CN207734819U - A kind of burning boiler emission-control equipment - Google Patents

A kind of burning boiler emission-control equipment Download PDF

Info

Publication number
CN207734819U
CN207734819U CN201721538777.9U CN201721538777U CN207734819U CN 207734819 U CN207734819 U CN 207734819U CN 201721538777 U CN201721538777 U CN 201721538777U CN 207734819 U CN207734819 U CN 207734819U
Authority
CN
China
Prior art keywords
mounting bracket
spray
wind turbine
cyclone dust
water storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721538777.9U
Other languages
Chinese (zh)
Inventor
魏晓霞
张小伟
郑旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longdong University
Original Assignee
Longdong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longdong University filed Critical Longdong University
Priority to CN201721538777.9U priority Critical patent/CN207734819U/en
Application granted granted Critical
Publication of CN207734819U publication Critical patent/CN207734819U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a kind of burning boiler emission-control equipments,Including cyclone dust collectors,Pedestal and spray structure,The side of the pedestal is placed with boiler,First mounting bracket is installed above the pedestal,The surface of first mounting bracket is equipped with cyclone dust collectors,The first wind turbine is installed above first mounting bracket of the cyclone dust collectors side,The side of first mounting bracket is equipped with the second wind turbine,The output end of second wind turbine is connected with the second appendix,The side of second wind turbine is equipped with the second mounting bracket,The second water storage box is installed below second mounting bracket,The first water storage box is installed above second mounting bracket,Upper end inside the spray structure is equipped with spray tube,The bottom of the spray tube is equipped with atomizer,The side of the spray structure is equipped with the second appendix by flange.The utility model shows that boiler waste gas processing is more thorough, more environmentally-friendly by being equipped with a series of structures.

