CN207749675U - A kind of trepanning double steel plate shear wall - Google Patents

A kind of trepanning double steel plate shear wall Download PDF

Info

Publication number
CN207749675U
CN207749675U CN201721834519.5U CN201721834519U CN207749675U CN 207749675 U CN207749675 U CN 207749675U CN 201721834519 U CN201721834519 U CN 201721834519U CN 207749675 U CN207749675 U CN 207749675U
Authority
CN
China
Prior art keywords
steel plate
stress
steel
wall
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721834519.5U
Other languages
Chinese (zh)
Inventor
张鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qiancheng Integrated Housing Co Ltd
Original Assignee
Beijing Qiancheng Integrated Housing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qiancheng Integrated Housing Co Ltd filed Critical Beijing Qiancheng Integrated Housing Co Ltd
Priority to CN201721834519.5U priority Critical patent/CN207749675U/en
Application granted granted Critical
Publication of CN207749675U publication Critical patent/CN207749675U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model is related to steel plate shear force wall technical fields, provide a kind of trepanning double steel plate shear wall, including stress steel plate, wall support part;Stress steel plate is set to shear wall both sides, and multiple first connecting holes are distributed on stress steel plate in the matrix form, and the first connecting hole of the stress steel plate of both sides is oppositely arranged;Wall support part is installed on the first connecting hole being oppositely arranged, and automatic welding can be achieved between wall support part and the first connecting hole;The stress steel plate of both sides is combined into entirety by multiple wall support parts;Casting concrete between the stress steel plate of both sides.The stress steel plate connection of the utility model both sides is reliable, and accurate positioning can realize operative constraint to wall inner concrete, steel plate and concrete is made well to cooperate;For other components such as floor negative reinforcement, heat preservation and decoration of outer wall system provider taking root just, connect;Ensure that steel plate osseotomy site is airtight, waterproof;Industrialization production, factory's automatic welding can be achieved.

