CN207714508U - Civil engineering building built pile - Google Patents

Civil engineering building built pile Download PDF

Info

Publication number
CN207714508U
CN207714508U CN201820036755.0U CN201820036755U CN207714508U CN 207714508 U CN207714508 U CN 207714508U CN 201820036755 U CN201820036755 U CN 201820036755U CN 207714508 U CN207714508 U CN 207714508U
Authority
CN
China
Prior art keywords
mounting
mounting blocks
adjusting
plate
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820036755.0U
Other languages
Chinese (zh)
Inventor
葛贝德
张建华
柳志萍
李晓琳
王天成
马利耕
于微微
卢爽
杜园元
朱琳琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Vocational and Technical College
Original Assignee
Harbin Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Vocational and Technical College filed Critical Harbin Vocational and Technical College
Priority to CN201820036755.0U priority Critical patent/CN207714508U/en
Application granted granted Critical
Publication of CN207714508U publication Critical patent/CN207714508U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Civil engineering building built pile,Including fixed plate,Mounting plate,Mounting blocks,Turning set,Adjusting rod,Adjusting set,Pull lever,Positioning sleeve,It is adapted with mounting plate in the middle part of the fixed plate,The mounting plate is connected and fixed plate,The mounting plate both sides have mounting rod,The mounting rod is sequentially connected fixed plate,Mounting blocks,Nut is installed,The installation nut is intermeshed with mounting rod,The mounting blocks both sides connect pull lever,The mounting blocks include left mounting blocks,Right mounting blocks,There is rotation grooving inside the left mounting blocks,The rotation grooving connects turning set,The adjusting rod left end has pivot protrusion,The pivot protrusion is adapted with turning set,Pivot protrusion is connected inside the turning set,The pivot protrusion rotates in turning set,Have inside the right mounting blocks and adjusts grooving,The adjusting grooving connects adjusting set.

