CN207776478U - Outer climbing frame protective device - Google Patents
Outer climbing frame protective device Download PDFInfo
- Publication number
- CN207776478U CN207776478U CN201820084731.2U CN201820084731U CN207776478U CN 207776478 U CN207776478 U CN 207776478U CN 201820084731 U CN201820084731 U CN 201820084731U CN 207776478 U CN207776478 U CN 207776478U
- Authority
- CN
- China
- Prior art keywords
- climbing frame
- outer climbing
- steel plate
- protective device
- agent structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a kind of outer climbing frame protective devices, belong to field of engineering building.Outer climbing frame protective device includes expanded metal lath and the bottom steel plate that is arranged between outer climbing frame and agent structure being arranged in outer climbing frame periphery, and expanded metal lath is riveted on the outer surface of outer climbing frame, and bottom steel plate can close the gap between outer climbing frame bottom and agent structure.Expanded metal lath is riveted on the outer surface of outer climbing frame, avoids the insecurity caused by Dense mesh screen breakage, can prevent artificial destruction or loosening, makes its safety and stability, neat and artistic;The bottom of outer climbing frame and the setting of the gap of agent structure totally-enclosed steel plate together, gap that can be between effective protection outer climbing frame and agent structure, solve where there is security risk.
Description
Technical field
The utility model is related to field of engineering building more particularly to a kind of outer climbing frame protective devices.
Background technology
In the protective device of building field, especially the falling object from high altitude of high-building construction operation is all weight all the time
The emphasis of point danger source protection.Protection network is generally used for various construction sites, especially skyscraper by the prior art, can be sealed entirely
Construction is closed, the person can be effectively prevented, the fall injury of object reduces the pollution of noise dust, reaches civilized construction, protection ring
Border, the effect of beautifying city, traditional construction scene are generally woven into soft protection network using tightrope and are protected, i.e. Dense mesh screen, but
It is that this protection network matter is soft yielding, it is inflammable, and prolonged use, the material of Dense mesh screen will appear aging, in external impacts
Under be easy to destroy, bring safety accident.In addition, having at least gap of 30cm in the bottom of outer climbing frame and agent structure, in the past
Be all by the way that big eye net is arranged, the whereabouts that prevents bulky objects from falling, but small size such as finger stone can not be prevented etc. and
Intensity is not also high, and due to being manual operation, worker is easy carelessness in the process, once supervision and management is not in place, it is easy to cause height
Sky pendant object or falling from high altitude, form great security risk, cause great social influence and economic loss.
Utility model content
The purpose of this utility model is to provide a kind of outer climbing frame protective devices, alleviate using Dense mesh screen as protection network
When the security risk brought of cracky, in turn avoid the danger sources such as construction operation section falling object from high altitude, improve the safety of construction.
To achieve the above object, following technical scheme is provided,
Outer climbing frame protective device provided by the utility model, including the expanded metal lath in outer climbing frame periphery and setting are set
Bottom steel plate between the outer climbing frame and agent structure, the expanded metal lath is riveted on the outer surface of the outer climbing frame, described
Bottom steel plate, the bottom steel plate can close the gap between the outer climbing frame bottom and agent structure.
Further, the mesh diameter of the expanded metal lath is 3-5mm.
Further, the bottom steel plate level setting, the bottom steel plate are detachably connected on the outer climbing frame,
The bottom steel plate level rides upon on the gap between the outer climbing frame bottom and the agent structure;
Further, the agent structure is protruding in the horizontal direction has bindiny mechanism, the outer climbing frame to be connected and fixed
In the bindiny mechanism.
Further, described in one end of the bottom steel plate is hinged with the outer climbing frame bottom, the other end is fastened on
At the position that the bindiny mechanism of outer climbing frame bottom contacts with the agent structure.
Further, scalable channel steel is set on the bottom truss of the outer climbing frame;When the scalable channel steel stretches out,
It is laid with the steel plate on the scalable channel steel.
Further, the outer climbing frame uses attached lifting scaffold, console mode steel pipe outer climbing frame or fastener type steel pipe
Outer climbing frame.
Further, the one middle part protection of setting between the outer climbing frame and the agent structure.
Further, the middle part protection includes rack and strut, and the rack fixed frame is set on the strut, described
One end of strut connects the column of the outer climbing frame by rotary buckle.
Compared with prior art, outer climbing frame protective device provided by the utility model, expanded metal lath are riveted on the outer of outer climbing frame
Surface so that the insecurity caused by Dense mesh screen breakage is avoided in the construction process, can prevent artificial destruction or loosening,
Make its safety and stability, neat and artistic;Totally enclosed bottom steel plate together is arranged in the bottom of outer climbing frame and the gap of agent structure,
Existing gap herein is using big eye net and is not totally-enclosed, can prevent big object from falling, but small stone, rubbish etc. has been thrown away
Fall down the possibility hurted sb.'s feelings, the present invention using totally enclosed bottom steel plate can be between effective protection outer climbing frame and agent structure between
Gap, solve where there is security risk.