Description

A kind of trepanning double steel plate shear wall
Technical field
The utility model is related to steel plate shear force wall technical field, more particularly to a kind of trepanning double steel plate shear wall.
Background technology
The principal mode of existing double steel plate shear wall has:Peg formula double steel plate shear wall, T shape ribbed stiffener double steel plates shearing Wall, batten plate connection double steel plate shear wall, split bolt double steel plate shear wall, Hybrid connections double steel plate shear wall;Above-mentioned five kinds of steel It is steel plate, concrete filled that the common feature of plate shear wall, which is bilateral, if can be good at working together can for steel plate and concrete It realizes relatively large flat in-plane stiffness, good shock resistance is provided.
As shown in Figure 1, the peg of peg formula double steel plate shear wall is connected with outside plate, peg head of a nail one end is wrapped in In concrete;It since the peg on the steel plate of both sides is mutual and is not connected with, easily leads under seismic force effects, steel plate and peg are to mixed Solidifying soil cannot constrain well, and concrete local failure easily occurs in peg cap position, and it is good with steel to can not achieve concrete It works together and obtains maximum shear resistance.
As shown in Fig. 2, the ribbed stiffener of T shape ribbed stiffener double steel plate shear walls and the relationship of concrete are cut with peg formula double steel plate Power wall, there is also can not achieve concrete and the good similar problems for working together the maximum shear resistance of acquisition of steel.
As shown in figure 3, the batten plate of batten plate connection double steel plate shear wall can form effective connection with shear wall both sides steel plate, and Operative constraint is realized to concrete, good co-operation is realized, maximum shear resistance is provided;But steel plate shear force wall length and width Size is larger, and typically no less than 3 meters multiply 3 meters, both sides steel plate and batten plate(Batten plate spacing is typically no less than 300 millimeters)Between weldering It connects and cannot achieve automatic welding machine welding, human weld, low production efficiency, welding quality is used to be not easy to ensure at present.
As shown in figure 4, the split bolt of split bolt double steel plate shear wall can be constrained effectively in casting concrete Steel plate does not rise mould, but due to split bolt to steel plate spacing become larger Constrained, become smaller no constraint, in the front spring of casting concrete Spacing can be reduced in outer force effect, and steel plate shear force wall thickness is made to become smaller;It is worn less than bilateral plate fixation additionally, due to split bolt diameter The aperture of bolt will appear bolt and concrete under seismic force effects and generate relative displacement, steel and concrete with bilateral plate fixation It works together undesirable.
As shown in figure 5, Hybrid connections double steel plate shear wall(By peg, batten plate Hybrid connections), relative to bolt as shown in Figure 1 Nail type double steel plate shear wall performance can increase, but batten plate welding is still had any problem.
Utility model content
The purpose of this utility model is exactly to have overcome the deficiencies of the prior art and provide a kind of novel trepanning double steel plate shearing Wall, can effectively reinforce the collaborative work between shear wall steel plate and wall inner concrete, at the same conveniently with other structures component Connection.
A kind of trepanning double steel plate shear wall of the utility model, including stress steel plate, wall support part;
The stress steel plate is set to shear wall both sides, is distributed with multiple first on the stress steel plate in the matrix form and connects Hole is connect, the first connecting hole of the stress steel plate of both sides is oppositely arranged;
The wall support part is installed on first connecting hole being oppositely arranged, the wall support part and described first Automatic welding can be achieved between connecting hole, so that the hole-opening of shear wall both sides stress steel plate institute is effectively reinforced, avoid trepanning Stress steel plate shear resistance is set to incur loss;
Stress steel plate is combined into entirety by multiple wall support parts;It is poured between the stress steel plate of both sides mixed Solidifying soil.
Further, the wall support part includes round steel and steel plate disk;The round steel both ends are both provided with endoporus, described Internal thread is set on endoporus side wall;It is both provided with external screw thread on the outside of the round steel both ends;The steel plate disk is medial recess structure, The second connecting hole is provided in the middle part of the steel plate disk, the diameter of second connecting hole is slightly larger than the diameter of the round steel;The circle The both ends of steel are each passed through second connecting hole and are welded with the steel plate disk.
Further, the steel plate disk includes first and second, and the first position is in steel plate disk periphery Perpendicular to the planar structure of the round steel axis, convenience is bonded welding with shear wall stress steel plate;Described second is curved surface Structure, second connection first and second connecting hole.
Further, the thickness of the steel plate disk is more than or equal to the thickness of the stress steel plate;The both ends of the round steel are most Outer rim is flushed with the outer most edge of the stress steel plate.
Further, the diameter of first connecting hole subtracts twice of steel plate disk steel plate thickness less than steel plate disk diameter.
Further, it is welded as a whole by angle steel between upper and lower two blocks of adjacent stress steel plates;The angle steel packet The first face and the second face are included, the angle steel is placed at the top of the stress steel plate of lower part, and first face and top stress steel plate patch are neat, It is welded with the angle steel perpendicular to lower part stress steel plate, top stress steel plate and lower part stress steel plate in second face.
Further, the angle steel is equilateral or unequal angle.
Further, external reinforcing bar is realized by reinforced bar sleeve and the external screw thread at the round steel both ends and is consolidated with the round steel Fixed connection is achieved a fixed connection by the round steel endoporus that is threaded into of external end reinforced setting.
The beneficial effects of the utility model are:
1, the hole-opening of shear wall both sides stress steel plate institute is made effectively to be reinforced, avoiding trepanning enables stress steel plate shearing resistance Power incurs loss;
2, effectively position both sides stress steel plate;
3, operative constraint is realized to wall inner concrete, makes steel and the good co-operation of concrete;
4, it is provided for other components and easily takes root, connects, such as floor negative reinforcement, the peace of heat preservation and decoration of outer wall system Dress, installation etc. of taking root of interior decoration;
5, ensure that steel plate osseotomy site is airtight, waterproof;
6, industrialization production, factory's automatic welding can be achieved.
Description of the drawings
Fig. 1 show peg connection shear wall structure schematic diagram.
Fig. 2 show T shape ribbed stiffeners connection shear wall structure schematic diagram.