Description

A kind of burning boiler emission-control equipment
Technical field
The utility model is related to emission-control equipment technical field, specially a kind of burning boiler emission-control equipment.
Background technology
It is more and more extensive with the application of industrial development, organic compound from waste gas is will produce in production and using process, it is early The exhaust gas of these organic compounds of phase is directly discharged into air, is the source of the major air pollutants of industrial park, in recent years, people Environmental consciousness constantly enhance, to control atmosphere pollution requirement increasingly improve, organic waste gas treatment method is also with the time Passage constantly develop, industrial is also widely used, and existing boiler is in order to reduce tail gas pollution, protection ring Border usually installs deduster additional in the offgas outlet of boiler, currently, some boilers in the market use desulfurizing dust-collector dedusting, it can Effective desulfurization, but other harmful substances matter still cannot effectively absorb, and national standard is still not achieved in the flue dust of discharge, to company and week Surrounding environment all causes certain pollution, for the mode of the gas cleaning of coal-burning boiler also predominantly single desulfurization or denitration Or dedusting, this obviously cannot be such that flue gas thoroughly purifies, and although the technology of desulphurization denitration in the market has very much, but also not It is enough perfect, therefore, it is badly in need of the burning boiler emission-control equipment that a kind of purification efficiency is high, effect is good in the market.
Utility model content
The purpose of this utility model is to provide a kind of burning boiler emission-control equipments, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions:A kind of burning boiler emission-control equipment, packet Cyclone dust collectors, pedestal and spray structure are included, the side of the pedestal is placed with boiler, first is equipped with above the pedestal The surface of mounting bracket, first mounting bracket is equipped with cyclone dust collectors, and the bottom of the cyclone dust collectors is provided with disposal box, The first wind turbine is installed above first mounting bracket of the cyclone dust collectors side, the input terminal of first wind turbine passes through first Air intake duct is connect with boiler, and the output end of first wind turbine is connect by the first appendix with cyclone dust collectors, and described first The side of mounting bracket is equipped with the second wind turbine, and the output end of the cyclone dust collectors is connected by the second air intake duct and the second wind turbine It connects, the output end of second wind turbine is connected with the second appendix, and the side of second wind turbine is equipped with the second mounting bracket, institute It states and the second water storage box is installed below the second mounting bracket, second water storage box is internally provided with the first water pump, and described First water storage box is installed above two mounting brackets, reflux line, first water are connected with below first water storage box The output end of pump is connect by the first woven hose with the first water storage box, and first water storage box is internally provided with the second gas transmission Pipe, the side of second mounting bracket are equipped with spray structure, and the spray structure is internally provided with lye and the second water pump, And the upper end inside spray structure is equipped with spray tube, the bottom of the spray tube is equipped with atomizer, second water pump Output end connected by the input terminal of the second woven hose and spray tube, the side of the spray structure is equipped with the by flange Two appendixs, and the other side of spray structure is provided with power cord, and chimney, the chimney are equipped with above the spray structure Be internally provided with activated carbon adsorption layer, the side of the activated carbon adsorption layer is provided with HEPA high efficiency filter layers, the HEPA The side of high efficiency filter layer is provided with micropore ceramic filter layer, and the side of the micropore ceramic filter layer is provided with demister, institute The surface for stating spray structure is equipped with control panel.
Preferably, the bottom of the pedestal is equipped with universal wheel, and universal wheel is equipped with braking mechanism.
Preferably, the bottom of the spray structure is provided with liquid outlet.
Preferably, the bottom of the disposal box is equipped with pulley.
Preferably, the bottom of the chimney is detachably connected by screw thread and spray structure.
Compared with prior art, the utility model has the beneficial effects that:The burning boiler emission-control equipment passes through installation Have cyclone dust collectors and the first wind turbine, by boiler generate exhaust gas be absorbed into cyclone dust collectors through the first wind turbine, to exhaust gas into Row dust removal process prevents the dust of processing from disorderly flying, pollutes environment, lead to by being placed with disposal box below cyclone dust collectors It crosses and the second wind turbine is installed, the exhaust gas Jing Guo dedusting is subjected to water cooling by the first water storage box, the exhaust gas of heat is prevented to be discharged into greatly In gas, cause greenhouse effects, slow down the process of global warming, by reflux line and the first woven hose by the first water storage box with Second water storage box is connected, and forms water cycle, reduces the waste of water resource, by being equipped with spray structure, and in spray structure Be internally provided with spray tube and atomizer, so that exhaust gas is carried out chemical reaction neutralisation treatment, it made to generate harmless gas, protect Retaining ring border, by being internally provided with water pump and lye in spray structure, and the output end of water pump passes through the second woven hose and spray The input terminal of shower pipe connects, and forms a circulatory system, reduces the waste of lye, be provided with out by the bottom in spray structure Neutral solution can be discharged, not pollute the environment, by spraying when forming neutral solution in lye and after exhaust gas by liquid mouth The top peace of structure turns have chimney, wherein being internally provided with activated carbon adsorption layer, HEPA high efficiency filter layers and micro- in chimney Hole ceramic filter layer, wherein the peculiar smell in air is adsorbed by activated carbon adsorption layer, using HEPA high efficiency filter layers to particle Object is filtered, and micropore ceramic filter layer filters fine particle, by being equipped with universal wheel, keeps the present apparatus easy to remove, can be with Meaning connects any boiler, handles exhaust gas therein, and each exhaust-gas treatment field is suitble to use.
Description of the drawings
Fig. 1 is the internal structure schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the cooling structure schematic diagram of the utility model;
Fig. 4 is the chimney structure schematic diagram of the utility model.