Description of the drawings
Fig. 1 is the structural schematic diagram of the outer climbing frame external protection device in the utility model embodiment.
Fig. 2 is the structural schematic diagram of outer climbing frame in the utility model embodiment.
Fig. 3 is the structural schematic diagram of the first connection fastener and column in Fig. 2.
Fig. 4 is the second connection fastener structural schematic diagram in Fig. 2.
Fig. 5 is the structural schematic diagram of long transverse tube in Fig. 2.
Fig. 6 is the structural schematic diagram of outer climbing frame external protection net in the utility model embodiment.
Reference numeral:1- outer climbing frames;2- expanded metal laths;The bottoms 3- steel plate;4- agent structures;5- columns;The second junction buttons of 6-
Part;7- long transverse tubes;The first connection fasteners of 8-;9- loading plates;10- angle iron frames;11- square tubes;12- main framework connecting parts;13- connects
Connect steel plate;101- bindiny mechanisms;601- hinge structures;602- pedestals;603- protrusions;701- through-holes.
Specific implementation mode
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1, the utility model provides a kind of outer climbing frame protective device, including the steel in 1 periphery of outer climbing frame is set
Expanded metals 2 and the bottom steel plate 3 being arranged between outer climbing frame 1 and agent structure 4, expanded metal lath 2 is riveted on the outer surface of outer climbing frame 1,
So that avoiding the insecurity caused by Dense mesh screen breakage in the construction process, artificial destruction or loosening can be prevented, it is made
It is safety and stability, neat and artistic;Bottom steel plate 3 can close the gap between 1 bottom of outer climbing frame and agent structure 4, can effectively prevent
Protect the gap between outer climbing frame 1 and agent structure 4, solve where there is security risk.
Further, in the present embodiment, as shown in Figure 2-5, the external protection of outer climbing frame 1 includes angle iron frame 10, main frame
Frame connector 12, expanded metal lath 2 and the junction steel plate 13 for fixing square tube 11, square tube 11 are fixed on angle steel by junction steel plate 13
In frame 10, it is used to support outside plate net 2, expanded metal lath 2 is riveted on the outside of angle iron frame 10 and square tube 11, main frame connection
Part 12 is distributed in the inside of angle iron frame 10, and is connected with climbing frame main frame by bolt.Junction steel plate 13 is located at angle iron frame
10 center is connected by welding with angle iron frame 10.When the utility model is used, expanded metal lath 2 is used as outer climbing frame external protection
Net, expanded metal lath 2 are fixed on 10 outside of angle iron frame, and angle iron frame 10 is connected by the main framework connecting part 12 of inside with main frame
It connects, main frame connecting plate can be freely rotated around rotary shaft and be connect with main frame by bolt, angle steel in main framework connecting part 12
10 connecting plate of frame is welded in 10 inside of angle iron frame.Wherein, the mesh diameter of expanded metal lath 2 be 3-5mm, the setting of expanded metal lath 2,
So that outer guard is become the steel material of safer beauty, and be fixedly connected on climbing frame main frame by rivet, with climbing
Frame lifts synchronization lifting, avoids the insecurity caused by Dense mesh screen breakage in the construction process, can prevent artificial destruction
Or loosen, make its safety and stability, neat and artistic, assembly and disassembly simplicity.
Further, agent structure 4 is protruding in the horizontal direction has bindiny mechanism 101, outer climbing frame 1 to be fastened on
On connection mechanism 101, outer climbing frame 1 is using attached lifting scaffold, console mode steel pipe outer climbing frame or fastener type steel pipe outer climbing frame, originally
Outer climbing frame 1 in embodiment, using fastener type steel pipe outer climbing frame.As shown in fig. 6, fastener type steel pipe outer climbing frame includes column 5, length
Transverse tube 7, the first connection fastener 8, the second connection fastener 6 and loading plate 9, column 5 and long transverse tube 7 are seamless square tube, long transverse tube 7
Both ends are equipped with through-hole 701;First connection fastener 8 is coaxial pairing page structure 601, and the second connection fastener 6 is that a band is double
Bolted hinge structure 601 is fixed with pedestal 602 on 601 side of hinge structure, 602 upper edge of the pedestal hinge knot
Structure 601 it is axially extending go out a protrusion 603, which matches with 701 size of through-hole;The loading plate 9 is slab construction,
Partly extend lower prominent formed on two sides to link up with.The size of the hook is matched with long transverse tube 7, and loading plate 9 is facilitated to be hung on long cross
On pipe 7, during outer climbing frame 1 is installed, loading plate 9 is hung up in time, can play the role of stable outer climbing frame 1 and build
Outer climbing frame 1;Wherein, 7 one end of long transverse tube is embedded in the beam slab of agent structure 4, together with 4 face concrete placings of agent structure,
The one end for stretching out agent structure 4 is connected and fixed with column 5 and loading plate 9 by the first fastener, the second connection fastener 6 and hook,
Constitute above-mentioned bindiny mechanism 101;For outer climbing frame 1 after installation is complete, loading plate 9 is indispensable tool in construction.602 lower section of pedestal
Equipped with triangle gusset, a side is fixed on the hinge structure 601, and another side is fixed on 602 bottom surface of pedestal, improves and holds
Stress.