Description

Civil engineering building built pile
Technical field
The utility model is related to building field more particularly to a kind of civil engineering building built piles.
Background technology
Civil engineering can use a large amount of building group and attach together, however existing civil engineering is not easy to adjust with building built pile Section, increases group and attaches together the difficulty of installation, and reduce group and attach together integrally-built stability.
Utility model content
The utility model is directed to deficiencies of the prior art, provides a kind of civil engineering building convenient for adjusting Built pile.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of civil engineering building built pile, including fixed plate, mounting plate, mounting blocks, turning set, adjusting rod, adjusting Set, pull lever, positioning sleeve, the fixed plate middle part are adapted with mounting plate, and the mounting plate is connected and fixed plate, the mounting plate There is mounting rod, the mounting rod to be sequentially connected fixed plate, mounting blocks, installation nut, the installation nut and mounting rod for both sides Intermeshing, the mounting blocks both sides connect pull lever, and the mounting blocks include left mounting blocks, right mounting blocks, the left installation There is rotation grooving, the rotation grooving to connect turning set, the adjusting rod left end has pivot protrusion, the rotation inside block Protrusion is adapted with turning set, pivot protrusion is connected inside the turning set, the pivot protrusion rotates in turning set, described Have inside right mounting blocks and adjust grooving, the adjusting grooving connects adjusting set, and adjusting rod is connected inside the adjusting set, described Adjusting rod is intermeshed with adjusting set, and the fixed plate both sides connect cooperation fixed plate by fixing glue.
There is the pull lever pull plate, the pull plate both sides to have locating pin slot, the locating pin slot connection positioning Nail, the pull plate are slided in locating pin, and connecting positioning sleeve on the inside of the cooperation fixed plate, the locating pin is sequentially connected fixed Position nail slot, positioning sleeve, the positioning sleeve are intermeshed with locating pin.
Advantageous effect:
Mounting rod is sequentially connected fixed plate, mounting blocks, installation nut, enables fixed plate, mounting plate, mounting blocks opposed configuration steady Fixed, turning set is fixed in rotation grooving, enables turning set and left mounting blocks stable connection, and adjusting set, which is fixed on, to be adjusted in grooving, So that adjusting set is connected firmly with right mounting blocks, adjusting rod and adjusting set are intermeshed, enable adjusting rod between right mounting blocks at a distance from Convenient for adjusting, pivot protrusion rotates in turning set, and make adjusting rod is convenient for adjusting, pull plate to be slided in locating pin, enables and drawing Convenient for adjusting, locating pin is intermeshed with positioning sleeve, can be pulled on plate and is fixed on corresponding position, this building work for lever position Journey, convenient for being adjusted, is alleviated group and attaches together the difficulty of installation, and improved group and attach together integrally-built stability with building built pile.
Description of the drawings
Fig. 1 is that civil engineering described in the utility model builds built pile structural schematic diagram.
Fig. 2 is pull plate described in the utility model, locating sleeve structure schematic diagram.
Specific implementation mode
The utility model is described in further detail below according to drawings and examples:
A kind of civil engineering building built pile, including fixed plate 1, mounting plate 2, mounting blocks 5, turning set 7, adjusting rod 9, Adjusting set 10, pull lever 13, positioning sleeve 16,1 middle part of the fixed plate are adapted with mounting plate 2, and the mounting plate 2 is connected and fixed There is mounting rod 3, the mounting rod 3 to be sequentially connected fixed plate 1, mounting blocks 5, installation nut 4 for plate 1,2 both sides of the mounting plate, The installation nut 4 is intermeshed with mounting rod 3, and 5 both sides of the mounting blocks connect pull lever 13, and the mounting blocks 5 include a left side There is rotation grooving 6, the rotation grooving 6 to connect turning set 7, the tune for mounting blocks, right mounting blocks, the left mounting blocks inside There is 9 left end of pole pivot protrusion 8, the pivot protrusion 8 to be adapted with turning set 7, and 7 inside connection rotation of the turning set is convex 8 are played, the rotation in turning set 7 of the pivot protrusion 8, the right mounting blocks inside, which has, adjusts grooving 11, the adjusting grooving 11 connection adjusting sets 10,10 inside of the adjusting set connect adjusting rod 9, and the adjusting rod 9 is intermeshed with adjusting set 10, described 1 both sides of fixed plate connect cooperation fixed plate 17 by fixing glue 12.
There is the pull lever 13 pull plate 14,14 both sides of the pull plate to have locating pin slot 18, the locating pin slot 18 connection locating pins 15, the pull plate 14 are slided in locating pin 15, the 17 inside connecting positioning sleeve 16 of cooperation fixed plate, The locating pin 15 is sequentially connected locating pin slot 18, positioning sleeve 16, and the positioning sleeve 16 is intermeshed with locating pin 15.
Mounting rod 3 is sequentially connected fixed plate 1, mounting blocks 5, installation nut 4, enables fixed plate 1, mounting plate 2,5 phase of mounting blocks To stable structure, turning set 7 is fixed in rotation grooving 6, and turning set 7 and left mounting blocks stable connection, adjusting set 10 is enabled to fix It is adjusting in grooving 11, adjusting set 10 is made to be connected firmly with right mounting blocks, adjusting rod 9 is intermeshed with adjusting set 10, is enabled and being adjusted Bar 9 between right mounting blocks at a distance from convenient for adjusting, the rotation in the turning set 7 of pivot protrusion 8, make adjusting rod 9 convenient for adjusting, draw Movable plate 14 slides in locating pin 15, enables 13 position of pull lever convenient for adjusting, and locating pin 15 is intermeshed with positioning sleeve 16, can It pulls on plate 14 and is fixed on corresponding position, this civil engineering, convenient for being adjusted, is alleviated group and attach together installation with building built pile Difficulty, and improve group and attach together integrally-built stability.

