CN207714147U - A kind of bridge wet seam stainless steel plate bed die - Google Patents

A kind of bridge wet seam stainless steel plate bed die Download PDF

Info

Publication number
CN207714147U
CN207714147U CN201721536798.7U CN201721536798U CN207714147U CN 207714147 U CN207714147 U CN 207714147U CN 201721536798 U CN201721536798 U CN 201721536798U CN 207714147 U CN207714147 U CN 207714147U
Authority
CN
China
Prior art keywords
steel plate
stainless steel
construction
bed die
wet seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721536798.7U
Other languages
Chinese (zh)
Inventor
***
任亚杰
李平
渠小伟
李慧杰
梁帅
刘彬彬
周斌
段旭东
杨建国
魏兴茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201721536798.7U priority Critical patent/CN207714147U/en
Application granted granted Critical
Publication of CN207714147U publication Critical patent/CN207714147U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The template that the utility model is related to be used in the wet seam construction of bridge, specially a kind of bridge wet seam stainless steel plate bed die are particularly suitable for the construction of the wet seam of overcrossing railway bridge.A kind of bridge wet seam stainless steel plate bed die, including stainless steel plate, spaced U-shaped hanging ring on stainless steel plate top surface.It is as follows using the stainless steel plate bed die construction procedure:Steel plate is temporarily fixed on the reserved steel bar of precast beam both sides by stainless steel plate bed die before hanging beam, and unified determine of every beam fixes stainless steel plate in identical side, is lifted to bridge location with precast beam.After Stainless Molding Board is lifted with beam body, carried in translation, it is closely connected with prefabricated beam flange plate bottom, it is welded and fixed after wedging.Processing is sealed to stainless steel plate and the imprecise place of flange plate, pours wet joint concrete, wet seam construction is completed.The utility model solves the problems such as Business Line construction risk is big, and form removal is difficult, reduces construction input, shortens the construction time.