Certainly, the present embodiment is not limited to the structure of fastener type steel pipe outer climbing frame, can also use attached lifting scaffold, should
Attached lifting scaffold refers to setting up certain altitude and being attached in engineering structure, can by itself lifting device and device
It successively climbs or declines with engineering structure, the external scaffolding with overturn-preventing, falling proof device;Attached lifting scaffold mainly by
The compositions such as attached lifting scaffold frame structure, attachment support, anti-tilt device, falling proof device, elevating mechanism and control device.
Further, middle part protection is that horizontally disposed middle part is protected, and middle part protection is set to strut by strut and fixed frame
On rack composition, wherein the first end of strut, which is connect by a rotary buckle with the column 5 of outer climbing frame 1, enables strut to connect
Contact is that axis rotates in the vertical direction, and the second end of strut is closed with this between outer climbing frame 1 and building against agent structure 4
Gap.
Further, bottom steel plate 3 is detachably connected on outer climbing frame 1, can level set up and close 1 bottom of outer climbing frame with
Specifically the scalable channel steel of plural number, scalable channel steel is arranged in gap between agent structure 4 in the bottom truss of outer climbing frame 1
It stretches out truss and resists agent structure 4, steel plate is laid in stretching out on that section of channel steel of truss, it will be between outer climbing frame 1 and agent structure 4
Horizontal clearance is tight-closed, thoroughly obstructs the small objects that horizontal protective in the middle part of upper layer fails barrier.
As another embodiment, bottom steel plate 3 can also be inclined at 1 bottom of outer climbing frame and agent structure 4 it
Between, specifically, one end of bottom steel plate 3 is hinged with 1 bottom of outer climbing frame, the other end is fastened on and is connect with 1 bottom of outer climbing frame
Bindiny mechanism 101 the position contacted with agent structure 4 at.
The utility model, with lower portion, carries out secondary structure and builds by laying bricks or stones, exterior wall faces side hole and carries in advance for construction operation layer
Before build by laying bricks or stones to form masonry 5, only process in advance, be but avoided that falling for personnel in work progress.Pass through the interspersed work of process
The double optimization of industry and climbing frame eliminates the setting of horizontal safety net.
The outer climbing frame protective device that the utility model embodiment provides, expanded metal lath 2 are riveted on the outer surface of outer climbing frame 1, make
It obtains and avoids the insecurity caused by Dense mesh screen breakage in the construction process, artificial destruction or loosening can be prevented, make its peace
It is complete to stablize, is neat and artistic;Totally-enclosed steel plate together is arranged with the gaps 30cm of agent structure 4 in the bottom of outer climbing frame 1, existing
Gap using big eye net and is not totally-enclosed herein, can prevent big object from falling, but small stone, rubbish etc. has been thrown away and fallen down wound
The possibility of people, the utility model using totally enclosed bottom steel plate 3 can be between effective protection outer climbing frame 1 and agent structure 4 between
Gap, solve where there is security risk, build troop by laying bricks or stones in conjunction with secondary structure and march into the arena construction early stage, exterior wall, which faces side hole, to shift to an earlier date
It builds by laying bricks or stones so that the horizontal safety net of construction operation layer lower part can be cancelled, and save material input, reduce cost, improve and apply
Work safety, reduces process, shortens the duration.
Obviously, above-described embodiment of the utility model is used for the purpose of clearly illustrating the utility model example, and
It is not the restriction to the embodiment of the utility model.For those of ordinary skill in the art, in above description
On the basis of can also make other variations or changes in different ways.There is no need and unable to give all embodiments
It is exhaustive.All any modification, equivalent and improvement made within the spirit and principle of the present invention etc., should be included in
Within the protection domain of the utility model claims.