Claims (2)

1. a kind of civil engineering building built pile, it is characterized in that:Including fixed plate, mounting plate, mounting blocks, turning set, adjusting Bar, adjusting set, pull lever, positioning sleeve, the fixed plate middle part are adapted with mounting plate, and the mounting plate is connected and fixed plate, institute Stating mounting plate both sides, there is mounting rod, the mounting rod to be sequentially connected fixed plate, mounting blocks, installation nut, the installation nut It is intermeshed with mounting rod, the mounting blocks both sides connect pull lever, and the mounting blocks include left mounting blocks, right mounting blocks, institute Stating inside left mounting blocks has rotation grooving, and the rotation grooving connects turning set, and the adjusting rod left end has pivot protrusion, The pivot protrusion is adapted with turning set, pivot protrusion is connected inside the turning set, the pivot protrusion is in turning set Rotation, the right mounting blocks inside, which has, adjusts grooving, and the adjusting grooving connects adjusting set, connects and adjusts inside the adjusting set Pole, the adjusting rod are intermeshed with adjusting set, and the fixed plate both sides connect cooperation fixed plate by fixing glue.
2. civil engineering according to claim 1 building built pile, it is characterized in that:The pull lever has pull plate, There is locating pin slot, the locating pin slot to connect locating pin for the pull plate both sides, and the pull plate is slided in locating pin, institute Connecting positioning sleeve on the inside of cooperation fixed plate is stated, the locating pin is sequentially connected locating pin slot, positioning sleeve, the positioning sleeve and positioning Nail intermeshing.
CN201820036755.0U 2018-01-10 2018-01-10 Civil engineering building built pile Expired - Fee Related CN207714508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820036755.0U CN207714508U (en) 2018-01-10 2018-01-10 Civil engineering building built pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820036755.0U CN207714508U (en) 2018-01-10 2018-01-10 Civil engineering building built pile

Publications (1)

Publication Number Publication Date
CN207714508U true CN207714508U (en) 2018-08-10

Family

ID=63055131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820036755.0U Expired - Fee Related CN207714508U (en) 2018-01-10 2018-01-10 Civil engineering building built pile

Country Status (1)

Country Link
CN (1) CN207714508U (en)

Similar Documents

Publication Publication Date Title
CN206053324U (en) A kind of curved adjustable securing member of building template list
CN208195810U (en) A kind of saw blade spacing adjusting device of cutter with double saw bits
CN103526907B (en) A kind of inclination stone material dry suspending structure and construction method thereof
CN207714508U (en) Civil engineering building built pile
CN202577594U (en) Multi-directional adjusting type connecting device
CN201771185U (en) Novel template combined clamp
CN203566538U (en) Novel multifunctional included angle clamp
CN203499191U (en) Tilted stone cladding structure
CN109527802A (en) A kind of band hiding telescopic electric elevatable table frame of line function
CN204819917U (en) Gypsum board stile mechanism
CN204899281U (en) Bearing diagonal for assembly type structure
CN204531420U (en) Concreting plate device
CN205552814U (en) Quick locking device suitable for precast concrete mould
CN201826481U (en) Glass fixed code
CN207615562U (en) A kind of machine straightening device of spring steel line of spring coiling machine
CN202079526U (en) Symmetry adjusting fixture
CN207144507U (en) For fabricated shear wall sleeve grouting Feng Cangyong pointers
CN207348232U (en) Conical eccentric pivot buckle structure
CN207194248U (en) Point-type sunshade decorative perforated metal curtain wall
CN206393508U (en) The wind electricity blade pressurization plug-type quick-speed jigs of frock
CN211001594U (en) Graphene SMC automobile diversion empennage structure
CN216665015U (en) Composite building template capable of insulating sound
CN208965927U (en) A kind of internal connecting type separating wall decorative sheet
CN221073191U (en) Arc conical surface gypsum board furred ceiling structure
CN206393150U (en) The frame structure for frock of being pressurizeed for wind electricity blade

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180810

Termination date: 20190110