In figure:The first appendixs of 1-;The first wind turbines of 2-;The first air intake ducts of 3-;4- cyclone dust collectors;The first mounting brackets of 5-; 6- disposal boxes;7- boilers;8- pedestals;9- universal wheels;10- chimneys;11- spray structures;12- spray tubes;13- atomizers;14- Second woven hose;15- lye;16- power cords;The second water pumps of 17-;The second appendixs of 18-;19- reflux lines;20- second inhales Tracheae;The second wind turbines of 21-;22- control panels;The first water storage boxes of 23-;The first woven hoses of 24-;The second mounting brackets of 25-;26- Two water storage boxes;The first water pumps of 27-;28- activated carbon adsorption layers;29-HEPA high efficiency filter layers;30- micropore ceramic filter layers;31- Demister.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, a kind of embodiment provided by the utility model:A kind of burning boiler emission-control equipment, including The bottom of cyclone dust collectors 4, pedestal 8 and spray structure 11, pedestal 8 is equipped with universal wheel 9, and universal wheel 9 is equipped with braking machine Structure keeps the present apparatus easy to remove, can arbitrarily connect any boiler 7, handle exhaust gas therein, is suitble to each exhaust-gas treatment Field uses, and the side of pedestal 8 is placed with boiler 7, and the top of pedestal 8 is equipped with the first mounting bracket 5, the table of the first mounting bracket 5 Face is equipped with cyclone dust collectors 4, and the bottom of cyclone dust collectors 4 is provided with disposal box 6, prevents the dust of processing from disorderly flying, pollutes ring The bottom in border, disposal box 6 is equipped with pulley, easy to remove, handles dust, 5 top of the first mounting bracket of 4 side of cyclone dust collectors First wind turbine 2 is installed, the input terminal of the first wind turbine 2 is connect by the first air intake duct 3 with boiler 7, the output end of the first wind turbine 2 It is connect with cyclone dust collectors 4 by the first appendix 1, the exhaust gas that boiler generates is absorbed into cyclone dust removal through the first wind turbine 2 Device 4 is dusted processing to exhaust gas, and the side of the first mounting bracket 5 is equipped with the second wind turbine 21, the output end of cyclone dust collectors 4 It is connect with the second wind turbine 21 by the second air intake duct 20, the output end of the second wind turbine 21 is connected with the second appendix 18, the second wind The side of machine 21 is equipped with the second mounting bracket 25, and the lower section of the second mounting bracket 25 is equipped with the second water storage box 26, the second water storage box 26 are internally provided with the first water pump 27, and the top of the second mounting bracket 25 is equipped with the first water storage box 23, the first water storage box 23 Lower section is connected with reflux line 19, and the output end of the first water pump 27 is connect by the first woven hose 24 with the first water storage box 23, shape It is recycled at water, reduces the waste of water resource, the first water storage box 23 is internally provided with the second appendix 18, will be by dedusting Exhaust gas carries out water cooling by the first water storage box 23, prevents the exhaust gas of heat to be discharged into air, causes greenhouse effects, slow down the whole world The side of the process to warm, the second mounting bracket 25 is equipped with spray structure 11, and spray structure 11 is internally provided with 15 He of lye Second water pump 17, and the upper end inside spray structure 11 is equipped with spray tube 12, the bottom of spray tube 12 is equipped with atomizer 13, so that exhaust gas is carried out chemical reaction neutralisation treatment, it is made to generate harmless gas, environmental protection, the output end of the second water pump 17 It is connect with the input terminal of spray tube 12 by the second woven hose 14, forms a circulatory system, reduce the waste of lye 15, spray The side of structure 11 is equipped with the second appendix 18 by flange, and the other side of spray structure 11 is provided with power cord 16, spray The top of leaching structure 11 is equipped with chimney 10, and the bottom of chimney 10 is detachably connected by screw thread and spray structure 11, chimney 10 Be internally provided with activated carbon adsorption layer 28, the side of activated carbon adsorption layer 28 is provided with HEPA high efficiency filter layers 29, HEPA high The side of effect filter layer 29 is provided with micropore ceramic filter layer 30, and the side of micropore ceramic filter layer 30 is provided with demister 31, The peculiar smell in air is wherein adsorbed by activated carbon adsorption layer 28, particulate matter was carried out using HEPA high efficiency filter layers 29 Filter, micropore ceramic filter layer 30 filter fine particle, and the surface of spray structure 11 is equipped with control panel 22, spray structure 11 Bottom is provided with liquid outlet, when forming neutral solution in lye 15 and after exhaust gas, neutral solution can be discharged, will not pollute ring Border.
Operation principle:Operating position is waited in use, being moved to the present apparatus by universal wheel 9, and power cord 16 is connected into electricity First air intake duct 3 is connected on boiler 7 by source, attracts through the first air intake duct 2 by the exhaust gas in boiler 7 by the first wind turbine 2 Come, exhaust gas is being discharged into cyclone dust collectors 4 by the first appendix 1, the lower section of cyclone dust collectors 4 is provided with disposal box 6, is convenient for Dust is collected, by being connected with the second air intake duct 20 in the side of cyclone dust collectors 4, and is passed through exhaust gas by the second wind turbine 21 Second appendix 18 enters spray structure 11, by being equipped with the second mounting bracket 25 in the side of the second wind turbine 21, and first The top of mounting bracket 25 is equipped with the first water storage box 23, and the second appendix 18 carries out water cooling by the first water storage box 23, prevents heat Exhaust emission environment, by being equipped with spray structure 11 in the side of the second mounting bracket 25, by spray structure 11 Portion is provided with lye 15 and the second water pump 17, and the upper end inside spray structure 11 is equipped with spray tube 12 and atomizer 13, chemical reaction neutralisation treatment is carried out to exhaust gas, prevents acid waste gas from polluting environment, and the output end of the second water pump 17 passes through the Two woven hoses 14 are connect with spray tube 12, are kept lye 15 Ke Xunhuanliyong, until when lye 15 becomes neutral solution, are passed through spray Solution is discharged the liquid outlet of 11 bottom of structure, does not pollute the environment, exhaust gas after chemical treatment enter chimney 10, by Chimney 10 is internally provided with activated carbon adsorption layer 28, HEPA high efficiency filter layers 29 and micropore ceramic filter layer 30, by exhaust gas The different particulate matter of middle diameter is adsorbed, and demister 31 is being passed through, and ensures the gas that the exhaust gas being finally discharged is harmless.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.

