charger into The harsh test of row is the key that ensure system reliability.
Charger detection at present is gradually tested using artificial subitem, is needed artificially to carry out various operations, be recorded respectively multinomial Data;Data acquisition uses multimeter, deviation larger;For power supply using adjusting manually, pressure regulation error is big;Load uses resistance Silk, resistance value is constant to cause load that cannot be continuously adjusted;Testing efficiency is low and reliability is not high, and test event is on the low side.
Product full inspection is carried out using current detection device during large-scale production to need to put into a large amount of costs of labor, and Detection quality and efficiency will be greatly improved using charger comprehensive test device, saves production cost, test event is more perfect, Test data is more intuitive.
Invention content
In order to solve the above-mentioned problems in the prior art, the utility model proposes a kind of wind electricity change paddle charger synthesis Test device, the device can accurate testing charger performance, raising testing efficiency and quality.
To achieve the goals above, the utility model uses following technical scheme:
A kind of wind electricity change paddle charger comprehensive test device includes mainly PLC A1-A4, isolating transformer T1, breaker F2, fuse disconnecting switch F1, digital power 1U1, charger 1U2, electronic load 1U3, relay 1K1, DC power supply 1U4, DC fan -1M1-1M3, it is characterised in that:
The fuse disconnecting switch F1 input terminals are connect with power distribution cabinet, and the input terminal of output end and breaker F2 connects It connects;
The breaker F2 output ends are connect with digital power 1U1;
The output end of the digital power 1U1 is connect with the input terminal of charger 1U2;
The output end of the charger 1U2 is connect with electronic load 1U3;
The isolating transformer T1 armature windings are connected with fuse disconnecting switch F1 wherein 1, the isolation transformation Device secondary windings is respectively connected to the input terminal and host computer U5 input terminals of DC power supply 1U4 by 2 circuit breaker F2;
The DC power supply 1U4 output ends are divided into three tunnels, and the first via connects DC fan -1M1-1M3, the connection of the second tunnel PLC input terminals, third road output head anode connect one end of charger, the digital quantity input of the other end connection PLC of charger End, third road negative pole of output end connect coil one end of relay -1K1, the number of the coil other end connection PLC of relay -1K1 Word amount output end;The contact portion charger 1U2 of relay -1K1;
The communication of the communication fastener and charger of the PLC connects;
The host computer is connect with PLC;
The digital power and electronic load are communicated by RS232 to be connect with PLC.
The utility model still further comprises following preferred embodiment:
The charger comprehensive test device further includes scram button, run indicator, malfunction indicator lamp and cabinet heat dissipation Fan;The scram button is connected between digital power hardware enable port and DC power supply;The run indicator and event Barrier indicator light is connected between PLC digital outputs and DC power supply;The cabinet radiator fan is connected in parallel with DC power supply, Radiator fan is installed on cabinet, outer cross air blasting.
The charger comprehensive test device further includes oscillograph 1U6, and 2 voltage probes of oscillograph are separately connected charging 2 phase input terminal of device and output end, 2 current probes are separately connected 1 phase input terminal of charger and output end;
Entire charger comprehensive test device is mounted in power control cabinet, wherein host computer, fuse disconnecting switch, emergency stop Button, run indicator, malfunction indicator lamp are mounted on control counter top, and cabinet radiator fan is installed on cabinet both sides, remaining Device is installed in inside cabinet.
The utility model has technique effect beneficial below:
The utility model uses isolating transformer, it is ensured that will not pacify to personal property when system jam and low pressure electricity consumption It damages entirely.
The utility model is sampled using high-precision oscillograph, it is ensured that test data accuracy improves test event, and data are more Add intuitive;
The utility model uses digital power and electronic load, input voltage and load-receipt instruction, adjusting more to smooth out With it is accurate.
Description of the drawings
Fig. 1 is the structure diagram of the application wind electricity change paddle charger comprehensive test device;
Fig. 2 is the electrical schematic diagram of the application wind electricity change paddle charger comprehensive test device.
Wherein, in two width attached drawings, the meaning of the label of attached drawing is as follows:1U5 is host computer, 1AX PLC, 1T1 are isolation Transformer, 1F2 are breaker, 1F1 is fuse disconnecting switch, 1U1 is digital power, 1U2 is charger, 1U3 is electronics Load, 1K1 are relay, 1U4 is DC power supply, 1M1-1M3 is DC fan.