Fig. 3 show batten plate connection shear wall structure schematic diagram.
Fig. 4 show split bolt connection shear wall structure schematic diagram.
Fig. 5 show Hybrid connections shear wall structure schematic diagram.
Fig. 6 show novel trepanning double steel plate shear wall structure schematic diagram.
Fig. 7 show the utility model embodiment trepanning double steel plate shear wall body supporting piece structure schematic diagram.
Fig. 8-a, Fig. 8-b show wall support part and external steel bar connecting structure schematic diagram.
Fig. 9 show lower part stress steel plate and Bolted angle connection schematic diagram.
Figure 10 show upper and lower stress steel plate connection relationship diagram.
Figure 11 show shear wall and floor connection relationship diagram.
Wherein:1- stress steel plates;2- concrete;3- pegs;4-T shape reinforcements;5- batten plates;6- split bolts;7- wall branch Support member;8- reinforced bar sleeves;9- floor negative reinforcements;10- weld seams;11- angle steel;71- round steel;72- steel plate disks;111- first Face;The second faces 112-;711- external screw threads;712- endoporus;721- first;722- second;The second connecting holes of 723-.
Specific implementation mode
The utility model specific embodiment is described in detail below in conjunction with specific attached drawing.It should be noted that following implementations Example described in technical characteristic or technical characteristic combination be not construed as it is isolated, they can be combined with each other from And reach superior technique effect.In the attached drawing of following embodiments, the identical label that each attached drawing occurs represents identical spy Sign or component, can be applied in different embodiments.
As shown in fig. 6, a kind of trepanning double steel plate shear wall of the utility model embodiment, including stress steel plate 1, wall support Part 7;The stress steel plate 1 is set to shear wall both sides, and multiple first connections are distributed on the stress steel plate 1 in the matrix form First connecting hole in hole, the stress steel plate 1 of both sides is oppositely arranged, and the diameter of first connecting hole is less than steel plate disk 72 directly Diameter subtracts twice of 72 steel plate thickness of steel plate disk.The wall support part 7 is installed on first connecting hole being oppositely arranged, described Automatic welding can be achieved between wall support part 7 and first connecting hole;The stress steel plate 1 of both sides passes through multiple described Wall support part 7 is combined into entirety;Casting concrete between the stress steel plate 1 of both sides.
As shown in Figure 7, it is preferred that the wall support part 7 includes round steel 71 and steel plate disk 72;71 both ends of the round steel are equal It is provided with endoporus 712, internal thread is set on the endoporus side wall;It is both provided with external screw thread 711 on the outside of 71 both ends of the round steel;Institute It is medial recess structure to state steel plate disk 72, and 72 middle part of the steel plate disk is provided with the second connecting hole 723, second connecting hole 723 Diameter be slightly larger than the round steel 71 diameter;The both ends of the round steel 71 be each passed through second connecting hole 723 with it is described Steel plate disk 72 welds.
Preferably, the steel plate disk 72 includes first 721 and second 722, and described first 721 is located at the steel plate 72 periphery of disk, for perpendicular to the planar structure of 71 axis of the round steel, convenience is bonded welding with stress steel plate 1;Described second Portion 722 is curved-surface structure, second 722 connection first 721 and second connecting hole 723.The steel plate disk 72 thickness is more than or equal to the thickness of the stress steel plate 1;The both ends outer most edge of the round steel 71 and the stress steel plate 1 are most Outer rim flushes.
By the welding of above-mentioned preferred wall connecting piece 7 and both sides stress steel plate 1,1 institute of both sides stress steel plate can be made Open cavity(First connecting hole)Effectively reinforced, avoiding trepanning makes the shear resistance of stress steel plate 1 weaken, meanwhile, make two Side stress steel plate 1 is accurately positioned, and operative constraint is realized to the concrete in the middle part of wall.
As Figure 8-9, it is preferred that be welded as one by angle steel 11 between upper and lower two blocks of adjacent stress steel plates 1 Body;The angle steel 11 includes the first face 111 and the second face 112, and the angle steel 11 is placed in 1 top of stress steel plate of lower part, described First face 111 is pasted together with top stress steel plate 1, and second face 112 is perpendicular to lower part stress steel plate 1,1 He of top stress steel plate Lower part stress steel plate 1 is welded with the angle steel 11.The model of the angle steel 11 determines according to actual conditions, can be it is equilateral or Unequal angle.By this kind design, it can be achieved that accurate three-dimensional localization when upper layer shear wall is installed, as shown in Figure 10;Meanwhile So that last layer shear wall becomes easily to weld with next story shear wall weld seam, it is easier to ensure quality;Welding node is as shown in Figure 10 Node;It can also be provided for other components and easily take root, connect.
As shown in Fig. 8-a, Fig. 8-b, external reinforcing bar 9 can pass through the external screw thread 711 at 71 both ends of reinforced bar sleeve 8 and the round steel Realize with the round steel 71 be fixedly connected or the internal thread of end thread and 71 both ends of the round steel by external reinforcing bar 9 712 realizations are fixedly connected with the round steel 71.
As shown in figs. 10-11, the connection type of floor and the trepanning double steel plate shear wall is:Soffit is placed in described On second face 112 of angle steel 11, the vertical load of floor is undertaken by second face 112;The end of floor is adjacent to the stress Steel plate 1;The negative reinforcement 9 on floor top by the external screw thread 711 at 71 both ends of reinforced bar sleeve 8 and the round steel realize with it is described Round steel 71 is fixedly connected or by the end thread of external reinforcing bar 9 and the realization of internal thread 712 at 71 both ends of the round steel and institute State being fixedly connected for round steel 71;Floor top is unilateral when having a hogging moment load such as Fig. 8-a, and unilateral to have negative reinforcement to pass through above-mentioned Load is conducted to the steel plate shear force wall and undertaken by structure, and floor top is bilateral when having a hogging moment load such as Fig. 8-b, hogging moment steel Load is conducted to the round steel 71 by muscle by above structure, and two side loads are offset, are held if there is difference to be transmitted to steel plate shear force wall Load.
Above-described embodiment is only illustrated with the connection of floor and shear wall, but is not restricted to the connection with floor, may be used also For the connection with roof boarding, decorative board material, exterior-wall heat insulation etc..
Although having been presented for several embodiments of the utility model herein, those skilled in the art should manage Solution, in the case where not departing from the spirit of the present invention, can be changed the embodiments herein.Above-described embodiment only shows Example property, it should not be using the embodiments herein as the restriction of the utility model interest field.