Claims (5)

1. a kind of burning boiler emission-control equipment, including cyclone dust collectors (4), pedestal (8) and spray structure (11), feature It is:The side of the pedestal (8) is placed with boiler (7), and the first mounting bracket (5) is equipped with above the pedestal (8), described The surface of first mounting bracket (5) is equipped with cyclone dust collectors (4), and the bottom of the cyclone dust collectors (4) is provided with disposal box (6), the first wind turbine (2), first wind turbine (2) are installed above the first mounting bracket (5) of cyclone dust collectors (4) side Input terminal connect with boiler (7) by the first air intake duct (3), the output end of first wind turbine (2) passes through the first appendix (1) it is connect with cyclone dust collectors (4), the side of first mounting bracket (5) is equipped with the second wind turbine (21), the cyclone dust removal The output end of device (4) is connect by the second air intake duct (20) with the second wind turbine (21), and the output end of second wind turbine (21) connects It is connected to the second appendix (18), the side of second wind turbine (21) is equipped with the second mounting bracket (25), second mounting bracket (25) the second water storage box (26) is installed, second water storage box (26) is internally provided with the first water pump (27), institute below It states and the first water storage box (23) is installed above the second mounting bracket (25), reflux is connected with below first water storage box (23) The output end of pipeline (19), first water pump (27) is connect by the first woven hose (24) with the first water storage box (23), described First water storage box (23) is internally provided with the second appendix (18), and the side of second mounting bracket (25) is equipped with spray knot Structure (11), the spray structure (11) is internally provided with lye (15) and the second water pump (17), and spray structure (11) is internal Upper end spray tube (12) is installed, the bottom of the spray tube (12) is equipped with atomizer (13), second water pump (17) output end is connect by the second woven hose (14) with the input terminal of spray tube (12), the side of the spray structure (11) The second appendix (18) is installed by flange, and the other side of spray structure (11) is provided with power cord (16), the spray Chimney (10) is installed, the chimney (10) is internally provided with activated carbon adsorption layer (28), the work above structure (11) Property charcoal adsorption layer (28) side be provided with HEPA high efficiency filter layers (29), the side setting of the HEPA high efficiency filter layers (29) There are micropore ceramic filter layer (30), the side of the micropore ceramic filter layer (30) to be provided with demister (31), the spray knot The surface of structure (11) is equipped with control panel (22).
2. a kind of burning boiler emission-control equipment according to claim 1, it is characterised in that:The bottom of the pedestal (8) Portion is equipped with universal wheel (9), and universal wheel (9) is equipped with braking mechanism.
3. a kind of burning boiler emission-control equipment according to claim 1, it is characterised in that:The spray structure (11) Bottom be provided with liquid outlet.
4. a kind of burning boiler emission-control equipment according to claim 1, it is characterised in that:The disposal box (6) Bottom is equipped with pulley.
5. a kind of burning boiler emission-control equipment according to claim 1, it is characterised in that:The bottom of the chimney (10) Portion is detachably connected by screw thread and spray structure (11).
CN201721538777.9U 2018-06-11 2018-06-11 A kind of burning boiler emission-control equipment Expired - Fee Related CN207734819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721538777.9U CN207734819U (en) 2018-06-11 2018-06-11 A kind of burning boiler emission-control equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721538777.9U CN207734819U (en) 2018-06-11 2018-06-11 A kind of burning boiler emission-control equipment