Description

A kind of bridge wet seam stainless steel plate bed die
Technical field
The template that the utility model is related to be used in the wet seam construction of bridge, specially a kind of wet seam stainless steel of bridge Plate bed die is particularly suitable for the construction of the wet seam of bridge of spanning existing railway.
Background technology
In recent years, with the fast development of Chinese economy, urban size also gradually expands, the railway positioned at suburb slowly melts Enter city or the center as city, overcrossing railway becomes municipal bridge and designs unavoidable major issue.Due to railway phase To closure, precast beam is widely used in overcrossing railway detail design.Wet seam, which is constructed, after erection of precast beams is Inevitably, but due to the closure, timeliness, spatiality of overcrossing railway construction.How in the interior wet seam of guarantee of block point Construction safety, quality, progress and ensure railway operation safely become construction key factor.
The wet seam construction of common bridge domestic at present is all made of wooden model as wet joint template, is needed after having poured concrete It removes, this construction method installation form need to hang mould above rail track, and need to put into a large amount of labours, equipment, have in block point All difficulty is completed in construction in the time of limit, and security risk is larger.
Invention content
The purpose of this utility model is to ensure railway operation safety, reduction risk, reduction working sources input, shortening work Phase reduces difficulty of construction, provides a kind of stainless steel plate bed die without form removal for the construction of wet seam.
Above-mentioned technical problem is solved, the technical solution adopted in the utility model is:A kind of wet seam stainless steel plate of bridge Bed die, including stainless steel plate, spaced U-shaped hanging ring on stainless steel plate top surface.
It is as follows using the stainless steel plate bed die construction procedure:Stainless steel plate bed die is temporarily fixed at precast beam before hanging beam On the reserved steel bar of both sides, unified determine of every beam fixes stainless steel plate in identical side, is lifted to bridge with precast beam Position.Stainless steel plate within the scope of beam body diaphragm plate both sides 1m is not installed temporarily, is being installed after diaphragm plate has constructed form removable. Stainless Molding Board with beam body simultaneously lift after, carried in translation, it is closely connected with prefabricated beam flange plate bottom, after wedging with beam-ends reserving rib It is welded and fixed.Processing is sealed to stainless steel plate and the uncompacted place of flange plate, pours wet joint concrete, wet seam is applied Work is completed.
The utility model is tentatively installed, is lifted, stainless steel plate for the wet seam construction of overcrossing railway precast beam, stainless steel plate Accurate adjustment is installed, and consolidation is in place;Stainless steel plate bed die and the closely connected not tight position of beam bottom are handled, wet seam reinforcing bar is bound, Wet joint concrete is poured, wet seam construction is completed.The utility model solves that Business Line construction risk is big, and form removal difficulty etc. is asked Topic reduces construction input, shortens the construction time.
Description of the drawings
Fig. 1 is stainless steel plate die structure schematic diagram.
Fig. 2 is stainless steel plate bed die sectional view.
Fig. 3 is stainless steel plate bed die decomposition diagram.
Fig. 4 is stainless steel plate bed die lifting schematic diagram.
Fig. 5 is the translation of stainless steel plate bed die, promotes adjusting schematic diagram.
Fig. 6 is that stainless steel plate bed die consolidates schematic diagram.
Fig. 7 is schematic diagram after the completion of the construction of wet seam.
Fig. 8 is sectional view after the completion of the construction of wet seam.
In figure:1- hanging rings, 2- stainless steel plates, 3- beam-ends reserved steel bars, the prefabricated beam flange plates of 4-, 5- precast beams.
Specific implementation mode
A kind of bridge wet seam stainless steel plate bed die, including stainless steel plate 2, stainless steel plate are arranged at intervals with U on 2 top surface Type hanging ring 1.
The technical solution protected to the requires of the utility model below in conjunction with attached drawing and an example illustrates.
Newly-built Shuozhou City develops Lu Huihe bridge overcrossing railway Grade Separation Projects by being formed across railway and non-across railway two parts, 40m prefabricated PC concrete box girders are used with the parts Pu Tie superstructure across north, 60 total, 59 wet seams, wherein Elongated wet seam 6, with end, in and 1/4 crossbeam 53, the wet seam length of per pass be 40m.Steps are as follows for Specific construction:
1. as shown in Figure 1, Figure 2, Figure 3 shows, stainless steel plate die structure schematic diagram.
The wet joint gap of this bridge is 42.3cm, thickness 18cm, prefabricated case beam flange plate U-shaped steel muscle protruded length 19cm. It is computed wet seam stainless steel plate bed die and uses 6mm thickness OCr13 stainless steel plates, the wide 54.3cm of stainless steel plate, stainless steel plate welding 20 U-shaped hanging rings of HPB300 Φ, hanging ring spacing 30cm.
The professional processing factory of stainless steel plate bed die commission is processed making, and hanging ring is welded with steel plate using welding rod special for special.
Wet seam length between consideration stainless steel plate raw material size, piece weight and crossbeam, determines every piece of bed die when processing Length;Be computed stainless steel plate bed die specification be 1550 × 543 × 6mm, 1250 × 543 × 5mm, 1080 × 543 × 5mm, 517 × 543 × 5mm, 470 × 543 × 5mm, 250 × 543 × 5mm etc..
2. as shown in figure 4, stainless steel plate bed die is tentatively fixed, lift.
Steel plate should be temporarily fixed at before hanging beam on the reserved U-shaped steel muscle of the wet seam in beam both sides by stainless steel plate bed die(It will Hanging ring and reserved U-shaped reinforcement welding), every beam is unified to be determined in identical side fixation steel plate, is lifted with prefabricated case beam To bridge location.Steel plate within the scope of the 1m of diaphragm plate both sides is not installed temporarily, is being installed after diaphragm plate has constructed form removable.
3. as shown in figure 5, the translation of stainless steel plate bed die, promotion are adjusted.
After stainless steel plate bed die lifts simultaneously with beam body, carried in translation, it is closely connected with prefabricated case beam flange plate bottom.
4. stainless steel plate bed die as shown in Figure 6 is fixed.
After stainless steel plate and prefabricated case beam flange plate bottom are closely connected, wedging is simultaneously welded and fixed.
5. as shown in Figure 7, Figure 8, wet seam casting concrete.
To ensure that stainless steel plate bed die is fully sealed with prefabricated case beam flange plate bottom surface, not closely connected place is handled Ensure seamless, binds wet seam reinforcing bar, then pour C50 concrete, stainless steel plate bed die and concrete placings are integral, wet seam Construction is completed.