Claims (8)

1. a kind of trepanning double steel plate shear wall, which is characterized in that including stress steel plate, wall support part;
The stress steel plate is set to shear wall both sides, and multiple first connections are distributed on the stress steel plate in the matrix form First connecting hole in hole, the stress steel plate of both sides is oppositely arranged;
The wall support part is installed on first connecting hole being oppositely arranged, and the wall support part is connect with described first It is welded between hole;
The stress steel plate of both sides is combined into entirety by multiple wall support parts;Between the stress steel plate of both sides Casting concrete.
2. trepanning double steel plate shear wall as described in claim 1, which is characterized in that the wall support part includes round steel and steel Plate disc;The round steel both ends are both provided with endoporus, and internal thread is arranged on the endoporus side wall;It is respectively provided on the outside of the round steel both ends There is external screw thread;The steel plate disk is medial recess structure, and the second connecting hole, second connecting hole are provided in the middle part of the steel plate disk Diameter be slightly larger than the round steel diameter;The both ends of the round steel are each passed through second connecting hole and are welded with the steel plate disk It connects.
3. trepanning double steel plate shear wall as claimed in claim 2, which is characterized in that the steel plate disk includes first and second Portion, the first position is in steel plate disk periphery, for perpendicular to the planar structure of the round steel axis, it is convenient with shear wall by The fitting of power steel plate is welded;Described second is curved-surface structure, second connection first and second connection Hole.
4. trepanning double steel plate shear wall as claimed in claim 2, which is characterized in that the thickness of the steel plate disk is more than or equal to institute State the thickness of stress steel plate;The both ends outer most edge of the round steel is flushed with the outer most edge of the stress steel plate.
5. trepanning double steel plate shear wall as described in claim 1, which is characterized in that the diameter of first connecting hole is less than steel Plate disc diameter subtracts twice of steel plate disk steel plate thickness.
6. trepanning double steel plate shear wall as described in any one in claim 1-5, which is characterized in that upper and lower two pieces of adjacent institutes It states and is welded as a whole by angle steel between stress steel plate;The angle steel includes the first face and the second face, and the angle steel is placed in lower part Stress steel plate at the top of, first face and top stress steel plate patch are neat, and second face is perpendicular to lower part stress steel plate, top Stress steel plate and lower part stress steel plate are welded with the angle steel.
7. trepanning double steel plate shear wall as claimed in claim 6, which is characterized in that the angle steel is equilateral or inequilateral angle Steel.
8. trepanning double steel plate shear wall as claimed in claim 2, which is characterized in that external reinforcing bar passes through reinforced bar sleeve and described The external screw thread realization at round steel both ends and being fixedly connected for the round steel;Or round steel is threaded by external end reinforced setting Endoporus achieves a fixed connection.
CN201721834519.5U 2017-12-25 2017-12-25 A kind of trepanning double steel plate shear wall Active CN207749675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721834519.5U CN207749675U (en) 2017-12-25 2017-12-25 A kind of trepanning double steel plate shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721834519.5U CN207749675U (en) 2017-12-25 2017-12-25 A kind of trepanning double steel plate shear wall