Specific implementation mode
Each component connection relation of charger comprehensive test device of the utility model as shown in Figure 1, include host computer 1U5, It is controlled for human-computer interaction interface, monitors and issue the control command of PLC controller 1AX by TCP/IP modes, control is entire Test device operates, and tester is negative by operation host computer interface startup test device, adjusting charger input voltage output Carry etc., it in emergency circumstances claps scram button and terminates operation, ensure personal equipment safety;Digital power 1U1 is for receiving PLC (this Also become PLC controller in utility model) input voltage of 1AX orders adjusting charger 1U2;Electronic load 1U3 receives PLC controls Device 1AX orders processed adjust the output loading of charger 1U2;PLC controller 1AX is for monitoring charger 1U2 states and start and stop control System is communicated by CAN communication network and 1U1/1U2/1U3, monitors and issue concerned control command;DC power supply 1U4 provides straight Galvanic electricity is to related device;Oscillograph 1U6 measures the electric properties correlations such as charger input and output voltage, electric current, frequency.
The electronic schematic diagram of the utility model is as shown in Fig. 2, system controls different components fortune using an operation console Row structure.Main main automatically controlled device is installed as follows inside operation console:Host computer -1U5, isolating transformer -1T1, breaker - 1F2, fuse disconnecting switch -1F1, digital power -1U1, charger -1U2, electronic load -1U3, relay -1K1, direct current Power supply -1U4, run indicator -1H1, malfunction indicator lamp -1H2, oscillograph -1U6, radiator fan -1M1- to 1M3, emergency stop are opened Pass -1S1, PLC controller -1A1 are to -1A4, wherein -1A2 is digital quantity input card, -1A3 is digital output fastener, -1A4 For CAN communication fastener.
Three-phase alternating-current supply, which is connected to by power distribution cabinet+L extractions after fuse disconnecting switch -1F1, is divided into 2 tunnels, passes through all the way Breaker -1F2 is followed by digital power -1U1, and charger -1U2 is connected to after digital power -1U1, is finally connected to Electronic Negative Load -1U3, this is main power section.Another way is connected to isolating transformer -1T1, realizes that auxiliary power supply is safe and effective, through breaker - It is divided into 2 tunnels after 1F3, host computer -1U5 power supplies, another way is given to give DC power supply -1U4 all the way.DC power supply -1U4 will be after isolation Exchange 230VAC is transformed into after direct current 24VDC to be opened to fan, PLC controller -1A1, charger -1U2 dry contacts and emergency stop respectively Pass -1S1 powers.
Charger -1U2 dry contact OK signals are sent to 1 channel of digital quantity input card -1A2.Digital output fastener- 1 channel of 1A3 is connected to the A1 of relay -1K1 coils, and the A2 of relay -1K1 coils is connected to the cathode of DC power supply -1U4, real The start and stop function of existing charger -1U2.2 channels of digital output fastener -1A3 are connected to run indicator -1H1, when charger - Lamp is bright when 1U2 normal operations.3 channels of digital output fastener -1A3 are connected to malfunction indicator lamp -1H2, when charger -1U2 is transported Lamp is bright when row failure.Digital quantity input card -1A2, digital output fastener-the 1A3, -1A4 power supplies of CAN communication fastener are controlled by PLC Device 1A1 processed is provided.
1 channel of oscillograph -1U6 carries out the detections such as input voltage, the frequency of charger -1U2, and 2 channels carry out charger - The input electric cur- rent measure of 1U2,3 channels carry out the output voltage detection of charger -1U2, and 4 channels carry out the output of charger -1U2 Current detecting.
The CAN communication of CAN communication fastener -1A4 and charger -1U2 forms CAN communication network, wherein CAN communication fastener - 1A4 is main website.The 1X2 of the 1X1 and electronic load -1U3 of PLC controller -1A1 and digital power -1U1 form RS-232 communication networks Network, PLC controller -1A1 are main website.Host computer -1U5 and PLC controller -1A1 is communicated by TCP/IP.The utility model controls Mode is as follows:By issuing a command to PLC controller -1A1 under TCP/IP, (input voltage value, opens load value output host computer -1U5 Dynamic test etc.), the corresponding command of host computer -1U5 is handed down to charger -1U2, PLC control by PLC controller -1A1 by CAN The corresponding command of host computer -1U5 is handed down to digital power -1U1 and electronic load -1U3 by device -1A1 by RS232.Digital electricity Itself relevant information is uploaded to PLC controller -1A1 by source -1U1 and electronic load -1U3 by RS232, and charger -1U2 passes through Itself relevant information is uploaded to PLC controller -1A1 by CAN, and PLC controller -1A1 integrates upload information and uploaded by TCP/IP It is shown to host computer -1U5.The execution of action and logic judgment depend on PLC controller -1A1.