Claims (10)
1. a kind of outer climbing frame protective device, which is characterized in that including be arranged the outer climbing frame (1) periphery expanded metal lath (2) and
The bottom steel plate (3) being arranged between the outer climbing frame (1) and agent structure (4), the expanded metal lath (2) are riveted on outside described and climb
The outer surface of frame (1), the bottom steel plate (3), the bottom steel plate (3) can close the outer climbing frame (1) bottom and main body
Gap between structure (4).
2. outer climbing frame protective device according to claim 1, which is characterized in that the mesh diameter of the expanded metal lath (2) is
3-5mm。
3. outer climbing frame protective device according to claim 1, which is characterized in that the bottom steel plate (3) is horizontally disposed.
4. outer climbing frame protective device according to claim 3, which is characterized in that the bottom steel plate (3) removably connects
It is connected on the outer climbing frame (1), bottom steel plate (3) level sets up early outer climbing frame (1) bottom and the agent structure
(4) on the gap between.
5. outer climbing frame protective device according to claim 4, which is characterized in that on the bottom truss of the outer climbing frame (1)
Scalable channel steel is set;When the scalable channel steel stretches out, the steel plate is laid on the scalable channel steel.
6. outer climbing frame protective device according to claim 1, which is characterized in that the agent structure (4) is in the horizontal direction
It is protruding to there is bindiny mechanism (101), the outer climbing frame (1) to be fastened in the bindiny mechanism (101).
7. outer climbing frame protective device according to claim 6, which is characterized in that one end of the bottom steel plate (3) and institute
State the bindiny mechanism (101) and the master that outer climbing frame (1) bottom is hinged, the other end is fastened on the outer climbing frame (1) bottom
At the position of body structure (4) contact.
8. outer climbing frame protective device according to claim 1, which is characterized in that the outer climbing frame (1) uses adhering lifting
Scaffold, console mode steel pipe outer climbing frame or fastener type steel pipe outer climbing frame.
9. according to claim 1-8 any one of them outer climbing frame protective devices, which is characterized in that the outer climbing frame (1) with
One middle part protection of setting between the agent structure (4).
10. outer climbing frame protective device according to claim 9, which is characterized in that the middle part protection includes rack and branch
Bar, the rack fixed frame are set on the strut, and one end of the strut connects the vertical of the outer climbing frame by rotary buckle
Column (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820084731.2U CN207776478U (en) | 2018-01-18 | 2018-01-18 | Outer climbing frame protective device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820084731.2U CN207776478U (en) | 2018-01-18 | 2018-01-18 | Outer climbing frame protective device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207776478U true CN207776478U (en) | 2018-08-28 |
Family
ID=63213380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820084731.2U Active CN207776478U (en) | 2018-01-18 | 2018-01-18 | Outer climbing frame protective device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207776478U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108166767A (en) * | 2018-01-18 | 2018-06-15 | 北京崇建工程有限公司 | A kind of construction method and outer climbing frame protective device |
-
2018
- 2018-01-18 CN CN201820084731.2U patent/CN207776478U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108166767A (en) * | 2018-01-18 | 2018-06-15 | 北京崇建工程有限公司 | A kind of construction method and outer climbing frame protective device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383588B (en) | Lifting platform for protecting safety of high-level construction | |
CN108166767A (en) | A kind of construction method and outer climbing frame protective device | |
CN206987412U (en) | A kind of building curtain wall construction anti-fall device | |
CN207776478U (en) | Outer climbing frame protective device | |
CN104291222B (en) | The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row | |
CN204627010U (en) | A kind of outer guard net being applicable to climbing frame | |
CN204418629U (en) | Integrated form climbs frame | |
CN207267961U (en) | A kind of bridge pier shaft pours operating platform | |
CN212053859U (en) | Horizontal overhanging flexible protective net for construction of main structure of building | |
CN205171979U (en) | Integrated form all steel lift platform | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN204676865U (en) | A kind of building scaffold | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
CN105888269A (en) | Suspended cable type safety protection device for building construction overhead operation, and construction method of suspended cable type safety protection device | |
CN103046734A (en) | Environment-friendly flame-retardant scaffold system | |
CN206273949U (en) | A kind of plug-in movable operating platform | |
CN205713050U (en) | A kind of scaffold protection network of municipal works | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN213869047U (en) | All-directional safety protection device with anti-falling structure for super high-rise building | |
CN210419022U (en) | Tower crane standard knot with safety performance | |
CN207144531U (en) | Tall building drop preventing falls behind anchoring from extension double-layer horizontal safety net device | |
CN105735662A (en) | Prefabricated assembled building casting net and mounting method | |
CN207829444U (en) | A kind of high-altitude steel structure security maintenance security system structure | |
CN206205418U (en) | A kind of anti-falling safe protection network | |
CN209261249U (en) | A kind of staircase protective device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |