CN207750084U - The closely connected construction supporting structure for passing through existing building of newly-built underground engineering - Google Patents

The closely connected construction supporting structure for passing through existing building of newly-built underground engineering Download PDF

Info

Publication number
CN207750084U
CN207750084U CN201721711360.8U CN201721711360U CN207750084U CN 207750084 U CN207750084 U CN 207750084U CN 201721711360 U CN201721711360 U CN 201721711360U CN 207750084 U CN207750084 U CN 207750084U
Authority
CN
China
Prior art keywords
steel pipe
round steel
pipe
link plate
passing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721711360.8U
Other languages
Chinese (zh)
Inventor
李积栋
油新华
肖龙鸽
平洋
马庆松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China State Construction Engineering Research Institute Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201721711360.8U priority Critical patent/CN207750084U/en
Application granted granted Critical
Publication of CN207750084U publication Critical patent/CN207750084U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model is related to the construction supporting technical fields of underground engineering, disclose a kind of closely connected construction supporting structure for passing through existing building of newly-built underground engineering.The utility model pipe curtain is formed by one group of round steel pipe laid out in parallel, is opened up on the side wall of the lower half circle of each round steel pipe there are two notch, and two notches are symmetrical arranged, along the elongated setting of the length direction of round steel pipe;Each round steel pipe is internally provided with interior connecting plate, and along the elongated setting of length direction of round steel pipe, two sides and the lower edge of both sides notch are welded and fixed interior connecting plate;Outside link plate is provided between adjacent round steel pipe, along the elongated setting of length direction of round steel pipe, lower edge of the two sides respectively with two adjacent notches is welded and fixed outside link plate;Between round steel pipe and interior connecting plate on the outside of pipe curtain and outside link plate is located at side on the outside of pipe curtain and has poured concrete.The utility model supporting intensity is high, and stability is high, and construction is convenient.

Description

The closely connected construction supporting structure for passing through existing building of newly-built underground engineering
Technical field
The utility model is related to the construction supporting technical fields of underground engineering, close more particularly to a kind of newly-built underground engineering Patch passes through the construction supporting structure of existing building.
Background technology
With the development that domestic rail traffic is maked rapid progress, ripe day by day, the phase between each track circuit of subway work technology Situations such as mutually intersecting, is parallel, connecting, build together is increasing, and Beijing is in several Underground Rail Transit lines built, major part at present It is interspersed overlapping with existing rail line many places in city, wear existing station under existing largely(Or section)Engineering.
Newly-built Underground Construction unavoidably to cause existing structure deformation and internal force increase, be more than its ability to bear or When permissible value, it is possible to influence existing structure normal use, or even structure is caused to be destroyed, jeopardize safety.When using newly-built structure It is closely connected when passing through existing structure, it is more stringent to the deformation requirements and settlement Control of existing structure.Traditional form of construction work will be big Section turns to small pilot tunnel, carries out partial excavation, is carried out at the same time branch's supporting, and concrete permanent structure is carried out again after the completion of excavating Construction, this form of construction work Technical comparing is ripe, but is affected in the construction process to existing structure, is carrying out big face When long-pending soil excavation, it is susceptible to the problems such as generating surface subsidence because of face unstability or existing structure is caused to deform.
Utility model content
The utility model provides that a kind of supporting intensity is high, stability is high, construction easily creates that underground engineering is closely connected to pass through The construction supporting structure of existing building.
Technical problems to be solved are:Existing support pattern is in the work progress of new construction to the shadow of existing structure Sound is larger, when carrying out the soil excavation of large area, is susceptible to and generates surface subsidence because of face unstability or cause existing The problems such as malformation.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering, including pipe curtain, interior connection Plate, outside link plate and ejection for water plugging structure,
The pipe curtain is formed by one group of round steel pipe laid out in parallel, and each round steel pipe is opened on the semicircle of side on the inside of pipe curtain If there are two notch, two notches are rectangular, using round steel pipe perpendicular to the central axes of pipe curtain arragement direction as symmetry axis pair Claim setting, length direction elongated setting of the notch along round steel pipe;Each round steel pipe is internally provided with interior connecting plate, interior connecting plate edge The elongated setting of length direction of round steel pipe, the two sides and the lower edge of both sides notch of interior connecting plate are welded and fixed;Adjacent circle Outside link plate is provided between steel pipe, outside link plate is along the elongated setting of length direction of round steel pipe, the two sides point of outside link plate Lower edge not with two adjacent notches is welded and fixed;
Between round steel pipe and interior connecting plate on the outside of pipe curtain and outside link plate is located at side on the outside of pipe curtain and pours There is concrete, ejection for water plugging structure is provided between the outside of the concrete of outside link plate side, adjacent round steel pipe.
The utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering, further, the circle The outer diameter of steel pipe is 2000mm, and wall thickness is not less than 20mm.
The utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering, further, adjacent institute The minimum range stated between round steel pipe is no more than 600mm.
The utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering, further, described to lack The width of mouth is the 1/3-2/3 of round steel pipe radius.
The utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering, further, described interior Connecting plate and the steel plate that outside link plate is that thickness is not less than 10mm.
The utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering, further, institute's rheme It is not less than the width of notch in the thickness of the concrete of outside link plate side.
The utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering to be had compared with prior art It has the advantages that:
The structure that the utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering is simple, first carries out The construction of permanent supporting construction, then under the protection of permanent supporting construction, then carries out earth excavation and subsequent construction, Reduce influence of the construction to surrounding formations and existing structure, effectively prevent surface subsidence or causes the feelings such as existing structure deformation Condition;The utility model construction is convenient, connecting plate is arranged between pipe curtain, then direct casting concrete, eliminates traditional supporting Interim inverted arch in structure and median septum eliminate template scaffold and take and tear operation open, greatly reduces construction workload, reduce Material consumption and construction cost, reduce environmental pollution, improve construction efficiency, shorten construction period, improve construction Safety, construction quality are more secure.
The utility model is provided with the interior connecting plate with the coherent connection of outside link plate in round steel pipe, above interior connecting plate Round steel pipe in poured concrete, after the completion of permanent support construction, extra round steel pipe, increases on the inside of excision pipe curtain Big newly-built underground engineering can utilize area.
The construction supporting structure for passing through existing building closely connected to the newly-built underground engineering of the utility model below in conjunction with the accompanying drawings It is described further.
Description of the drawings
Fig. 1 is the structural representation that the utility model creates the closely connected construction supporting structure for passing through existing building of underground engineering Figure;
Fig. 2 is the schematic diagram after the completion of new construction constructing structure.
Reference numeral:
1- pipe curtains;11- round steel pipes;Connecting plate in 2-;3- outside link plates;4- ejection for water plugging structures;5- concrete;The bottoms 6- Plate.
Specific implementation mode
As shown in Figure 1, it includes pipe that the utility model, which creates the closely connected construction supporting structure for passing through existing building of underground engineering, Curtain 1, interior connecting plate 2, outside link plate 3 and ejection for water plugging structure 4,
Pipe curtain 1 is rectangular, annular or arch, is close to existing building setting, is formed by one group of 11 laid out in parallel of round steel pipe, circle The outer diameter of steel pipe 11 is 2000mm, and wall thickness is not less than 20mm;Minimum range between adjacent round steel pipe 11 is no more than 600mm, often A round steel pipe 11 is opened up on the semicircle of 1 inside side of pipe curtain there are two notch, and two notches are rectangular, with perpendicular to pipe The central axes of the round steel pipe 11 of 1 arragement direction of curtain are symmetrical arranged for symmetry axis, and notch elongated is set along the length direction of round steel pipe 11 It sets, the width of notch is the 1/3-2/3 of 11 radius of round steel pipe;Each round steel pipe 11 is internally provided with interior connecting plate 2, interior connecting plate 2 are arranged perpendicular to central axes, and interior connecting plate 2 is along the elongated setting of length direction of round steel pipe 11, the two sides of interior connecting plate 2 and two The lower edge of side notch is welded and fixed;Outside link plate 3 is provided between adjacent round steel pipe 11, outside link plate 3 is along round steel pipe 11 The elongated setting of length direction, the lower edge of the two sides of outside link plate 3 respectively with two adjacent notches is welded and fixed, interior company Fishplate bar 2 and the steel plate that outside link plate 3 is that thickness is not less than 10mm;
Between the round steel pipe 11 and interior connecting plate 2 in 1 outside of pipe curtain and outside link plate 3 is located at 1 outside side of pipe curtain Concrete 5 is poured, the thickness for being located at the concrete 5 of 3 side of outside link plate is not less than the width of notch;Positioned at outside link plate It is provided with ejection for water plugging structure 4 between the outside of the concrete 5 of 3 sides, adjacent round steel pipe 11.
The construction method of the closely connected construction supporting structure for passing through existing building of the newly-built underground engineering of the utility model, including with Lower step:
Step 1: according to design requirement and examine on the spot as a result, determine the diameter of round steel pipe 11, length, arrangement mode with And 11 spacing of round steel pipe;
Step 2: excavating shaft, builds jacking counterforce wall and workbench;
Step 3: layering jacking round steel pipe 11 is linked to be pipe curtain 1, the earthwork in pipe, and the slip casting between steel pipe are excavated in jacking Sealing forms ejection for water plugging structure 4;
Step 4: opening up notch in round steel pipe 11, interior connecting plate 2 and outside link plate 3 are then welded;
Step 5: casting concrete, maintenance to predetermined strength form construction supporting structure;
Step 6: under the protection of construction supporting structure, the earth excavation of big cross section is carried out;
Step 7: with the stage excavation of the earthwork, apply bottom plate 6, and by positioned at interior connecting plate 2 close to 1 inside of pipe curtain Round steel pipe 11 is cut off, and forms complete constructing structure, as shown in Figure 2.
Embodiment described above is only that preferred embodiments of the present invention are described, not to this practicality Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, those of ordinary skill in the art are to this The various modifications and improvement that the technical solution of utility model is made should all fall into the protection of the utility model claims book determination In range.

Claims (6)

1. the closely connected construction supporting structure for passing through existing building of newly-built underground engineering, it is characterised in that:Including pipe curtain(1), interior company Fishplate bar(2), outside link plate(3)With ejection for water plugging structure(4);
The pipe curtain(1)By one group of round steel pipe(11)Laid out in parallel forms, each round steel pipe(11)Close to pipe curtain(1)Inside side Semicircle on open up there are two notch, two notches are rectangular, with round steel pipe(11)Perpendicular to pipe curtain(1)Arragement direction Central axes are symmetrical arranged for symmetry axis, and notch is along round steel pipe(11)The elongated setting of length direction;Each round steel pipe(11)It is internal It is provided with interior connecting plate(2), interior connecting plate(2)Along round steel pipe(11)The elongated setting of length direction, interior connecting plate(2)Both sides Side and the lower edge of both sides notch are welded and fixed;Adjacent round steel pipe(11)Between be provided with outside link plate(3), outside link plate (3)Along round steel pipe(11)The elongated setting of length direction, outside link plate(3)Two sides respectively under two adjacent notches Edge is welded and fixed;
Positioned at pipe curtain(1)The round steel pipe in outside(11)With interior connecting plate(2)Between and outside link plate(3)Positioned at pipe curtain(1)Outside Side side has poured concrete(5), it is located at outside link plate(3)The concrete of side(5)Outside, adjacent round steel pipe(11)It Between be provided with ejection for water plugging structure(4).
2. the closely connected construction supporting structure for passing through existing building of newly-built underground engineering according to claim 1, feature exist In:The round steel pipe(11)Outer diameter be 2000mm, wall thickness be not less than 20mm.
3. the closely connected construction supporting structure for passing through existing building of newly-built underground engineering according to claim 1, feature exist In:The adjacent round steel pipe(11)Between minimum range be no more than 600mm.
4. the closely connected construction supporting structure for passing through existing building of newly-built underground engineering according to claim 1, feature exist In:The width of the notch is round steel pipe(11)The 1/3-2/3 of radius.
5. the closely connected construction supporting structure for passing through existing building of newly-built underground engineering according to claim 1, feature exist In:The interior connecting plate(2)With outside link plate(3)It is the steel plate that thickness is not less than 10mm.
6. the closely connected construction supporting structure for passing through existing building of newly-built underground engineering according to claim 1, feature exist In:It is described to be located at outside link plate(3)The concrete of side(5)Thickness be not less than notch width.
CN201721711360.8U 2017-12-11 2017-12-11 The closely connected construction supporting structure for passing through existing building of newly-built underground engineering Expired - Fee Related CN207750084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721711360.8U CN207750084U (en) 2017-12-11 2017-12-11 The closely connected construction supporting structure for passing through existing building of newly-built underground engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721711360.8U CN207750084U (en) 2017-12-11 2017-12-11 The closely connected construction supporting structure for passing through existing building of newly-built underground engineering