Publications (1)

Publication Number Publication Date
CN207749675U true CN207749675U (en) 2018-08-21

Family

ID=63150420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721834519.5U Active CN207749675U (en) 2017-12-25 2017-12-25 A kind of trepanning double steel plate shear wall

Country Status (1)

Country Link
CN (1) CN207749675U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273481A (en) * 2019-07-30 2019-09-24 华侨大学 A kind of connecting node and its construction method of double steel plate compound shear wall and floor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273481A (en) * 2019-07-30 2019-09-24 华侨大学 A kind of connecting node and its construction method of double steel plate compound shear wall and floor
CN110273481B (en) * 2019-07-30 2023-12-29 华侨大学 Connecting node of double-steel-plate combined shear wall and floor slab and construction method thereof

Similar Documents

Publication Publication Date Title
JP6628955B2 (en) Vertically integrated stringer
CN108086532A (en) A kind of perforate double steel plate shear wall
CN108035461A (en) A kind of perforate double steel plate shear wall body supporting item
CN207846676U (en) A kind of connecting node of double steel plate shear wall and floor
CN206623005U (en) A kind of fast-positioning device being connected for steel arch-shelf unit with junction steel plate
CN207749675U (en) A kind of trepanning double steel plate shear wall
PT819200E (en) SERIES OF ACCESSORIES TO JOIN I OR U-BEAMS OR OTHER CROSS BEAMS OF BEAMS
CN107165314A (en) Assembled sandwich heat preservation concrete shear wall structure non-dismantling formwork system
CN108035443B (en) Connection method of double-steel-plate shear wall and floor slab
CN108086531B (en) Horizontal joint connection method for double-steel-plate shear wall
CN207749685U (en) A kind of trepanning double steel plate shear wall body support element
CN108035444A (en) A kind of connection method of double steel plate shear wall and floor negative reinforcement
CN207846689U (en) A kind of connecting node of double steel plate shear wall and floor negative reinforcement
CN106836486A (en) A kind of weak direction of principal axis connecting node of H types post and preparation method thereof
CN216516398U (en) Laminated plate
CN206800624U (en) With the Multicarity concrete filled steel tube pole steel beam face outer bolt assembled connecting node to wearing screw rod
CN208034956U (en) Mold and its end mode structure
CN207727774U (en) A kind of aluminium alloy plate type node structure that web is reinforced
CN207314522U (en) The connecting node of reinforced column top layer and girder steel
CN208815765U (en) A kind of steel building frame support structure composite plate
CN105821966B (en) A kind of support flat push type multi-cavity steel tube concrete coupled column braced frame system
CN207749676U (en) A kind of double steel plate shear wall horizontal joint connecting node
CN106284687A (en) A kind of beam-column skew crossing structure
CN208267175U (en) It is cast-in-place to use skeleton and structural wall