Claims (1)

1. a kind of bridge wet seam stainless steel plate bed die, it is characterised in that including stainless steel plate(2), stainless steel plate(2)Top surface On be arranged at intervals with U-shaped hanging ring(1), stainless steel plate is using 6mm thickness OCr13 stainless steel plates, U-shaped hanging ring(1)For HPB300 Φ 20 U-shaped hanging ring, hanging ring spacing 30cm.
CN201721536798.7U 2017-11-17 2017-11-17 A kind of bridge wet seam stainless steel plate bed die Expired - Fee Related CN207714147U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721536798.7U CN207714147U (en) 2017-11-17 2017-11-17 A kind of bridge wet seam stainless steel plate bed die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721536798.7U CN207714147U (en) 2017-11-17 2017-11-17 A kind of bridge wet seam stainless steel plate bed die

Publications (1)

Publication Number Publication Date
CN207714147U true CN207714147U (en) 2018-08-10

Family

ID=63061396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721536798.7U Expired - Fee Related CN207714147U (en) 2017-11-17 2017-11-17 A kind of bridge wet seam stainless steel plate bed die

Country Status (1)

Country Link
CN (1) CN207714147U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305081A (en) * 2020-04-02 2020-06-19 江西省高速公路投资集团有限责任公司 Construction process of wet joint connecting structure of prefabricated bridge deck
CN111908320A (en) * 2020-08-11 2020-11-10 中国建筑第八工程局有限公司 Method for quickly converting steel wire rope for hoisting ultra-deep underground continuous wall
CN114263119A (en) * 2021-12-28 2022-04-01 中铁六局集团石家庄铁路建设有限公司 Construction method for bridging machine to span railway

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305081A (en) * 2020-04-02 2020-06-19 江西省高速公路投资集团有限责任公司 Construction process of wet joint connecting structure of prefabricated bridge deck
CN111908320A (en) * 2020-08-11 2020-11-10 中国建筑第八工程局有限公司 Method for quickly converting steel wire rope for hoisting ultra-deep underground continuous wall
CN114263119A (en) * 2021-12-28 2022-04-01 中铁六局集团石家庄铁路建设有限公司 Construction method for bridging machine to span railway
CN114263119B (en) * 2021-12-28 2024-04-23 中铁六局集团石家庄铁路建设有限公司 Bridge girder erection machine cross-railway girder erection construction method

Similar Documents

Publication Publication Date Title
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
CN207714147U (en) A kind of bridge wet seam stainless steel plate bed die
CN106223360A (en) Use the open cut cast in place and precast construction subway station construction method of stake supporting system
CN104746422A (en) Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN108797638A (en) Integrated assembled piping lane based on composite bottom board and its construction method
CN106012960B (en) A kind of assembled long piled wharf superstructure system and its construction method
CN101125441A (en) Post-tensioned method prestressed concrete box beam whole opening prefabricated construction method
CN106988436B (en) A kind of method that reserving hole blocks
CN203821347U (en) Reinforced concrete prefabricated gallery structure of roller compacted concrete dam
CN104895230A (en) Post-cast belt for precast composite floor slabs and construction method of post-cast belt
CN108035594A (en) The prefabricated decompression cone construction method of concrete silo structure
CN214245383U (en) Combined die system for bent cap construction
CN108797312A (en) A kind of bent cap structure and its construction method
CN208441138U (en) Integrated assembled piping lane based on composite bottom board
CN103711199B (en) Method and structure for processing construction joints at large-section beam and column joints
CN106381812B (en) A kind of affixed pier construction method of installation of Steel Concrete composite beam
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN203487469U (en) Bottom die prefabricated plate of hollow pier body
CN107190898A (en) Exempt from formwork super thick floor and its construction method
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN103216085B (en) A kind of removable lining self-bearing type reinforcement bar truss mould plate
CN215052265U (en) Reinforced concrete thin wall body reinforced structure
CN106012808B (en) A kind of Wavelike steel webplate profiled sheet combination beam and its construction method
CN105019362B (en) The pier top block of slug matching precast beam
CN205636493U (en) A device that is used for high mound of hollow thin wall of bridge to bind

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180810