Publications (1)

Publication Number Publication Date
CN207750084U true CN207750084U (en) 2018-08-21

Family

ID=63148932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721711360.8U Expired - Fee Related CN207750084U (en) 2017-12-11 2017-12-11 The closely connected construction supporting structure for passing through existing building of newly-built underground engineering

Country Status (1)

Country Link
CN (1) CN207750084U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505631A (en) * 2018-11-30 2019-03-22 上海隧道工程有限公司 The adjustable bracketing of pipe curtain inner support
CN111156038A (en) * 2020-03-10 2020-05-15 中铁工程装备集团有限公司 Underground space construction method based on circumferential shield and pipe curtain

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505631A (en) * 2018-11-30 2019-03-22 上海隧道工程有限公司 The adjustable bracketing of pipe curtain inner support
CN111156038A (en) * 2020-03-10 2020-05-15 中铁工程装备集团有限公司 Underground space construction method based on circumferential shield and pipe curtain
CN111156038B (en) * 2020-03-10 2021-05-14 中铁工程装备集团有限公司 Underground space construction method based on circumferential shield and pipe curtain

Similar Documents

Publication Publication Date Title
CN103469817B (en) Existing subway station main structure broadening construction method
CN105201532B (en) The Ring Cutting construction method of underground Long span spherical crown shape dome under weak surrounding rock
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN104131704A (en) Steel pipe column concrete lateral pouring method and steel pipe column structure used in method
CN207047613U (en) A kind of railway roadbed changeover portion support meanss and railway roadbed changeover portion support system
CN207750084U (en) The closely connected construction supporting structure for passing through existing building of newly-built underground engineering
CN113062354A (en) Assembly method for prefabricated subway station of open-cut pile support system
CN109736884B (en) Treatment structure for water gushing in underground river close to tunnel and construction method of treatment structure
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN206844275U (en) Mutual buckle type precast concrete cover ditch and its suspender
CN104088219A (en) Temporary river-crossing bridge structure for water-power engineering construction and construction method
CN203583493U (en) Combined lattice steel frame spray anchoring foundation pit supporting structure
CN108979663B (en) Subway station main body structure construction method adopting temporary middle column support
CN105041348B (en) A kind of underground space tunneling construction method of use compound roof
CN105065040B (en) A kind of prefabricated underground space tunneling construction method of top plate
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN106758818A (en) A kind of Bailey beam provision for disengagement
CN105134250A (en) Support disassembly-free and direct lining method for weak surrounding rock subway station
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN208106458U (en) Supporting structure for ultra-shallow soil-covering rectangular large section
CN202768001U (en) Arc bridge type integral supporting structure for inclined well bell mouth construction
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN207079602U (en) A kind of Simple assembled slope protecting device
CN103485366B (en) Safe stress conversion construction method for improvement on main structure of subway station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180821

Termination date: 20191211