Publications (1)

Publication Number Publication Date
CN207734819U true CN207734819U (en) 2018-08-17

Family

ID=63115782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721538777.9U Expired - Fee Related CN207734819U (en) 2018-06-11 2018-06-11 A kind of burning boiler emission-control equipment

Country Status (1)

Country Link
CN (1) CN207734819U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109092863A (en) * 2018-09-13 2018-12-28 河南博鑫高科实业有限公司 Quadratic aluminum dust resource utilization utilizes the device and technique for producing refining slag
CN110864554A (en) * 2019-11-26 2020-03-06 湖南和美园食品有限公司 Candy recovery furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109092863A (en) * 2018-09-13 2018-12-28 河南博鑫高科实业有限公司 Quadratic aluminum dust resource utilization utilizes the device and technique for producing refining slag
CN110864554A (en) * 2019-11-26 2020-03-06 湖南和美园食品有限公司 Candy recovery furnace

Similar Documents

Publication Publication Date Title
CN101829468B (en) Flue-gas cleaning method and system for waste incineration
CN210624545U (en) Environment-friendly exhaust treatment device
CN208599409U (en) A kind of flue gas processing device for boiler
CN206215021U (en) A kind of wet type flue gas desulphurization system of waste incineration
CN103185346A (en) Combined purification system for waste incineration smoke and technology of combined purification system
CN203861953U (en) Asphalt flue-gas processing device
CN207734819U (en) A kind of burning boiler emission-control equipment
CN108636030A (en) A kind of emission-control equipment
CN204996283U (en) Boiler exhaust -gas treatment apparatus
CN108261917A (en) A kind of industry hot waste gas processing unit and treatment process
CN211245936U (en) Spray set for flue gas purification
CN206064141U (en) A kind of coal-fired flue-gas treatment and purification device
CN203635060U (en) Tail gas purification system in circulating treatment manner
CN209049172U (en) A kind of industrial waste gas processing system
CN205461588U (en) Papermaking waste gas treatment system
CN106215561B (en) A kind of coal-fired flue gas treatment method
CN210495866U (en) Environment-friendly exhaust gas purification device for granulating chemical fiber friction material
CN107441907A (en) A kind of material boiler smoke multi-pollutant handling process and equipment
CN208893867U (en) A kind of environment-friendly type industrial waste-gas purifier
CN207324501U (en) A kind of desulphurization denitration purifying and dedusting device of flue gas
CN106823640A (en) A kind of simple efficiency of waste gas purifying processing device
CN202569894U (en) Painting organic waste gas recovery processing device
CN202427317U (en) Flue gas purifying device
CN205549946U (en) Modular spraying exhaust gas purification system
CN204853524U (en) Desulfurizing dust remover

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180817