Claims (4)

1. a kind of wind electricity change paddle charger comprehensive test device, including PLC, isolating transformer (T1), breaker (F2), fuse Formula disconnecting switch (F1), digital power (1U1), charger (1U2), electronic load (1U3), relay (1K1), DC power supply (1U4), DC fan (- 1M1-1M3), it is characterised in that:
Fuse disconnecting switch (F1) input terminal is connect with power distribution cabinet, and the input terminal of output end and breaker (F2) connects It connects;
Breaker (F2) output end is connect with digital power (1U1);
The output end of the digital power (1U1) is connect with the input terminal of charger (1U2);
The output end of the charger (1U2) is connect with electronic load (1U3);
Isolating transformer (T1) armature winding is connected with fuse disconnecting switch (F1) wherein 1, the isolation transformation Device secondary windings is respectively connected to the input terminal of DC power supply (1U4) by 2 circuit breakers (F2) and host computer (U5) inputs End;
DC power supply (1U4) output end is divided into three tunnels, and the first via connects DC fan (- 1M1-1M3), the connection of the second tunnel PLC input terminals, third road output head anode connect one end of charger, and the other end of charger connects PLC digital quantity input terminals, Coil one end of third road negative pole of output end connection relay (1K1), the number of the coil other end connection PLC of relay (1K1) Word amount output end;The contact portion charger (1U2) of relay (1K1);
The communication of the PLC communication fasteners and charger connects, and PLC is connect with host computer;
The digital power (1U1) and electronic load (1U3) are communicated by RS232 to be connect with PLC.
2. wind electricity change paddle charger comprehensive test device according to claim 1, it is characterised in that:
The charger comprehensive test device further includes scram button, run indicator, malfunction indicator lamp and cabinet radiator fan; The scram button is connected between digital power hardware enable port and DC power supply;The run indicator and indicating fault Lamp string is associated between PLC digital outputs and DC power supply;The cabinet radiator fan is connected in parallel with DC power supply, radiation air Fan is installed on cabinet, outer cross air blasting.
3. wind electricity change paddle charger comprehensive test device according to claim 2, it is characterised in that:
The charger comprehensive test device further includes oscillograph (1U6), and 2 voltage probes of oscillograph (1U6) are separately connected 2 phase input terminal of charger and output end, 2 current probes are separately connected 1 phase input terminal of charger and output end.
4. wind electricity change paddle charger comprehensive test device according to claim 3, it is characterised in that:
Entire charger comprehensive test device is mounted in power control cabinet, wherein host computer, fuse disconnecting switch (F1), emergency stop Button, run indicator, malfunction indicator lamp are mounted on control counter top, and cabinet radiator fan is installed on cabinet both sides, remaining Device is installed in inside cabinet.
CN201820071795.9U 2018-01-15 2018-01-15 A kind of wind electricity change paddle charger comprehensive test device Active CN207780209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820071795.9U CN207780209U (en) 2018-01-15 2018-01-15 A kind of wind electricity change paddle charger comprehensive test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820071795.9U CN207780209U (en) 2018-01-15 2018-01-15 A kind of wind electricity change paddle charger comprehensive test device

Publications (1)

Publication Number Publication Date
CN207780209U true CN207780209U (en) 2018-08-28

Family

ID=63212873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820071795.9U Active CN207780209U (en) 2018-01-15 2018-01-15 A kind of wind electricity change paddle charger comprehensive test device

Country Status (1)

Country Link
CN (1) CN207780209U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111398702A (en) * 2020-02-21 2020-07-10 固安华电天仁控制设备有限公司 Automatic detection system and method for functions of wind power variable pitch capacitor charger

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111398702A (en) * 2020-02-21 2020-07-10 固安华电天仁控制设备有限公司 Automatic detection system and method for functions of wind power variable pitch capacitor charger

Similar Documents

Publication Publication Date Title
CN202815191U (en) Storage battery internal resistance measuring device
CN102253296A (en) Method for testing comprehensive device of transformer
CN201255765Y (en) Automatic test equipment for circuit breaker life characteristic
CN105974247B (en) System and method for testing conductive slip ring
CN207502636U (en) A kind of test device of variable pitch servo-driver
CN207780209U (en) A kind of wind electricity change paddle charger comprehensive test device
CN106602689B (en) System for preventing direct-current power supply bus from losing voltage and operation method thereof
CN209841989U (en) Transformer substation direct current system storage battery connection detection device
CN109884456B (en) Power module and direct current fuse short circuit test platform
CN103454552A (en) Transformer winding deformation on-line monitoring chip
CN105259424A (en) Electric generator iron loss test apparatus and experimental method
CN202093096U (en) Low-voltage short-circuit impedance test device of transformer
CN203054118U (en) Short-circuit protection test apparatus for IGBT power unit
CN214375065U (en) Large-scale generator excitation system open loop low current test device
CN204334130U (en) Chargeable intelligent cable CT electricity getting device
CN204479711U (en) A kind of integrated apparatus detecting substation relay protection device relay performance
CN202939279U (en) Test device of direct current circuit breaker
CN216563283U (en) Online self-maintenance system for storage battery
CN109283419A (en) Low-voltage electrical apparatus electrical endurance test device based on DC solid fictitious load
CN115864653A (en) Remote inversion feed-type storage battery pack online capacity checking system and method
CN207249088U (en) Fault detector detection platform based on high-voltage large current closed loop detection technique
CN111509780A (en) Synchronous constant value adjusting system and method based on transformer transformation ratio
CN219871666U (en) Distributed test system for phase selection switching-on and switching-off device
CN216848075U (en) Storage battery pack remote maintenance system with hard locking logic protection
CN202914068U (en) Changing-oil-into-electricity driving system electric control room used for oil drilling equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 065500 Industrial Park, Gu'an County, Langfang City, Hebei Province

Patentee after: Guoneng information technology (Hebei) Co.,Ltd.

Address before: 065500 North District of Gu'an Industrial Park, Langfang City, Hebei Province

Patentee before: GU'AN HUADIAN TIANREN CONTROL EQUIPMENT Co.,Ltd.